N6274224R6726_0003 Restructure CLINs.pdf
PDF 997 KB Posted
- Solicitation number
- N6274224R6726
About this file
This document is Amendment 0003 to Solicitation N6274224R6726 for a design-build contract to replace the wastewater treatment system (WWTS) and effluent decontamination system (EDS) at the AFRIMS Yothi Annex in Bangkok, Thailand.
The key changes in this amendment are:
- Restructure of the contract line items (CLINs) - CLIN 0001 is now the Base Bid Item for the WWTS replacement, and CLIN 0002 is an Option Item for the EDS replacement.
- The period of performance for the Base Bid Item (WWTS) is 720 calendar days, with the Option Item (EDS) to be 720 days after the option is exercised.
- The Government will evaluate offers by adding the total price for the Option Item to the Base Bid Item.
- The Government may require the delivery of the Option Item within 120 days of contract award.
- The revised Bill of Quantities (BOQ) is provided as Exhibit D.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6274224R6726_0003 Exhibit D.BOQrev..xlsx | XLSX spreadsheet | |
| N62747224R6726 _0002 Extend Due Date.pdf | ||
| N6274224R6726_0001 released.pdf | ||
| EXHIBIT A-D.pdf | ||
| Exhibit A Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| Exhibit D Blank BOQ.xlsx | XLSX spreadsheet | |
| N6274224R6726 Released w Attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR6067288
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N6274224R6726 D/B Replace Wastew ater Treatment System (WWTS) and Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand.
Detail of Amendment 0003 begins on the follow ing page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6274224R6726
X 9B. DATED (SEE ITEM 11)
26-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Aug-2024
CODE
NAVFAC ROICC THAILAND (US EMBASSY)
7 SATHORN TAI ROAD
BANGKOK THAILAND 10120
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274224R6726
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMD 0003 RESTRUCTURE CLINS
The following changes will be considered part of this solicitation:
A. Proposal due date is unchanged and remains 5 September 2024, no later than 11:00 a.m. Thailand time.
B. The following changes are hereby incorporated to solicitation, Parts 1 and 3 under this solicitation.
SUMMARY OF CHANGES
AMENDMENT 0003
PART 1
PROPOSAL FORMS AND DOCUMENTS
1. Restructure CLINs as follows:
CLIN 0001: Base Bid Item 0001 CLIN 0002: Option Item 0001
2. Section 002200, add 52.217.5 EVALUATION OF OPTIONS (JUL 1990) in full text.
3. Section 007000, add 52.217 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED
LINE ITEM (MAR 1989) in full text.
4. Section 007000, 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) is updated.
PART 3
STATEMENT OF WORK
1. Page 1 of 22, Part 3 under Section 1. PROJECT DESCRIPTIONS
Change from:
Period of Performance for complete design and construction:
CLIN 0001: REPLACE WASTEWATER TREATMENT SYSTEM (WWTS), 720 Calendar days.
CLIN 0002: REPLACE EFFLUENT DECONTAMINATION SYSTEM (EDS), 720 Calendar days concurrently with CLIN 0001.
To:
Period of Performance for complete design and construction:
CLIN 0001: BASE BID ITEM 0001 - REPLACE WASTEWATER TREATMENT SYSTEM (WWTS), 720
Calendar days.
CLIN 0002: OPTION ITEM 0001 - REPLACE EFFLUENT DECONTAMINATION SYSTEM (EDS), 720
Calendar days after exercising the option.
2. Page 4 of 22, Part 3 under Section 4. PROJECT REQUIREMENTS
CLIN 0001: REPLACE WASTEWATER TREATMENT SYSTEM (WWTS)
CLIN 0002: REPLACE EFFLUENT DECONTAMINATION SYSTEM (EDS)
To:
CLIN 0001: BASE BID ITEM 0001 - REPLACE WASTEWATER TREATMENT SYSTEM (WWTS)
CLIN 0002: OPTION ITEM 0001 - REPLACE EFFLUENT DECONTAMINATION SYSTEM (EDS)
3. Pages 7 and 10 of 22, Part 3 under Section 5. REQUIREMENT DESCRIPTION
5.1 CLIN 0001: REPLACE WASTEWATER TREATMENT SYSTEM (WWTS)
5.2 CLIN 0002: REPLACE EFFLUENT DECONTAMINATION SYSTEM (EDS)
To:
5.1 CLIN 0001: BASE BID ITEM 0001 - REPLACE WASTEWATER TREATMENT SYSTEM (WWTS)
5.2 CLIN 0002: OPTION ITEM 0001 - REPLACE EFFLUENT DECONTAMINATION SYSTEM (EDS)
C. The following attachment is incorporated to the RFP.
- Exhibit D - BOQ rev.
(End of Summary of Changes)
SECTION 00 10 00 - SOLICITATION
CLIN 0001
The CLIN extended description has changed from:
This is a Design-Build project. The contractor shall provide complete design and replace wastewater treatment system (WWTS) at AFRIMS Yothi Annex, Bangkok, Thailand, in accordance with the Parts 2-6 attached here within.
To:
BASE BID ITEM 0001
This is a Design-Build project. The contractor shall provide complete design and replace wastewater treatment system (WWTS) at AFRIMS Yothi Annex, Bangkok, Thailand, in accordance with the Parts 2-6 attached here within.
CLIN 0002
The CLIN extended description has changed from:
This is a Design-Build project. The contractor shall provide complete design and replace effluent decontamination system (EDS) at AFRIMS Yothi Annex, Bangkok, Thailand, in accordance with the Parts 2-6 attached here within.
To:
OPTION ITEM 0001
This is a Design-Build project. The contractor shall provide complete design and replace effluent decontamination system (EDS) at AFRIMS Yothi Annex, Bangkok, Thailand, in accordance with the Parts 2-6 attached here within.
The option status has changed from No Status to Option.
SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of provision)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option unilaterally by modification to the Contractor within one hundred and twenty (120) calendar days from contract award for Option Item 0001. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Contract Award Document (SF1442), (b) prosecute the work diligently, and (c) complete the entire work for both Base Bid and Option items ready for use not later than seven hundred and twenty (720) calendar days after Contract Award. The time stated for completion shall include final cleanup of the premises.
CLIN 0001: Replace Wastewater Treatment System (WWTS) – 720 calendar day CLIN 0002: Replace Effluent Decontamination System (EDS) – 720 calendar day, after exercising the option.
(End of clause)
(End of Summary of Changes)
N6274224R6726_0003 Exhibit D. BOQ rev.
NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)
A SUBSTRUCTURE
A10 FOUNDATION
- Excavation & backfill m3
- Piling work EA
- Reinforcing & structure steel kg
- Concrete m3
- Accessories LOT
B SHELL
B10 SUPERSTRUCTURE
B1010 STRUCTURAL FRAMES, FLOOR DECK/SLABS, WALLS & RAMP
- Reinforcing & structure steel kg
- Concrete m3
- Stainless steel handrails EA
- Accessories, related to structural works LOT
B1020 ROOF STRUCTURES, ROOF DECK & SLAB
- Reinforcing & structure steel kg
- Concrete m3
B2010 EXTERIOR WALLS, LOUVERS & SCREENS
- CMU walls m2
- Reinforcing & structure steel kg
- Mortar/cement plastering m2
- Exterior wall painting m2
- Accessories LOT
B30 ROOFING
- Roof panel for roof & canopies m2
- Gutters & downspouts EA
- Accessories LOT
C INTERIORS
C103004 IDENTIFYING DEVICES
- Building nameplate with accessories EA
- Room designation nameplates with accessories EA
C2010 STAIR CONSTRUCTION
- Steel Stair construction EA
- Stainless steel handrails and all accessories EA
C3020 FLOOR FINISHS
- Trowel finished concrete floor m2
C3030 CEILING FINISHS
- Moisture resistant gypsum board completed with all accessories m2
- Thermal insulation in ceiling with all accessories m2
D SERVICES
D2020 DOMESTIC WATER DISTRIBUTION
- Piping & fitting LOT
- Valves, related equipment and accessories LOT
D2030 SANITARY WASTE
- Sanitary waste pipes & fitting EA
- Vent pipes & fitting EA
BILL OF QUANTITIES
Project Title D/B REPLACE WASTEWATER TREATMENT SYSTEM AND EFFLUENT DECONTAMINATION SYSTEM AT AFRIMS YOTHI ANNEX, THAILAND Revision 00
ITEM DESCRIPTION
QUANTITY MATERIAL COST LABOR COST TOTAL
CLIN 0001: BASE BID ITEM 0001 - REPLACE WASTEWATER TREATMENT SYSTEM (WWTS)
- Floor drains and accessories EA
D2040 RAIN WATER DRAINAGE
- Rain water pipes & fitting EA
- Roof drains and all accessories EA
D3090 OTHER HVAC SYSTEM & EQUIPMENT
- Ventilation system with accessories EA
D40 FIRE PROTECTION
- Fire extinguishers will brackets and accessories EA
D50 ELECTRICAL
D5010 EE SERVICES & DISTRIBUTION
- Main Distribution Board with CB, metering and all control equipments EA
- EE Panelboards completed with CB and all accessories EA
- ATS with enclosure, control/protection and all accessorie EA
D5020 LIGHTING & BRANCH WIRING
- Cable & wiring LOT
- Conduit & raceway LOT
- Receptacle outlet with accessories EA
- Lighting switches with accessories EA
- Lighting Fixtures, linear LED tube with reflector EA
- Accessories LOT
D5030 COMMUNICATION & SECURITY
D5090 OTHER ELECTRICAL SERVICES
- Grounding system EA
F SPECIAL CONSTRUCTION AND DEMOLITION
F10 SPECIAL CONSTRUCTION
F1040 SPECIAL FACILITIES
Furnish and install Wastewater Treatment System (WWTS) equipment including but not limited to submersible pumps, submersible ejector, guide rails, wastewater float switch, centrifugal pumps, diaphragm metering pumps, rotary air blowers, air diffusers, membranes, chemical tanks, temperature sensors, pH combination convertible sensors, DO sensor, control system, piping, wire, conduit, and other associated items according to use. EA Furnish and install a temporary Wastewater Treatment System (WWTS) equipment and other associated items according to use. EA Perform the required test but not limited to commisioning test under normal and abnormal (failture) operation scenarios. EA Perform the test of treated wastewater to confirm compliance with the local regulations. EA
F20 SELECTIVE BUILDING DEMOLITION
F2020 HAZARDOUS COMPONENTS ABATEMENT
Dismantle of the existing WWTS including but not limited to disconnect piping system, decontaminate and clean inside WWTS, fill all tanks with an approved granular material. EA
G BUILDING WORKS
G1010 SITE CLEARINGS
- Remove ground vegetation, tree removal, tree relocation, grubbing, clearing and debris disposal LOT
G1020 SITE DEMOLITION & RELOCATION
- Demolition the existing structures in construction area LOT
G1030 SITE EARTHWORK
- Grading/compaction and slope stabilization in construction area LOT
G2020 PARKING LOTS
- Reinforced concrete pavement including marking, signage, parking stops, and lighting for outdoor parking m2
G3010 WATER SUPPLY
- Incoming water pipes from main pipe to facility EA
- Water pressure pumps, control valves and all related equipment EA
- Pump control panel and wiring EA
- Water meter, connection fee and all accessories EA
- Accessories LOT
G3020 SANITARY SEWER
- Waste water pipe and fitting discharged from facility EA
- Sewer manholes and cleanouts EA
- Accessories LOT
G40 SITE ELECTRICAL UTILITIES
G4010 ELECTRICAL DISTRIBUTION
- Underground LV cables and conduit to MDB EA
- EE ploes, crossarms, insulators and all accessories EA
- Metering and connection fee EA
NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)
X FIELD REQUIREMENTS
- Calculation and Design Drawing LOT
- Construction permit & site clearance LOT
- Site mobilization & demobilization LOT
- Site topology survey LOT
- Soil investigation & report LOT
- Technical training to users LOT
A SUBSTRUCTURE
A10 FOUNDATION
- Excavation & backfill m3
- Piling work EA
- Reinforcing & structure steel kg
- Concrete m3
- Accessories LOT
B SHELL
B10 SUPERSTRUCTURE
B1010 STRUCTURAL FRAMES, FLOOR DECK/SLABS & RAMP
- Reinforcing & structure steel kg
- Concrete m3
- Stainless steel handrails for ramp EA
- Accessories, related to structural works LOT
B1020 ROOF STRUCTURES, ROOF DECK & SLAB
- Reinforcing & structure steel kg
- Concrete m3
- Watertight roof sealant LOT
B2010 EXTERIOR WALLS, LOUVERS & SCREENS
- CMU walls m2
- Reinforcing & structure steel kg
- Mortar/cement plastering m2
- Exterior wall painting m2
- Galvanized steel chain-link walls for pump house (if required) LOT
- Ventilated louvers and screens for building LOT
- Accessories LOT
Table 2: FIELD REQUIREMENTS (CLIN 0001)
DESCRIPTION QUANTITY MATERIAL COST LABOR COST ENGINEERING ESTIMATE
TOTAL ITEM A-to-G-to-X
VAT
TOTAL CLIN 0001
CLIN 0002: OPTION ITEM 0001 - REPLACE EFFLUENT DECONTAMINATION SYSTEM (EDS)
B2020 EXTERIOR WINDOWS
- Glass windows with frame, insect screen & all accessories EA
- Adjustable window blinds with its accessories EA
B2030 EXTERIOR DOORS
- Double swing panel non-corrosive steel door. EA
- Single swing panel non-corrosive steel door. EA
- Door accessories LOT
B30 ROOFING
- Roof panel for roof & canopies m2
- Gutters & downspouts EA
- Accessories LOT
C INTERIORS
C1010 PARTITIONS
- 15cm thick, CMU interior walls m2
- Accessories LOT
C1030 FITTINGS
- Cloth hangers EA
- Frameless mirrors EA
- Hose bibs for general purpose cleaning EA
C103004 IDENTIFYING DEVICES
- Building sign/logos with accessories and signage lighting EA
- Building nameplate with accessories EA
- Room designation nameplates with accessories EA
C2010 STAIR CONSTRUCTION
- Interior stair construction with trowel finished concrete and noses EA
- Exterior stair construction with trowel finished concrete and noses EA
- Stainless steel handrails and all accessories EA
C3010 WALL FINISHS
- Cement plastering wall finishes for all rooms m2
- Painting finishes for all rooms m2
- Ceramic tile wall finishes for all restrooms m2
C3020 FLOOR FINISHS
- Trowel finished concrete floor m2
C3030 CEILING FINISHS
- Moisture resistant gypsum board completed with all accessories m2
- Thermal insulation in ceiling with all accessories m2
D SERVICES
D2010 PLUMBING FIXTURES
- Sinks with grease traps and all related fitting EA
D2020 DOMESTIC WATER DISTRIBUTION
- Piping & fitting LOT
- Valves, related equipment and accessories LOT
D2030 SANITARY WASTE
- Sanitary waste pipes & fitting EA
- Vent pipes & fitting EA
- Floor drains and accessories EA
D2040 RAIN WATER DRAINAGE
- Rain water pipes & fitting EA
- Roof drains and all accessories EA
D3090 OTHER HVAC SYSTEM & EQUIPMENT
- Wall mounted fans with accessories EA
- Exhaust fans with ducts and accessories EA
D40 FIRE PROTECTION
- Fire extinguishers will brackets and accessories EA
D50 ELECTRICAL
D5010 EE SERVICES & DISTRIBUTION
- Main Distribution Board with CB, metering and all control equipments EA
- EE Panelboards completed with CB and all accessories EA
- ATS with enclosure, control/protection and all accessorie EA
D5020 LIGHTING & BRANCH WIRING
- Cable & wiring LOT
- Conduit & raceway LOT
- Receptacle outlet with accessories EA
- Lighting switches with accessories EA
- Lighting Fixtures, linear LED tube with reflector EA
- Accessories LOT
D5030 COMMUNICATION & SECURITY
D503001 FIRE ALARM SYSTEMS
- Fire Alarm Control Panel (FCP) with backup battery/charger EA
- Manual Stations with related fitting EA
- Combined smoke-heat detectors EA
- Alarm Bells EA
- Fire resistant cable and other twisted pairs wiring LOT
- Conduit & raceways LOT
- Accessories LOT
D503002 TELEPHONE SYSTEM
LAN SYSTEM
- Computer Server Racks with related equipment EA
- LAN Outlets, RJ45 EA
- LAN cables LOT
- Conduit & raceways LOT
- Accessories LOT
D5090 OTHER ELECTRICAL SERVICES
- Emergency lights for egress system EA
- Exit signs for egress system EA
- Grounding system EA
- Lightning protection system EA
F SPECIAL CONSTRUCTION AND DEMOLITION
F10 SPECIAL CONSTRUCTION
F1040 SPECIAL FACILITIES
Furnish and install Thermal Effluent Decontamination System (EDS) for BSL-3 including but not limited to holding tanks, thermal heat treatment, steam heated, cooling system, pressure vessel, HEPA filtered exhaust, cooling heat exchange exchanger, fluid cooler, control system, piping, wire, conduit, and other associated items according to use. EA Furnish and install a temporary Effluent Decontamination System (EDS) and other associated items according to use. EA
Perform Installation Qualification and Operational Qualification Test (IQ/OQ), Factory Acceptance Test (FAT), Site Acceptance Test (SAT), Commissioning test under normal and abnormal (failure) operation scenarios. EA
Provide testing materials and program for monthly biological validation test for 3 months after completion of installation. EA
F20 SELECTIVE BUILDING DEMOLITION
F2020 HAZARDOUS COMPONENTS ABATEMENT
Dismantle of the existing EDSs including but not limited to disconnect piping system, decontaminate and clean inside EDS, fill all tanks with an approved granular material. EA
G BUILDING WORKS
G1010 SITE CLEARINGS
- Remove ground vegetation, tree removal, tree relocation, grubbing, clearing and debris disposal LOT
G1020 SITE DEMOLITION & RELOCATION
- Demolition the existing structures in construction area LOT
G1030 SITE EARTHWORK
- Grading/compaction and slope stabilization in construction area LOT
G3010 WATER SUPPLY
- Incoming water pipes from main pipe to facility EA
- Water pressure pumps, control valves and all related equipment EA
- Pump control panel and wiring EA
- Water meter, connection fee and all accessories EA
- Accessories LOT
G3020 SANITARY SEWER
- Waste water pipe and fitting discharged from facility EA
- Sewer manholes and cleanouts EA
- Accessories LOT
G40 SITE ELECTRICAL UTILITIES
G4010 ELECTRICAL DISTRIBUTION
- Underground LV cables and conduit to MDB EA
- EE ploes, crossarms, insulators and all accessories EA
- Metering and connection fee EA
G4030 SITE COMMUNICATION & SECURITY
- IP65 pull boxes with empty IMC conduits for telephone system EA
- IP65 pull boxes with empty IMC conduits for LAN system EA
- Accessories LOT
NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)
X FIELD REQUIREMENTS
- Calculation and Design Drawing LOT
- Construction permit & site clearance LOT
- Site mobilization & demobilization LOT
- Site topology survey LOT
- Soil investigation & report LOT
- Technical training to users LOT
Table 2: FIELD REQUIREMENTS (CLIN 0002)
ENGINEERING ESTIMATE
TOTAL ITEM A-to-G-to-X
VAT
TOTAL CLIN 0002
GRAND TOTAL (CLIN 0001 TO 0002)
DESCRIPTION QUANTITY MATERIAL COST LABOR COST
| N6274224R6726_0003 Exhibit D. BOQ rev.pdf |
| BOQ |
File details come from the government source that posted it. Updated .