This document is a Bill of Quantities (BOQ) for a federal contract opportunity to construct a training facility, earth-covered ammunition magazine (ECM) storage, and renovate an existing 25-meter firing range in Lopburi, Thailand.
The key details include:
- The contract opportunity ID is N6274224R6725, issued by the Department of the Navy Naval Facilities Engineering Command.
- The contract has 3 major CLINs: 1) Construct a single-story training facility, 2) Construct an earth-covered ammunition magazine (ECM) storage, and 3) Renovate an existing 25-meter firing range.
- The BOQ provides detailed line items, quantities, unit costs, and total costs for the required construction and renovation work.
- A pre-proposal site visit is scheduled for July 30, 2024, and the closing date for pre-proposal inquiries is August 5, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Released_amd2_24R6725_PPI.pdf | ||
| Attachment4_Revised BOQ_Amd0002_24R6725.xlsx | XLSX spreadsheet | |
| Released_amd1_N6274224R6725.pdf | ||
| Exhibit A_PPI_Fillable.docx | DOCX document | |
| RELEASED RFP 24R6725.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| FOR OFFICIAL USE ONLY |
| BOQ |
Project Title N6274224R6725:D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand
ITEM DESCRIPTION TOTAL
CLIN 0001 CONSTRUCT A SINGLE-STORY TRAINING FACILITY
CLIN 0002 CONSTRUCT AN EARTH-COVERAGE AMMUNITION MAGAZINES (ECM) STORAGE
CLIN 0003 RENOVATEAN EXISTING 25 METERS FIRING RANGE
VAT Included
GRAND TOTAL
CLIN 0001 TRAINNING FAC
| FOR OFFICIAL USE ONLY |
| BOQ |
Project Title N6274224R6725: D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand
| ITEM | DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | TOTAL | ||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| CLIN 0001: CONSTRUCT A SINGLE-STORY TRAINING FACILITY | |||||||||
| A | SUBSTRUCTURE | ||||||||
| A10 | FOUNDATION | ||||||||
| - Excavation & backfill | m3 | ||||||||
| - Piling work | EA | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Other (If any) | |||||||||
| B | SHELL | ||||||||
| B10 | SUPERSTRUCTURE | ||||||||
| STRUCTURAL FRAMES, FLOOR DECK/SLABS | |||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Other (If any) | |||||||||
| ROOF STRUCTURES | |||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Watertight roof sealant | EA | ||||||||
| - Other (If any) | |||||||||
| B30 | ROOFING | ||||||||
| - Corrugated metal roof panels | m2 | ||||||||
| - Gutters & downspouts | m | ||||||||
| - Roof heat insulation | m2 | ||||||||
| - Other (If any) | |||||||||
| C | INTERIORS | ||||||||
| IDENTIFYING DEVICES | |||||||||
| - Project plaque with accessories | EA | ||||||||
| - Building sign/logos with accessories and signage lighting | EA | ||||||||
| STAIR CONSTRUCTION | |||||||||
| - Exterior stair construction | EA | ||||||||
| - Other (If any) | |||||||||
| FLOOR FINISHS | |||||||||
| - Trowel finished concrete floor | m2 | ||||||||
| D | SERVICE | ||||||||
| D50 | ELECTRICAL | ||||||||
| EE SERVICES & DISTRIBUTION | |||||||||
| - EE Panelboards completed with CB and all accessories | EA | ||||||||
| LIGHTING & BRANCH WIRING | |||||||||
| - Cable & wiring | EA | ||||||||
| - Receptacle outlet with accessories | EA | ||||||||
| - Lighting switches with accessories | EA | ||||||||
| - Lighting Fixtures, linear LED tube | EA | ||||||||
| - Other (If any) | |||||||||
| OTHER ELECTRICAL SERVICES | |||||||||
| - Grounding system | EA | ||||||||
| - Lightning protection system | EA | ||||||||
| G | BUILDING WORKS | ||||||||
| G10 | SITE CLEARINGS | ||||||||
| - Remove ground vegetation, tree removal, tree relocation, grubbing, clearing and debris disposal | LOT | ||||||||
| SITE DEMOLITION & RELOCATION | |||||||||
| - Demolition the existing structures in construction area | LOT | ||||||||
| SITE EARTHWORK | |||||||||
| - Grading/compaction and slope stabilization in construction area | LOT | ||||||||
| G20 | ROADWAYS | ||||||||
| - Reinforced concrete access roads | m | ||||||||
| PARKING LOTS | |||||||||
| - Reinforced concrete pavement including marking, signage, parking stops, and lighting for outdoor parking | m2 | ||||||||
| G40 | SITE ELECTRICAL UTILITIES | ||||||||
| ELECTRICAL DISTRIBUTION | |||||||||
| - Power transformer with all related equipments | EA | ||||||||
| - Overhead HV cables and all accessories | EA | ||||||||
| - LV cables and conduit to MDB | EA | ||||||||
| - Metering and connection fee | EA | ||||||||
| Table 2: FIELD REQUIREMENTS (CLIN 0001) | |||||||||
| DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| X | FIELD REQUIREMENTS | ||||||||
| - Calculation and Design Drawings | EA | ||||||||
| - Construction permit & site clearance | EA | ||||||||
| - Site mobilization & demobilization | EA | ||||||||
| - Site topology survey | EA | ||||||||
| - Soil investigation & report | EA | ||||||||
| - Test & commisioning | LOT | ||||||||
| - Technical training to users | EA | ||||||||
| TOTAL ITEM A-to-G-to-X | |||||||||
| VAT | Included | ||||||||
| TOTAL CLIN 0001 |
CLIN 0002 ECM
| FOR OFFICIAL USE ONLY |
| BOQ |
Project Title N6274224R6725: D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand
| ITEM | DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | TOTAL | ||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| CLIN 0002:CONSTRUCT AN EARTH-COVERAGE AMMUNITION MAGAZINES (ECM) STORAGE | |||||||||
| A | SUBSTRUCTURE | ||||||||
| A10 | FOUNDATION | ||||||||
| - Excavation & backfill | m3 | ||||||||
| - Piling work | EA | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Other (If any) | |||||||||
| B | SHELL | ||||||||
| B10 | SUPERSTRUCTURE | ||||||||
| STRUCTURAL FRAMES, FLOOR | |||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Other (If any) | |||||||||
| ROOF STRUCTURES | |||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Other (If any) | |||||||||
| B20 | EXTERIOR WALLS | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Drain cell and Geotextile | m2 | ||||||||
| - Covered earth, compaction and erosion control | m2 | ||||||||
| - Other (if any) | |||||||||
| EXTERIOR DOOR | |||||||||
| - ECM entrance door | EA |
| C | INTERIORS | ||||||||
| C10 | IDENTIFYING DEVICES | ||||||||
| - Project plaque with accessories | EA | ||||||||
| - Building sign/logos with accessories and signage lighting | EA | ||||||||
| C30 | FLOOR FINISHS | ||||||||
| - Trowel finished concrete floor | m2 | ||||||||
| D | SERVICE | ||||||||
| D30 | HVAC | ||||||||
| DISTRIBUTION SYSTEM | |||||||||
| -Roof ventilation fan | EA | ||||||||
| D50 | ELECTRICAL | ||||||||
| EE SERVICES & DISTRIBUTION | |||||||||
| - EE Panelboards completed with CB and all accessories | EA | ||||||||
| LIGHTING & BRANCH WIRING | |||||||||
| - Cable & wiring | EA | ||||||||
| - Receptacle outlet with accessories | EA | ||||||||
| - Lighting switches with accessories | EA | ||||||||
| - Lighting Fixtures on perimeter fence | EA | ||||||||
| -High bay lighting fixture with concrete pole | EA | ||||||||
| - Other (If any) | |||||||||
| COMMUNICATION AND SECURITY | |||||||||
| - CCTV system | EA | ||||||||
| OTHER ELECTRICAL SERVICES | |||||||||
| - Static grounding | EA | ||||||||
| - Grounding system | EA | ||||||||
| - Lightning protection system | EA | ||||||||
| G | BUILDING WORKS | ||||||||
| G10 | SITE CLEARINGS | ||||||||
| - Remove ground vegetation, tree removal, tree relocation, grubbing, clearing and debris disposal | LOT | ||||||||
| SITE DEMOLITION & RELOCATION | |||||||||
| - Demolition the existing structures in construction area | LOT | ||||||||
| SITE EARTHWORK | |||||||||
| - Grading/compaction and slope stabilization in construction area | LOT | ||||||||
| G20 | ROADWAYS | ||||||||
| - Reinforced concrete access roads | m2 | ||||||||
| PARKING LOTS | |||||||||
| - Reinforced concrete pavement including marking, signage, parking stops | m2 | ||||||||
| FENCE AND GATE | |||||||||
| -Perimeter fence | m | ||||||||
| -Vehicle gate | Ea | ||||||||
| G40 | SITE ELECTRICAL UTILITIES | ||||||||
| ELECTRICAL DISTRIBUTION | |||||||||
| - Power transformer with all related equipments | EA | ||||||||
| - Overhead HV cables and all accessories | EA | ||||||||
| - LV cables and conduit to MDB | EA | ||||||||
| - Metering and connection fee | EA | ||||||||
| Table 2: FIELD REQUIREMENTS (CLIN 0002) | |||||||||
| DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| X | FIELD REQUIREMENTS | ||||||||
| - Calculation and Design Drawings | EA | ||||||||
| - Construction permit & site clearance | EA | ||||||||
| - Site mobilization & demobilization | EA | ||||||||
| - Site topology survey | EA | ||||||||
| - Soil investigation & report | EA | ||||||||
| - Test & commisioning | LOT | ||||||||
| - Technical training to users | EA | ||||||||
| TOTAL ITEM A-to-G-to-X | |||||||||
| VAT | Included | ||||||||
| TOTAL CLIN 0002 |
CLIN 0003 25 M FIRING RANGE
| FOR OFFICIAL USE ONLY |
| BOQ |
Project Title N6274224R6725:D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand
| ITEM | DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | TOTAL | ||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| CLIN 0003: RENOVATEAN EXISTING 25 METERS FIRING RANGE | |||||||||
| A | SUBSTRUCTURE | ||||||||
| A10 | FOUNDATION | ||||||||
| - Excavation & backfill | m3 | ||||||||
| - Piling work | EA | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Other (if any) | |||||||||
| B | SHELL | ||||||||
| B10 | SUPERSTRUCTURE | ||||||||
| ROOF STRUCTURES, STEEL STRUCTURE | |||||||||
| - Structure steel | kg | ||||||||
| - Watertight roof sealant | EA | ||||||||
| - Other (If any) | |||||||||
| B20 | EXTERIOR WALLS, LOUVERS & SCREENS | ||||||||
| - CMU walls | m2 | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Mortar/cement plastering | m2 | ||||||||
| - Exterior wall painting | m2 | ||||||||
| - Other (if any) | |||||||||
| EXTERIOR DOOR AND WINDOW | |||||||||
| - Double swing panel non-corrosive steel door. | EA | ||||||||
| - Window | EA | ||||||||
| B30 | ROOFING | ||||||||
| - Corrugated metal roof panels | m2 | ||||||||
| - Gutters & downspouts | m | ||||||||
| - Other (if any) | |||||||||
| C | INTERIORS | ||||||||
| C10 | IDENTIFYING DEVICES | ||||||||
| - Project plaque with accessories | EA | ||||||||
| - Building nameplate with accessories | EA | ||||||||
| C30 | WALL FINISHS | ||||||||
| - Cement plastering wall finishes | m2 | ||||||||
| - Painting finishes | m2 | ||||||||
| FLOOR FINISHS | |||||||||
| - Trowel finished concrete floor | m2 | ||||||||
| D | SERVICES | ||||||||
| D20 | RAIN WATER DRAINAGE | ||||||||
| - Rain water pipes & fitting | EA | ||||||||
| - Roof drains and all accessories | EA | ||||||||
| D50 | ELECTRICAL | ||||||||
| EE SERVICES & DISTRIBUTION | |||||||||
| - Main Distribution Board with CB, metering and all control equipments | EA | ||||||||
| - EE Panelboards completed with CB and all accessories | EA | ||||||||
| - MTS with enclosure, control/protection and all accessorie | EA | ||||||||
| LIGHTING & BRANCH WIRING | |||||||||
| - Cable & wiring | EA | ||||||||
| - Conduit & raceway | EA | ||||||||
| - Receptacle outlet with accessories | EA | ||||||||
| - Lighting switches with accessories | EA | ||||||||
| - Lighting Fixtures, linear LED tube with reflector | EA | ||||||||
| - Lighting Fixtures, Downlight LED with reflector | EA | ||||||||
| - Accessories | LOT | ||||||||
| OTHER ELECTRICAL SERVICES | |||||||||
| - Grounding system | EA | ||||||||
| - Lightning protection system | EA | ||||||||
| E | EQUIPMENT & FURNISHING | ||||||||
| E20 | FIXED FURNISHINGS | ||||||||
| - Target bases | m3 | ||||||||
| - Shooting targets | EA | ||||||||
| - Paddle targets | EA | ||||||||
| - Poppers | EA | ||||||||
| - Bleacher seating | EA | ||||||||
| G | BUILDING WORKS | ||||||||
| G10 | SITE CLEARING | ||||||||
| - Site clearing, tree and vegetation removal, grubbing and all related work | LOT | ||||||||
| SITE DEMOLITION & RELOCATION | |||||||||
| - Demolition the existing firing line and other structures in construction area | LOT | ||||||||
| - Removing the debris from site | LOT | ||||||||
| SITE EARTHWORK | |||||||||
| - Soil, compaction, transportation and machinery for target & side berms | m3 | ||||||||
| - Slope surface compaction | m2 | ||||||||
| - Grading/compaction | LOT | ||||||||
| - Erosion control | EA | ||||||||
| G40 | SITE ELECTRICAL UTILITIES | ||||||||
| ELECTRICAL DISTRIBUTION | |||||||||
| - Overhead LV cables and all accessories | EA | ||||||||
| - Overhead LV cables and conduit to MDB | EA | ||||||||
| - EE poles, crossarms, insulators and all accessories | EA | ||||||||
| - Metering and connection fee | EA | ||||||||
| Table 2: FIELD REQUIREMENTS (CLIN 0003) | |||||||||
| DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| X | FIELD REQUIREMENTS | ||||||||
| - Calculation and Design Drawings | EA | ||||||||
| - Construction permit & site clearance | EA | ||||||||
| - Site mobilization & demobilization | EA | ||||||||
| - Site topology survey | EA | ||||||||
| - Soil investigation & report | EA | ||||||||
| - Test & commisioning | LOT | ||||||||
| - Technical training to users | EA | ||||||||
| TOTAL ITEM A-to-G-to-X | |||||||||
| VAT | Included | ||||||||
| TOTAL CLIN 0003 |