This document is an amendment to a solicitation for a design-build construction project to provide a new 6-story rappel tower and landing pad at Camp Tecson in Bulacan, Philippines. The project has an estimated value between $500,000 and $1,000,000.
The amendment revises the technical solution requirements under Non-Cost Factor 4, clarifying that only conceptual design drawings are required rather than a full technical narrative. It also corrects the contract period of performance from 90 days to 490 days. The amendment provides answers to pre-proposal inquiries and summarizes changes to other sections of the solicitation, including wind load requirements, site development responsibilities, and the lack of available geotechnical data. The due date for proposal submission remains August 19, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6274224R6715-0001_081324.pdf | ||
| Exhibit D 24R6715 Blank BOQ_Rappel Tower.xlsx | XLSX spreadsheet | |
| Exhibit A_PPI_Fillable.docx | DOCX document | |
| RELEASED RFP_24R6715.pdf | ||
| PHIL_BAR_Base Access Request Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR6054115
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N6274224R6715 D/B Construction of Rappel Tow er and Landing Pad, Camp Tecson, Bulacan, Philippines
Amendment 0002 begins on the next page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274224R6715
X 9B. DATED (SEE ITEM 11)
08-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Aug-2024
CODE
NAVFAC ROICC THAILAND (US EMBASSY)
7 SATHORN TAI ROAD
BANGKOK 10120
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274224R6715
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMD 0002 FACTOR 4 & ANS TO PPI
A. Part 1, Section 2.3 Evaluation Factors and Proposal Submission Requirements, Item a., Volume 2, Non-Cost Factor 4 - Technical Solution, (a) Submittal Requirements are revised per the following:
Changed from:
(a) Submittal Requirements:
(a) Submittal Requirements:
i. Provide a narrative describing the technical solution to the project that meets the requirements of the RFP. Include the following:
1. Site layout including a description of the building orientation, roadways, parking (include ingress and egress), and emergency vehicle access., and ATFP standoff distances.
Narrative shall not exceed two (2) double-sided pages (or four (4) single-sided pages).
ii. Provide the following conceptual design drawing details:
1. Site layout plan showing footprint of proposed building, locations of transformer, and existing road within 50 m radius from the proposed buildings. The drawing shall also include connecting point of main power supply system.
2. Electrical drawings.
3. Structural drawings, including roof structure, reinforcing steel details and other critical details (i.e. structure type, structural members, equipment supports, etc.).
(b) Basis of Evaluation: The Government will evaluate the narrative, and conceptual drawings considering the extent to which the Offeror demonstrates a clear understanding of the architectural and engineering requirements of the project. The Government will evaluate the Offeror's technical solution to determine adherence to the technical requirements of the RFP.
i. Acceptable. Narrative, and all required drawings, are submitted; the narrative accurately describes the requirements, the drawings address all key aspects of the project and are adequate to use for creating detailed design drawings, The Offeror illustrates understanding of the statement of the requirements.
ii. Unacceptable. The Offeror did not submit a narrative, all required drawings or the drawings submitted do not address all key aspects of the project or are not adequate to use for creating detailed design drawings. The Offeror did not illustrate understanding of the statement of the requirements.
To:
(a) Submittal Requirements:
(c) Submittal Requirements:
i. Provide a narrative describing the technical solution to the project that meets the
1. Site layout including a description of the building orientation, roadways, parking distances.
i. Provide the following conceptual design drawing details:
1. Site layout plan showing footprint of proposed building, locations of transformer, also include connecting point of main power supply system.
2. Electrical drawings.
3. Structural drawings, including roof structure, reinforcing steel details and other
(d) Basis of Evaluation: The Government will evaluate the narrative, and conceptual drawings architectural and engineering requirements of the project. The Government will evaluate the Offeror's technical solution to determine adherence to the technical requirements of the RFP.
iii. Acceptable. Narrative, and All required drawings, are submitted; the narrative accurately describes the requirements, the drawings address all key aspects of the
iv. Unacceptable. The Offeror did not submit a narrative, all required drawings or the
B. Answers to Pre-Proposal Inquiries (PPIs) are provided in Attachment-01 Questions & Answers of this amendment. As a result of the provided answers, Attachment-02, summarizing changes under Parts 1, 2, and 3.
C. The period of performance, SF1442 under block#11, is corrected from 90 to 490 calendar days.
D. Additionally, this amendment incorporates the Host Nation Requirements under Section 00 73 00 - Supplementary Conditions.
The due date of proposal submission is unchange & remains on August 19, 2024 at 1100am, ThailandTime.
All other paragraphs, provisions, and conditions remain unchanged.
The offeror must acknowledge receipt of this amendment.
SECTION 00 10 00 - SOLICITATION
The contractor period of performance end date has increased by 400 days from 90 days to 490 days.
SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS
The following have been modified:
EVALUATION FACTORS FOR AWARD
Section 002200 – Supplementary Instructions
PART I - GENERAL
1.1 SOURCE SELECTION
This competitive procurement uses source selection procedures to select the responsible Offeror whose proposal conforms to the requirements of the solicitation and is determined to provide the best value to the Government, price and other factors considered. The Government will use the Lowest Price Technically Acceptable (LPTA) method to evaluate proposals submitted in response to this solicitation. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with Offerors in the competitive range; and to award the contract to the Offeror submitting the lowest priced, technically acceptable (LPTA) proposal.
Per NPGI 15.101-2 (DFARS) Lowest price technically acceptable (LPTA) source selection process. (Business Rule), the number of proposals to be evaluated for technical acceptability may be limited to the lowest priced offers at the discretion of the Contracting Officer. If the number of proposals to be evaluated is limited, the technical proposal shall be provided to the evaluator(s) without any identification of price. If the lowest priced proposal is not found to be technically acceptable then the next lowest price proposal shall be evaluated. If that proposal is also not found to be technically acceptable, then the process described will be conducted again as many times as necessary, until such time as the Government identifies a technically acceptable proposal. The source selection method must be included in the request for proposal. If the Contracting Officer later determines that discussions are necessary, the procedures in FAR 15.306 shall be followed.
1.2 INTENT TO AWARD WITHOUT CONDUCTING DISCUSSIONS
The Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
1.3 BASIS OF AWARD
An overall non-price factor rating must be at least “ACCEPTABLE” in order to be eligible for award. An “UNACCEPTABLE” rating in any factor results in the overall non-price factor proposal being rated
“UNACCEPTABLE” unless corrected through discussions. An overall non-price factor rating of “UNACCEPTABLE” make a proposal ineligible for award.
Definitions:
Technical Acceptable/Unacceptable Ratings:
Acceptable: Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable: Proposal does not clearly meet the minimum requirements of the solicitation.
Past Performance Acceptable/Unacceptable Ratings:
Acceptable: Based on the Offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. Note: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on pastperformance (see FAR 15.305(a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown past performance.
In the context of acceptability/unacceptability “unknown” shall be considered “acceptable.”.
Unacceptable: Based on the Offeror’s performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.
PART II - EVALUATION FACTORS FOR AWARD
2.1 EVALUATION CRITIERIA
a. The contract resulting from this solicitation will be awarded to the responsible Offeror whose offer, conforming to the solicitation, is determined to be the lowest price technically acceptable (LPTA) proposal based on the evaluation factors set forth in the solicitation.
b. “Relevant” means similar to the acquisition in terms of size, scope, and complexity and nature of the work being solicited. The Government will only consider projects for construction services of the type described in non-cost factor 1 – Offeror Experience, below.
c. Past performance information on “relevant projects” meeting the definition in paragraph (b) will constitute the primary consideration in the Government’s evaluation under non-cost factor 2 – Past Performance. The Government may, however, review and consider past performance information on other projects as made available to the Government from other sources such as the Contractor Performance Assessment Reporting System (CPARS) and inquiries with previous clients / owners. The Government will determine the relevance of the past performance information received on other projects, as well as consider the source, context and currency of such information in its evaluation.
d. Offerors who submit past performance and experience information of a parent, sister, predecessor or other affiliated company must describe what involvement such company will have on the acquisition. The proposal should clearly indicate how the resources of the parent, sister, predecessor or other affiliated company – its workforce, management, facilities, or other resources – will be provided or relied upon for contract performance.
e. The Contracting Officer may discount favorable past performance and experience of a subcontractor unless the prime contractor clearly provides, in its proposal, evidence of a binding teaming agreement or other contractual agreement which creates legal responsibility on the part of the subcontractors.
f. In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability “unknown” shall be considered “acceptable.”
g. The Government, in compliance with FAR 15.305(a)(2)(ii), Offerors are authorized to provide information on problems encountered on the identified contracts and the Offeror’s corrective actions. The Government shall consider this information, as well as information obtained from any other sources, when evaluating the Offeror’s past performance.
2.2 PRICE EVALUATION
The price proposal will be evaluated to determine the reasonableness and completeness of the Offeror’s proposal.
The Contracting Officer may conduct price realism if the Contracting Officer determined that it is necessary.
Unrealistically low (or high) proposed price or unbalanced prices, may be grounds for eliminating a proposal from competition either on the basis that the Offeror does not understand the requirement or has made an unrealistic or unreasonable proposal.
2.3 EVALUATION FACTORS AND PROPOSAL SUBMISSION REQUIREMENTS
a. The Offeror’s proposal shall contain a response to each of the following evaluation factors and shall be in the form prescribed by this solicitation. The solicitation requires the evaluation of price and non-cost factors in two volumes listed below:
Volume 1: Price Factor Volume 2: Non-Cost Factor 1 – Offeror Experience
Non-Cost Factor 2 – Past Performance Non-Cost Factor 3 – Safety Non-Cost Factor 4 – Techinal Solution
b. The distinction between past performance and Offeror experience is experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance relates to how well a contractor has performed.
c. The following describes each evaluation factor, submittal requirements and basis for assigning ratings:
Volume 1:
(1.1) Price Factor
(a) Solicitation Submittal Requirements:
i. The Standard Form 1442 with Blocks 14 through 20c completed, signed, and dated;
ii. Acknowledge any and all amendments issued under this solicitation either by annotating it in Block 19 of the SF 1442 or signing each SF 30
iii. A completed Price Schedule for all CLINs;
iv. A completed Bill of Quantities (BOQ, Exhibit D) showing price breakdown for CLINs.
Provide in both PDF and Excel formats;
v. Completed Representations and Certifications, to include a copy of the electronic annual representations and certifications thru System for Awards Management (SAM) at www.sam.gov;
vi. Responsibility Determination and Financial Capability, as specified in Paragraph 4;
vii. Evidence of active SAM.gov registration at www.sam.gov.
(b) Basis of Evaluation: The Government will evaluate price based on the total price of all priced CLINS. Analysis will be performed by one or more of the following techniques to ensure a fair, reasonable and realistic price:
i. Comparison of proposed prices received in response to this RFP;
ii. Comparison of proposed prices with the Independent Government Estimate (IGE);
iii. Comparison of proposed prices with available historical information.
Volume 2:
(2.1) Non-Cost Factor 1 - Offeror Experience:
(a) Submittal Requirements: Submit a minimum of three (3) and a maximum of five (5) construction projects for the Offeror that best demonstrates Offeror experience on relevant projects that are similar size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as similar design-build construction with the following relevant characteristics:
a. Similar in Size: Construction Projects between $300,000 and $800,000 in final construction cost. One project must be at least $500,000. Any project outside this range may not be considered.
b. Similar in Scope: Design build construction of a two or more-story reinforced concrete structure building with a minimum size of 250 SM.
c. Similar In Complexity: Construction projects involving multiple trades, working in areas with limited access, constructing various projects simultaneously, or managing multiple work sites performed in Southeast Asia, Nepal, Maldives, or Timor Leste.
Projects submitted for the Offeror shall be completed within the past (5) years of the date of issuance of this RFP. If submitting an ongoing construction project, the project should be at least 80% complete at the time of proposal submission. A project is defined as a construction project performed under a single contract.
The Offeror Experience Project Data Sheet in the form of Exhibit B is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on the form may be expanded; however, total length for each Offeror Experience Project Data Sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages) claimed for past performance. Data sheets for each project should not exceed two (2) pages.
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods).
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity or the Joint Venture partners. Offerors are still limited to a total of five (5) projects combined.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract in order for the past performance information of the affiliate/subsidiary/parent/LLC/LTD member companies to be considered. The proposal shall state specific commitments of technical resources (e.g., personnel, equipment) that the affiliate/subsidiary/parent/LLC/LTD member companies commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/area of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/ parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the Offeror in performance of the contract. Any projects submitted in excess of the five (5) will not be considered.
(b) Basis of Evaluation: The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing similar design-build construction projects with the relevant characteristics defined in the solicitation submittal requirements for this non-cost factor above. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects. Any projects submitted in excess of the five (5) for Offeror experience will not be considered. The Government will not evaluate information exceeding the first two (2) pages for each Project Data Sheet.
i. Acceptable. The contractor has demonstrated construction experience in performing similar design-build construction projects with the relevant characteristics defined in the solicitation submittal requirements for this non-cost factor.
ii. Unacceptable. The contractor did not submit Offeror Experience Project Data Sheets, the submitted data sheets did not demonstrate relevant construction experience performing similar design-build construction projects with the relevant characteristics defined in the solicitation submittal requirements for this non-cost factor, or the Offeror submitted less than three (3) relevant projects.
(1) Non-Cost Factor 2 - Past Performance:
(a) If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 Offeror Experience. If there is not a completed CPARS evaluation, then submit Past Performance Questionnaires (Exhibit C) for each project included in Factor 1. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.
However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Contract Specialist.
Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Offeror Experience. Offerors may also address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Performance award or additional information submitted will not be considered.
(b) Basis of Evaluation: This evaluation will consider how well the Offeror’s team performed on relevant projects submitted under Factor 1 – Offeror Experience and may also consider past performance on other projects currently documented in known sources. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government.
Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval Systems (PPIRS) using all CAGE/UEI numbers of Contractors who are part of a partnership or joint venture identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination.
The assessment of the Offeror’s team’s past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.
i. Acceptable. The Offeror has satisfactory or better ratings in the Contractor Performance
Assessment Reporting System (CPARS) or on Past Performance Questionnaires (PPQ) (Exhibit C) for at least three (3) projects rated acceptable in Factor 1. In the case of an Offeror without a record of recent and relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the Offeror shall be determined to have “unknown” past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”
ii. Unacceptable. The Offeror was not rated satisfactory or better in the Contractor Performance Assessment Reporting System (CPARS) or on Past Performance Questionnaires (PPQ) (Exhibit C) for at least three (3) of the projects determined to be relevant and acceptable under Factor 1 – Offeror Experience, or the Government has found less than satisfactory documentation for the contractor’s performance using Government databases. Additionally, Offerors will be rated unacceptable if they do not provide a CPARS if it exists for any project submitted under Factor 1 – Offeror Experience. Submitting a PPQ in place of a CPARS when a CPARS exists will result in unacceptable rating.
(2) Non-Cost Factor 3 - Safety:
(a) Submittal Requirements: The Offeror shall submit a safety narrative that fully describes the safety management system that they will use to oversee the safety compliance and performance of self-performed and subcontractor (if utilized) performed work. The narrative should describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and all subcontractor (if utilized) performed work. Additionally, the narrative should describe the methods Offeror will use to execute an effective safety program including mishap prevention techniques and processes, encouraging employee reporting of unsafe conditions, and preventing unsafe work activities that could lead to near-miss or injury mishaps. The technical approach to safety narrative shall be limited to five (5) pages.
(b) Basis of Evaluation: The Government will evaluate the narrative to determine how the Offeror will implement and oversee its safety program for protection of the prime contractor and subcontractor (if utilized) personnel. The Government will evaluate the Offeror’s plan to monitor safety performance of the prime contractor and all subcontractors (if utilized) during contract performance, with a focus on specific management practices that will be utilized for providing deliberate safety program management and mishap prevention. The Government will only evaluate up to the first five (5) pages submitted.
i. Acceptable. The Offeror demonstrates an understanding of the requirement to provide for the safety of prime and subcontractor (if utilized) personnel, the narrative describes the methods Offeror will use to execute an effective program that includes mishap prevention techniques and processes, encouraging employee reporting of unsafe conditions, and prevents unsafe work activities that could lead to near-miss or injury mishaps.
ii. Unacceptable. The Offeror’s narrative does not demonstrate an understanding of the requirement to provide for the safety of prime and subcontractor (if utilized) personnel, the narrative does not describe the methods Offeror will use to execute an effective program that includes mishap prevention techniques and processes, encouraging employee reporting of unsafe conditions, and does not prevent unsafe work activities that could lead to near-miss or injury mishaps, or the Offeror did not submit a sufficient narrative within the first five (5) pages.
(3) Non-Cost Factor 4 - Technical Solution:
(e) Submittal Requirements:
iii. Provide a narrative describing the technical solution to the project that meets the
2. Site layout including a description of the building orientation, roadways, parking distances.
i. Provide the following conceptual design drawing details:
4. Site layout plan showing footprint of proposed building, locations of transformer, also include connecting point of main power supply system.
5. Electrical drawings.
6. Structural drawings, including roof structure, reinforcing steel details and other
(f) Basis of Evaluation: The Government will evaluate the narrative, and conceptual drawings architectural and engineering requirements of the project. The Government will evaluate the Offeror's technical solution to determine adherence to the technical requirements of the RFP.
v. Acceptable. Narrative, and All required drawings, are submitted; the narrative accurately describes the requirements, the drawings address all key aspects of the
vi. Unacceptable. The Offeror did not submit a narrative, all required drawings or the
2.4 FINAL SELECTION
All Offerors will be evaluated for each of the technical (non-cost) Factors and the responsible Offeror submitting the lowest priced technically acceptable offer will be selected for contract award. A responsibility determination shall be made for each presumed awardee. A presumed awardee may be determined to be non-responsible if it has an excessive amount of current awards or ongoing projects, is currently behind or has excessive rework issues on existing contracts, or is otherwise deemed an increased risk to the US Government for unsuccessful performance.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been added by full text:
HOST NATION REQUIREMENTS
52.236-7 Permits and Responsibilities. (Nov 1991)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
(End of clause)
Contractor Licensing and Hiring Requirements Contractors must be duly authorized to operate and conduct business in any host country and must fully comply with all laws, decrees, labor standards, and regulations of the host country during the performance of the contract. The United States has established international agreements with the Philippines that include provisions relating to the procurement of supplies, employment preferences and use of local and U.S. contractors, as well as restrictions on hiring of third country nationals or utilization of third country contractors. Offerors are expected to comply with all controlling international agreements and with the laws of host nations whether the United States Government provides notice of the existence of such requirements. The contractor will not be permitted use of third country personnel or contractors in the performance of this contract without a demonstration that reasonable efforts to employ citizens, nationals, and permanent residents of host nation and the United States, or contractors of the host nation and the United States, have been made and that wages competitive with or higher than those being paid for similar work performed in the host nation by citizens of the host nation or of the United States are being offered. The contractor shall not employee third country personnel or contractors without written notification of United States approval from the Contracting Officer.
Permit Compliance The United States does not directly hold environmental permits in the host nation. The contractor shall comply with environmental permits held by the host nation for the benefit of a DoD project even if the contractor is not named in the permit. Contractor shall document general procedures and their implementation for compliance with permit conditions, Best Management Practices, and required mitigations. Contractor shall be responsible for any required corrective actions. Contractor shall provide permit compliance and corrective action documentation to the COR and any additional Government and Host Nation representatives as requested by the COR.
Temporary Construction Facilities Physical Appearance Be aware of local sensitivities and cultural values. Temporary facilities and visible components thereof shall be of solid color without visible markings, graphics, and/or text.
Biosecurity for Construction Contracts Invasive species can be purposefully or inadvertently moved with construction equipment, personal protective equipment and hand tools, foot traffic, vehicles and vessels, raw construction materials, and packing materials. Invasive species can become pests and affect the economy, ecology, and human health.
It is critically important to be aware of ways to prevent the movement of invasive species and implement best management practices. The Contractor shall take all practicable measures to prevent introduction or spread of invasive species in association with contract performance, including importation of supplies, equipment or personnel and movement of supplies, equipment, or personnel between locations. At a minimum, all activities shall comply with U.S. and host nation biosecurity laws and regulations, shall include 100 percent inspection of equipment and supplies. If the contract performance results in introduction or spread of invasive species, the contractor shall be responsible for taking appropriate measures, in consultation with appropriate authorities, to contain and prevent contract related spread of such species at no additional cost to the government. In addition, the Contractor shall:
a. Comply with all necessary inspections of raw construction materials, equipment, and vehicles for invasive and pest species prior to entering of the project site and prior to moving equipment offsite. The Contractor is responsible for any cleaning or inspection fees.
b. Non-native invasive species can be inadvertently moved with construction equipment, Personal protective equipment, hand tools, foot traffic, vehicles, vessels, raw construction materials, and packing materials.
c. Conduct vehicle washdown and inspection for soil and other material to prevent the inadvertent movement of invasive species from the project site to other locations. Establish appropriate facilities that comply with all environmental laws and regulations, and promptly take corrective or preventative actions for noncompliance. Include these details in a biosecurity/Hazard Analysis and Critical Control Point (HACCP) plan and environmental briefs.
d. Submit a biosecurity/HACCP Plan, prepared in accordance with USFWS HACCP Manual for all imported equipment and imported construction materials and supplies. The HACCP plan must address, as a minimum, the identification and control of invasive and non-native species in construction equipment and construction materials and supplies.
e. Implement and update the HACCP plan accordingly to reduce the risk of spreading invasive species. The HACCP development team should include at least two members, one member with biological expertise with invasive species and one member from the project team who has a clear understanding of the project activities and requirements. Contractor is responsible for training all personnel on the project specific HACCP requirements once the plan is approved by the Government.
f. The Contractor must compile all supporting documentation (e.g. reports, checklists and logs) required under their HACCP Plan and submit such documents to the Contracting Officer on a monthly basis. Once all HACCP plan activities are complete, bound hardcopies of the plan and all supporting documentation and submit to the Contracting Officer.
(End of Summary of Changes)
D/B Construction of Rappel Tower and Landing Pad Amendment 0002 -N6274224R6715 Camp Tecson, Bulacan, Philippines Attachment 01 – Answers to Pre-Proposal Inquires
No. Reference (Sect/Para/Page) QUESTION GOVERNMENT RESPONSE
1 SF1442, page 1 of 35 Section 11. The Contractor shall begin performance within 10 calendar days and complete it within 90 calendar days after receiving award.
Can we assume the 90 calendar days is just a typo and this is 490 days as per Part 3, STATEMENT OF WORK, Period of Performance for complete design and construction: 490 days?
Yes, it was a typo. Amendment 0002 corrects the period of performance in Block 11 of SF1442 from 90 to 490 calendar days.
2 PART 1 – GENERAL,
(3) Non-Cost Factor 4 - Technical Solution:
(a) Submittal Requirements:
1. Site layout including a description of the building orientation, roadways, parking (include ingress and egress), emergency vehicle access, and ATFP standoff distances.
Please clarify Antiterrorism and Force Protection (ATFP) standoff distances requirements.
ATFP standoff distances requirement was deleted. It is not required.
Amendment 0001: RFP Part 1, EVALUATION FACTORS FOR AWARD, Non-Cost Factor 4 (a) - Technical Solution – has been revised to read “Site layout plan showing footprint of proposed building, locations of transformer, and existing road within 50 m radius from the proposed buildings. The drawing shall also include connecting point of main power supply system”
Part 3, para. 4, page 4 of 18,
4. PROJECT REQUIREMENTS: CLIN
0001: The primary structure shall be capable of withstanding a design wind speed of 196 km/h for a Building Risk Category IV.
Please confirm which wind loads:
design wind speed requirement to be use, 196 km/h or 224 km/h.
Part 3, Page 11 of 18, B10
SUPERSTRUCTURE:
Wind loads: Design wind speed: 224 km/h (140mph);
Exposure Category C, Surface Roughness C.
Design wind load shall be 224 km/h.
Amendment 0001: RFP Part 3, Section 4, paragraph 4 has been revised to read: “The primary structure shall be capable of withstanding a design wind speed of 224 km/h for a building Risk Category IV.”
4 Part 3, Page 10 of 18
6. ESR: A10 GENERAL:
GOVERNMENT PROVIDED
GEOTECHNICAL INFORMATION
Subsurface soil information, including a geotechnical report from projects immediately adjacent to the project site are included in other portions of this RFP. Please provide the Subsurface soil information, including a geotechnical report of the adjacent site.
There is no soil information or geotechnical information to provide:
Amendment 0001: Part 3, Page 10 of 18, Sec. 6, Article A10, Para.
1 and 2 – has been deleted.
5 Part 3, Page 12 of 18
6. ESR: B30 ROOFING
Submittal Requirements: Components of a minimum roof submittal include the roof plan, method of drainage, standard details and details unique to the project, wind load calculations and requirements.
Please confirm if this is part of the
PROPOSAL SUBMISSION
REQUIREMENTS. This requirement is not included in Volume 2: Non-Cost Factor 4 – Technical Solution.
No. Roof drawing has been removed from the requirements for Non-Cost Factor 4.
Amendment 0001: RFP Part 1. Section 2.3, Sub-section c, Volume 2: (2.1), Article (3)(a) was revised to read “Submittal Requirements:
i. Provide the following conceptual design drawing details:
1. Site layout plan showing footprint of proposed building, locations of transformer, and existing road within 50 m radius from the proposed buildings. The drawing shall also include connecting point of main power supply system.”
6 Part 3 – Statement of work – Site analysis – Building permit
Please confirm if the contractor is required to obtain approval solely from the camp commander.
No. Per Part 3, Section 3.1, para. 4, says “The contractor shall obtain necessary local, national permits, and AFP Building Permit Requirements (see Part 6, ATTACHMENT 6) required for construction of the project.”.
7 Part 3 – Statement of work – Site analysis – Site Development
Please confirm if the contractor is responsible for developing the site, including the pathway of the cable glider.
Yes, site development of the entire project, including the pathway of the glider, is contractor responsibility.
Per RFP Part 3, Section 1, para 3, states that “Typical work for the facility shall include but is not limited to:
a. planning, design, and construction
b. site planning and site verification
Part 3, Section 3.1, para 4, states that “The Contractor shall be responsible for providing the services of a geotechnical engineer to conduct any subsurface exploration, investigation, testing, and analysis that the Designer of Record deems necessary for the design and construction of the proposed building and site improvements.”;
and
Per Part 3, Section 3.2, Subsection f, states that “Except for construction of required site utilities to support the facility, the site development is only limited to the areas affected by the construction covered by this RFP.”
8 Part 3 – Statement of work – Site analysis – Project Requirements
Please confirm that aviation warning lights are not required for the tower.
This is confirmed, aviation warning lights are not required. There is no airfield in the vicinity.
9 Part 3 – Statement of work – Site analysis – Project Requirements
Please confirm that the contractor is not responsible for the utility company's development, metering, cabling charges, and related fees.
The Contractor shall be solely responsible for securing and maintaining all utilities necessary for construction operations. This includes obtaining permits, installing equipment, paying utility bills, and providing metering. To ensure the facility is fully operational upon completion, the Contractor must establish a permanent electrical connection to shore power.
Per Part 3, Section 4, paragraph 16: “Building shall be connected to local Philippine electrical service (MERALCO) and shall be metered. Contractor shall provide transformer/s and connection to shore power to include all associated work and a separate meter. Provide weatherproof type light fixtures for exterior use including switches. “
10 No specific reference found Are there CAD Files provided for the conceptual plans on Part 6?
There are no CAD files to provide.
11 Part 3, Section 4, Page 6 Do we need to stick with the design & plan of the conceptual plans? Or are we required to revise or change?
Yes. Contractor may revise or change the conceptual plan meeting the minimum requirement of the Solicitation.
Part 3, Section 4, para. 22, says “Please refer to the conceptual layout shown in Part 6, Attachment for reference only.”
12 Part 6, Attachment 1, Photo 1, Page 2 Are there any plotted Lot Plan or Site Development Plan in order to have the exact dimension and location of the Rappel Tower, Landing Pad & Anchoring Posts? Also, in reference to the existing rappel tower.
No. There is no lot plan to provide. Conceptual plans are provided in RFP Part 6, Attachment 1, Photo 1.
13 No specific reference found Since we will send all the plans thru soft copy, what is the required paper size for plotting?
Acceptable drawing sheet size is 22in x 34in (558.6mm x 863.6mm).
Per Part 2, Section 9.1, Subsection b, which states that “Electronic Design Deliverables shall be provided in accordance with FC 1- 300-09N. Complete construction plans including site plan, architectural, structural, plumbing, mechanical, and electrical drawings shall be provided in accordance with FC 1-300-09N.”
14 Part 3, Section 3.1, Page 3 Are there any soil test report and geotechnical report?
Refer to answer #4.
15 Part 1, Section 45, Page 24 Our company is US Small Business (SDVOSB) and currently in the process of registering our business in the Philippines. To meet the requirements of this solicitation, we plan to team up with a local company in the Philippines.
Is a Teaming Agreement an acceptable arrangement in this situation? If so, what specific documentation must be submitted with our proposal to formalize this teaming relationship?
Per Part 1, Section 2.3 Evaluation Factors and Proposal Submission Requirements, Volume 2: Non-Cost Factor -1 Offeror Experience, it clearly states how to meet the solicitation requirements. The burden is on the offerors to consult with a lawyer to obtain the information necessary to meet these requirements. The government does not possess information regarding business registration in the Philippines. It is the responsibility of the offerors to seek legal counsel to understand any restrictions and fulfill these requirements.
16 Temporary Access Do we need to developed access road going to the site? For Delivery of materials
No. Location of existing access roads are shown in Part 6, Attachment 1, Photo 2.
17 Removal of trees Do we prioritize earth-balling small trees around the affected area, if possible?
“Earth-balling” is not a requirement of the Solicitation.
D/B Construction of Rappel Tower and Landing Pad N6274224R6715
Camp Tecson, Bulacan, Philippines
Amendment 0001
C. The following changes are hereby incorporated to solicitation, Part 1 to 3, under this solicitation.
Part 1
Non-Cost Factor
1. On Page 20 of 35, Sec. 2.3, Subsection c, Volume 2: (2.1), Article (3)(a).
Change from:
(a) Submittal Requirements:
i. Provide a narrative describing the technical solution to the project that meets the requirements of the RFP. Include the following:
1. Site layout including a description of the building orientation, roadways, parking (include ingress and egress), emergency vehicle access, and ATFP standoff distances.
Narrative shall not exceed two (2) double-sided pages (or four (4) single-sided pages).
ii. Provide the following conceptual design drawing details:
1. Site layout plan showing footprint of proposed building, locations of transformer, and existing road within 50 m radius from the proposed buildings. The drawing shall also include connecting point of main power supply system.
2. Electrical drawings.
3. Structural drawings, including roof structure, reinforcing steel details and other critical details (i.e. structure type, structural members, equipment supports, etc.).
(b) Basis of Evaluation: The Government will evaluate the narrative, and conceptual drawings considering the extent to which the Offeror demonstrates a clear understanding of the architectural and engineering requirements of the project. The
Government will evaluate the Offeror's technical solution to determine adherence to the technical requirements of the RFP.
i. Acceptable. Narrative, and all required drawings, are submitted; the narrative accurately describes the requirements, the drawings address all key aspects of the project and are adequate to use for creating detailed design drawings, The Offeror illustrates understanding of the statement of the requirements.
ii. Unacceptable. The Offeror did not submit a narrative, all required drawings or the drawings submitted do not address all key aspects of the project or are not adequate to use for creating detailed design drawings. The Offeror did not illustrate understanding of the statement of the requirements.
To:
(a) Submittal Requirements:
i. Provide the following conceptual design drawing details:
1. Site layout plan showing footprint of proposed building, locations of transformer, and existing road within 50 m radius from the proposed buildings. The drawing shall also include connecting point of main power supply system.
Amendment 0002, Attachment 02 - Summary of Changes
D/B Construction of Rappel Tower and Landing Pad N6274224R6715
Camp Tecson, Bulacan, Philippines
(b) Basis of Evaluation: The Government will evaluate the conceptual drawings considering the extent to which the Offeror demonstrates a clear understanding of the architectural and engineering requirements of the project. The Government will evaluate the Offeror's technical solution to determine adherence to the technical requirements of the RFP.
i. Acceptable. All required drawings are submitted; the drawings address all key aspects of the project and are adequate to use for creating detailed design drawings, The Offeror illustrates understanding of the statement of the requirements.
ii. Unacceptable. The Offeror did not submit all required drawings, or the drawings submitted do not address all key aspects of the project or are not adequate to use for creating detailed design drawings. The Offeror did not illustrate understanding of the statement of the requirements.
PART 2
GENERAL REQUIREMENTS
2. On Page 15 of 46, Sec. 9.1., Sub-section b
Add:
Electronic Design Deliverables shall be provided in accordance with FC 1-300-09N. Complete construction plans including site plan, architectural, structural,…