This document is an amendment to a solicitation for the D/B construction of a training facility, earth-covered magazine (ECM) storage, and renovation of an existing 25-meter firing range in Lopburi, Thailand.

The key details are:

  • The amendment provides answers to pre-proposal inquiries (PPIs) and incorporates changes to Parts 3 and 6 of the solicitation, as well as a revised Bill of Quantities. The closing date for proposals remains August 27, 2024.
  • Notable changes include: requiring all workers to be Thai nationals, providing additional details on ECM demolition and construction, expanding the firing range requirements to include a CCTV system, and clarifying site preparation and utility work.
  • The solicitation is being issued by the Department of the Navy's Naval Facilities Engineering Command for a design-build contract. The pre-proposal site visit was held on July 30, 2024.

View the file

Other files

File Type Posted
Attachment4_Revised BOQ_Amd0002_24R6725.xlsx XLSX spreadsheet
Released_amd1_N6274224R6725.pdf PDF
Exhibit D_BOQ_ 24R6725 Fillable.xlsx XLSX spreadsheet
Exhibit A_PPI_Fillable.docx DOCX document
RELEASED RFP 24R6725.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR6066388

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N6274224R6725 D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand

The amendment begins on the next page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Aug-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6274224R6725

X 9B. DATED (SEE ITEM 11)

22-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Aug-2024

CODE

NAVFAC ROICC THAILAND (US EMBASSY)

7 SATHORN TAI ROAD

BANGKOK 10120

N62742 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6274224R6725

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMD2 ANSWERS TO PPIS

Answers to Pre-Proposal Inquiries (PPIs) are provided in Attachment-01 Questions & Answers of this amendment.

As a result of the provided answers, Attachment-02, summarizing changes under Parts 3 & 6, Attachment -03 Revised Part 6 and Attachment – 04 Revised BOQ are incorporated into the solicitation.

The date set for receipt of proposals is unchanged and remains on August 27, 2024 at 1100am, Thailand Time.

All other paragraphs, provisions, and conditions remain unchanged.

The offeror must acknowledge receipt of this amendment.

(End of Summary of Changes)

Attachment 01 - Answers to PPIs Amendment 0002 - N6274224R6725

NO

Reference

(Sect/Para/Page)

QUESTIONS GOVERNMENT RESPONSE

1 Part 2, 22 b. Is there any known asbestos or lead in the buildings to be demolished?

No. See amendment 0001, Part 3, Section 5.2 CLIN 0002 Base Bid Item 0002: CONSTRUCT

AN EARTH-COVERAGE AMMUNITION

MAGAZINES (ECM) STORAGE, Section

5.2.3 ECM STORAGE, Add: e. There is no

known asbestos or lead in the buildings to be demolished.

2 Part 3, 5.1.1 b. “Vegetation shall be cleared around all structures to a distance of five meters.”

Contractor understands this provision applies to buildings and the ECM berm but not the firing range berm. Is this correct?

No. The provision applies to all buildings and structures including the firing range berms. Per Part 3, Section 5.1.1 CIVIL WORK, b:

Vegetation shall be cleared around all structures to a distance of five meters.

3 Part 3 (Parking)

5.1.3 b., 5.3 d.

“Provide…five (5) military trucks and five (5) cars” and “Provide… five (5) military trucks and ten (10) cars” for the Single-Story Training Facility and the Firing Range respectively. Since these two buildings are expected to be near each other does the parking requirement merge? Or is it cumulative? In other words, are spaces required for fifteen (15) cars and ten (10) military trucks for the complex?

Yes, it is cumulative. The total pavement parking space requires fifteen (15) cars and ten

(10) military trucks for the complex. Per Part 3, Section 5.1.3 TRAINING FACILITY, b.

Parking space and Section 5.3 RENOVATE AN EXISTING 25 METERS FIRING RANGE, d.

Parking space.

4 Part 3, 5.1.3 c. How many spares are desired in the electrical panel board? Without other information Contractor would consider providing two spare slots. Is this adequate?

The exact number of spares in the electrical panel board shall be determined based on the codes and standards specified in Part 3, Section

2.1, APPLICABLE CODES AND

STANDARDS.

5 Part 3, 5.2.3 ECM

STORAGE, 5.2.3

a.7

For ECM, Contractor understands the prescriptive information provided on the drawings in Part 6 are for ECM’s that have been successfully placed in service for similar purposes and is fit for purpose for this project. No blast analysis or design is required. Contractor understands the information on the drawings is “minimum required” and shall not, for instance, use wall thicknesses, roof thicknesses or door thicknesses less than shown.

Correct, blast analysis is not required. Yes, the information provided on the drawings in Part 6 is a minimum requirement per Part 3, Section 4.

PROJECT REQUIREMENTS: The RFP sets forth the minimum project requirements that the DB Contractor shall use to design, document, and construct a complete and usable facility.

Attachment 01 - Answers to PPIs Amendment 0002 - N6274224R6725

6 Part 3, 5.2.3 ECM

STORAGE

For ECM components not prescribed on the ECM drawings in Part 6, Contractor is responsible for analysis and design, e.g., the foundation.

Yes. The contractor is responsible for all analysis and design per Part 3, Section 4.

PROJECT REQUIREMENTS: The concept drawings in PART 6 of this RFP package are for information only and are not intended to be final, complete, and coordinated designs. As the Designer of Record (DOR), the DB Contractor shall provide a final, complete, and fully coordinated design by all applicable codes, regulations, and contract requirements.

7 Part 3, 5.2.3 ECM

STORAGE

The SDZ is not critical for this facility. Yes. Per Part 3, Section 5.2.3 ECM STORAGE, the SDZ is not critical for this facility.

8 MIL-HDBK-1027

2.2.5.3, Part 2 Warranty

“Maintain vegetation on berms and drainageways.” Contractor understands that Contractor is not responsible for maintenance of vegetation at any time after Final Acceptance. In other words, the 12-month warranty does not apply to vegetation. Correct?

The Contractor will not be responsible for maintaining vegetation after the government's final acceptance. Additionally, vegetation is not included in the one-year warranty.

9 MIL-HDBK-1027

2.2.8.2 c.

What vehicles are expected to need to access the area within the berm for maintenance?

There are no requirements for vehicle access within the berm area for maintenance purposes.

10 MIL-HDBK-1027

Fig. 2.2-7

Transverse spacing: 2.75 cc for rifles, 1.50 for pistols and shotguns.

Yes. Per Part 6 Attachment, MIL-HDBK-1027, Fig. 2.2-7, the transverse spacing is 2.75 cc for rifles and 1.50 cc for pistols and shotguns.

11 MIL-HDBK-1027

2.2.11.2 a., Fig. 2.2-

“Top width of berm shall be 3 meters.”

Contractor understands the 1.5 m dimension on the typical berm detail in Part 6 takes precedence. Is this correct?

Correct. Top width of berm shall be 1.5 m per Part 3, Section 5.3 RENOVATE AN EXISTING 25 METERS FIRING RANGE, a.

Back berm and side berm improvement.

Part 3 takes precedence over Part 6 per part 2, Section 5. Design, k. Design-Build Contract - Order of Precedence.

12 Section 00 10 000, h, Could you please provide the slide presentation from the Pre-proposal Conference and site visit?

No, the government will not provide the PowerPoint presentation, including the meeting minutes from the pre-proposal site visit.

D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand

Amendment 002 N6274224R6725 Attachment 02 Summary of Change

SUMMARY OF CHANGE

PART 3

STATEMENT OF WORK

Part 3, Section 3. SITE ANALYSIS, 3.1 EXISTING SITE CONDITIONS, Add:

Unexploded ordnance (UXO) Clearance: The Royal Thai Army will clear UXO, as needed, from the site locations before the contractor mobilizes.

Part 3, Section 1. PROJECT DESCRIPTION, Add:

All workers shall be of Thai nationality.

Part 3, Section 5.2 CLIN 0002 Base Bid Item 0002: CONSTRUCT AN EARTH-COVERAGE AMMUNITION MAGAZINES (ECM) STORAGE, 5.2.3 ECM STORAGE, Add:

e. Demolish existing building as shown in Part 6, attachment 6-1. The contractor shall return the removed materials from the existing building to the Royal Thai Army and remove the debris from the military base. There is no known asbestos or lead in the buildings to be demolished.

f. Construct a concrete access road from the front road to the ECM, with an approximate width of 6 m and a length of 80 m.

g. Construct a concrete road in front of the new ECM, with an approximate width of 6 m and a length of 360 m

Part 3, Section 5. 3 CLIN 0003 Base Bid Item 0003: RENOVATE AN EXISTING 25 METERS FIRING RANGE, a. Back berm and side berm improvement, 1), Change to:

1) Provide compacted soil and top the berms to construct the back and side berms to elevate the height to be approximately 6.00 m from ground for the back berm and 6.00 m high from ground for the side berms. The Royal Thai Army has permitted the contractor to cut down any trees that obstruct the work.

Part 3, Section 5. 3 CLIN 0003 Base Bid Item 0003: RENOVATE AN EXISTING 25 METERS FIRING RANGE, Add:

h. Road: Remove an existing road and construct a new access road for the 25 m Firing range.

Approximated road width is 4 m and length is100 m.

i. CCTV System

1) Provide and install a CCTV system for the shooting range training observation. The CCTV system is for training observation purposes to monitor training areas of the 25 m Firing range, display CCTV images to the training observer, record and store images for debriefing after training. The CCTV system shall meet the requirements as following:

a) Provide 10 (ten) day and night CCTV cameras. The cameras shall have infrared LEDs mounted on its housing or can accept the emission, produced by an infrared turret.

D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand

Amendment 002 N6274224R6725 Attachment 02 Summary of Change

b) The CCTV system shall operate full time to monitor the shooting training areas. For video training assessment, the appropriate cameras shall focus on the training area.

c) CCTV monitoring and controls shall provide monitoring and display control of live CCTV images from any CCTV camera. The CCTV system shall also provide controls to display and view recorded video imagery.

d) CCTV system shall provide digital video recording of all video imagery cameras 8 hours per day, seven days per week. The CCTV system shall be capable of storing up to fifteen

(15) days of video information of all connected CCTV cameras.

e) Provide and install cable supporting structures, including equipment racks, empty conduits with pull strings, junction boxes, outlet boxes, outlet connectors, and cover plates.

j. The contractor shall return the removed materials from the existing building to the Royal Thai Army and remove the debris from the military base.

PART 6

STATEMENT OF WORK

Add: Attachment 6-1

1. Photo: ECM building location/GPS: 14°48'25.0"N 100°41'16.4"E

2. Photo: Demolish existing buildings for the new ECM construction

3. Photo: Construct crush rock road in front of the new ECM, approximated length is 360 m

D/B Construct Training Facility, Earth Covered Magazine (ECM), Amendment 0002 - N6274224R6725 and Renovate Range, Lopburi Thailand Attachment 03 – Revised Part 6

Attachment 6-1

ECM building location/GPS: 14°48'25.0"N 100°41'16.4"E

ECM

ECM

D/B Construct Training Facility, Earth Covered Magazine (ECM), Amendment 0002 - N6274224R6725 and Renovate Range, Lopburi Thailand Attachment 03 – Revised Part 6

Remove the existing buildings for the new ECM construction

Construct a concrete road in front of the new ECM, approximated length is 360 m

REMOVE EXISTING BUILDINGS

CLIN 0001 CONSTRUCTION OF A SINGLE-STORY TRAINING FACILITY

CLIN 0002

CLIN 0003 RENOVATION OF AN EXISTING 25 METERS FIRING RANGE

GRAND TOTAL

CONSTRUCTION OF AN EARTH-COVERAGE AMMUNITION MAGAZINES (ECM) STORAGE

FOR OFFICIAL USE ONLY

Bill of Quantity Project Title N6274224R6725:D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand

ITEM

DESCRIPTION TOTAL

# SENSITIVE BUT UNCLASSIFIED

D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand Amendment 0002

Attachment 04 - Revised BOQ

NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)

A SUBSTRUCTURE

A10 FOUNDATION

- Excavation & backfill m3

- Piling work EA

- Reinforcing & structure steel kg

- Concrete m3

- Other (If any)

B SHELL

B10 SUPERSTRUCTURE

STRUCTURAL FRAMES, FLOOR DECK/SLABS

- Reinforcing & structure steel kg

- Concrete m3

- Other (If any)

ROOF STRUCTURES

- Reinforcing & structure steel kg

- Watertight roof sealant EA

- Other (If any)

B30 ROOFING

- Corrugated metal roof panels m2

- Gutters & downspouts m

- Roof heat insulation m2

- Other (If any)

C INTERIORS

IDENTIFYING DEVICES

- Project plaque with accessories EA

- Building sign/logos with accessories and signage lighting EA

STAIR CONSTRUCTION

- Exterior stair construction EA

- Other (If any)

FLOOR FINISHS

- Trowel finished concrete floor m2

D SERVICE

D50 ELECTRICAL

EE SERVICES & DISTRIBUTION

- EE Panelboards completed with CB and all accessories EA

LIGHTING & BRANCH WIRING

- Cable & wiring EA

- Receptacle outlet with accessories EA

- Lighting switches with accessories EA

- Lighting Fixtures, linear LED tube EA

- Other (If any)

OTHER ELECTRICAL SERVICES

- Grounding system EA

- Lightning protection system EA

G BUILDING WORKS

G10 SITE CLEARINGS

- Remove ground vegetation, tree removal, tree relocation, grubbing, clearing and debris disposal LOT

SITE DEMOLITION & RELOCATION

- Demolition the existing structures in construction area LOT

SITE EARTHWORK

- Grading/compaction and slope stabilization in construction area LOT

G20 ROADWAYS

- Reinforced concrete access roads m2

PARKING LOTS

- Reinforced concrete pavement including marking, signage, parking stops, and lighting for outdoor parking m2

G40 SITE ELECTRICAL UTILITIES

ELECTRICAL DISTRIBUTION

- Power transformer with all related equipments EA

- Overhead HV cables and all accessories EA

- LV cables and conduit to MDB EA

CLIN 0001: CONSTRUCTION OF A SINGLE-STORY TRAINING FACILITY

FOR OFFICIAL USE ONLY

Bill of Quantity Project

Title N6274224R6725: D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand

ITEM DESCRIPTION

QUANTITY MATERIAL COST LABOR COST TOTAL

SENSITIVE BUT UNCLASSIFIED

D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand Amendment 0002

- Metering and connection fee EA

X FIELD REQUIREMENTS

- Calculation and Design Drawings EA

- Construction permit & site clearance EA

- Site mobilization & demobilization EA

- Site topology survey EA

- Soil investigation & report EA

- Test & commisioning LOT

- Technical training to users EA

Included

$0 $0 $0

ENGINEERING ESTIMATE

TOTAL ITEM A-to-G-to-X

VAT

TOTAL CLIN 0001

Table 2: FIELD REQUIREMENTS (CLIN 0001)

DESCRIPTION

QUANTITY MATERIAL COST LABOR COST

SENSITIVE BUT UNCLASSIFIED

D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand Amendment 0002

A10 FOUNDATION

- Excavation & backfill m3

- Piling work EA

- Reinforcing & structure steel kg

- Concrete m3

- Other (If any)

B SHELL

B10 SUPERSTRUCTURE

STRUCTURAL FRAMES, FLOOR

- Reinforcing & structure steel kg

- Concrete m3

- Other (If any)

ROOF STRUCTURES

- Reinforcing & structure steel kg

- Concrete m3

- Other (If any)

B20 EXTERIOR WALLS

- Reinforcing & structure steel kg

- Concrete m3

- Drain cell and Geotextile m2

- Covered earth, compaction and erosion control m2

- Other (if any)

EXTERIOR DOOR

- ECM entrance door EA

C INTERIORS

C10 IDENTIFYING DEVICES

- Project plaque with accessories EA

- Building sign/logos with accessories and signage lighting EA

C30 FLOOR FINISHS

- Trowel finished concrete floor m2

D SERVICE

D30 HVAC

DISTRIBUTION SYSTEM

-Roof ventilation fan EA

D50 ELECTRICAL

EE SERVICES & DISTRIBUTION

- EE Panelboards completed with CB and all accessories EA

LIGHTING & BRANCH WIRING

- Cable & wiring EA

- Receptacle outlet with accessories EA

- Lighting switches with accessories EA

TOTAL

CLIN 0002: CONSTRUCTION OF AN EARTH-COVERAGE AMMUNITION MAGAZINES (ECM) STORAGE

FOR OFFICIAL USE ONLY

Bill of Quantity Project Title N6274224R6725: D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand

ITEM DESCRIPTION

QUANTITY MATERIAL COST LABOR COST

SENSITIVE BUT UNCLASSIFIED

D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand Amendment 0002

- Lighting Fixtures on perimeter fence EA

-High bay lighting fixture with concrete pole EA

- Other (If any)

COMMUNICATION AND SECURITY

- CCTV system for security EA

OTHER ELECTRICAL SERVICES

- Static grounding EA

- Grounding system EA

- Lightning protection system

EA

G BUILDING WORKS

G10 SITE CLEARINGS

- Remove ground vegetation, tree removal, tree relocation, grubbing, clearing and debris disposal LOT

SITE DEMOLITION & RELOCATION

- Demolition the existing structures in construction area LOT

SITE EARTHWORK

- Grading/compaction and slope stabilization in construction area LOT

G20 ROADWAYS

- Reinforced concrete access roads m2

- Concrete road in front of the new ECM m3

PARKING LOTS

- Reinforced concrete pavement including marking, signage, parking stops m2

FENCE AND GATE

-Perimeter fence m

-Vehicle gate Ea

G40 SITE ELECTRICAL UTILITIES

ELECTRICAL DISTRIBUTION

- Power transformer with all related equipments EA

- Overhead HV cables and all accessories EA

- LV cables and conduit to MDB EA

- Metering and connection fee EA

NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)

X FIELD REQUIREMENTS

- Calculation and Design Drawings EA

- Construction permit & site clearance EA

- Site mobilization & demobilization EA

- Site topology survey EA

- Soil investigation & report EA

- Test & commisioning LOT

- Technical training to users EA

Included

MATERIAL COST LABOR COST ENGINEERING ESTIMATE

TOTAL ITEM A-to-G-to-X

VAT

TOTAL CLIN 0002

Table 2: FIELD REQUIREMENTS (CLIN 0002)

DESCRIPTION

QUANTITY

SENSITIVE BUT UNCLASSIFIED

D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand Amendment 0002

A10 FOUNDATION

- Excavation & backfill m3

- Piling work EA

- Reinforcing & structure steel kg

- Concrete m3

- Other (if any)

B SHELL

B10 SUPERSTRUCTURE

ROOF STRUCTURES, STEEL STRUCTURE

- Structure steel kg

- Watertight roof sealant EA

- Other (If any)

B20 EXTERIOR WALLS, LOUVERS & SCREENS

- CMU walls m2

- Reinforcing & structure steel kg

- Mortar/cement plastering m2

- Exterior wall painting m2

- Other (if any)

EXTERIOR DOOR AND WINDOW

- Double swing panel non-corrosive steel door. EA

- Window EA

B30 ROOFING

- Corrugated metal roof panels m2

- Gutters & downspouts m

- Other (if any)

C INTERIORS

C10 IDENTIFYING DEVICES

- Project plaque with accessories EA

- Building nameplate with accessories EA

C30 WALL FINISHS

- Cement plastering wall finishes m2

- Painting finishes m2

TOTAL

CLIN 0003: RENOVATION OF AN EXISTING 25 METERS FIRING RANGE

ITEM DESCRIPTION

QUANTITY MATERIAL COST LABOR COST

FOR OFFICIAL USE ONLY

Bill of Quantity Project Title N6274224R6725: D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand

SENSITIVE BUT UNCLASSIFIED

D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand Amendment 0002

FLOOR FINISHS

- Trowel finished concrete floor m2

D SERVICES

D20 RAIN WATER DRAINAGE

- Rain water pipes & fitting EA

- Roof drains and all accessories EA

D50 ELECTRICAL

EE SERVICES & DISTRIBUTION

- Main Distribution Board with CB, metering and all control equipments EA

- EE Panelboards completed with CB and all accessories EA

- MTS with enclosure, control/protection and all accessorie EA

LIGHTING & BRANCH WIRING

- Cable & wiring EA

- Conduit & raceway EA

- Receptacle outlet with accessories EA

- Lighting switches with accessories EA

- Lighting Fixtures, linear LED tube with reflector EA

- Lighting Fixtures, Downlight LED with reflector EA

- Accessories LOT

CCTV SYSTEM

- Day and night vision waterproof outdoor type CCTV camera

- Control set

- Monitor

- UPS

- Cable and conduit

- Other (if any)

OTHER ELECTRICAL SERVICES

- Grounding system EA

- Lightning protection system

EA

E EQUIPMENT & FURNISHING

E20 FIXED FURNISHINGS

- Target bases m3

- Shooting targets EA

- Paddle targets EA

- Poppers EA

- Bleacher seating EA

G BUILDING WORKS

G10 SITE CLEARING

- Site clearing, tree and vegetation removal, grubbing and all related work LOT

SITE DEMOLITION & RELOCATION

SENSITIVE BUT UNCLASSIFIED

D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand Amendment 0002

- Demolition the existing firing line and other structures in construction area LOT

- Removing the debris from site LOT

SITE EARTHWORK

- Soil, compaction, transportation and machinery for target & side berms m3

- Slope surface compaction m2

- Grading/compaction LOT

- Erosion control EA

G20 ROADWAYS

- Reinforced concrete access roads m2

PARKING LOTS

- Reinforced concrete pavement including marking, signage, parking stops, and lighting for outdoor parking m2

G40 SITE ELECTRICAL UTILITIES

ELECTRICAL DISTRIBUTION

- Overhead LV cables and all accessories EA

- Overhead LV cables and conduit to MDB EA

- EE poles, crossarms, insulators and all accessories EA

- Metering and connection fee EA

NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)

X FIELD REQUIREMENTS

- Calculation and Design Drawings EA

- Construction permit & site clearance EA

- Site mobilization & demobilization EA

- Site topology survey EA

- Soil investigation & report EA

- Test & commisioning LOT

- Technical training to users EA

Included

TOTAL ITEM A-to-G-to-X

VAT

TOTAL CLIN 0003

Table 2: FIELD REQUIREMENTS (CLIN 0003)

DESCRIPTION

QUANTITY MATERIAL COST LABOR COST ENGINEERING ESTIMATE

SENSITIVE BUT UNCLASSIFIED

D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand Amendment 0002

Released SF 30_AMD0002_24R6725
Attachment1_amd2_6725
Attachment 02_Summary of change
Attachment 03_Revised Part 6
Attachment 04_24R6725 Revised BOQR1
24R6725 Sanitized BOQR1_5Aug24
324R6725 Sanitized BOQR1_5Aug24
424R6725 Sanitized BOQR1_5Aug24
524R6725 Sanitized BOQR1_5Aug24

File details come from the government source that posted it. Updated .