1314_Amend5_Issued.pdf
PDF 24 KB Posted
- Attached to
- FY17 MCAF PAF150400 APR EXPAND AIRCRAFT PARKING APRON, ROYAL AUSTRALIAN AIR FORCE BASE DARWIN, AUSTRALIA
- Solicitation number
- N6274218R1314
About this file
1314_Amend5_Issued.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1314_Amend6_Issued.pdf | ||
| 1314_Amend4_Issued.pdf | ||
| 1314_Amend3_Issued.pdf | ||
| 1314_Amend2_Issued.pdf | ||
| 1314_Amend1_Issued.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RFP N62742-18-R-1314, WON# 1396553, FY17 MCAF PROJECT PAF150400 APR EXPAND AIRCRAFT PARKING APRON, ROYAL
AUSTRALIAN AIR FORCE (RAAF) BASE DARWIN, AUSTRALIA
Amendment No. 0005 is continued on page 2.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274218R1314
X 9B. DATED (SEE ITEM 11)
21-Nov-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer Xis extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jan-2018
CODE
NAVFAC PACIFIC
A-E/CONSTR CONTRACTS BRANCH (CODE ACQ31)
258 MAKALAPA DR STE 100
JBPHH HI 96860-3134
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274218R1314 Amendment No. 0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
DOCUMENT 00 01 15 LIST OF DRAWINGS
1.2 CONTRACT DRAWINGS
The following sketches dated 01/25/2018, are added to the list of drawings:
SK-012 ELECTRICAL SITE PLAN - DEMOLITION
SK-013 EXISTING SITE CONDITIONS AND BORING AND TEST PIT LOCATION PLAN
These Sketches accompany this Amendment.
On NAVFAC Drawing No. 17210309 (G-004)
AIRFIELD SAFETY AND OPERATION NOTES, Note 3, replace “CONTRACTOR SHALL COORDINATE CIVILIAN AND COMMERCIAL AIRCRAFT OPERATIONS ON TAXIWAY A.” with “NOT USED”.
On NAVFAC Drawing No. 17210320 (CW002)
Add symbol and designation for Boring “BH14” as shown on attached Sketch SK-013.
On NAVFAC Drawing No. 17210430 (EL-102)
Demolition work revised as shown on attached Sketch SK-012.
SECTION 01 11 00 SUMMARY OF WORK
Paragraph 1.1 GENERAL REQUIREMENT – after subparagraph g. add the following subparagraph:
“h. Immediately notify the Contracting Officer if the Commonwealth or any person authorised by the Commonwealth impedes, disrupts, or frustrates the Contractor’s performance of the Contract, or otherwise causes potential Contractor delay.”
AUSTRALIAN REQUIREMENTS SCHEDULE Version 1.1 – incorporate the following:
Paragraph 11. Access to the Base and the Site
Delete subparagraph (b)(ii)D in its entirety.
Paragraph 18. Estate Information
Delete “retained by the Contractor and” in the 3rd line after the word “information”.
Paragraph 20. Insurance
Revise subparagraph 20.1(a) to add “in the amount of at least $20 million per occurrence” in the 2nd line after the word “Insurance”.
SECTION 01 45 00.00 20 QUALITY CONTROL
Paragraph 1.5.4 QC Specialists Duties and Qualifications Table
Under Area of Responsibility (2nd column), delete “Section 31 68 13 Soil and Rock Anchors;”
Under Frequency (3rd column), delete “and tank water surcharging,”
SECTION 01 45 35 SPECIAL INSPECTIONS
Paragraph 1.4 SUBMITTALS
Delete paragraph in its entirety and replace with “Not Used.”
Paragraph 1.5 SPECIAL INSPECTOR QUALIFICATIONS
Delete paragraph and all sub-paragraphs in their entirety and replace with “Not Used.”
Paragraph 2.1 FABRICATOR SPECIAL INSPECTIONS
Delete paragraph in its entirety and replace with “Not Used.”
Paragraph 3.1 RESPONSIBILITIES
Delete paragraph and all sub-paragraphs in their entirety and replace with “Not Used.”
Paragraph 3.2 DEFECTIVE WORK
Delete paragraph in its entirety and replace with “Not Used.”
SECTION 32 05 33 LANDSCAPE ESTABLISHMENT
Paragraph 3.2 IRRIGATION ESTABLISHMENT PERIOD
Delete paragraph in its entirety.
Paragraph 3.2.1 Maintenance During the Irrigation Establishment Period
Delete paragraph in its entirety.
Paragraph 3.2.2 Water Restrictions
Delete paragraph in its entirety.
Paragraph 3.2.3 Fire Hydrants
Delete paragraph in its entirety.
Paragraph 3.2.4 Final Acceptance
Delete paragraph in its entirety.
Paragraph 3.2.5 Controller Charts
Delete paragraph in its entirety.
SECTION 32 13 11 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY
PAVEMENTS
Paragraph 2.11.2 Concrete Mixers
In the first sentence, replace “truck mixers” with “portable mixers”.
Paragraph 2.11.2.4 Truck
Delete the first sentence “Truck mixers are not allowed for mixing.”
In the second sentence, delete “mixing or”.
SECTION 33 52 43.13 AVIATION FUEL PIPING
Paragraph 2.1.1 (Stainless) Steel Piping
Insert Table A following sub-paragraph 2.1.1(b) and before paragraph 2.1.2:
TABLE A
Nominal Pipe Size Nominal (Average) Pipe O.D. Wall Thickness(tn)
203 mm (DN 200) 218 mm 6.2 mm
100 mm (DN 100) 114 mm 5.5 mm
(End of Summary of Changes)