This is a DD Form 1423-1, Contract Data Requirements List (CDRL), specifying one required data deliverable for a naval contract related to USS HIGGINS (DDG-76).

The required data item is the Integrated Production Schedule (IPS), identified as Data Item A001, which must be prepared in accordance with NAVSEA Standard Item 009-60 Category I requirements. The contractor must provide the schedule of work to be performed in writing, in English, on approved transferable media. The initial submittal is due within five (5) calendar days upon contract award to integrate with the Project Schedule. Subsequent submissions are required every 30 days after the initial submittal until the start of the availability period, after which no further submissions are necessary. The schedule must be submitted electronically. Distribution is authorized to Department of Defense components and DOD contractors with critical technology controls; destruction must prevent disclosure of contents. The requiring office is SRF-JRMC, CODE 1209, with three designated Points of Contact: Ryuuji Nakajima, Andrew Kwon, and Conan Tsukayama. One final copy of the IPS is to be delivered to SRF-JRMC. The form was prepared and approved by Ryuuji Nakajima on 10/28/2026. The contract and contractor information fields are marked "TBD" pending contract award.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926RA0320008 SF 30.pdf PDF
Solicitation Amendment - N6264926RA0320008.pdf PDF
Solicitation Amendment N6264926RA0320007 SF 30.pdf PDF
Solicitation Amendment - N6264926RA0320007.pdf PDF
Exhibit (B) CDRL (REV) - GFM_HIGGINS Bundle1.pdf PDF
Att (IX) HIG_6C1_B1_POP_List.xlsx XLSX spreadsheet
Att (II) Price Proposal Form N6264926RA032.xlsx XLSX spreadsheet
Amend0006_Att IX HIG_6C1_B1_POP_List_R4.xlsx XLSX spreadsheet
Solicitation Amendment N6264926RA0320006 SF 30.pdf PDF
Solicitation Amendment_Conformed - N6264926RA0320006.pdf PDF
Solicitation Amendment N6264926RA0320003 SF 30.pdf PDF
Att IX HIG_6C1_B1_POP_List_R1.xlsx XLSX spreadsheet
CDRL - GFM_HIGGINS Bundle1.pdf PDF
Solicitation Amendment N6264926RA0320002 SF 30.pdf PDF
CDRL - HIGGINS Bundle1.pdf PDF
Att IX HIG_6C1_B1_POP_List.xlsx XLSX spreadsheet
Solicitation Amendment N6264926RA0320001 SF 30.pdf PDF
Solicitation - N6264926RA032.pdf PDF
Att IV GFP_List_V3_DDG76_B1.xlsx XLSX spreadsheet
Att VII Quality Assurance Surveillance Plan (QASP).pdf PDF
Att II Proposal Sheet N6264926FA032.xlsx XLSX spreadsheet
Att III RFI Form.docx DOCX document
Att V Source of Repair Instruction.pdf PDF
Att VI Warranty Tracking Information.pdf PDF
Solicitation - N6264926RA032.pdf PDF
Att VIII Contract Data Sheet.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A001
title: INTEGRATED PRODUCTION SCHEDULE (IPS)
sub: N/A
auth: DI-MGMT-82075
ref: SEE BLK 16
req_ofc: SRF-JRMC, CODE 1209
dd250: LT
appcode: NO
dist: D (SEE BLK16)
freq: ASREQ
asof: N/A
firstsub: SEE BLK16
subsub: SEE BLK16
addressee1: SRF-JRMC (BLK16)
draft1:
reg1: 1
repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 1
total_repro: 0
remarks:

BLOCK 4:

Contractor must provide in writing, in English, in approved transferable media, a schedule of work to be performed, in accordance with Category I, NAVSEA Standard Item 009-60.

BLOCK 5:

USS HIGGINS (DDG-76) 6C1 SRA

BLOCK 9: Distribution authorized to DOD components and DOD contractors; critical technology; October 2007. Other requests for this document shall be referred to Naval Sea Systems Command (SEA 04 RM). Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLOCK 10, 12, and 13:

1. Initial submittal of the schedule of work to be performed shall be within five (5) calendar days upon award of the contract in order to integrate with the Project Schedule.

2. Subsequent submissions must be submitted every 30 days after initial submittal, until the start of the availability. Subsequent submissions are not required after the start of the availability.

BLOCK 14

1. The schedule of work to be performed shall be submitted electronically.

2. Code 1209 Points of Contacts (POC) are:

Ryuuji Nakajima (Bldg. A46 2F) ryuuji.nakajima.ln@us.navy.mil

Andrew Kwon (Bldg. A46 2F) andrew.kwon5.civ@us.navy.mil

Conan Tsukayama (Bldg. 2046 RM508) conan.p.tsukayama.civ@us.navy.mil

group:
total_price:
prep_name: NAKAJIMA, Ryuuji
line_item: ALL
exhibit: A
xtdp: Off
xtm: Off
othercat: X-MGMT
system:
ctr_no: TBD
contr: TBD
remarksb:
Page2:
Reset:
2026-10-28T11:04:26+0900
NAKAJIMA.RYUUJI.1298614240
prep_date: 10/28/2026
app_by: NAKAJIMA, Ryuuji
2026-10-28T11:05:19+0900
NAKAJIMA.RYUUJI.1298614240
app_date: 10/28/2026
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .