Exhibit D 24R6715 Blank BOQ_Rappel Tower.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
D/B Construction of Rappel Tower and Landing Pad, Camp Tecson, San Miguel, Bulacan, Philippines
Solicitation number
N6274224R6715
Issued by

About this file

This document appears to be a Blank Bill of Quantities (BOQ) for a Design-Build (D/B) construction project to build a 6-story rappel tower and landing pad at Camp Tecson in Bulacan, Philippines. The project has a projected value between $500,000 and $1,000,000.

The BOQ provides a detailed breakdown of the required construction elements, quantities, and estimated material and labor costs for items such as foundations, superstructure, exterior closure, roofing, interior construction, stairs, electrical systems, and specialized rappel tower components. A related federal contract opportunity solicitation document is also provided, which announces the forthcoming project and outlines key details. It states that a pre-proposal site visit is scheduled for the third or fourth week of July 2024, and interested contractors must submit a Base Access Request form by June 14, 2024 to attend. The solicitation will likely be issued by the Department of the Navy Naval Facilities Engineering Command in June 2024.

View the file

Other files

File Type Posted
Released_AMD2_6715.pdf PDF
N6274224R6715-0001_081324.pdf PDF
Exhibit A_PPI_Fillable.docx DOCX document
RELEASED RFP_24R6715.pdf PDF
PHIL_BAR_Base Access Request Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Blank BOQ

BILL OF MATERIALS

CLIN 0001, BASE BID ITEM 0001: DESIGN AND CONSTRUCTION OF 6-STORY RAPPEL TOWER AND LANDING PADERROR:#REF!
LEVEL 2 GROUP ELEMENTSQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATETOTAL, US $
Level 3 ElementNUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
A10FOUNDATIONS- 0ERROR:#REF!
A1010Standard Foundation- 0ERROR:#REF!
6-Story Rappel Tower- 0
A101002.1perform excavationcu.m- 0- 0ERROR:#REF!
A101002.3provide rebarkg- 0- 0
A101002.4provide formsqm- 0- 0
provide floor moisture barrierSM- 0- 0ERROR:#REF!
A101002.5provide concretecu.m- 0- 0
A101002.6provide Backfill and perform Compactionsqm- 0- 0
Anchorage Poles at Landing Pad- 0
A101002.1perform excavationcu.m- 0- 0ERROR:#REF!
A101002.3provide rebarkg- 0- 0
A101002.4provide formsqm- 0- 0
provide floor moisture barrierSM- 0- 0ERROR:#REF!
A101002.5provide concretecu.m- 0- 0
A101002.6provide Backfill and perform Compactionsqm- 0- 0
A1030Slab on Grade (6m by 8m)- 0ERROR:#REF!
A103001.1provide rebarkg- 0- 0ERROR:#REF!
A103001.2provide formsqm- 0- 0ERROR:#REF!
provide floor moisture barrierSM- 0- 0ERROR:#REF!
A103001.3provide concretecu.m- 0- 0ERROR:#REF!
B10SUPERSTRUCTURE- 0ERROR:#REF!
B1010Floor Construction- 0ERROR:#REF!
2F to 4F Column- 0
provide rebar at columns and beamskg- 0- 0ERROR:#REF!
provide formsqm- 0- 0
provide concretecu.m- 0- 0
2F to 4F Slab- 0
provide formsqm- 0- 0
provide rebarkg- 0- 0
provide concretecu.m- 0- 0
5F column- 0
provide rebar at columns and beamskg- 0- 0
provide formsqm- 0- 0
provide concretecu.m- 0- 0
5F Slab- 0
provide formsqm- 0- 0
provide rebarkg- 0- 0
provide concretecu.m- 0- 0
6F column- 0
provide rebar at columns and beamskg- 0- 0
provide formsqm- 0- 0
provide concretecu.m- 0- 0
6F Slab- 0
provide formsqm- 0- 0
provide rebarkg- 0- 0
provide concretecu.m- 0- 0
Anchorage Poles at Landing Pad- 0
provide hot-dipped galvanized steel pole (3mm thk by 320mm bottom-dia by 125mm top-dia by 20ft long)ea- 0- 0
B20EXTERIOR CLOSURE- 0ERROR:#REF!
B2010Exterior wall- 0
GF- 0
B201001.1CHB 8", 7MPasqm- 0- 0
Masonry (Rebars)KG- 0- 0ERROR:#REF!
CHB Grout FillCM- 0- 0ERROR:#REF!
Masonry wall (plastering)sqm- 0- 0
5F- 0
B201001.2CHB 8", 7MPasqm- 0- 0
Masonry (Rebars)KG- 0- 0ERROR:#REF!
CHB Grout FillCM- 0- 0ERROR:#REF!
Masonry wall (plastering)sqm- 0- 0
B2090Other Exterior Closure- 0- 0
B201001.3railings at 2F to 6Fset- 0- 0
Metal cladding with FSRR logo at the front of the tower from GF to 4Fea- 0- 0
B30ROOFING- 0ERROR:#REF!
B3010Roof Coverings & Roof Drains- 0ERROR:#REF!
B301090Waterproofing membranesqm- 0- 0
Steel Roof StructureSM- 0- 0ERROR:#REF!
Roofing, Cliplock type, including accessoriesSM- 0- 0ERROR:#REF!
B301003Insulation, RockwoolSM- 0- 0ERROR:#REF!
provide roof drainssqm- 0- 0
C10INTERIOR CONSTRUCTION- 0ERROR:#REF!
C1010Interior Walls- 0ERROR:#REF!
Storage Room at the GF- 0
CHB Grout FillCM- 0- 0ERROR:#REF!
Masonry (Rebars)KG- 0- 0ERROR:#REF!
CHB 8", 7MPaSM- 0- 0ERROR:#REF!
C1020Interior Doors- 0ERROR:#REF!
steel door with accessories for storage roomsets- 0- 0
C1030Other Fire Protection Systems- 0ERROR:#REF!
portable fire extinguisher with cabinet, and fire alarm systemsLot- 0- 0ERROR:#REF!
C20STAIRS- 0ERROR:#REF!
C2010Stair Construction- 0ERROR:#REF!
C201001.1provide FormworkFLT- 0- 0ERROR:#REF!
C201001.2provide rebarFLT- 0- 0ERROR:#REF!
C201001.3provide concreteFLT- 0- 0ERROR:#REF!
C201090Stair Finishes- 0ERROR:#REF!
C201090.1Metal railingslm- 0- 0ERROR:#REF!
C30INTERIOR FINISHES- 0ERROR:#REF!
C3010Wall Finishes- 0ERROR:#REF!
C301001.1Columns - GF to TD Painting worksERROR:#REF!
Skim CoatSM- 0- 0
PlasteringSM- 0- 0
Top Coat (2 coats )SM- 0- 0
C301001.2Wall - GF, painting workERROR:#REF!
Skim CoatSM- 0- 0
PlasteringSM- 0- 0
Top Coat (2 coats )SM- 0- 0
C301001.3Wall - 5D, painting workERROR:#REF!
Skim CoatSM- 0- 0
PlasteringSM- 0- 0
Top Coat (2 coats )SM- 0- 0
C3020Floor Finishes- 0- 0
C3020010.1GF to TD Floor Hardener & Sealersqm- 0- 0
C3030Ceiling Finishes- 0ERROR:#REF!
Painted ceiling- 0ERROR:#REF!
Skim CoatSM- 0- 0
PlasteringSM- 0- 0
Top Coat (2 coats )SM- 0- 0
D50ELECTRICAL- 0ERROR:#REF!
D5010Electrical Service & Distribution- 0ERROR:#REF!
Rough‐insSM- 0- 0ERROR:#REF!
WiringSM- 0- 0ERROR:#REF!
Panel boards and circuit breakersLot- 0- 0ERROR:#REF!
Transformer incl. accessoriesEA- 0- 0ERROR:#REF!
Electrical connection to baseSM- 0- 0ERROR:#REF!
MTSea- 0- 0ERROR:#REF!
D5020Lighting & Branch Wiring- 0ERROR:#REF!
Lights, fixures and wiring devices - include perimeter lightingSM- 0- 0ERROR:#REF!
D5090lightning arresterset- 0- 0ERROR:#REF!
F10Special Construction- 0- 0
Steel frame system for the 9-grid cable attachments at the 6F- 0
Cable Attachment (9-grids) systemset- 0- 0
3/8" galvanized steel aircraft cablesea- 0- 0
motorized retractable system (automatic line retriever), 45kN, compatible to 9-13mm dia cableset- 0- 0
landing skid (only half is needed)ea- 0- 0
Table 2: SITEWORK
LEVEL 2 GROUP ELEMENTSQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
Level 3 ElementNUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION- 0ERROR:#REF!
G1010Site Clearing- 0ERROR:#REF!
Clearing, grubbing and Tree CuttingSM- 0- 0ERROR:#REF!
G1030Site Earthwork- 0ERROR:#REF!
ExcavationCM- 0- 0ERROR:#REF!
Backfilling and CompactionCM- 0- 0ERROR:#REF!
G20SITE IMPROVEMENTS- 0ERROR:#REF!
G2050landing pad170ea- 0- 0ERROR:#REF!
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT- 0ERROR:#REF!
X10Field Requirements- 0ERROR:#REF!
Mobilization / DemobilizationLS- 0ERROR:#REF!
Predesign surveys, capability assessment, etcLS- 0ERROR:#REF!
Detailed Engineering Design Package, Project Management, and Project Rendering, and PlaqueLS- 0ERROR:#REF!
X20Office Overhead- 0ERROR:#REF!
TempFacil, permits, and utilities monthsLS- 0- 0ERROR:#REF!
CLIN0001 Total0.00ERROR:#REF!
Grand Total Cost0.00ERROR:#REF!