1_Amend0002-Issued.pdf

PDF 199 KB Posted

Attached to
FY19 MCON P-295, ORDNANCE OPERATIONS, ANDERSEN AIR FORCE BASE, GUAM
Solicitation number
N6274219R1301
Issued by

About this file

1_Amend0002-Issued.pdf

View the file

Other files

File Type Posted
1-Amend0006_Issued.pdf PDF
Amend0005_Issued.pdf PDF
Amend0004_Issued.pdf PDF
0-19R1301_Amend0003.pdf PDF
6_JA-KnoxBoxP295-Redacted_Issued.pdf PDF
2_SF1442_PricePropSch.pdf PDF
Amend0001_Issued.pdf PDF
N6274219R1301_5-MonacoJA_Redacted-Issued.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

18RXXXX

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RFP N62742-19-R-1301, WON 1571418, FY19 MCON P-295, ORDNANCE OPERATIONS, ANDERSEN AIR FORCE BASE, GUAM

Amendment No. 0002 is continued on Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274219R1301

X 9B. DATED (SEE ITEM 11)

15-Apr-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-May-2019

CODE

NAVFAC PACIFIC

CONSTRUCTION CONTRACTS BR (CODE ACQ33)

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

N62742 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL: TEL:

N6274219R1301 Amendment No. 0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SOLICITATION, OFFER AND AWARD (SF1442) with REVISED PRICE PROPOSAL SCHEDULE

Replace the Solicitation, Offer and Award (Construction, Alteration, or Repair), Standard Form 1442 and Price Proposal Schedule with the attached Solicitation, Offer and Award (Construction, Alteration, or Repair), Standard Form 1442 and Revised Price Proposal Schedule (Amendment No. 0002).

DOCUMENT 00 01 15 LIST OF DRAWINGS

1.2 CONTRACT DRAWINGS

The following drawings, bearing the revision date of 5/6/2019, are revised:

NAVFAC DWG NO. Title

17227058 TITLE SHEET, VICINITY AND LOCATION MAPS

17227068 HAZARDOUS MATERIAL NOTES

17227075 EXISTING CONDITION & REMOVAL PLAN

17227076 CLEARING & GRUBBING PLAN

17227077 CLEARING & GRUBBING PLAN

17227078 GENERAL SITE & IMPROVEMENTS PLAN

17227079 SITE GRADING & DRAINAGE PLAN

17227080 UTILITY PLAN

17227081 UTILITY PLAN

17227082 PERIMETER SECURITY FENCE PLAN

17227084 ENTRY GATE PLAN

17227085 UTILITY PROFILES

17227087 MISCELLANEOUS DETAILS

17227088 MISCELLANEOUS DETAILS

17227089 MISCELLANEOUS DETAILS

17227090 MISCELLANEOUS DETAILS

17227093 GENERAL NOTES - 1

17227095 ORDNANCE OPERATIONS FOUNDATION PLAN

17227096 ORDNANCE OPERATIONS ROOF FRAMING PLAN

17227098 INERT STOREHOUSE ROOF FRAMING PLAN

17227099 ORDNANCE OPERATIONS BUILDING SECTIONS

17227100 INERT STOREHOUSE BUILDING SECTIONS

17227102 TYPICAL DETAILS – 2

17227103 TYPICAL DETAILS - 3

17227106 ORDNANCE OPERATIONS BUILDING ROOF WIND PRESSURE DIAGRAM

17227107 INERT STOREHOUSE ROOF WIND PRESSURE DIAGRAM

17227108 ORDNANCE OPERATIONS FOUNDATION DETAILS

17227109 ORDNANCE OPERATIONS ROOF FRAMING DETAILS

17227110 INERT STOREHOUSE FOUNDATOIN DETAILS

17227111 INERT STOREHOUSE RETAINING WALL DETAIL AND STAIR SECTION

17227112 INERT STOREHOUSE ROOF FRAMING DETAILS

17227115 ROOF FOUNDATION DETAILS

17227119 ORDNANCE OPERATIONS BUILDING FLOOR PLAN

17227120 ORDNANCE OPERATIONS BUILDING REFLECTED CEILING PLAN

17227121 ORDNANCE OPERATIONS BUILDING ROOF PLAN

17227122 INERT STOREHOUSE FLOOR PLAN

17227123 INERT STOREHOUSE REFLECTED CEILING PLAN

17227124 INERT STOREHOUSE ROOF PLAN

17227125 ORDNANCE OPERATIONS BUILDING ELEVATIONS

17227126 INERT STOREHOUSE BUILDING ELEVATIONS

17227127 ORDNANCE OPERATIONS BUILDING SECTIONS

17227128 INERT STOREHOUSE BUILDING SECTIONS

17227131 ENLARGED STAIR PLANS, ELEVATIONS & SECTIONS

17227132 ORDNANCE OPERATIONS WALL SECTIONS

17227133 INERT STOREHOUSE WALL SECTIONS

17227134 WALL TYPES

17227135 ORDNANCE OPERATIONS BLDG FLOOR PATTERN PLAN, ROOM FINISH

SCHEDULE & LIST OF MATERIALS

17227136 DOOR & LOUVER SCHEDULE AND TYPES

17227137 MOUNTING HEIGHT SCHEDULE & SIGNAGE DETAILS

17227138 MISCELLANEOUS DETAILS

17227139 MISCELLANEOUS DETAILS

17227145 LEGEND AND ABBREVIATIONS, MECHANICAL NOTES

17227146 ORDNANCE OPERATIONS BUILDING MECHANICAL PLAN

17227147 INERT STOREHOUSE MECHANICAL PLAN

17227148 ORDNANCE OPERATIONS BUILDING PLUMBING PLAN

17227150 DETAILS

17227151 DETAILS

17227153 EQUIPMENT SCHEDULES

17227154 WATER PIPING DIAGRAM

17227155 SANITARY PIPING DIAGRAM

17227156 REFRIGERANT PIPING DIAGRAM

17227177 ELECTRICAL GENERAL NOTES, SYMBOL LIST, ABBREVIATIONS AND

MOUNTING HEIGHT SCHEDULE

17227179 ELECTRICAL SITE PLAN

17227181 LIGHTNING PROTECTION OVERHEAD CATENARY AND GROUNDING

SYSTEM PLAN

17227182 LIGHTING PLAN – ORDNANCE OPERATIONS BUILDING

17227184 POWER PLAN – ORDNANCE OPERATIONS BUILDING

17227192 MISCELLANEOUS DETAILS 1

17227193 MISCELLANEOUS DETAILS 2

17227194 MISCELLANEOUS DETAILS 3

17227195 MISCELLANEOUS DETAILS 4

17227198 MISCELLANEOUS DETAILS 7

17227199 MISCELLANEOUS DETAILS 8

17227200 MISCELLANEOUS DETAILS 9

17227204 SECONDARY ONE LINE DIAGRAMS

17227206 MISCELLANEOUS DIAGRAMS 2

17227207 PANEL SCHEDULES

17227208 INTERIOR LIGHTING CONTROL SCHEDULE

17227212 TELECOMMUNICATIONS GENERAL NOTES, SYMBOL LIST, ABBREVIATIONS,

AND MOUNTING HEIGHT SCHEDULES

17227214 TELECOMMUNICATIONS DEMOLITION SITE PLAN 2 OF 2

17227216 TELECOMMUNICATIONS SITE PLAN 1

17227217 TELECOMMUNICATIONS SITE PLAN 2

17227218 TELECOMMUNICATIONS SITE PLAN 3

17227219 TELECOMMUNICATIONS SITE PLAN 4

17227220 TELECOMMUNICATIONS SITE PLAN 5

17227221 TELECOMMUNICATIONS SITE PLAN 6

17227225 TELECOMMUNICATIONS PLAN – ORDNANCE OPERATIONS BUILDING

17227226 TELECOMMUNICATIONS PLAN – INERT STOREHOUSE BUILDING

17227227 ENLARGED TELECOM ROOM – ORDNANCE OPERATIONS BUILDING

17227230 MISCELLANEOUS DETAILS 2

17227232 MISCELLANEOUS DETIALS 4

17227236 MISCELLANEOUS DETAILS 8

17227237 MISCELLANEOUS DETAILS 9

17227241 OUTSIDE PLANT PATHWAY DIAGRAM

17227242 OUTSIDE PLANT CABLING DIAGRAM

17227243 MISCELLANEOUS DIAGRAMS

These revised Drawings accompany this Amendment.

On NAVFAC Dwg. No. 17227069 (H-002)

Area 1, Existing Building 9100 Notes

Note 1: In the second sentence, replace “Contract Award” with “Notice to Proceed.”

Note 3: In the second sentence, replace “Areas indicated by the Government” with “Relocation area presented in C-105”

On NAVFAC Dwg. No. 17227072 (C-001)

Wastewater Disposal System Permit Notes

Item 2: Change “Owner” to “Contracting Officer.”

PROJECT TABLE OF CONTENTS

Delete Sections 07 14 00 and 08 71 00 in their entirety and replace with Sections “07 14 00, FLUID-APPLIED WATERPROOFING, dated May 6, 2019” and “08 71 00, DOOR HARDWARE, dated May 6, 2019”.” Sections 07 14 00 and 08 71 00, dated May 6, 2019, accompany this Amendment.

SECTION 01 14 00, WORK RESTRICTIONS

1.3 SPECIAL SCHEDULING REQUIREMENTS

Paragraph d: Delete the last sentence and replace with the following: “Erosion and dust control are required during earthwork. The Contractor must provide waste characterization necessary for disposal.”

SECTION 01 33 00, SUBMITTAL PROCEDURES

Within the Submittal Register, delete “Asbestos hazard abatement plan” and replace it with “Asbestos Removal and Control Procedure Plan.”

SECTION 01 35 26, GOVERNMENTAL SAFETY REQUIREMENTS

1.8.2.11 Revise “Asbestos Hazard Abatement Plan” with “Asbestos Removal and Control Procedure Plan”.

SECTION 02 61 13, EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

1.4 DESCRIPTION OF WORK

After first paragraph, add the following: “Notify the Contracting Officer within 24 hours if contaminated material is discovered that has not been previously identified or if other discrepancies between data provided and actual field conditions are discovered.”

1.4.3.1 Area 1: Existing Building 9100

Item C: In the second sentence, replace “contract award” with “notice to proceed.”

Item D: Delete the last sentence and replace with the following: “The excess soil from Area 1 may be reused onsite without restriction if it meets fill requirements in accordance with Section 31 23 00.00 20 - EXCAVATION AND FILL or recycled/disposed of at offbase facilities as clean soil.”

Item E: Delete the second through fourth sentences and replace with the following: “The soil and concrete will be relocated to the area as presented in C-105 with clean soil cap of a minimum thickness of 0.15 meter. A permeable but protective barrier (i.e. orange warning barrier geotextile) shall be place below and above the impacted materials.”

1.4.3.2 Area 2: Septic Tank System and Effluent Disposal Basin Area

In the last sentence, replace “the geotechnical requirements” with “the fill requirements in accordance with Section

31 23 00.00 20 - EXCAVATION AND FILL.”

1.4.3.3 Area 3: New Inert Storehouse and Utility Construction Area

In the last sentence of second paragraph, replace “the geotechnical requirements” with “the fill requirements in accordance with Section 31 23 00.00 20 - EXCAVATION AND FILL.”

1.4.3.4 Area 4: Stormwater Infiltration Pit

In the last sentence of second paragraph, replace “the geotechnical requirements” with “the fill requirements in accordance with Section 31 23 00.00 20 - EXCAVATION AND FILL.”

1.4.3.5 Area 5, Underground Utilities and Security Fencing Area

In the last sentence of second paragraph, replace “the geotechnical requirements” with “the fill requirements in accordance with Section 31 23 00.00 20 - EXCAVATION AND FILL.”

1.4.4 Excess Soil/Waste Characterization and Disposal

Add the following paragraph: “There are no provisions for onsite treatment of contaminated materials. All contaminated materials except pesticides-impacted materials shall be disposed of at permitted offbase Treatment, Storage, and Disposal Facilities (TSDF). Only pesticides-impacted materials will be relocated to the area shown in C-105.

1.4.4.1.2 Pesticides Impacted Soil

Replace the second sentence with the following: “The pesticides impacted materials will be relocated to the area as presented in C-105 with clean soil cap of a minimum thickness of 0.15 meter.”

Revise the last sentence to read “…all RCRA requirements including 40 CFR 263 and 49 CFR 171-179 shall be strictly followed.”

1.4.4.3 Other Potential Landfill Debris

In the first sentence, replace “metal objectives” with “metal objects.”

Delete the third and fourth sentences and replace with the following: “Notify the Contracting Officer within 24 hours if material is discovered.”

1.5 SUBMITTALS

SD-06 Test Reports: replace “contract award” with “notice to proceed.”

3.1 SURVEYS

Delete this paragraph in its entirety and replace with the following:

“3.1 NOT USED.”

3.6.4 Relocation of Pesticide Impacted Materials

Delete the first sentence in its entirety and replace with the following:

If the test results for the soil and concrete slab beneath Building 9100 are above the Tier 1 ESL, the soil and concrete will be relocated to the area as presented in C-105 with clean soil cap of a minimum thickness of 0.15 meter.”

SECTION 02 82 16.00 20, ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS

Entire Section 02 82 16.00 20: delete all instances of “Asbestos Hazard Abatement Plan” (8 locations) and replace with “Asbestos Removal and Control Procedure Plan”.

1.3.1 Description of Work

Delete the last sentence of the fourth paragraph, and replace with “If any previously unforeseen suspected materials such as asbestos or lead paints become uncovered, the Contractor must notify the Contracting Officer within 24 hours and must collect and analyze the suspected materials prior to the planned demolition project.”

1.3.9 Asbestos Hazard Abatement Plan

At the beginning of this paragraph, add the following: “The Contractor must prepare an Asbestos Removal and Control Procedure Plan to obtain approvals from the Contracting Officer and Guam EPA. The Plan must be prepared to comply with 40 CFR 61, Subpart M. Once the plan is approved by the Contracting Officer, the Contractor must submit the plan to the Guam EPA for review and approval.”

At the end of section 02 82 16.00 20: Attachment 1. Hazardous Material Survey for FY19 MCON Project P-295 Ordnance Operations Building 9100, Andersen Air Force Base, dated December 26, 2018, prepared by Myounghee Noh Associates, L.L.C. accompanies this Amendment

SECTION 10 44 20 FIRE DEPARTMENT ACCESS BOX

2.1 Fire Department Access Box:

Delete the second sentence and replace with “Fire department access box shall include manufacturer’s mounting kit, Knox-Coat proprietary finish for additional corrosion protection and interior gasket seal.”

SECTION 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

2.4.5.2 Fiber Optic Patch Panel:

In the third sentence, delete “LC” and replace with “SC.”

SECTION 31 23 00.00 20 EXCAVATION AND FILL

1.1 REFERENCES

Delete the following in its entirety:

“ASTM D2216 (2010 Laboratory Determination of Water (Moisture Content of Soil and Rock by Mass)”

3.13.2.6 Moisture Content Tests

Delete this paragraph in its entirety.

SECTION 33 30 00 SANITARY SEWERS

3.1.6 – Sewage Absorption Trench Construction

After this paragraph, add the following:

“Use Vetiver family of plants at the effluent disposal basin. Vetiver is a common landscaping plant in Guam and is known for its high water use rate and drought tolerant. They are also proven to be nitrate, phosphorus, and fecal coliform reducing plants. Estimated planting density is about 6-10 plants per square meter. During growth establishment period, a temporary irrigation may be needed. Weed control is also needed to prevent growth of other plants in the planting area. Contractor will be responsible for plant maintenance until ground cover of about 95% is attained.”

In the title, delete “Absorption Trench Construction” and replace with “Effluent Disposal Basin.”

In the first paragraph, delete all instances of the word “tile” and replace with “pipe.”

In the first paragraph, delete the last sentence in its entirety.