This document appears to be an Exhibit D - Bill of Quantity for a federal construction contract opportunity. The contract is for the Design/Build Construction of a Finger Pier in Lami, Fiji, with Solicitation Number N6274224R6723.

The Bill of Quantity provides a detailed breakdown of the required construction activities and associated material, labor, and engineering cost estimates. Key items include driven precast concrete piles, aluminum deck and rail, plumbing and electrical work, and various site preparation activities. The total contract is for the Construction of Finger Pier, which is the sole CLIN (Contract Line Item Number).

The related federal contract opportunity indicates this is a solicitation being issued by the Department of the Navy, Naval Facilities Engineering Command. A pre-solicitation site visit is scheduled for July 31, 2024, and interested parties must submit a list of attendees by July 25, 2024. The exhibit and bill of quantity appear to be provided as attachments to this solicitation for use by offerors in preparing their proposals.

View the file

Other files

File Type Posted
N6274224R6723_0003 CNX the RFP.pdf PDF
N6274224R6723_0002 released.pdf PDF
N6274224R6723_0001 released.pdf PDF
N6274224R6723 released.pdf PDF
BAR_Base Access Request_Form_FIJI.docx DOCX document
EXHIBIT A-D.pdf PDF
Exhibit A Pre Proposal Inquiry Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BILL OF QUANTITY DATE PREPARED

ACTIVITY AND LOCATION:CONSTRUCTION CONTRACT NO.ID NO.
Lami, FijiN6274224R6723
ESTIMATED BYCATEGORY CODE
PROJECT TITLE:NO
D/B Construction of Finger PierSTATUS OF DESIGNJOB ORDER NO.
CLIN 001 Construction of Finger PierQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
A10FOUNDATIONS
A1010Driven precast concrete piles (22 meter)unit
Soil compactionsq.m
B10SUPERSTRUCTURE
Aluminium deck, rail, and its accessoriesunit
Gangwayunit
D20PLUMBING
D2020Clean water distribution linesls
Water pump and other accessoriesls
D50ELECTRICAL
D5010Electrical Service and Distributionls
D5020Lighting & Branch Wiringls
E10EQUIPMENTS
Marine power and water pedestalsunit
F10SPECIAL CONSTRUCTION
Name sign and project plaqueunit
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10Field Requirements
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 001 Construction of Finger PierQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1010Site Clearingls
G1030Mobilizationls
De-mobilizationls
Soil Testls
Design and drawingls
Construction of temporary facilitiesls
G30SITE CIVIL/ MECHANICAL UTILITIES
Water supply connection
Electricity connection
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 001

&1#&"Times New Roman"&10&K000000SBU - CONTRACTING AND ACQUISITIONS

Sheet2

&1#&"Times New Roman"&10&K000000SBU - CONTRACTING AND ACQUISITIONS

Sheet3

&1#&"Times New Roman"&10&K000000SBU - CONTRACTING AND ACQUISITIONS

File details come from the government source that posted it. Updated .