Technical_Questions.docx

DOCX document 18 KB Posted

Attached to
Final Amendment 0008 Lease of 138 Commerical Vehicles Supercedes all Other Versions
Solicitation number
N63285-14-R-0001
Issued by

About this file

Amendment 0007 to extend the Proposal Response time from 21 NOv 2013 to 27 Nov 2013 at 2 00 p.m. EST and to respond to additional Technical Questions.

View the file

Other files

File Type Posted
Master_FY14_Vehicle_Specs_21_Nov_13_(2)_RFQ(2).xlsx XLSX spreadsheet
PERFORMANCE_WORK_STATEMENT_FY14..docx DOCX document
Technical_Questions_Amend_9.docx DOCX document
N63285-14-R-0001_Amendment_0009.doc DOC document
Master_FY14_Vehicle_Specs_18_Nov_13_(2)_RFQ.xlsx XLSX spreadsheet
Master_FY14_Vehicle_Specs_18_Nov_13_(2)_RFQ.xlsx XLSX spreadsheet
Technical_Questions_Amend_8.docx DOCX document
Master_FY14_Vehicle_Specs_7Oct_13_(2)_RFQ.xlsx XLSX spreadsheet
N63285-14-R-0001_1.pdf PDF
Techncial_Questions.docx DOCX document
Techncial_Questions.docx DOCX document
PERFORMANCE_WORK_STATEMENT_FY14..docx DOCX document
PERFORMANCE_WORK_STATEMENT_FY14..docx DOCX document
Master_FY14_Vehicle_Specs_7Oct_13_(2)_RFQ.xlsx XLSX spreadsheet
N63285-14-R-0001.doc DOC document
Final_Specs_0001_254_Vehicles.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESPONSES TO TECHNICAL QUESTIONS

Amendment 7

N63285-14-R-0001

ATTACHMENT 2

Question:

1.) If we cannot supply certain vehicles (Ex. Charger Police Package) may we submit bids only for the vehicles we can supply or must the leasing company be able to meet all demands for all of the 138 vehicles?

Answer: Vehicles are to be pre-wired for lights and sirens. No lights and sirens added. The Government will have the lights and sirens added.

2.) In one part of the solicitation it states the Fed. Government plans to tag these vehicles with Gov’t plates, however, in the PWS it states the leasing company should supply vehicles tagged/registered/inspected in the associated delivery state. Can you please clarify if we have any duty to register the vehicles we are providing or if this is the responsibility of the Gov’t?

Answer: The leasing company should supply vehicles tagged/registered/inspected in the associated delivery state. Reference to Federal Government tagging vehicles will be removed.

Question:

3.) Will it stay as a small business set-aside?

Answer: Yes.

4.) Are you asking for any type of maintenance package as part of lease quote?

Answer: No.

5.) What is acceptable as far as “alternative fuel” is concerned?

Answer: The definition of “alternative fuels” is stated as blends of 85% or more of methanol, denatured ethanol, and other alcohols with gasoline or other fuels.

6.) On the FY14 Specification Sheet, the Toyota Highlanders are showing 3.6V6 engines. The Toyota Highlanders do not have 3.6V6 engines. This appears to be a typo. Is that correct?

Answer: This is a typo. The Toyota Highlanders engine size should be a minimum of a V6 engine.

7.) The FAR clause at 52.232-23, Assignment of Claims is missing from the RFP.

Answer: The FAR clause at 52.232-23, Assignment of Claims is added.

8.) The Turn-Around response date for this RFP is revised from 21 November 2013 at 2:00 p.m. EST to 27 November2013 at 2:00 p.m. EST.

9.) There are conflicts with certain models listed and E85 availability. Is the NCIS open to alternate makes/models?

Answer: Alternate is acceptable. All vehicles must be non-domestic models

10.) Are E85-capable vehicles mandatory?

Answer: It is mandatory where stated in the specification.

11.) A couple models listed will not be available from the manufacturer until after February 2014. Will NCIS accept substitute makes/models that fall into the same vehicle category?

Answer: Yes, as long as they are non-domestic/foreign models. In addition, New 2013 models are acceptable.

Attachment 2 Page 2