TGI_38K6115001A01_c1v1_Rev1.pdf
PDF 1017 KB Posted
- Attached to
- USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE#3
- Solicitation number
- N6264926RA052
About this file
Task Group Instruction Summary
This is a WebAIM Short Form Task Group Instruction (TGI No. 38K6115001) dated 15 April 2026 for the USS Rafael Peralta (DDG-115), a U.S. Navy destroyer. The instruction authorizes installation of reinforcement for the Kingpost of Fueling At Sea (FAS) Station No. 7, with contractor work scheduled from 26 October 2026 through 4 December 2026.
The work scope encompasses fabrication and installation of four reinforcement assemblies and two non-tight collar plates across multiple compartments and weather decks on the starboard and port sides of the vessel, specifically at frames 322–338 (02 Level Weather, Starboard), frames 285–290 (01 Level Weather, Port), and frames 324–333 (various compartments). All work must be performed in accordance with referenced drawing PDD 150-ELM260166 and NAVSEA/Local Standard Items. The contractor must remove existing curtain plates and chocks, install new reinforcements, and accomplish surface treatment requirements per specified NAVSEA standards. Government-furnished materials include metal sheets, plates, insulators, adhesive, and structural angles. SRF-JRMC (Ship Repair Facility-Japan Regional Maintenance Center) will provide crane services, electrical/utility services, and safety/gas-free inspections. A potential asbestos hazard has been identified. Four planners and one Work Integration Manager oversee the project, with designated points of contact provided for coordination.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
15-APR-2026 1347
20.15.6.0.9333 (July 2025) ICN: 38K6115001 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: REINF FOR KINGPOST AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: F/O - INSTALL REINFORCEMENT FOR KINGPOST OF FAS STATION NO. 7
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 5
OD01L081
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
TAKEUCHI, NORIYUKI 231B 3152439983 14-APR-2026
APPROVED BY: CODE: PHONE: DATE:
TAKAGI, RYOUTA 231B 3152434502 15-APR-2026
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
OD01-L081
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
150A1101
1. SCOPE/PURPOSE:
1.1 Title: Reinforcement for Kingpost of Fueling At Sea (FAS) Station No. 7; install
1.2 Location of Work:
1.2.1 Passage (01-314-01-L)
1.2.2 Stateroom (01-320-1-L)
1.2.3 Pressure Lock (01-330-3-L)
1.2.4 02 Level Weather, Frames between 322 and 338, Starboard (Stbd)
1.2.5 01 Level Weather, Frames between 285 and 290, Port
1.2.6 Generator Room (3-370-0-E)
TGI Short Form
15-APR-2026 1347
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6115001 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: REINF FOR KINGPOST AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: F/O - INSTALL REINFORCEMENT FOR KINGPOST OF FAS STATION NO. 7
FOUO Pg 2 of 5
CU PHASE DESCRIPTION (Cont.)
1.3 Identification:
1.3.1 Quantity (One Lot), Reinforcement for Kingpost of FAS Station No. 7 in 01-314-01-L and 01-320-1-L, including chocks, Frames between 324 and 327, Stbd
Remarks: See Sheets 3 and 4 of Ref. No. 3 for material and detail
1.3.2 Quantity (One Lot), Reinforcement for Kingpost of FAS Station No. 7 in 01-320-1-L, including chocks, Frames between 328 and 329, Stbd
Remarks: See Sheet 5 of Ref. No. 3 for material and detail
1.3.3 Quantity (One Lot), Reinforcement for Kingpost of FAS Station No. 7 in 01-330-3-L, including chock and pad, Frames between 330 and 333, Stbd
Remarks: See Sheet 6 of Ref. No. 3 for material and detail
1.3.4 Quantity (2 EA), Non-Tight Collar Plate on Curtain Plate, Reinforcement, and 02 Level Deck Plating, Frames between 325 and 327, Stbd
Material: OS, ASTM A569, 0.105 Inch Thickness Sheet Remarks: See Sheet 4 Detail 4-C of Ref. No. 3 for detail
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. PROCEDURE:
2.1 Fabricate and install each new reinforcement and non-tight collar plate listed in 1.3.1 through 1.3.4 in accordance with Ref.
No. 3.
2.1.1 Remove existing curtain plate and chock for installation of the reinforcement.
2.1.2 Accomplish the requirements of 009-012 of Ref. No. One, including Table 2, Column(s) A, Lines One through 7.
2.2 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.
2.3 Notes:
2.3.1 Planner: Code 231B N. Takeuchi, 243-9983
Planner: Code 232 R. Toriumi, 080-9899-1237
Kouichi.Yoshida.ja Typewritten Text 10/26/2026
Kouichi.Yoshida.ja Typewritten Text 12/4/2026
15-APR-2026 1347
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6115001 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: REINF FOR KINGPOST AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: F/O - INSTALL REINFORCEMENT FOR KINGPOST OF FAS STATION NO. 7
FOUO Pg 3 of 5
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
Planner: Code 233 M. Yamaguchi, 080-9350-1450 Planner: Code 234 S. Ito, 243-4297
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560
2.3.3 This TGI clears DFS DDG115-1014-2025 in its entirely.
2.3.4 JCN OD01-L081 is related to this TGI.
2.4 Government Furnished Material (GFM):
2.4.1 SRF-JRMC will provide GFM listed in the Material List.
2.5 SRF-JRMC will provide the following service work: (TGI No. 38K6115001S02).
2.5.1 [C740] Crane and crane rigging service.
2.5.2 [X99E] Utility service, electrical.
2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.5.6 [C133] QA inspection for (G) symbol(s).
15-APR-2026 1347
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6115001 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: REINF FOR KINGPOST AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: F/O - INSTALL REINFORCEMENT FOR KINGPOST OF FAS STATION NO. 7
FOUO Pg 4 of 5
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 PDD 150-ELM-
260166
INSTL OF REINFORCEMENT
FOR LEG BASE OF
KINGPOST
- Y ALL
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M SHEET,METAL, ORIG: C231B N.
TAKEUCHI 243-9983
ORDER FOR KTR
9B 9515 002371890 NA 4 N 60965004 1/SH
002 M PLATE,ME, 1 FT X 2 FT
ORIG: C231B N. TAKEUCHI
243-9983
ORDER FOR KTR
9B 9515 002243088 NA 4 N 60965005 2/SF
003 M PLATE,ME, 1 FT X 6 FT
ORIG: C231B N. TAKEUCHI
243-9983
ORDER FOR KTR
9B 9515 002243090 NA 4 N 60965006 6/SF
004 M PLATE,ME, 1 FT X 6 FT
ORIG: C231B N. TAKEUCHI
243-9983
ORDER FOR KTR
9B 9515 002243093 NA 4 N 60965007 6/SF
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K6115001 KEY OP: A01
15-APR-2026 1347
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6115001 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: REINF FOR KINGPOST AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: F/O - INSTALL REINFORCEMENT FOR KINGPOST OF FAS STATION NO. 7
FOUO Pg 5 of 5
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
006 M INSULATI, ORIG: C231B N.
TAKEUCHI 243-9983
ORDER FOR KTR
9Q 5640 013713263 NA 4 N 60965008 5/SH
007 M INSULATI, ORIG: C231B N.
TAKEUCHI 243-9983
ORDER FOR KTR
9Q 5640 013713262 NA 4 N 60965009 5/SH
008 M INSULATI, ORIG: C231B N.
TAKEUCHI 243-9983
ORDER FOR KTR
9Q 5640 LL4808710 NA 4 N 60967420 3/SH
009 M INSULATI, ORIG: C231B N.
TAKEUCHI 243-9983
ORDER FOR KTR
9Q 5640 LL4808709 NA 4 N 60967423 5/SH
010 M INSULATI, ORIG: C231B N.
TAKEUCHI 243-9983
ORDER FOR KTR
9Q 5640 LL4823204 NA 4 N 60967424 1/SH
011 M TAPE,TEX, ORIG: C231B N.
TAKEUCHI 243-9983
ORDER FOR KTR
9B 8315 002671632 NA 4 N 60965010 2/RO
012 M TAPE,TEX, ORIG: C231B N.
TAKEUCHI 243-9983
ORDER FOR KTR
9B 8315 002671633 NA 4 N 60965012 2/RO
013 M CAP,SNAP, ORIG: C231B N.
TAKEUCHI 243-9983
ORDER FOR KTR
9B 5325 007377648 NA 4 N 60965002 50/EA
014 M ADHESIVE, ORIG: C231B N.
TAKEUCHI 243-9983
ORDER FOR KTR
9B 8040 002738708 NA 4 Y 60965013 1/GL
015 M ANGLE,STRUCTURAL, ORIG:
C231B N. TAKEUCHI 243-9983
ORDER FOR KTR
9B 9520 002777314 NA 4 N 61055146 10/FT
400 M COUPLING, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 4730 007225473 NA 4 N 60935002 2/PG
401 M BACKING,, ORDERED FOR
KTR
C234 S.ITO 243-4297
9C 4730 LL4558783 NA 4 N 60937406 2/EA
402 M GAKSET S, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 5330 LL9005127 NA 4 N 60937405 1/SH
403 M CORK AND RUBBER SHE,
ORDERED FOR KTR
C234 S.ITO 243-4297
9B 5330 002919598 NA 4 N 60935003 1/SH
404 M SHEET,NO, ORDERED FOR
KTR
C234 S.ITO 243-4297
9B 9390 013753347 NA 4 N 60935004 1/RO
405 M SHIELD,S, ORDERED FOR KTR
C234 S.ITO 243-4297
9B 4730 010100997 NA 4 N 60935005 1/EA
File details come from the government source that posted it. Updated .