This document is a Bill of Quantity for a federal contract opportunity to construct a training facility, earth-covered magazine (ECM) storage, and renovate an existing 25-meter firing range in Lopburi, Thailand. The contract is solicited under Solicitation Number N6274224R6725 by the Department of the Navy Naval Facilities Engineering Command.
The Bill of Quantity provides detailed line items for the construction and renovation work, including quantities, material and labor costs, and total estimated costs for each CLIN (Contract Line Item Number). CLIN 0001 covers construction of a single-story training facility, CLIN 0002 covers construction of an earth-covered ammunition magazine (ECM) storage, and CLIN 0003 covers renovation of an existing 25-meter firing range. The document also includes field requirements such as design drawings, site surveys, and testing. A pre-proposal site visit is scheduled for July 30, 2024, and the closing date for pre-proposal inquiries is August 5, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Released_amd2_24R6725_PPI.pdf | ||
| Released_amd1_N6274224R6725.pdf | ||
| Exhibit D_BOQ_ 24R6725 Fillable.xlsx | XLSX spreadsheet | |
| Exhibit A_PPI_Fillable.docx | DOCX document | |
| RELEASED RFP 24R6725.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| FOR OFFICIAL USE ONLY |
| Bill of Quantity |
Project Title N6274224R6725:D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand
ITEM DESCRIPTION TOTAL
CLIN 0001 CONSTRUCTION OF A SINGLE-STORY TRAINING FACILITY
CLIN 0002 CONSTRUCTION OF AN EARTH-COVERAGE AMMUNITION MAGAZINES (ECM) STORAGE
CLIN 0003 RENOVATION OF AN EXISTING 25 METERS FIRING RANGE
GRAND TOTAL
_x000D_&1#&"Calibri"&14&K000000 SENSITIVE BUT UNCLASSIFIED
CLIN 0001 TRAINING FAC
| FOR OFFICIAL USE ONLY |
| Bill of Quantity |
Project Title N6274224R6725: D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand
| ITEM | DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | TOTAL | ||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| CLIN 0001: CONSTRUCTION OF A SINGLE-STORY TRAINING FACILITY | |||||||||
| A | SUBSTRUCTURE | ||||||||
| A10 | FOUNDATION | ||||||||
| - Excavation & backfill | m3 | ||||||||
| - Piling work | EA | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Other (If any) | |||||||||
| B | SHELL | ||||||||
| B10 | SUPERSTRUCTURE | ||||||||
| STRUCTURAL FRAMES, FLOOR DECK/SLABS | |||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Other (If any) | |||||||||
| ROOF STRUCTURES | |||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Watertight roof sealant | EA | ||||||||
| - Other (If any) | |||||||||
| B30 | ROOFING | ||||||||
| - Corrugated metal roof panels | m2 | ||||||||
| - Gutters & downspouts | m | ||||||||
| - Roof heat insulation | m2 | ||||||||
| - Other (If any) | |||||||||
| C | INTERIORS | ||||||||
| IDENTIFYING DEVICES | |||||||||
| - Project plaque with accessories | EA | ||||||||
| - Building sign/logos with accessories and signage lighting | EA | ||||||||
| STAIR CONSTRUCTION | |||||||||
| - Exterior stair construction | EA | ||||||||
| - Other (If any) | |||||||||
| FLOOR FINISHS | |||||||||
| - Trowel finished concrete floor | m2 | ||||||||
| D | SERVICE | ||||||||
| D50 | ELECTRICAL | ||||||||
| EE SERVICES & DISTRIBUTION | |||||||||
| - EE Panelboards completed with CB and all accessories | EA | ||||||||
| LIGHTING & BRANCH WIRING | |||||||||
| - Cable & wiring | EA | ||||||||
| - Receptacle outlet with accessories | EA | ||||||||
| - Lighting switches with accessories | EA | ||||||||
| - Lighting Fixtures, linear LED tube | EA | ||||||||
| - Other (If any) | |||||||||
| OTHER ELECTRICAL SERVICES | |||||||||
| - Grounding system | EA | ||||||||
| - Lightning protection system | EA | ||||||||
| G | BUILDING WORKS | ||||||||
| G10 | SITE CLEARINGS | ||||||||
| - Remove ground vegetation, tree removal, tree relocation, grubbing, clearing and debris disposal | LOT | ||||||||
| SITE DEMOLITION & RELOCATION | |||||||||
| - Demolition the existing structures in construction area | LOT | ||||||||
| SITE EARTHWORK | |||||||||
| - Grading/compaction and slope stabilization in construction area | LOT | ||||||||
| G20 | ROADWAYS | ||||||||
| - Reinforced concrete access roads | m2 | ||||||||
| PARKING LOTS | |||||||||
| - Reinforced concrete pavement including marking, signage, parking stops, and lighting for outdoor parking | m2 | ||||||||
| G40 | SITE ELECTRICAL UTILITIES | ||||||||
| ELECTRICAL DISTRIBUTION | |||||||||
| - Power transformer with all related equipments | EA | ||||||||
| - Overhead HV cables and all accessories | EA | ||||||||
| - LV cables and conduit to MDB | EA | ||||||||
| - Metering and connection fee | EA | ||||||||
| Table 2: FIELD REQUIREMENTS (CLIN 0001) | |||||||||
| DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| X | FIELD REQUIREMENTS | ||||||||
| - Calculation and Design Drawings | EA | ||||||||
| - Construction permit & site clearance | EA | ||||||||
| - Site mobilization & demobilization | EA | ||||||||
| - Site topology survey | EA | ||||||||
| - Soil investigation & report | EA | ||||||||
| - Test & commisioning | LOT | ||||||||
| - Technical training to users | EA | ||||||||
| TOTAL ITEM A-to-G-to-X | |||||||||
| VAT | Included | ||||||||
| TOTAL CLIN 0001 | $0 | $0 | $0 |
CLIN 0002 ECM
| FOR OFFICIAL USE ONLY |
| Bill of Quantity |
Project Title N6274224R6725: D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand
| ITEM | DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | TOTAL | ||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| CLIN 0002: CONSTRUCTION OF AN EARTH-COVERAGE AMMUNITION MAGAZINES (ECM) STORAGE | |||||||||
| A | SUBSTRUCTURE | ||||||||
| A10 | FOUNDATION | ||||||||
| - Excavation & backfill | m3 | ||||||||
| - Piling work | EA | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Other (If any) | |||||||||
| B | SHELL | ||||||||
| B10 | SUPERSTRUCTURE | ||||||||
| STRUCTURAL FRAMES, FLOOR | |||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Other (If any) | |||||||||
| ROOF STRUCTURES | |||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Other (If any) | |||||||||
| B20 | EXTERIOR WALLS | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Drain cell and Geotextile | m2 | ||||||||
| - Covered earth, compaction and erosion control | m2 | ||||||||
| - Other (if any) | |||||||||
| EXTERIOR DOOR | |||||||||
| - ECM entrance door | EA |
| C | INTERIORS | ||||||||
| C10 | IDENTIFYING DEVICES | ||||||||
| - Project plaque with accessories | EA | ||||||||
| - Building sign/logos with accessories and signage lighting | EA | ||||||||
| C30 | FLOOR FINISHS | ||||||||
| - Trowel finished concrete floor | m2 | ||||||||
| D | SERVICE | ||||||||
| D30 | HVAC | ||||||||
| DISTRIBUTION SYSTEM | |||||||||
| -Roof ventilation fan | EA | ||||||||
| D50 | ELECTRICAL | ||||||||
| EE SERVICES & DISTRIBUTION | |||||||||
| - EE Panelboards completed with CB and all accessories | EA | ||||||||
| LIGHTING & BRANCH WIRING | |||||||||
| - Cable & wiring | EA | ||||||||
| - Receptacle outlet with accessories | EA | ||||||||
| - Lighting switches with accessories | EA | ||||||||
| - Lighting Fixtures on perimeter fence | EA | ||||||||
| -High bay lighting fixture with concrete pole | EA | ||||||||
| - Other (If any) | |||||||||
| COMMUNICATION AND SECURITY | |||||||||
| - CCTV system for security | EA | ||||||||
| OTHER ELECTRICAL SERVICES | |||||||||
| - Static grounding | EA | ||||||||
| - Grounding system | EA | ||||||||
| - Lightning protection system | EA | ||||||||
| G | BUILDING WORKS | ||||||||
| G10 | SITE CLEARINGS | ||||||||
| - Remove ground vegetation, tree removal, tree relocation, grubbing, clearing and debris disposal | LOT | ||||||||
| SITE DEMOLITION & RELOCATION | |||||||||
| - Demolition the existing structures in construction area | LOT | ||||||||
| SITE EARTHWORK | |||||||||
| - Grading/compaction and slope stabilization in construction area | LOT | ||||||||
| G20 | ROADWAYS | ||||||||
| - Reinforced concrete access roads | m2 | ||||||||
| - Concrete road in front of the new ECM | m3 | ||||||||
| PARKING LOTS | |||||||||
| - Reinforced concrete pavement including marking, signage, parking stops | m2 | ||||||||
| FENCE AND GATE | |||||||||
| -Perimeter fence | m | ||||||||
| -Vehicle gate | Ea | ||||||||
| G40 | SITE ELECTRICAL UTILITIES | ||||||||
| ELECTRICAL DISTRIBUTION | |||||||||
| - Power transformer with all related equipments | EA | ||||||||
| - Overhead HV cables and all accessories | EA | ||||||||
| - LV cables and conduit to MDB | EA | ||||||||
| - Metering and connection fee | EA | ||||||||
| Table 2: FIELD REQUIREMENTS (CLIN 0002) | |||||||||
| DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| X | FIELD REQUIREMENTS | ||||||||
| - Calculation and Design Drawings | EA | ||||||||
| - Construction permit & site clearance | EA | ||||||||
| - Site mobilization & demobilization | EA | ||||||||
| - Site topology survey | EA | ||||||||
| - Soil investigation & report | EA | ||||||||
| - Test & commisioning | LOT | ||||||||
| - Technical training to users | EA | ||||||||
| TOTAL ITEM A-to-G-to-X | |||||||||
| VAT | Included | ||||||||
| TOTAL CLIN 0002 |
CLIN 0003 25 M FIRING RANGE
| FOR OFFICIAL USE ONLY |
| Bill of Quantity |
Project Title N6274224R6725: D/B Construct Training Facility, Earth Covered Magazine (ECM), and Renovate Range, Lopburi Thailand
| ITEM | DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | TOTAL | ||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| CLIN 0003: RENOVATION OF AN EXISTING 25 METERS FIRING RANGE | |||||||||
| A | SUBSTRUCTURE | ||||||||
| A10 | FOUNDATION | ||||||||
| - Excavation & backfill | m3 | ||||||||
| - Piling work | EA | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Concrete | m3 | ||||||||
| - Other (if any) | |||||||||
| B | SHELL | ||||||||
| B10 | SUPERSTRUCTURE | ||||||||
| ROOF STRUCTURES, STEEL STRUCTURE | |||||||||
| - Structure steel | kg | ||||||||
| - Watertight roof sealant | EA | ||||||||
| - Other (If any) | |||||||||
| B20 | EXTERIOR WALLS, LOUVERS & SCREENS | ||||||||
| - CMU walls | m2 | ||||||||
| - Reinforcing & structure steel | kg | ||||||||
| - Mortar/cement plastering | m2 | ||||||||
| - Exterior wall painting | m2 | ||||||||
| - Other (if any) | |||||||||
| EXTERIOR DOOR AND WINDOW | |||||||||
| - Double swing panel non-corrosive steel door. | EA | ||||||||
| - Window | EA | ||||||||
| B30 | ROOFING | ||||||||
| - Corrugated metal roof panels | m2 | ||||||||
| - Gutters & downspouts | m | ||||||||
| - Other (if any) | |||||||||
| C | INTERIORS | ||||||||
| C10 | IDENTIFYING DEVICES | ||||||||
| - Project plaque with accessories | EA | ||||||||
| - Building nameplate with accessories | EA | ||||||||
| C30 | WALL FINISHS | ||||||||
| - Cement plastering wall finishes | m2 | ||||||||
| - Painting finishes | m2 | ||||||||
| FLOOR FINISHS | |||||||||
| - Trowel finished concrete floor | m2 | ||||||||
| D | SERVICES | ||||||||
| D20 | RAIN WATER DRAINAGE | ||||||||
| - Rain water pipes & fitting | EA | ||||||||
| - Roof drains and all accessories | EA | ||||||||
| D50 | ELECTRICAL | ||||||||
| EE SERVICES & DISTRIBUTION | |||||||||
| - Main Distribution Board with CB, metering and all control equipments | EA | ||||||||
| - EE Panelboards completed with CB and all accessories | EA | ||||||||
| - MTS with enclosure, control/protection and all accessorie | EA | ||||||||
| LIGHTING & BRANCH WIRING | |||||||||
| - Cable & wiring | EA | ||||||||
| - Conduit & raceway | EA | ||||||||
| - Receptacle outlet with accessories | EA | ||||||||
| - Lighting switches with accessories | EA | ||||||||
| - Lighting Fixtures, linear LED tube with reflector | EA | ||||||||
| - Lighting Fixtures, Downlight LED with reflector | EA | ||||||||
| - Accessories | LOT | ||||||||
| CCTV SYSTEM | |||||||||
| - Day and night vision waterproof outdoor type CCTV camera | |||||||||
| - Control set | |||||||||
| - Monitor | |||||||||
| - UPS | |||||||||
| - Cable and conduit | |||||||||
| - Other (if any) | |||||||||
| OTHER ELECTRICAL SERVICES | |||||||||
| - Grounding system | EA | ||||||||
| - Lightning protection system | EA | ||||||||
| E | EQUIPMENT & FURNISHING | ||||||||
| E20 | FIXED FURNISHINGS | ||||||||
| - Target bases | m3 | ||||||||
| - Shooting targets | EA | ||||||||
| - Paddle targets | EA | ||||||||
| - Poppers | EA | ||||||||
| - Bleacher seating | EA | ||||||||
| G | BUILDING WORKS | ||||||||
| G10 | SITE CLEARING | ||||||||
| - Site clearing, tree and vegetation removal, grubbing and all related work | LOT | ||||||||
| SITE DEMOLITION & RELOCATION | |||||||||
| - Demolition the existing firing line and other structures in construction area | LOT | ||||||||
| - Removing the debris from site | LOT | ||||||||
| SITE EARTHWORK | |||||||||
| - Soil, compaction, transportation and machinery for target & side berms | m3 | ||||||||
| - Slope surface compaction | m2 | ||||||||
| - Grading/compaction | LOT | ||||||||
| - Erosion control | EA | ||||||||
| G20 | ROADWAYS | ||||||||
| - Reinforced concrete access roads | m2 | ||||||||
| PARKING LOTS | |||||||||
| - Reinforced concrete pavement including marking, signage, parking stops, and lighting for outdoor parking | m2 | ||||||||
| G40 | SITE ELECTRICAL UTILITIES | ||||||||
| ELECTRICAL DISTRIBUTION | |||||||||
| - Overhead LV cables and all accessories | EA | ||||||||
| - Overhead LV cables and conduit to MDB | EA | ||||||||
| - EE poles, crossarms, insulators and all accessories | EA | ||||||||
| - Metering and connection fee | EA | ||||||||
| Table 2: FIELD REQUIREMENTS (CLIN 0003) | |||||||||
| DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| X | FIELD REQUIREMENTS | ||||||||
| - Calculation and Design Drawings | EA | ||||||||
| - Construction permit & site clearance | EA | ||||||||
| - Site mobilization & demobilization | EA | ||||||||
| - Site topology survey | EA | ||||||||
| - Soil investigation & report | EA | ||||||||
| - Test & commisioning | LOT | ||||||||
| - Technical training to users | EA | ||||||||
| TOTAL ITEM A-to-G-to-X | |||||||||
| VAT | Included | ||||||||
| TOTAL CLIN 0003 |