Solicitation Amendment N6264926RA0320007 SF 30.pdf
PDF 585 KB Posted
- Attached to
- USS HIGGINS (DDG 76) SRA 6C1, Bundle #1
- Solicitation number
- N6264926RA032
About this file
Amendment 0007 to Solicitation N6264926RA032
This document is Standard Form 30 (Amendment of Solicitation/Modification of Contract) issued by NAVSUP Fleet Logistics Center Yokosuka on November 16, 2026. The amendment modifies solicitation N6264926RA032, originally issued March 6, 2026, for USS HIGGINS (DDG-76) ship repair and maintenance work to be performed at a government facility in Japan. The response deadline has been extended to December 16, 2026 at 10:00 AM Japan Standard Time. The period of performance has been revised from December 14, 2026–July 20, 2027 to February 1, 2027–September 7, 2027, with the required work package changed from Fiscal Year 26 6C1 to Fiscal Year 27 7C1 availability status. The number of Task Group Instructions (TGIs) has been decreased from 32 to 5, consisting of fuel tank cleaning, assessment, inspection, repair, and preservation work across multiple fuel service tanks and fuel tank groups.
The solicitation now permits partial proposals by individual work items and authorizes the government to make single or multiple awards to one or more contractors. Eligible offerors must possess an active U.S. Navy Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) certification and must be authorized to operate in Japan per DFARS 252.225-7042. The contract will be firm fixed price with award in Japanese Yen using an FY27 budget exchange rate of JPY 153.2542 per USD 1.00. Evaluation will follow lowest price technically acceptable (LPTA) source selection using three factors: price, technical acceptability based on proposed labor hours and materials, and past performance. A growth CLIN (0002) representing 9% of CLIN 0001 is included to accommodate anticipated additional work using a fixed fully burdened labor rate to be established at contract award. The solicitation requires submission of a proposal breakdown form, past performance data sheets for relevant contracts within the past three years, current MSRA/ABR certification, and compliance documentation with DFARS 252.225-7042.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Created On:
16 Nov 2026, 02:11 AM Greenwich Mean Time
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): Amendment 0007 has been hereby issued to incorporate the changes below:
1. Revised Period of Performance (POP)
From: 14-Dec-2026 through 20-Jul-2027 To: 1-Feb-2027 through 7-Sep-2027
2. The required work per TGI (Task Group Instructions) has been decreased.
3. The availability of required work has been changed from 6C1 to 7C1.
4. Revise the solicitation to permit the submission of partial proposals (by individual Work Items) and to establish the Government's authority to make single or multiple awards to one or more Offerors
Due to above changes, Section A, B, H, L and M have been modified.
Due to above changes, Attachments in Section J have been modified as below.
Attachment (1) Work Specification(s) for TGI: The number of TGI has been decreased from 32 to 5.
Attachment (II) Proposal Breakdown Form (Contractor Response Required) has been revised.
Attachment (IV) Government Furnished Property (GFP-GFM listings) has been revised.
Attachment (IX) Bundle 1 Contract POP List (R4) has been revised.
Exhibit (A) Contract Data Requirements List (CDRL) - NSI (NAVSEA Standard Item) 009-60 has been revised.
Exhibit (B) Contract Data Requirements List (CDRL) for GFP (Government Furnished Material) has been revised.
Due to above changes, fill-in part of FAR Clause 52.225-17 in Section M has been modified
Due to above changes, this solicitation is hereby reopened with new proposal closing date of 16-Dec-2026.
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date 25 Aug 2026 16 Dec 2026
Miscellaneous text in this section has been modified to:
MASTER AGREEMENT FOR THE REPAIR AND ALTERATION OF VESSELS (MARAV): In the event the successful offeror possesses an active Master Agreement for Repair and Alteration of Vessels (MARAV) with the U.S. Navy in the form of either a Master Ship Repair Agreement (MSRA) or an Agreement for Boat Repair (ABR), award for this requirement will be made in the form of a firm fixed price job order under the applicable agreement and all of the terms and conditions of the offer's existing MARAV will apply.
MSRA/ABR Number:
Firms who do not possess an active U.S MSRA/ABR as a Prime Contractor are ineligible for award. Non MSRA /ABR holders may request an application for an MSRA or an ABR certification by requesting an application package from: flcy_msra_abr_group@us.navy.mil. Please note that the MSRA/ABR Certification process may require a year to complete. This solicitation is intended only for sources duly authorized to operate and do business in Japan as prescribed by DFARS 252.225-7042.
1.USS HIGGINS (DDG 76): NAVSUP Fleet Logistics Center Yokosuka (NAVSUP FLCY) has a new requirement in support of the USS HIGGINS (DDG 76). The repair and maintenance package of work items are included as Task Group Instruction (TGI) provided in ATTACHMENT (I).
2. PERIOD OF PERFORMANCE: 1-Feb-2027 through 7-Sep-2027
3. PLACE OF PERFORMANCE: Government Facility
4. OFFER: Offerors must provide all information required by this solicitation no later than 16-Dec-2026 at 10:00 AM Japan Standard Time (JST).
N6264926RA0320007
PARTIAL PROPOSALS AUTHORIZED:
Offerors are hereby notified that this solicitation permits the submission of partial proposals. The Government reserves the right to make single or multiple awards on a Work Item-by-Work Item basis to one or more responsible contractors, or to make single or multiple awards under this solicitation for the entire scope, whichever is determined to be in the best interest of the Government. Any Work Items that receive no bids may be descoped or re-solicited independently without invalidating, delaying, or otherwise affecting the evaluation and award of the remaining items.
Detailed submission and evaluation criteria regarding partial proposals are set forth in Sections L and M of this solicitation. This solicitation is intended only for sources duly authorized to operate and do business in Japan, as prescribed by DFARS 252.225-7042.
Section B - Supplies or Services & Prices or Costs
The miscellaneous text for the following CLIN(s) / SLIN(s) / ELIN(s) were added:
Miscellaneous Text:
- Supplies or Services & Prices or Costs
The contractor is required to submit an itemized breakdown of the total price proposal using Attachment II Price Proposal Breakdown Sheet provided in Section J. Failure to properly complete and submit Attachment II by the specified closing date may cause rejection of the proposal.
Note - Award will be made in Japanese Yen.
Below is the Contract Price in United States Dollar (USD):
CLIN 0001: _____________USD
CLIN 0002: _____________USD
TOTAL PRICE: _____________USD
Note - FY27 Budget Exchange Rate of JPY 153.2542 per USD 1.00 applies.
Miscellaneous Text:
: The labor hours and material requirements listed under the Growth CLIN are part of the contract. Prime contractor efforts will be deducted *Note 1 from the labor hours allocated. Subcontractor efforts and materials will be deducted from the materials allocated. When it is evident that no additional growth work will be tasked under the contract, all remaining unauthorized balance of labor hours and materials in the Growth CLIN will be recouped by the ACO through a contract modification as a decrease in price, which will be a final settlement for all LOE to Completion labor hours and material dollars. Once the number of labor hours and materials for directed work has been settled, neither party shall be entitled to an adjustment because the expended labor hours and materials differ from the settled price. This shall not preclude an adjustment otherwise permitted by law and regulation; e.g. fraud, product substitution, defective workmanship or materials.
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO
Description
The Contractor shall accomplish the work specification package requirements listed in Attachment (I) of Section J onboard USSHIGGINS (DDG-76) during FY26 6C1 SRA Bundle 1.Group Instructions (TGIs) as outlined in the provided drawings andspecification, and as attached in Section J ATTACHMENT (I).The contractor will be responsible for ship repair work to includeproviding the necessary management, scheduling, testing, qualityassurance, technical documentations to support the USSHIGGINS (DDG-
The Contractor shall accomplish the work specification package requirements listed in Attachment (I) of Section J onboard USSHIGGINS (DDG-76) during FY27 7C1 SRA Bundle 1.Partial bids/proposals are authorized. Offerors may submit pricing for any single work item, combination of work items, or the complete work specification package listed in ATTACHMENT (I). An offeror is not required to bid on all work specification items; however, bids submitted for less than the complete scope of any individual work
76) FY26 6C1 SRA Bundle 1.The Contractor is required to submit an itemized breakdown of theprice for each item on the form provided in Section J.
Failure to submitthis documentation properly completed by the specified closing datemay cause rejection of the offer.Note - The award will be made in Japanese Yen (JPY). The USDamounts shown are for funding purposes only. FY26 Budget ExchangeRate of JPY 150.4415 per USD 1.00 applies.
specification item will be rejected as non-responsive.
The Government reserves the right to make one award, multiple awards, or no award across the items listed in ATTACHMENT (I)."NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
Pricing Arrangement: Firm Fixed Price
INFORMATION FROM TO
Description
Growth Reservation associated with CLIN 0001. This growth CLIN amount represents 9.00% of the total proposed cost for CLIN0001.The contractor shall accomplish GROWTH WORKS necessary toaccommodate anticipated Growths USS HIGGINS (DDG 76) FY266C1 SRA Bundle 3 requirements.
Note - The award will be made in Japanese Yen (JPY).
The USDamounts shown are for funding purposes only. FY26 Budget ExchangeRate of JPY 150.4415 per USD 1.00 applies.
Growth Reservation associated with CLIN 0001*. This growth CLIN amount represents 9.00% of the total proposed cost for CLIN0001.Pricing Arrangement:
Firm Fixed Price
Section C - Description/Specifications/Statement of Work
The Requirements text has been modified to:
USS HIGGINS (DDG-76) FY27 7C1 SRA BUNDLE 1
Section H - Special Contract Requirements
Miscellaneous text in this section has been modified to:
H-1.0 OCCUPATIONAL AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT (29 CFR
1915)
The Contractor shall fully comply with 29 Code of Federal Regulations Part 1915, Occupational and Health Standards for Shipyard Employment (29 CFR 1915), as it is effective at the date of contract award, while performing any contract that is awarded from this solicitation. The provisions of 29 CFR 1915 shall apply to the same extent as if the ship repairing, shipbuilding, and shipbreaking employments and related employments to be performed under the contract are wholly accomplished on the navigable waters of the United States. The Contractor shall comply with applicable provisions of the laws and regulations where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed in addition to complying with the corresponding provisions of 29 CFR 1915 in instances in which those laws and regulations require compliance with more stringent safety standards. The Contractor shall promptly notify the contracting officer if it becomes aware of any law or regulation that is applicable where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed that precludes compliance with any provision of 29 CFR 1915.
H-2.0 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (NOV 1996)
The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software. Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.
H-3.0 CONTROL OF UNCLASSIFIED INFORMATION (SRF-JRMC Requirements Only) The Contractor shall not provide Controlled Unclassified Information (CUI) U.S. Navy technical information (engineering drawings, technical manuals, system or equipment photographs or any other U.S. Navy engineering data in any form (orally, paper copy, film or digital file/image) to anyone except SRF-JRMC employees, other Department of Defense (DoD) employees or U.S. DoD Contractors requiring the data for accomplishment of an SRF-JRMC business processes unless the data is marked Distribution Statement "A" (Approved for public release:
distribution is unlimited) or has been approved for unrestricted public release by the Commanding Officer of SRFJRMC or Commander U.S. Naval Forces Japan (COMNAVFORJAPAN) Public Affairs Officer (PAO). The Contractor shall notify SRF-JRMC Code 700 (Code 950 in Sasebo) and request written permission to release CUI outside of SRF-JRMC, DoD Activities or U.S. DoD Contractors that are not involved in the SRF-JRMC business process if the Contractor believes that the release is required to support a SRF-JRMC business or Public Affairs requirement.
H-4.0 Lay Down Space
The Contractor may request the lay down space adjacent to the ship yard in Yokosuka Naval base. Upon the receipt of approval by the Government, the Contractor may obtain the applicable lay down space. The Contractor shall be responsible for all the cost, but not limited to, for maintaining the facility, utility, safety, and security.
H-5.0 Applicable to Contracts Performed in Japan:
HISTORIC AND CULTURAL RESOURCES
If ship repair work is being performed in and around potentially significant historic buildings and structures (cultural properties) such as Dry Docks 1 through 6 and Cave 682 in Yokosuka Base, the contractor shall avoid changing the original materials and finishes used in the properties.
If work is being performed to repair or change a historical building/structure, the contractor shall submit design drawings, floor plans, and other relevant operational details to the CFAY Cultural Resource Manager through the Contracting Officer for review and approval prior to the commencement of work.
If work is being performed on a cultural or historical asset, such as a historical building/structure or archeological site, special precautions may be necessary. The contractor shall submit design drawings, floor plans, and other relevant operational details to the CFAY Cultural Resource Manager through the Contracting Officer for review and approval prior to the commencement of work. The contractor shall contact the CFAY Cultural Resources Manager through the Contracting Officer to determine if the work involves any archaeological, historical or cultural assets.
The contractor must conduct an archaeological monitoring by a qualified archaeologist for the planned excavations.
During the monitoring, use of flat bladed bucket is required for backhoe operations. If any cultural/historical artifacts/assets include brick structures, manufactures plates indicating years before 1945 on the machines and equipment are discovered during work, the contractor shall notify the Public Works Department (PWD) Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager (DSN 243-5136/COMM 046-816-5136) through the Contracting Officer, secure the discovery area, and continue to work around the secured area until further direction from the PWD Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager through the Contracting Officer.
If the items need to be temporarily removed, carefully protect them from disturbance, including weather conditions, unforeseen traffic, and pilfering. The PWD Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager through the Contracting Officer will provide further direction/guidance on how to protect the items. The Government retains ownership and control over historical and archaeological resources.
The contractor shall carefully protect in-place and report immediately to the Contracting Officer historical and archaeological items or human skeletal remains discovered in the course of work. Upon discovery, the contractor shall notify Cultural, Historical, and/or Natural Resources (CHNR) Manager (DSN 243-5136/COMM 046-816- 5136) through the Contracting Officer, secure the discovery area, and continue to work around the secured area. The Government retains ownership and control over historical and archaeological resources."
JAPANESE CONCILIATION PROCEDURES
(a) Except as otherwise provided in this contract any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to the US-Japan Joint Committee for conciliation in accordance with paragraph 10, Article XVIII, of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between Japan and the United States of America. Request by the Contractor for conciliation shall be made in accordance with the procedures provided herein.
(b) In the event the Contractor desires conciliation after the decision of the Contracting Officer has been served upon him, he will first file his appeal from such findings of fact within the time limits described therein before filing request for conciliation with the Joint Committee and then request for appellate authority under the clause of this contract entitled Disputes to suspend its action on his appeal until such time as the Joint Committee has had an opportunity for effecting conciliation.
(c) The request for conciliation will be submitted by the Contractor through the nearest local Japanese Defense Facilities Administration Bureau to the Contract Conciliation Panel of the Joint Committee. Upon the filing of the request with the Joint Committee, the Contractor will immediately notify the Contracting Officer in writing that the request for conciliation has been filed.
(d) In the event the disagreement submitted to the Joint Committee under subparagraph (b) above has been resolved through conciliation, it will be the responsibility of the Contractor to notify the appellate authority designated in the clause of this contract, entitled Disputes, of the settlement of the dispute and to withdraw his appeal.
(e) In the event the Contractor who has submitted a request for conciliation to the Joint Committee under subparagraph (b) above desires, notwithstanding the pending request for conciliation, that action by the appropriate authority under the clause of this contract entitled Disputes be resumed on his appeal, it is his responsibility to so request the said authority in writing. The Joint Committee shall be immediately informed by the Contractor of his action taken hereunder.
(f) No request for conciliation can be submitted to the Joint Committee in the case of a dispute upon which the final decision of the appropriate authority under the clause of this contract entitled Disputes has been rendered.
Pending the hearing of conciliation panel the Contractor shall proceed diligently with the performance of the contract and in accordance with the Contracting Officer's decision. The provisions of this clause shall not prejudice any right which the parties to the contract may have to file a civil suit.
CONSUMPTION TAX
(a) The Governments of the United States and Japan have agreed that this contract is exempt from the Japanese Consumption Tax. In accordance with paragraph (c) of the clause FAR 52.229-6, "TAXES -- FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)," the offerors or quoters shall not include the Consumption Tax (including underlying taxes) in their proposal or quotations. By submission of your proposal or quotation, you are certifying that your proposal or quotation does not contain any such tax. The following U.S. Government
(USG) proof of purchase forms shall be used to claim the exemption at tax offices:
USG Standard Form 1034 USG Standard Form 1113 USG Standard Form 44 Department of Defense Form 1155 Navy Comptroller Form 2277
(b) The Contractor shall retain the appropriate USG proof of purchase forms set forth above for a period of seven
(7) years. In addition, the Contractor shall maintain adequate records containing all pertinent information with regard to the claiming of Consumption Tax exemptions related to this contract. These records shall be subject to review by the Contracting Officer, or his or her designated representative, at any time up to seven (7) years from the date of final payment under this contract.
(c) Any questions concerning the applicability of the Consumption Tax should be directed to the appropriate local tax office.
CUSTOMS AND TAX EXEMPTION
(a) The Contractor shall, notwithstanding any other clause in this contract to the contrary, be required to submit a request in writing to the Contracting Officer for issuance of a Tax Exemption Certificate for any import duties and all taxes paid or to be paid from which the U.S. Government is entitled to an exemption. These taxes and duties are enumerated in Article XII of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between the Governments of the United States of America and Japan, regarding facilities areas and the status of United States Armed Forces in Japan. The Contractor's request shall include the following information:
(1) Name of contractor;
(2) Contract number and job order number (if applicable);
(3) Nomenclature of taxable material to be delivered and intended use;
(4) Quantity of taxable material used or to be delivered; and
(5) Period of taxable material use.
(b) In the case of gasoline and other petroleum products, the Contractor shall be responsible for making every reasonable effort to determine the accuracy of his figures on consumption. In this regard, the Contractor shall, upon request of the Contracting Officer, present all available data used by the Contractor as the basis for determining such figures. The Contractor shall be required to maintain adequate records containing all pertinent information with regard to the above requirements. Further, these records shall be subject to review by the Contracting Officer at any time up to three years from the date of final payment under this contract.
GROWTH CLIN
(a) Each contract resulting from this solicitation will utilize a Growth CLIN (CLIN 0002), funded proportionally to accommodate anticipated growth work arising during the performance of the specific Task Group Instructions (TGIs) awarded to the Contractor under CLIN 0001 The contractor shall provide (To Be Filled in upon Contract Award) man-hours and (To Be Filled in upon Contract Award) materials in the performance of CLIN 0002 in support of historically based growth for its awarded work items. Upon negotiation of each growth work task, the agreed labor and material amount shall become a completion requirement. Authorized growth work may not exceed the total obligated value of CLIN 0002 for the specific contract under single award or multiple awards. The percentage (%) established under CLIN 0002 shall be adjusted proportionally, based upon the total number of Task Group Instructions (TGIs) proposed by the Offeror in response to this solicitation.
(b) GROWTH WORK - Growth is defined as any additional work identified and authorized after contract award that is within the general scope of work of the specific TGIs awarded to the Contractor under CLIN 0001. Any additional work determined by the Contracting Officer as not within the scope of the Contractor's awarded TGIs ( ) shall be considered NEW including work related to TGIs awarded to other contractors or unawarded work WORK and will not be covered by this Growth CLIN.
(1) After any inspection reports detailed in any of the work items are submitted to Ship Repair Facility - Japan Regional Maintenance Center (SRF-JRMC), the contractor will propose solutions, recommendations, material availability, and time impacts to the Period of Performance. This will be in the form of a Condition Found Report (CFR), which will be submitted to SRF-JRMC within twenty-four (24) hours after the conditions have been found and identified. This form (SRF-JRMC Form 4730-141) shall be submitted electronically and physically for record-keeping purposes. The contractor shall not begin work reported under a CFR until an agreement is reached between the contractor, SRF-JRMC and the Administrative Contracting Officer (ACO).
(2) The contractor shall submit any repair items outside of the scope of the WIs via CFR (SRF-JRMC Form 4730-141) to SRF- JRMC to include schedule impacts.
(3) For any Government Furnished Material (GFM) or Contractor Furnished Material (CFM) that is part of any WI and which is later identified to not arrive on time for the requirement's completion, the contractor shall submit a CFR (Form 4730-141) to SRF- JRMC to include schedule impacts.
(4) SRF-JRMC shall review the CFR and will determine further action. When determined by SRF-JRMC that the work detailed on the CFR is required and would require additional man-hours or materials, the CFR is returned to the contractor through the Contracting Office, as growth work together with a Deficiency Log (DL) detailing the corrective actions and additional work requirements. A Growth Management Request (GMR) Level of Effort (LOE) to completion will be utilized for each growth work request and approval.
(5) Upon receipt of a growth work requirement, the contractor shall submit a proposal with the estimated price within 3 working days, or as specified by the Contracting Office. Naval Supply Systems Command (NAVSUP) Fleet Logistics Center Yokosuka (FLCY) and SRF-JRMC will review and approve each proposal. Once an agreement has been reached between the contractor, SRF-JRMC and the ACO, a signed GMR by the ACO will be issued to enable the contractor to commence work. The price negotiated by the parties shall be a firm fixed price for the growth work requirement.
(6) The ACO will develop a growth work tracking log for the Growth CLIN to identify, record, and reconcile all the approved GMR-LOE to completion. The tracking log shall include but not limited to LOE number, WI, Deficiency Log (DL) number, job description, and approved total price, labor hours, materials/other cost.
(b) Effort performed in fulfilling the obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as (local travel to and from an employee's usual work location), uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee's residence or other non-work locations or other time and effort which does not have a specific and direct contribution to the tasks described in Sections B and C.
(c) (1) The Contractor shall schedule the performance of all items of the work package. The contractor agrees that these man-hours, if tasked, shall be performed concurrently with the other contracted for work items, during the contract period of performance, without impacting, accelerating, or causing delay or disruption to the work required by the other contracted for work items, to any other Government contract, or to any other work in progress for the Government.
(2) The growth, if required, shall be tasked during the contract period of performance, as may be modified, on the schedule in coordination with the Contracting Officer.
(d) (1) The Contractor's fully burdened labor rate that will be proposed in the original contract and included below will be used for negotiating growth work to be performed under this contract. The contractor agrees that the number of man-hours included in its price proposal for contract modifications shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:
Abrasive cleaning/blasting
Fire Watch
Welding
Burning
Brazing
Carpentry
Machinists (inside and outside)
Electrical Work
Electronic Work
Engineering
Design Support
Lagging
Ship-fitting
Boiler-making
Painting
Sheet-metal
Pipefitting
Rigging
General Labor
Staging/Scaffolding
Labor Rate: (To be filled in upon Contract Award)
(2) The fully burdened ship repair labor rate proposed by the contractor listed in paragraph (e)(1) above shall include all costs associated with support functions (whether charged directly or indirectly by the offeror's accounting systems) provided in support of the direct production man-hour functions listed in paragraph (e)(1) above. Support functions shall be considered to be included in the offeror's fully burdened ship repair labor rate for direct production man-hours. Labor hours for the below support functions shall not be separately proposed in any circumstance, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:
Testing
Quality Assurance
Execution Planning
Cleaning
Supervision
Security
Surveying
Administration
Transportation
Purchasing Staff
Lofting
Other indirect support
Material handling & Warehousing
Safely/Environmental
(3) The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.
(4) Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's fully burdened ship repair labor rate and not separately priced.
(5) The contract fixed fully burdened ship repair labor rate shall be used for negotiating growth work during the entire availability regardless of how many labor hours and material dollars are procured and negotiated.
(6) The growth reservation man-hours and material dollar requirements listed above are part of this contract under the original solicitation and award. The man-hour reservation shall include both prime contractor and subcontractor efforts. Only actual production man-hours expended will be considered towards the contractor's obligation to provide the defined reservation man-hour effort. While supervision, quality assurance, and other nonproduction labor should be included in the pricing for reservation items in the original bid, they shall not count towards satisfying the contractor's obligation to provide reserved man-hours. The man-hour reservation shall not include any allowance for technical representatives or for any other Government directed source unless specifically addressed in the individual WI.
Proposed material price shall be based on actual costs to the Contractor of acquiring the materials provided. Proposed material price may include freight or duties which would be reflected on the invoice for the material. The material burden rates apply to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost. For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. The reservation in the contract is not to be considered Time and Material or a Level of Effort. This reservation is Level of Effort to Completion. Once the scope of work for a task has been listed and a mutually agreeable number of man-hours or materials has been agreed to, neither party will be entitled to an adjustment based on actual man-hours or material dollars required. The Contractor shall not commence work without approval from the ACO or receipt of the approved GMR.
(7) The contract fixed fully burdened ship repair labor rate and material burden rate are shown below. These fixed rates shall be used for negotiating growth work during the availability.
Fully Burdened Ship Repair Labor Rate (JPY) (To be filled in upon Contract Award)
Material Burden Rate (%) (To be filled in upon Contract Award)
(e) The balance of hours and material remaining on the Growth CLIN after negotiations have concluded and when it is evident that no additional growth work will be tasked is subject to a decrease change order. As a result, any unused funds on the Growth CLIN will be recouped by the ACO through a contract modification action as a decrease in price within 30 days after the end of the contract period of performance.
Section J - List of Attachments
Attachment (I) Work Specification(s) for TGI*
No. TGI DESCRIPTION
1 38KB312317-A01 F/O - CLEAN, ASSESS, INSPECT, REPAIR, AND PRESERVE FUEL SERVICE TANK (4-220-1-F)
2 38KB312318-A01 F/O - CLEAN, ASSESS, INSPECT, RPR, AND PSV FUEL SERVICE TANK (4-220-4-F)
3 38KB312328-A01 F/O - CLN, ASSESS, INSP, RPR, & PSV FRTK GP-1 (4-78-1-F) AND FTK GP-1 (5-78-1-F)
4 38KB312329-A01 F/O - CLN, ASSESS, INSP, RPR, AND PSV FRTK GP2 (4-78-2-F) AND FTK GP2 (5-78-2-F)
5 38KB312346-A01 F/O - CLEAN, ASSESS, INSPECT, RPR, AND PSV FUEL TANK GP-3 (5-254-3-F)
Attachment (II) Proposal Breakdown Form (Contractor Response Required)*
Attachment (III) Request for Information Sheet
Attachment (IV) Government Furnished Property (GFP-GFM listings)*
Attachment (V) Source of Repair Instruction
Attachment (VI) Warranty Tracking Information
Attachment (VII) Quality Assurance Surveillance Plan (QASP)
Attachment (VIII) Contracts Data Sheet
Attachment (IX) Bundle 1 Contract POP List*
Exhibit (A) Contract Data Requirements List (CDRL) - NSI (NAVSEA Standard Item) 009-60* Exhibit (B) Contract Data Requirements List (CDRL) for GFP (Government Furnished Material)*
* Revised under amendment 0007
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
L-1.0 GENERAL INSTRUCTIONS
The Task Group Instructions (TGIs), drawings and references will be provided via the Government's Department of Defense (DoD) Secure Access File Exchange (SAFE) web-based file transfer service. DoD SAFE is a secure Government repository which enables the sharing of large files which cannot be transmitted via email. The full user guide for DoD SAFE can be found in the following URL (https://safe.apps.mil/help/dod-safe-help.xml).
Any offeror intending to provide a proposal to this solicitation shall request access by sending an email to the following personnel serving as the point of contact for this procurement:
Points of Contact (POC):
Ai Gillard (ai,gillard.ln@us.navy.mil), Contracting Officer Shouko Sekiodo (shouko.sekido.ln@us.navy.mil), Contract Specialist
The Offeror shall certify that they currently hold an active U.S. Navy MSRA/ABR Agreement, or expect to complete the MSRA/ABR certification process prior to the projected contract award date, in order for their offer to be considered. Non MSRA/ABR holders may request an application for an MSRA or an ABR certification by requesting an application package from: flcy_msra_abr_group@us. navy.mil. Please note that the MSRA/ABR Certification process may require a year to complete.
The following are the general instructions:
To permit partial proposals across discrete work items tasked in Task Group Instruction (TGI) under CLINs and preserve the Government's authority to make multiple awards across several Offerors, incorporate following instructions:
Offerors may submit a proposal under one of two options:
(1) Option 1 (All-Inclusive Proposal): The offeror submits pricing and technical capability to perform 100% of the Work Items identified in CLIN 0001.
(2) Option 2 (Partial Proposal): The offeror submits pricing and technical capability for one or more discrete Work Item(s), but less than the full work package.
Note: Offerors are advised that if multiple proposals are submitted, the Government will give preference to the proposal that meets all requirements set forth in the solicitation.
(2)(a) Each Work Item proposed must be fully priced, technically compliant, and capable of standalone execution as defined in the TGI.
(2)(b) Partial bids within a single work item (TGI) will not be considered. An offeror submitting on a given Work Item must propose to perform 100% of the scope of that specific Work Item tasked in the TGI.
A. Offerors shall provide information in the format and sequence identified in the solicitation. The Offerors must provide information in sufficient detail to allow the Government to make a best value assessment of the Offerors capability. Any exception to the Government's technical requirements/specifications must be resolved prior to the solicitation closing date. Offerors that take exception to the Government's technical requirements without prior resolution with the Contracting Officer will not be considered for award. The Offeror is advised that the Government may incorporate any portions of the Offeror's proposal into the resulting contract.
B. Questions: Offerors may submit questions in writing via email to the following points of contact listed above. All questions shall be submitted using Attachment (III) Request for Information (RFI) provided with this solicitation. Questions shall be submitted no later than ), to ensure the Government is able to adequately address and respond to 16-Dec-2026 10:00 AM Japan Standard Time (JST questions submitted.
C. Proposal Validity: Offerors shall fill in block 12 in front page of Standard Form 33 (SF 33) with 90 days. If an offeror fails to fill in block 12, the proposal will be presumed to be valid for 90 days.
D. Amendments: The Government may revise the solicitation at any time by means of an Amendment. Any solicitation amendments and all related documents will be released electronically via email.
E. Subcontracting: Offerors are reminded of the requirements associated with subcontracting with contractors that are debarred, suspended or proposed for debarment contained at FAR 52.209-6. As with all FAR requirements, please ensure you are familiar with those requirements prior to submitting your proposal.
F. If any Long Lead Time Material (LLTM) is identified by the offeror during this period, the offeror shall notify the Government through an RFI.
G. Offerors shall include all anticipated testing work/T-Phase, to include testing work for anticipated standard interference work in your proposal.
H. The Government intends to award without discussions but reserves the right to conduct discussions if necessary. Therefore, offerors are encouraged to submit their best offer from a price standpoint.
I. Ship Check: To schedule a ship check, offerors shall email a request for a ship check to the POC listed above. Participants will be provided additional information to the ship check and will be subject to security, safety, and other applicable regulations established by CFAY Naval base, SRF-JRMC, and the Commanding Officer of the Ship.
J. In accordance with DFARS Clause 252.246-7006 and DFARS PGI 246-710-70, Offerors will be required to complete and submit Attachment (V) listed in Section J as part of their proposal package and Attachment (VI) shall be completed no later than when the warranted items are presented for receipt and/or acceptance.
K. Growth CLIN: The price for CLIN 0002, Growth Work will be derived from the proposed price for CLIN 0001 in accordance with the formula contained in Attachment II Proposal Breakdown Form. The average of the labor rate the successful offeror provides in the Price Proposal Breakdown Sheet will be inserted into H-Clause: Growth CLIN paragraph (e) (1) upon contract award as the fully loaded ship repair labor rate and will be utilized for the purpose of calculating total level of effort to completion under the negotiated Growth Work during the entirety of the contract. The average will be determined by dividing the sum of the total labor costs all CLIN by sum of the total man hours across all CLIN. Additionally, the estimated man-hours and material costs will be inserted into H-Clause: Growth CLIN paragraph (a) upon contract award. These amounts will be based upon the successful offeror's proposal in the Attachment (II) Proposal Breakdown Form, CLIN 0002.
L-2.0 SUBMISSION OF PROPOSALS
A. Proposal Due Date: All copies of proposals shall be received by the Government no later than the date specified in SF33 block 9 (Front Page) of the Solicitation. Late proposals WILL NOT be considered. Offerors are advised to consult FAR 15.208 related to timely receipt of proposal.
B. Electronic Submission: Offerors are instructed to submit their proposal electronically via email to the personnel serving as POC for this procurement. Other submission methods WILL NOT be accepted. In the event that it is impossible to submit the proposal via email due to file size limitations, offerors are instructed to request a drop-off from the POC and submit the proposal via DoD SAFE.
C. Proposal Format: For electronic copies, the files shall be in the format that is compatible with and capable of being opened with Microsoft Office Suite 2016 or Adobe Acrobat Reader 2017. The entire content of the proposal shall be in English. If any required document is written in a language other than English (e.g. Japanese), the offerer shall make effort to provide an English translation.
L-3.0 PROPOSAL CONTENT
The offeror is required to submit the following:
A. Solicitation (SF 33): The Offeror shall submit one copy of the completed SF33 with blocks 12 through 18 completed as well as all sections (e.g.
Section K) with applicable fill-ins. Submission of a signed offer to the Government constitutes agreement and acceptance of the solicited terms and conditions.
B. Solicitation Amendment (SF 30): If applicable, the Offeror shall submit one copy of all acknowledged SF30 by completing and signing block 15.
C. Price Summary: Offerors shall submit the fully completed price proposal utilizing Attachment (II) "Proposal Breakdown Form" of Section J.
Offerors shall also submit vendor quote's associated with Attachment (II).
D. Past Performance Information (PPI): The offeror should provide PPI "Contract Data Sheet(s)" (utilizing Attachment (VIII)) on no more than three
(3) of the offeror's most recently completed contracts with the U.S. Government, Government of Japan (including Japanese Maritime Self-Defense Forces (JMSDF)/other host nation governments if performed in country other than Japan), and/or the general public not to exceed three (3) years since completion for like or similar services to those to be provided under this solicitation. If the offeror is unable to provide three (3) relevant contracts for past performance evaluation, a lesser number may be submitted. Failure to submit Contract Data Sheet(s) shall be considered a certification that the Contractor has no past performance for like or similar items for the Government to evaluate; however, this does not preclude the Government from considering and evaluating past performance records and information in its possession for work it determines to be relevant.
E. Current MSRA or ABR Certification: Offerors who do not possess a current NAVSUP FLCY MSRA/ABR Agreement will be required to submit a copy of an approved/active U.S. Navy MSRA/ABR Agreement as a Prime Contractor as part of the proposal package.
F. This solicitation is intended only for sources duly authorized to operate and do business in Japan, as prescribed by DFARS 252.225-7042. Contractors outside Japan must submit documentation that unambiguously demonstrates the Offeror's compliance with DFARS 252.225-7042 (e.g., proof of incorporation) as part of their proposal.
Section M - Evaluation Factors for Award
M-1.0 GENERAL
The Government contemplates the award of a single Firm-Fixed-Price (FFP) contract resulting from this solicitation, but expressly reserves the right to make partial, split, or multiple awards if determined to be in its best interest. Proposals will be evaluated in accordance with FAR Part 15 "Contracting by Negotiation" utilizing lowest price technically acceptable (LPTA) source selection process identified in FAR 15.101-
2. LPTA is a process used in competitive negotiated contracting where the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price. Best value as defined in FAR 2.101, means the expected outcome of an acquisition that, in the Government's estimation, provides the greatest overall benefit in response to the requirement.
M-2.0 BASIS FOR AWARD- MULTIPLE AWARDS BY WORK ITEM
(a) The Government reserves the right to make partial or split award if necessary.
The Government intends to make a single FFP award for the entire scope of work. However, if no offeror is capable of performing 100 percent of the work, the Government reserves the right to make mutliple awards to one or more offerors for the potions of the work each is capable of performing, in order to accomplish as much of the total scope of work as practicable. As such, Offerors shall clearly identify in their proposals the specific work items they propose to perform.
In a multiple award scenario, award of one work item or combination of work items included in the proposal shall not guarantee award of any other work item or group of work items. The Government makes no guarantee that any particular proposal will receive the award. The Government make no commitment to award the entire scope of work of the proposal or any particular combination of work items. The contract resulting from this solicitation will be a Firm-Fixed-Price (FFP) award contract. Proposals will be evaluated in accordance with FAR Part 15 "Contracting by Negotiation" utilizing lowest price technically acceptable (LPTA) source selection process identified in FAR 15.101-2. LPTA is a process used in competitive negotiated contracts where the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price. Best value as defined in FAR 2.101, means the expected outcome of an acquisition that, in the Government's estimation, provides the greatest overall benefit in response to the requirement.
The Government will evaluate proposals using a phased priority hierarchy:
PHASE 1: EVALUATION OF ALL-INCLUSIVE (TOTAL SCOPE) PROPOSALS
The Government will first evaluate all proposals submitted under Option 1 (covering 100% of the Work Items). If an Option 1 proposal is determined to be technically acceptable, proposed by a responsible offeror, and offers a fair and reasonable price, award will be made to that offeror for the entire requirement. Under Phase 1, partial proposals will not be considered for award.
PHASE 2: EVALUATION OF PARTIAL (SPLIT-AWARD) PROPOSALS
The Government will only proceed to evaluate partial proposals submitted under Option 2 if:
(a) No acceptable all-inclusive (Option 1) proposal is received; OR
(b) All Option 1 proposals are determined technically unacceptable, non-responsive, or unreasonably priced; OR
(c) The Contracting Officer determines in writing that evaluation of partial proposals is in the Government's best interest. . In determining whether a partial-award approach is in the Government's best interest, the Government may consider, among other factors, whether a combination of partial award would better satisfy mission requirements, make more effective use of available funding, or result in a more advantageous price or technical solution than a single all-inclusive award.
(b) Independent Item Evaluation:
(1) Each Work Item [e.g., Items 0001 through 0010] will be evaluated independently.
(2) The Government reserves the right to make a single award covering all Work Items, or multiple awards…