N6274224R6723_0001 released.pdf
PDF 567 KB Posted
- Attached to
- D/B Construct Finger Pier, Lami, Fiji
- Solicitation number
- N6274224R6723
About this file
This document is an Amendment (Amendment 0001) to Solicitation N6274224R6723 for the D/B Construct Finger Pier project in Lami, Fiji. The key changes include:
- The proposal due date remains unchanged at August 19, 2024 by 11:00 AM Thailand time.
- The period of performance for the base bid construction has been extended from 360 to 420 calendar days.
- The Statement of Work was revised, including changes to the pier specifications, key personnel requirements, and site preparation tasks.
- A new conceptual drawing for the finger pier was provided in the attachments.
- The delivery location and other administrative details were updated.
All other terms and conditions of the solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6274224R6723_0003 CNX the RFP.pdf | ||
| N6274224R6723_0002 released.pdf | ||
| Exhibit D - BoQ.xlsx | XLSX spreadsheet | |
| N6274224R6723 released.pdf | ||
| BAR_Base Access Request_Form_FIJI.docx | DOCX document | |
| EXHIBIT A-D.pdf | ||
| Exhibit A Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR6065902
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N6274224R6723 D/B Construct Finger Pier, Lami, Fiji.
Detail of Amendment 0001 continued on the next page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6274224R6723
X 9B. DATED (SEE ITEM 11)
17-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Aug-2024
CODE
NAVFAC ROICC THAILAND (US EMBASSY)
7 SATHORN TAI ROAD
BANGKOK THAILAND 10120
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274224R6723
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMD 0001 SOW
The following changes will be considered part of this solicitation:
A. Proposal due date is unchanged and remains 19 August 2024, no later than 11:00 a.m. Thailand time.
B. The following changes are hereby incorporated to solicitation, Parts 3 and 6 under this solicitation.
PART 3
STATEMENT OF WORKS
1. On Page 1 of 10 under item 01 PROJECT DESCRIPTION;
Replaced as follows:
This is a design- build project to provide complete design and construction of a new finger pier in Lami, Fiji.
The project consists of new construction of T-shaped 50-meter length finger pier with a gangway. The floating deck and gangway will be made of marine grade aluminum supported with precast concrete piles. The pier will be equipped with ten (10) power and water pedestals.
The facility requires energy saving lighting and water saving plumbing system. Materials used shall be high quality and require little or no maintenance once installed. The facility shall have the appearance of cleanliness and professionalism upon completion.
After award, this Statement of Work (SOW) may be modified as determined by the Contracting Officer to address unforeseen conditions or further refine the requirements to better accomplish the project objectives based on new information realized during the administration of the contract.
Period of Performance for complete design and construction:
CLIN 0001: BASE BID ITEM 0001- CONSTRUCTION OF FINGER PIER, 360 420 Calendar days.
Once final design has been approved by the Contracting Officer, the design package will be delivered to the Fiji Police Force (FPF) for their review and acceptance. FPF design review is scheduled for 60 calendar days after the design package is delivered to the FPF. Mobilization and construction shall not begin until the FPF accepts the final design, the local installation commander authorizes the contractor permission to access the site for mobilization and construction, and the Contracting Officer agrees. The contractor may be allowed to mobilize sooner if design acceptance and installation access are granted sooner, all preconstruction submittals are completed, and the construction schedule is updated to reflect additional float. The Contractor shall schedule work accordingly to cause the least amount of interference with normal base operations.
Contractor shall consider at least ten (10) days work’s interruption due to base operations.
2. On Page 4 of 10 under section KEY PERSONNEL;
KEY PERSONNEL:
This project will require the following management personnel (check one):
Dedicated Superintendent, Dedicated Quality Control Manager, and Dedicated Site Safety Health Officer (3 different people on site during production at all times)
Dedicated Superintendent and Dedicated Quality Control Manager; Superintendent may serve as Site
Safety Health Officer if qualified but not Quality Control Manager (2 different people on site during production at all times)
Triple-Hat Superintendent, Quality Control Manager, and Site Safety Health Officer (1 person on site during production at all times)
To:
KEY PERSONNEL:
This project will require the following management personnel (check one):
Dedicated Superintendent, Dedicated Quality Control Manager, and Dedicated Site Safety Health Officer (3 different people on site during production at all times)
Dedicated Superintendent and Dedicated Quality Control Manager; Superintendent may serve as Site
Safety Health Officer if qualified but not Quality Control Manager (2 different people on site during production at all times)
Triple-Hat Superintendent, Quality Control Manager, and Site Safety Health Officer (1 person on site during production at all times)
3. On Page 7 of 10 under item B10 SUPERSTRUCTURE;
a. Provide and install T-shaped straight aluminum finger pier with total length approximately 50 meter long and 3 meter wide as shown in the conceptual drawing in Part 6.
b. The finger pier shall be equipped with gangway and the decking shall be pine treated.
c. The gangway shall be laterally restrained to prevent deflection and sideways movement under the vertical service loadings. The gangway shall be equipped with handrail.
d. The finger pier shall have positive flotation and be designed according to ASCE 7 or AS3962.
Environmental (wave, wind, and current) and berthing load shall be considered in the design.
e. The material shall be marine grade aluminum with minimum thickness 5.5 mm for all parts.
4. On Page 9 of 10 under item G10 SITE PREPARATION;
a. The Contractor is required to perform a topographic survey of the project area that will be impacted by his/her work. This topographic survey shall be included in the contractor’s design plans. Topographic and utility surveys to include surveys of the existing size and a capability assessment of existing utilities (power, water, sanitary, etc.) around the immediate vicinity of the building site for connection and support of utilities requirements for the new facility and services. Prior to starting work, physically verify the location of all existing utilities and obtain all additional survey data required to provide a quality final design. The Contractor shall verify the location of all utilities prior to construction. Minimize the impact of construction activity on operations and neighboring facilities.
b. The contractor shall apply and obtain all appropriate permits and clearances from local governing authority and pay fees including but are not limited to environmental preservation and social fees due to secure permits and approvals and other services from the local governing authority and comply with all other related laws and regulations applicable in Indonesia Fiji before commencement of any part of the work.
c. The contractor shall repair damages which occur from all works done and affected by this project.
d. The contractor is responsible to have control over their workforces and subcontractors’ behavior to maintain proper professional ethics and attitudes within project site. This is to include awareness to not disturb or commit violence and vandalism to the local community area adjacent to the project site.
e. The contractor is required to provide temporary site facilities including but not limited to site office with meeting room, enclosed material and equipment storage, toilets, and temporary worker camp. Those facilities should be structurally sound, safe, and comfortable to support human activities.
f. The contractor shall provide temporary utility services (i.e., water, electric, etc.) required for construction and to support temporary facilities and bear all associated costs for connection, installation, and usage bills to include administration fees and coordination effort with local authorities.
PART 6
ATTACHMENTS
5. On Page 3 of 10, Figure 6.2 Conceptual Drawing – replaced with a new conceptual drawing.
C. All other terms and conditions remain the same.
SECTION 00 10 00 - SOLICITATION
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
360 dys. ADC 1 NAVFAC ROICC THAILAND
WILLY SANJAYA
US EMBASSY JAKARTA
ANNEX BUILDING
JALAN BUDI KEMULIAAN 1/1
JAKARTA INDONESIA 10110
6221-3435-9617 FOB: Destination
N62742
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
420 dys. ADC 1 NAVFAC ROICC THAILAND
WILLY SANJAYA
US EMBASSY JAKARTA
ANNEX BUILDING
JALAN BUDI KEMULIAAN 1/1
JAKARTA INDONESIA 10110
6221-3435-9617 FOB: Destination
N62742
(End of Summary of Changes)
D/B Construct Finger Pier, Lami, Fiji N6274224R6723_0001 Part 6
Amendment 0001
PART 6
ATTACHMENT
1. On Page 3 of 10, Figure 6.2 Conceptual Drawing: Replaced with
Hangar Door Hangar Door
50 meter
Finger Pier
Gangway
| Amd 0001 _Part 6.pdf |
| 1. On Page 3 of 10, Figure 6.2 Conceptual Drawing: Replaced with |