This is a Price Proposal Form template for a firm fixed price job order under a Master Agreement for Repair and Alteration of Vessels (MARAV) for USS RAFAEL PERALTA (DDG-115). The form is structured to capture labor costs, material costs, and Other Direct Costs (ODCs) across two Contract Line Items (CLINs): CLIN 0001 for one Task Group Instruction (TGI) and CLIN 0002 as a Growth CLIN set at 9% of the base CLIN. Offerors must detail in-house labor and sub-contractor labor hours broken down by work categories including structural work, installation, welding, small metal work, repairs, painting, electrical work, prefabrication, and quality assurance, along with associated costs in Japanese Yen (JPY).

The solicitation (N6264926RA052) is issued by NAVSUP Fleet Logistics Center Yokosuka for ship repair and overhaul work with a proposal deadline of 16 June 2026 at 10:00 AM. The work is limited to one TGI (38K6115001A01) titled "Install Reinforcement for Kingpost of FAS Station No. 7," with performance scheduled from 3 August 2026 through 11 September 2026 at Yokosuka Naval Base, Japan. Eligibility is restricted to holders of an active Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) with the U.S. Navy, and all contractors must be duly authorized to operate in Japan per DFARS 252.225-7042. The completed form requires offerors to input labor hours, personnel counts, daily hours, and associated costs in the orange-highlighted cells, with totals automatically calculated through linked formulas.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264926RA052CLIN 0001(1 TGI)0¥0¥0¥0¥0
SHIP NAME:USS RAFAEL PERALTA (DDG-115)CLIN 0002 (Growth CLIN)0¥0¥0¥0¥0
AVAILABILITY:FY26 SIA BUNDLE#3Total for All CLIN0¥0¥0¥0¥0
Total TGIs (Specify Total)1Total Evaluated Price¥0
Growth CLIN %9.00%
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.TGI No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
138K6115001A01INSTALL REINFORCEMENT FOR KINGPOST OF FAS STATION NO. 7000¥0¥0¥0¥0
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

1_38K6115001A01

SHIP NAME/AVAILABILITY:USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE#3TGI 38K6115001A01 SUMMARY
SOLICITATION #:N6264926RA052
SRF-JRMC TGI #:38K6115001A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:INSTALL REINFORCEMENT FOR KINGPOST OF FAS STATION NO. 700¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

File details come from the government source that posted it. Updated .