Exhibit D Blank BOQ.xlsx
XLSX spreadsheet 46 KB Posted
- Solicitation number
- N6274224R6726
About this file
This document is a Bill of Quantities (BOQ) for the D/B Replace Wastewater Treatment System (WWTS) and Effluent Decontamination System (EDS) project at AFRIMS Yothi Annex in Thailand. The BOQ provides a detailed breakdown of the required items, quantities, material and labor costs, and total costs for the WWTS and EDS replacement work. Key details include the project title, location, revision number, and CLIN structure outlining the major work elements such as substructure, shell, interiors, services, special construction and demolition, and field requirements. The related federal contract opportunity is identified as Solicitation N6274224R6726, issued by the Department of the Navy Naval Facilities Engineering Command. The solicitation provides details on the project, a scheduled pre-solicitation site visit, and the proposal due date of August 26, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6274224R6726_0003 Restructure CLINs.pdf | ||
| N6274224R6726_0003 Exhibit D.BOQrev..xlsx | XLSX spreadsheet | |
| N62747224R6726 _0002 Extend Due Date.pdf | ||
| N6274224R6726_0001 released.pdf | ||
| EXHIBIT A-D.pdf | ||
| Exhibit A Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| N6274224R6726 Released w Attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOQ
BILL OF QUANTITIES
Project Title D/B REPLACE WASTEWATER TREATMENT SYSTEM AND EFFLUENT DECONTAMINATION SYSTEM AT AFRIMS YOTHI ANNEX, THAILAND Revision 00
| ITEM | DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | TOTAL | ||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| CLIN 0001: REPLACE WASTEWATER TREATMENT SYSTEM (WWTS) | |||||||||
| A | SUBSTRUCTURE | ||||||||
| A10 | FOUNDATION | ||||||||
| - Excavation & backfill | m3 | ||||||||
| - Piling work | EA | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Accessories | LOT | ||||||||
| B | SHELL | ||||||||
| B10 | SUPERSTRUCTURE | ||||||||
| B1010 | STRUCTURAL FRAMES, FLOOR DECK/SLABS, WALLS & RAMP | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Stainless steel handrails | EA | ||||||||
| - Accessories, related to structural works | LOT | ||||||||
| B1020 | ROOF STRUCTURES, ROOF DECK & SLAB | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| B2010 | EXTERIOR WALLS, LOUVERS & SCREENS | ||||||||
| - CMU walls | m2 | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Mortar/cement plastering | m2 | ||||||||
| - Exterior wall painting | m2 | ||||||||
| - Accessories | LOT | ||||||||
| B30 | ROOFING | ||||||||
| - Roof panel for roof & canopies | m2 | ||||||||
| - Gutters & downspouts | EA | ||||||||
| - Accessories | LOT | ||||||||
| C | INTERIORS | ||||||||
| C103004 | IDENTIFYING DEVICES | ||||||||
| - Building nameplate with accessories | EA | ||||||||
| - Room designation nameplates with accessories | EA | ||||||||
| C2010 | STAIR CONSTRUCTION | ||||||||
| - Steel Stair construction | EA | ||||||||
| - Stainless steel handrails and all accessories | EA | ||||||||
| C3020 | FLOOR FINISHS | ||||||||
| - Trowel finished concrete floor | m2 | ||||||||
| C3030 | CEILING FINISHS | ||||||||
| - Moisture resistant gypsum board completed with all accessories | m2 | ||||||||
| - Thermal insulation in ceiling with all accessories | m2 | ||||||||
| D | SERVICES | ||||||||
| D2020 | DOMESTIC WATER DISTRIBUTION | ||||||||
| - Piping & fitting | LOT | ||||||||
| - Valves, related equipment and accessories | LOT | ||||||||
| D2030 | SANITARY WASTE | ||||||||
| - Sanitary waste pipes & fitting | EA | ||||||||
| - Vent pipes & fitting | EA | ||||||||
| - Floor drains and accessories | EA | ||||||||
| D2040 | RAIN WATER DRAINAGE | ||||||||
| - Rain water pipes & fitting | EA | ||||||||
| - Roof drains and all accessories | EA | ||||||||
| D3090 | OTHER HVAC SYSTEM & EQUIPMENT | ||||||||
| - Ventilation system with accessories | EA |
| D40 | FIRE PROTECTION | |
| - Fire extinguishers will brackets and accessories | EA | |
| D50 | ELECTRICAL | |
| D5010 | EE SERVICES & DISTRIBUTION | |
| - Main Distribution Board with CB, metering and all control equipments | EA | |
| - EE Panelboards completed with CB and all accessories | EA | |
| - ATS with enclosure, control/protection and all accessorie | EA | |
| D5020 | LIGHTING & BRANCH WIRING | |
| - Cable & wiring | LOT | |
| - Conduit & raceway | LOT | |
| - Receptacle outlet with accessories | EA | |
| - Lighting switches with accessories | EA | |
| - Lighting Fixtures, linear LED tube with reflector | EA | |
| - Accessories | LOT | |
| D5030 | COMMUNICATION & SECURITY | |
| D5090 | OTHER ELECTRICAL SERVICES | |
| - Grounding system | EA |
| F | SPECIAL CONSTRUCTION AND DEMOLITION | |
| F10 | SPECIAL CONSTRUCTION | |
| F1040 | SPECIAL FACILITIES | |
| Furnish and install Wastewater Treatment System (WWTS) equipment including but not limited to submersible pumps, submersible ejector, guide rails, wastewater float switch, centrifugal pumps, diaphragm metering pumps, rotary air blowers, air diffusers, membranes, chemical tanks, temperature sensors, pH combination convertible sensors, DO sensor, control system, piping, wire, conduit, and other associated items according to use. | EA | |
| Furnish and install a temporary Wastewater Treatment System (WWTS) equipment and other associated items according to use. | EA | |
| Perform the required test but not limited to commisioning test under normal and abnormal (failture) operation scenarios. | EA | |
| Perform the test of treated wastewater to confirm compliance with the local regulations. | EA | |
| F20 | SELECTIVE BUILDING DEMOLITION | |
| F2020 | HAZARDOUS COMPONENTS ABATEMENT | |
| Dismantle of the existing WWTS including but not limited to disconnect piping system, decontaminate and clean inside WWTS, fill all tanks with an approved granular material. | EA |
| G | BUILDING WORKS | ||||||||
| G1010 | SITE CLEARINGS | ||||||||
| - Remove ground vegetation, tree removal, tree relocation, grubbing, clearing and debris disposal | LOT | ||||||||
| G1020 | SITE DEMOLITION & RELOCATION | ||||||||
| - Demolition the existing structures in construction area | LOT | ||||||||
| G1030 | SITE EARTHWORK | ||||||||
| - Grading/compaction and slope stabilization in construction area | LOT | ||||||||
| G2020 | PARKING LOTS | ||||||||
| - Reinforced concrete pavement including marking, signage, parking stops, and lighting for outdoor parking | m2 | ||||||||
| G3010 | WATER SUPPLY | ||||||||
| - Incoming water pipes from main pipe to facility | EA | ||||||||
| - Water pressure pumps, control valves and all related equipment | EA | ||||||||
| - Pump control panel and wiring | EA | ||||||||
| - Water meter, connection fee and all accessories | EA | ||||||||
| - Accessories | LOT | ||||||||
| G3020 | SANITARY SEWER | ||||||||
| - Waste water pipe and fitting discharged from facility | EA | ||||||||
| - Sewer manholes and cleanouts | EA | ||||||||
| - Accessories | LOT | ||||||||
| G40 | SITE ELECTRICAL UTILITIES | ||||||||
| G4010 | ELECTRICAL DISTRIBUTION | ||||||||
| - Underground LV cables and conduit to MDB | EA | ||||||||
| - EE ploes, crossarms, insulators and all accessories | EA | ||||||||
| - Metering and connection fee | EA | ||||||||
| Table 2: FIELD REQUIREMENTS (CLIN 0001) | |||||||||
| DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| X | FIELD REQUIREMENTS | ||||||||
| - Calculation and Design Drawing | LOT | ||||||||
| - Construction permit & site clearance | LOT | ||||||||
| - Site mobilization & demobilization | LOT | ||||||||
| - Site topology survey | LOT | ||||||||
| - Soil investigation & report | LOT | ||||||||
| - Technical training to users | LOT | ||||||||
| TOTAL ITEM A-to-G-to-X | |||||||||
| VAT | |||||||||
| TOTAL CLIN 0001 |
| CLIN 0002: REPLACE EFFLUENT DECONTAMINATION SYSTEM (EDS) | ||
| A | SUBSTRUCTURE | |
| A10 | FOUNDATION | |
| - Excavation & backfill | m3 | |
| - Piling work | EA | |
| - Reinforcing & structure steel | kg | |
| - Concrete | m3 | |
| - Accessories | LOT | |
| B | SHELL | |
| B10 | SUPERSTRUCTURE | |
| B1010 | STRUCTURAL FRAMES, FLOOR DECK/SLABS & RAMP | |
| - Reinforcing & structure steel | kg | |
| - Concrete | m3 | |
| - Stainless steel handrails for ramp | EA | |
| - Accessories, related to structural works | LOT | |
| B1020 | ROOF STRUCTURES, ROOF DECK & SLAB | |
| - Reinforcing & structure steel | kg | |
| - Concrete | m3 | |
| - Watertight roof sealant | LOT | |
| B2010 | EXTERIOR WALLS, LOUVERS & SCREENS | |
| - CMU walls | m2 | |
| - Reinforcing & structure steel | kg | |
| - Mortar/cement plastering | m2 | |
| - Exterior wall painting | m2 | |
| - Galvanized steel chain-link walls for pump house (if required) | LOT | |
| - Ventilated louvers and screens for building | LOT | |
| - Accessories | LOT | |
| B2020 | EXTERIOR WINDOWS | |
| - Glass windows with frame, insect screen & all accessories | EA | |
| - Adjustable window blinds with its accessories | EA | |
| B2030 | EXTERIOR DOORS | |
| - Double swing panel non-corrosive steel door. | EA | |
| - Single swing panel non-corrosive steel door. | EA | |
| - Door accessories | LOT | |
| B30 | ROOFING | |
| - Roof panel for roof & canopies | m2 | |
| - Gutters & downspouts | EA | |
| - Accessories | LOT | |
| C | INTERIORS | |
| C1010 | PARTITIONS | |
| - 15cm thick, CMU interior walls | m2 | |
| - Accessories | LOT | |
| C1030 | FITTINGS | |
| - Cloth hangers | EA | |
| - Frameless mirrors | EA | |
| - Hose bibs for general purpose cleaning | EA | |
| C103004 | IDENTIFYING DEVICES | |
| - Building sign/logos with accessories and signage lighting | EA | |
| - Building nameplate with accessories | EA | |
| - Room designation nameplates with accessories | EA | |
| C2010 | STAIR CONSTRUCTION | |
| - Interior stair construction with trowel finished concrete and noses | EA | |
| - Exterior stair construction with trowel finished concrete and noses | EA | |
| - Stainless steel handrails and all accessories | EA | |
| C3010 | WALL FINISHS | |
| - Cement plastering wall finishes for all rooms | m2 | |
| - Painting finishes for all rooms | m2 | |
| - Ceramic tile wall finishes for all restrooms | m2 | |
| C3020 | FLOOR FINISHS | |
| - Trowel finished concrete floor | m2 | |
| C3030 | CEILING FINISHS | |
| - Moisture resistant gypsum board completed with all accessories | m2 | |
| - Thermal insulation in ceiling with all accessories | m2 | |
| D | SERVICES | |
| D2010 | PLUMBING FIXTURES | |
| - Sinks with grease traps and all related fitting | EA | |
| D2020 | DOMESTIC WATER DISTRIBUTION | |
| - Piping & fitting | LOT | |
| - Valves, related equipment and accessories | LOT | |
| D2030 | SANITARY WASTE | |
| - Sanitary waste pipes & fitting | EA | |
| - Vent pipes & fitting | EA | |
| - Floor drains and accessories | EA | |
| D2040 | RAIN WATER DRAINAGE | |
| - Rain water pipes & fitting | EA | |
| - Roof drains and all accessories | EA | |
| D3090 | OTHER HVAC SYSTEM & EQUIPMENT | |
| - Wall mounted fans with accessories | EA | |
| - Exhaust fans with ducts and accessories | EA | |
| D40 | FIRE PROTECTION | |
| - Fire extinguishers will brackets and accessories | EA | |
| D50 | ELECTRICAL | |
| D5010 | EE SERVICES & DISTRIBUTION | |
| - Main Distribution Board with CB, metering and all control equipments | EA | |
| - EE Panelboards completed with CB and all accessories | EA | |
| - ATS with enclosure, control/protection and all accessorie | EA | |
| D5020 | LIGHTING & BRANCH WIRING | |
| - Cable & wiring | LOT | |
| - Conduit & raceway | LOT | |
| - Receptacle outlet with accessories | EA | |
| - Lighting switches with accessories | EA | |
| - Lighting Fixtures, linear LED tube with reflector | EA | |
| - Accessories | LOT | |
| D5030 | COMMUNICATION & SECURITY | |
| D503001 | FIRE ALARM SYSTEMS | |
| - Fire Alarm Control Panel (FCP) with backup battery/charger | EA | |
| - Manual Stations with related fitting | EA | |
| - Combined smoke-heat detectors | EA | |
| - Alarm Bells | EA | |
| - Fire resistant cable and other twisted pairs wiring | LOT | |
| - Conduit & raceways | LOT | |
| - Accessories | LOT | |
| D503002 | TELEPHONE SYSTEM | |
| LAN SYSTEM | ||
| - Computer Server Racks with related equipment | EA | |
| - LAN Outlets, RJ45 | EA | |
| - LAN cables | LOT | |
| - Conduit & raceways | LOT | |
| - Accessories | LOT | |
| D5090 | OTHER ELECTRICAL SERVICES | |
| - Emergency lights for egress system | EA | |
| - Exit signs for egress system | EA | |
| - Grounding system | EA | |
| - Lightning protection system | EA | |
| F | SPECIAL CONSTRUCTION AND DEMOLITION | |
| F10 | SPECIAL CONSTRUCTION | |
| F1040 | SPECIAL FACILITIES | |
| Furnish and install Thermal Effluent Decontamination System (EDS) for BSL-3 including but not limited to holding tanks, thermal heat treatment, steam heated, cooling system, pressure vessel, HEPA filtered exhaust, cooling heat exchange exchanger, fluid cooler, control system, piping, wire, conduit, and other associated items according to use. | EA | |
| Furnish and install a temporary Effluent Decontamination System (EDS) and other associated items according to use. | EA | |
| Perform Installation Qualification and Operational Qualification Test (IQ/OQ), Factory Acceptance Test (FAT), Site Acceptance Test (SAT), Commissioning test under normal and abnormal (failure) operation scenarios. | EA | |
| Provide testing materials and program for monthly biological validation test for 3 months after completion of installation. | EA | |
| F20 | SELECTIVE BUILDING DEMOLITION | |
| F2020 | HAZARDOUS COMPONENTS ABATEMENT | |
| Dismantle of the existing EDSs including but not limited to disconnect piping system, decontaminate and clean inside EDS, fill all tanks with an approved granular material. | EA |
| G | BUILDING WORKS | ||||||||
| G1010 | SITE CLEARINGS | ||||||||
| - Remove ground vegetation, tree removal, tree relocation, grubbing, clearing and debris disposal | LOT | ||||||||
| G1020 | SITE DEMOLITION & RELOCATION | ||||||||
| - Demolition the existing structures in construction area | LOT | ||||||||
| G1030 | SITE EARTHWORK | ||||||||
| - Grading/compaction and slope stabilization in construction area | LOT | ||||||||
| G3010 | WATER SUPPLY | ||||||||
| - Incoming water pipes from main pipe to facility | EA | ||||||||
| - Water pressure pumps, control valves and all related equipment | EA | ||||||||
| - Pump control panel and wiring | EA | ||||||||
| - Water meter, connection fee and all accessories | EA | ||||||||
| - Accessories | LOT | ||||||||
| G3020 | SANITARY SEWER | ||||||||
| - Waste water pipe and fitting discharged from facility | EA | ||||||||
| - Sewer manholes and cleanouts | EA | ||||||||
| - Accessories | LOT | ||||||||
| G40 | SITE ELECTRICAL UTILITIES | ||||||||
| G4010 | ELECTRICAL DISTRIBUTION | ||||||||
| - Underground LV cables and conduit to MDB | EA | ||||||||
| - EE ploes, crossarms, insulators and all accessories | EA | ||||||||
| - Metering and connection fee | EA | ||||||||
| G4030 | SITE COMMUNICATION & SECURITY | ||||||||
| - IP65 pull boxes with empty IMC conduits for telephone system | EA | ||||||||
| - IP65 pull boxes with empty IMC conduits for LAN system | EA | ||||||||
| - Accessories | LOT | ||||||||
| Table 2: FIELD REQUIREMENTS (CLIN 0002) | |||||||||
| DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| X | FIELD REQUIREMENTS | ||||||||
| - Calculation and Design Drawing | LOT | ||||||||
| - Construction permit & site clearance | LOT | ||||||||
| - Site mobilization & demobilization | LOT | ||||||||
| - Site topology survey | LOT | ||||||||
| - Soil investigation & report | LOT | ||||||||
| - Technical training to users | LOT | ||||||||
| TOTAL ITEM A-to-G-to-X | |||||||||
| VAT | |||||||||
| TOTAL CLIN 0002 |
GRAND TOTAL (CLIN 0001 TO 0002)
D/B Replace Wastewater Treatment System (WWTS) and Effluent Decontamination System (EDS), AFRIMS, Yothi, Thailand. N6274224R6726 Exhibit D.
File details come from the government source that posted it. Updated .