This document contains a Pre-Proposal Inquiry Form, Offeror Experience Project Data Sheet, Past Performance Questionnaire, and Bill of Quantities related to Solicitation N6274224R6726 for the Design-Build Replacement of the Wastewater Treatment System (WWTS) and Effluent Decontamination System (EDS) at the Armed Forces Research Institute of Medical Sciences (AFRIMS) facility in Yothi, Thailand.

The solicitation is being issued by the Naval Facilities Engineering Command (NAVFAC) with a proposal due date of August 26, 2024. A pre-solicitation site visit is scheduled for July 31, 2024. The contract will be a Design-Build effort with the successful offeror required to furnish and install new WWTS and EDS equipment, including associated electrical, plumbing, and civil work. Offerors must submit past performance information and complete a detailed bill of quantities template as part of their proposal. The award will be based on a best value trade-off between technical, past performance, and price factors.

View the file

Other files

File Type Posted
N6274224R6726_0003 Restructure CLINs.pdf PDF
N6274224R6726_0003 Exhibit D.BOQrev..xlsx XLSX spreadsheet
N62747224R6726 _0002 Extend Due Date.pdf PDF
N6274224R6726_0001 released.pdf PDF
Exhibit A Pre Proposal Inquiry Form.xlsx XLSX spreadsheet
Exhibit D Blank BOQ.xlsx XLSX spreadsheet
N6274224R6726 Released w Attachments.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE PROPOSAL INQUIRY FORM N62742224R6726

Exhibit A.

DATE:

Question No. Reference (Sect/Para/Page) QUESTION GOVERNMENT RESPONSE

EMAIL:

OFFEROR NAME:

ADDRESS:

PHONE NUMBER:

SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104

D/B Replace Wastewater Treatment System (WWTS) and N6274224R6726 Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand Page 1 of 1

EXHIBIT B - OFFEROR EXPERIENCE PROJECT DATA SHEET

Provide the following information on projects to demonstrate past experience on recent, relevant construction projects. Use continuation sheets, if needed.

PLACE PHOTO HERE

Offeror Name: ______________________________

Contract Number: ___________________________ Project Title/Location: ________________________ Short Project Description: ________________________

Effort involved Design Build:

___Yes, self-performed as the Prime contractor ___Yes, subcontracted and managed by the Prime contractor ___No, did not include DB

Contract Amount: __________________

Original Contract Completion Date: __________________ Final Contract Completion Date: __________________ Date Completed: __________________

Percentage of Work Performed: __________________

Prime or Subcontract Work: __________________

Customer/Client: __________________

Customer/Client Contact Information: (include for each POC: NAME, PHONE NUMBER, EMAIL

ADDRESS, AND MAILING ADDRESS)

D/B Replace Wastewater Treatment System (WWTS) and N6274224R6726 Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand. Exhibit C

EXHIBIT C – PAST PERFORMANCE QUESTIONNAIRE

1. The NAVFAC Form PPQ shall be utilized for all evaluations that require a Past Performance Questionnaire (PPQ).

2. Offerors should submit the PPQ with their offer. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Artitar Udit via email at artitar@state.gov prior to proposal closing date.

3. Offerors should provide PPQs with their proposal as required by RFP. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation."

mailto:artitar@state.gov

D/B Replace Wastewater Treatment System (WWTS) and N6274224R6726 Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand. Exhibit C

EXHIBIT C

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO NAVFAC WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON NAVFAC SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO NAVFAC. PLEASE CONTACT THE OFFEROR FOR NAVFAC POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY

AND ALL INFORMATION ON THIS FORM.

D/B Replace Wastewater Treatment System (WWTS) and N6274224R6726 Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand. Exhibit C

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.

Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.

There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract

Rating will be neither positive nor negative.

D/B Replace Wastewater Treatment System (WWTS) and N6274224R6726 Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand. Exhibit C Contractor Information (Firm Name): ________________________________________________ Client Information (Name): ________________________________________________________

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)? E VG S M U N

D/B Replace Wastewater Treatment System (WWTS) and N6274224R6726 Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand. Exhibit C

Contractor Information (Firm Name): ________________________________________________ Client Information (Name): ________________________________________________________

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)

A SUBSTRUCTURE

A10 FOUNDATION

- Excavation & backfill m3

- Piling work EA

- Reinforcing & structure steel kg

- Concrete m3

- Accessories LOT

B SHELL

B10 SUPERSTRUCTURE

B1010 STRUCTURAL FRAMES, FLOOR DECK/SLABS, WALLS & RAMP

- Reinforcing & structure steel kg

- Concrete m3

- Stainless steel handrails EA

- Accessories, related to structural works LOT

B1020 ROOF STRUCTURES, ROOF DECK & SLAB

- Reinforcing & structure steel kg

- Concrete m3

B2010 EXTERIOR WALLS, LOUVERS & SCREENS

- CMU walls m2

- Reinforcing & structure steel kg

- Mortar/cement plastering m2

- Exterior wall painting m2

- Accessories LOT

B30 ROOFING

- Roof panel for roof & canopies m2

- Gutters & downspouts EA

- Accessories LOT

C INTERIORS

C103004 IDENTIFYING DEVICES

- Building nameplate with accessories EA

- Room designation nameplates with accessories EA

C2010 STAIR CONSTRUCTION

- Steel Stair construction EA

- Stainless steel handrails and all accessories EA

C3020 FLOOR FINISHS

- Trowel finished concrete floor m2

C3030 CEILING FINISHS

- Moisture resistant gypsum board completed with all accessories m2

- Thermal insulation in ceiling with all accessories m2

D SERVICES

D2020 DOMESTIC WATER DISTRIBUTION

- Piping & fitting LOT

- Valves, related equipment and accessories LOT

D2030 SANITARY WASTE

- Sanitary waste pipes & fitting EA

- Vent pipes & fitting EA

- Floor drains and accessories EA

TOTAL

CLIN 0001: REPLACE WASTEWATER TREATMENT SYSTEM (WWTS)

BILL OF QUANTITIES

Project Title D/B REPLACE WASTEWATER TREATMENT SYSTEM AND EFFLUENT DECONTAMINATION SYSTEM AT AFRIMS YOTHI ANNEX, THAILAND Revision 00

ITEM DESCRIPTION

QUANTITY MATERIAL COST LABOR COST

D/B Replace Wastewater Treatment System (WWTS) and Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand.

N6274224R6726 Exhibit D.

D2040 RAIN WATER DRAINAGE

- Rain water pipes & fitting EA

- Roof drains and all accessories EA

D3090 OTHER HVAC SYSTEM & EQUIPMENT

- Ventilation system with accessories EA

D40 FIRE PROTECTION

- Fire extinguishers will brackets and accessories EA

D50 ELECTRICAL

D5010 EE SERVICES & DISTRIBUTION

- Main Distribution Board with CB, metering and all control equipments EA

- EE Panelboards completed with CB and all accessories EA

- ATS with enclosure, control/protection and all accessorie EA

D5020 LIGHTING & BRANCH WIRING

- Cable & wiring LOT

- Conduit & raceway LOT

- Receptacle outlet with accessories EA

- Lighting switches with accessories EA

- Lighting Fixtures, linear LED tube with reflector EA

- Accessories LOT

D5030 COMMUNICATION & SECURITY

D5090 OTHER ELECTRICAL SERVICES

- Grounding system EA

F SPECIAL CONSTRUCTION AND DEMOLITION

F10 SPECIAL CONSTRUCTION

F1040 SPECIAL FACILITIES

Furnish and install Wastewater Treatment System (WWTS) equipment including but not limited to submersible pumps, submersible ejector, guide rails, wastewater float switch, centrifugal pumps, diaphragm metering pumps, rotary air blowers, air diffusers, membranes, chemical tanks, temperature sensors, pH combination convertible sensors, DO sensor, control system, piping, wire, conduit, and other associated items according to use. EA

Furnish and install a temporary Wastewater Treatment System (WWTS) equipment and other associated items according to use. EA

Perform the required test but not limited to commisioning test under normal and abnormal (failture) operation scenarios. EA

Perform the test of treated wastewater to confirm compliance with the local regulations. EA

F20 SELECTIVE BUILDING DEMOLITION

F2020 HAZARDOUS COMPONENTS ABATEMENT

Dismantle of the existing WWTS including but not limited to disconnect piping system, decontaminate and clean inside WWTS, fill all tanks with an approved granular material. EA

G BUILDING WORKS

G1010 SITE CLEARINGS

- Remove ground vegetation, tree removal, tree relocation, grubbing, clearing and debris disposal LOT

G1020 SITE DEMOLITION & RELOCATION

- Demolition the existing structures in construction area LOT

G1030 SITE EARTHWORK

- Grading/compaction and slope stabilization in construction area LOT

G2020 PARKING LOTS

- Reinforced concrete pavement including marking, signage, parking stops, and lighting for outdoor parking m2

G3010 WATER SUPPLY

- Incoming water pipes from main pipe to facility EA

- Water pressure pumps, control valves and all related equipment EA

- Pump control panel and wiring EA

- Water meter, connection fee and all accessories EA

- Accessories LOT

D/B Replace Wastewater Treatment System (WWTS) and Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand.

G3020 SANITARY SEWER

- Waste water pipe and fitting discharged from facility EA

- Sewer manholes and cleanouts EA

- Accessories LOT

G40 SITE ELECTRICAL UTILITIES

G4010 ELECTRICAL DISTRIBUTION

- Underground LV cables and conduit to MDB EA

- EE ploes, crossarms, insulators and all accessories EA

- Metering and connection fee EA

NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)

X FIELD REQUIREMENTS

- Calculation and Design Drawing LOT

- Construction permit & site clearance LOT

- Site mobilization & demobilization LOT

- Site topology survey LOT

- Soil investigation & report LOT

- Technical training to users LOT

A SUBSTRUCTURE

A10 FOUNDATION

- Excavation & backfill m3

- Piling work EA

- Reinforcing & structure steel kg

- Concrete m3

- Accessories LOT

B SHELL

B10 SUPERSTRUCTURE

B1010 STRUCTURAL FRAMES, FLOOR DECK/SLABS & RAMP

- Reinforcing & structure steel kg

- Concrete m3

- Stainless steel handrails for ramp EA

- Accessories, related to structural works LOT

B1020 ROOF STRUCTURES, ROOF DECK & SLAB

- Reinforcing & structure steel kg

- Concrete m3

- Watertight roof sealant LOT

B2010 EXTERIOR WALLS, LOUVERS & SCREENS

- CMU walls m2

- Reinforcing & structure steel kg

- Mortar/cement plastering m2

- Exterior wall painting m2

- Galvanized steel chain-link walls for pump house (if required) LOT

- Ventilated louvers and screens for building LOT

- Accessories LOT

B2020 EXTERIOR WINDOWS

- Glass windows with frame, insect screen & all accessories EA

- Adjustable window blinds with its accessories EA

B2030 EXTERIOR DOORS

- Double swing panel non-corrosive steel door. EA

- Single swing panel non-corrosive steel door. EA

- Door accessories LOT

TOTAL ITEM A-to-G-to-X

VAT

TOTAL CLIN 0001

CLIN 0002: REPLACE EFFLUENT DECONTAMINATION SYSTEM (EDS)

Table 2: FIELD REQUIREMENTS (CLIN 0001)

DESCRIPTION

QUANTITY MATERIAL COST LABOR COST ENGINEERING ESTIMATE

D/B Replace Wastewater Treatment System (WWTS) and Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand.

B30 ROOFING

- Roof panel for roof & canopies m2

- Gutters & downspouts EA

- Accessories LOT

C INTERIORS

C1010 PARTITIONS

- 15cm thick, CMU interior walls m2

- Accessories LOT

C1030 FITTINGS

- Cloth hangers EA

- Frameless mirrors EA

- Hose bibs for general purpose cleaning EA

C103004 IDENTIFYING DEVICES

- Building sign/logos with accessories and signage lighting EA

- Building nameplate with accessories EA

- Room designation nameplates with accessories EA

C2010 STAIR CONSTRUCTION

- Interior stair construction with trowel finished concrete and noses EA

- Exterior stair construction with trowel finished concrete and noses EA

- Stainless steel handrails and all accessories EA

C3010 WALL FINISHS

- Cement plastering wall finishes for all rooms m2

- Painting finishes for all rooms m2

- Ceramic tile wall finishes for all restrooms m2

C3020 FLOOR FINISHS

- Trowel finished concrete floor m2

C3030 CEILING FINISHS

- Moisture resistant gypsum board completed with all accessories m2

- Thermal insulation in ceiling with all accessories m2

D SERVICES

D2010 PLUMBING FIXTURES

- Sinks with grease traps and all related fitting EA

D2020 DOMESTIC WATER DISTRIBUTION

- Piping & fitting LOT

- Valves, related equipment and accessories LOT

D2030 SANITARY WASTE

- Sanitary waste pipes & fitting EA

- Vent pipes & fitting EA

- Floor drains and accessories EA

D2040 RAIN WATER DRAINAGE

- Rain water pipes & fitting EA

- Roof drains and all accessories EA

D3090 OTHER HVAC SYSTEM & EQUIPMENT

- Wall mounted fans with accessories EA

- Exhaust fans with ducts and accessories EA

D40 FIRE PROTECTION

- Fire extinguishers will brackets and accessories EA

D50 ELECTRICAL

D5010 EE SERVICES & DISTRIBUTION

- Main Distribution Board with CB, metering and all control equipments EA

- EE Panelboards completed with CB and all accessories EA

- ATS with enclosure, control/protection and all accessorie EA

D5020 LIGHTING & BRANCH WIRING

- Cable & wiring LOT

- Conduit & raceway LOT

- Receptacle outlet with accessories EA

- Lighting switches with accessories EA

- Lighting Fixtures, linear LED tube with reflector EA

D/B Replace Wastewater Treatment System (WWTS) and Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand.

- Accessories LOT

D5030 COMMUNICATION & SECURITY

D503001 FIRE ALARM SYSTEMS

- Fire Alarm Control Panel (FCP) with backup battery/charger EA

- Manual Stations with related fitting EA

- Combined smoke-heat detectors EA

- Alarm Bells EA

- Fire resistant cable and other twisted pairs wiring LOT

- Conduit & raceways LOT

- Accessories LOT

D503002 TELEPHONE SYSTEM

LAN SYSTEM

- Computer Server Racks with related equipment EA

- LAN Outlets, RJ45 EA

- LAN cables LOT

- Conduit & raceways LOT

- Accessories LOT

D5090 OTHER ELECTRICAL SERVICES

- Emergency lights for egress system EA

- Exit signs for egress system EA

- Grounding system EA

- Lightning protection system EA

F SPECIAL CONSTRUCTION AND DEMOLITION

F10 SPECIAL CONSTRUCTION

F1040 SPECIAL FACILITIES

Furnish and install Thermal Effluent Decontamination System (EDS) for BSL-3 including but not limited to holding tanks, thermal heat treatment, steam heated, cooling system, pressure vessel, HEPA filtered exhaust, cooling heat exchange exchanger, fluid cooler, control system, piping, wire, conduit, and other associated items according to use. EA

Furnish and install a temporary Effluent Decontamination System (EDS) and other associated items according to use. EA

Perform Installation Qualification and Operational Qualification Test (IQ/OQ), Factory Acceptance Test (FAT), Site Acceptance Test (SAT), Commissioning test under normal and abnormal (failure) operation scenarios. EA

Provide testing materials and program for monthly biological validation test for 3 months after completion of installation. EA

F20 SELECTIVE BUILDING DEMOLITION

F2020 HAZARDOUS COMPONENTS ABATEMENT

Dismantle of the existing EDSs including but not limited to disconnect piping system, decontaminate and clean inside EDS, fill all tanks with an approved granular material. EA

G BUILDING WORKS

G1010 SITE CLEARINGS

- Remove ground vegetation, tree removal, tree relocation, grubbing, clearing and debris disposal LOT

G1020 SITE DEMOLITION & RELOCATION

- Demolition the existing structures in construction area LOT

G1030 SITE EARTHWORK

- Grading/compaction and slope stabilization in construction area LOT

G3010 WATER SUPPLY

- Incoming water pipes from main pipe to facility EA

- Water pressure pumps, control valves and all related equipment EA

- Pump control panel and wiring EA

- Water meter, connection fee and all accessories EA

- Accessories LOT

G3020 SANITARY SEWER

- Waste water pipe and fitting discharged from facility EA

- Sewer manholes and cleanouts EA

- Accessories LOT

D/B Replace Wastewater Treatment System (WWTS) and Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand.

G40 SITE ELECTRICAL UTILITIES

G4010 ELECTRICAL DISTRIBUTION

- Underground LV cables and conduit to MDB EA

- EE ploes, crossarms, insulators and all accessories EA

- Metering and connection fee EA

G4030 SITE COMMUNICATION & SECURITY

- IP65 pull boxes with empty IMC conduits for telephone system EA

- IP65 pull boxes with empty IMC conduits for LAN system EA

- Accessories LOT

NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)

X FIELD REQUIREMENTS

- Calculation and Design Drawing LOT

- Construction permit & site clearance LOT

- Site mobilization & demobilization LOT

- Site topology survey LOT

- Soil investigation & report LOT

- Technical training to users LOT

ENGINEERING ESTIMATE

TOTAL ITEM A-to-G-to-X

VAT

TOTAL CLIN 0002

GRAND TOTAL (CLIN 0001 TO 0002)

Table 2: FIELD REQUIREMENTS (CLIN 0002)

DESCRIPTION

QUANTITY MATERIAL COST LABOR COST

D/B Replace Wastewater Treatment System (WWTS) and Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand.