This is a Job Specification document for the prefabrication of a bow ramp for LCU-1651 (NBU-7), a naval vessel, prepared by the Sasebo Ship Repair Facility.

The work involves fabricating one bow ramp (approximately 15 inches height by 16 feet 11.5 inches width by 17 feet 3.75 inches length) in a contractor's shop, excluding final fit-up welding of components requiring templating from the existing hull. The anticipated award date is September 30, 2026, with a production completion date of June 30, 2027 and a period of performance from September 30, 2026 to July 30, 2027. The contractor must measure existing bow ramp dimensions without removal, fabricate the new ramp per drawing 169-5110389 Rev B, accomplish welding per standard 009-012 with either OPTION A or alternative methods approved under ELM-255171A, perform nondestructive testing (MT and VT required; PT accepted in areas where MT equipment cannot fit with prior documentation), and apply one coat of construction primer (MIL-PRF-23236 Type V or VI, 4-8 mils OFT) to prevent rust and corrosion. The government furnishes all materials including steel structural components, welding electrodes, bolts, fasteners, and various hardware listed in the material list. The cost estimate totals $263,000, comprising $227,500 in labor (4,550 man-hours), $35,380 in materials, and $76,076 in government-furnished material costs. Final preservation will be conducted under a separate ICN (38NBA10013 A01). The email chain indicates contractor concerns regarding 100% NDT requirements, labor availability, fabrication space limitations, and clarifications on preservation requirements, resulting in specification revisions being requested by the project team.

View the file

Other files

File Type Posted
Atch (1) to RFQ Questions.docx DOCX document
N6264926Q0482 Amendment 0002.pdf PDF
Atch (B) 38NBA16905_00_A01_REVISED SPEC-2.pdf PDF
Atch (A) Q and A.pdf PDF
N6264926Q04820001.pdf PDF
N6264926Q0482.pdf PDF
38NBA16905_00_A01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ship/HULL NO. I Ship/HULL NAME ICN: Rev: Key Op:

LCU-1651 I NBU-7 JON:

38NBA16905 A01

TITLE:

Prefabrication of Bow Ramp; accomplish

JOB SPECIFICATION

Anticipated Award Date: Production Completion Date: PREPARING ACTIVITY:

09/30/2026 POP Start Date: POP End Date: SASEBO

PREPARED BY: CODE DATE

K.MATSUMOTO H MK 8/12/2026

APPROVED BY:

CODE

S. MURAKAMI S225

CONCURRED BY:

AAJ

CODE

S. MOROOKA S231

ASSIST PLANNER'S NAME: , CODE

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

DESCRIPTION:

JSN(Sl; CU51-LQ59 CASREP#

SIF CONTACT: BARKEY J. / SAIK. G CWP# CCNS#

Approved by S3001S900 A. REYES/ Proje�na85� te tl12MI

AVL; SCM

LWC;

Work Completed

S/Force: Bite: Q!te:

1301395981 SHIPSUPT: Q!te: SRF CONTROL NO.:

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

09/30/2026 07/30/2027

06/30/2027

Shio/HULL NO. Shio/HULL NAME ICN: Rev: Key Op:

JON:

LCU-1651 NBU-7 38NBA16905

TITLE:

Prefabrication of Bow Ramp; accomplish

1. SCOPE:

1.1 Title: Prefabrication of Bow Ramp; accomplish

1.2 Location of Work:

1.2.1 Contractor's Shop

1. 3 Identification:

A01

1.3.1 Quantity (One EA), Bow Ramp (Approximately Size; 15 Inch H by 16 Feet and 11-1/2 Inch W by 17 Feet and 3-3/4 Inch L), Listed in 2.2

2. REFERENCES:

2.1 Standard Items (FY26)

2.2 169-5110389 Rev B, Bow Ramp Fabrication and Installation

3. REQUIREMENTS:

3.1 Accomplish the requirements of NOTE 17 of 2.2.

(V) "REPORT"

3.1.1 Submit one legible copy of a report listing results of

existing bow ramp dimensions measurement record without removal of the existing LCU-1651 bow ramp to SUPERVISOR.

3.2 Fabricate each new bow ramp listed in 1.3.1 out of each new material listed in 5.1, using 2.2 for guidance.

3.2.1 Exclude the final fit-up welding of components requiring templating from the existing hull (lifting pocket padeye double-fillet attachment welds in DETAIL 50-A of 2.2) from this fabrication scope.

3.2.2 Accomplish the requirements of 009-012 of 2.1, including Table 4, Column A, Lines One through 7 for welding. (See NOTE 4.3)

(V) "REPORT"

3.2.2.1 Ensure to notify which welding standard has been

selected to SUPERVISOR.

3.2.2.2 Accomplish nondestructive testing in accordance with

Line 11, using Tl. of TEST NOTES of 2.2 for guidance. (See NOTES 4.4)

3.3 Accomplish the requirements of 009-032 of 2.1 for cleaning and preservation of each new and disturbed surface to match surrounding area.

Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:

LCU-1651 NBU-7

JON: 38NBA16905 A01

TITLE:

Prefabrication of Bow Ramp; accomplish

3.3.1 Apply one coat of primer (MIL-PRF-23236 TY V or VI, Class 5 or 7, OFT 4-8 mils) for each new bow ramp to prevent any rust and/or corrosion.

3.4 Deliver new prefabricated bow ramp including each excess material when SHIPSUPT notified where directed location during DSRA.

(V) "REPORT"

3.4.1 Submit one legible copy of a report listing results of the bow ramp prefabrication work boundary of 2.2 to SUPERVISOR.

4. NOTES:

4.1 Initial Condition - Project Team requires the bow ramp will need to be prefabricated and ready to install shortly after 781 DSRA start by the other installation job.

4.2 SRF tool room will provide pressure gauge when required.

4.3 OPTION A) of Table 4 of 009-012 of 2.1 has been allowed to utilize under ELM-255171A.

4.4 PT NOT in areas MT equipment cannot fit will be accepted by S241 after the locations have been documented by KTR CFR.

4.5 Final preservation will be conducted by ICN 38NBA10013 A0l.

5. GOVERNMENT FURNISHED MATERIAL (GEM) :

5.1 See attached the Government Furnished Material List.

JON: 38NBA16905 A01

TITLE:

Prefabrication of Bow Ramp; accomplish

MATERIAL LIST

QTY

ITEM PC REF STOCK HAZ DOC REQD/ PARA

NO. NO. NO. M/C DESCRIPTION NUMBER MAT NO. UNIT NO.

ELECTROD, WELDING ROD, 7018M, 3/32"DIA

9G 3439

001 M X 14"L, MIL-E-22200/10, P/N; 255014102,

SA4742861

N 5297E901 20/CN 3.1

10LB/CN NO TEST IS REQUIRED

ELECTROD, WELDING ROD, 7018M, 1/8"DIA X

9G 3439

002 M 14"L, MIL-E-22200/10, P/N; 255014110,

SA4742863

N 5297E905 50/CN 3.1

10LB/CN NO TEST IS REQUIRED

ELECTROD, WELDING ROD, 7018M , 5/32"DIA

9G 3439

003 M X 14"L, MIL-E-22200/10, P/N; 255014128,

SA4742865

N 5297E908 30/CN 3.1

10LB/CN NO TEST IS REQUIRED

004 M

GREASE FITTING, 3/8"-18 NPT/ STRAIGHT, 9B 4730

N 5335E707 10/EA 3.1

STEEL, P/N H-400 SA2303016

005 M BAR.METAL, ROUND BAR, BRONZE, 4.5" DIA 9B 9530 N 5258B053 1/FT 3.1

FOR THRUST WASHER 010302709

006 M ROUND BAR, 2-3/4"OD, GRES 304/304L, 9B 9510 N 5336E705 3/FT 3.1 ASTM A276, 3 FT REQUIRED, P/N 89535K73 SA2401478

007 C SHACKLE, 1-3/4 INCH, G-215, 1019070

9B 4030 N 5335E708 4/EA

SA2301337

008 M 304/304L SS ROD, MUL Tl PURPOSE 304/304L 9B 9510 N 5336E706 2/FT 3.1 STAINLESS STEEL ROD, 2" DIAMETER SA2202839

009 M FLAT BAR, BRASS, 1 /4" THK, 3" W X 12" L, 9B 9510

N 5336E707 1/EA 3.1

P/N 8954K102 SA2400488

010 M PIN.COTTER, GRES, 3/16" X 2", 10 EA/PG

9B 5315

N 5258B055 1/PG 3.1

016211371

01 1 M GREASE.UTILITY, GENERAL PURPOSE, MIL- 9B 9150 y 5339B831 1/CN 3.1 DTL-23549 009857316

GREASE.UTILITY, TERMALINE II , SEA

9B 9150

012 M WATER-WASH RESISTANT GREASE,

013069167 y 5339B841 1/CN 3.1

35LB/CN

013 M ANGLE.STRUCTURAL, 1" X 1" X 1/8"THK, 9B 9520 N 5258B056 20/FT 3.1

ANGLE STEEL, ASTM A36 002775986

014 M ANGLE,STRUCTURAL, 1" X 1" X 1/8"THK, 9B 9520 N 5258B057 20/FT 3.1 ANGLE STEEL, ASTM A36 002775986

015 M ANGLE .STRUCTURAL, 1" X 1" X 1/8"THK, 9B 9520 N 5258B058 20/FT 3.1 ANGLE STEEL, ASTM A36 002775986

016 M ANGLE.STRUCTURAL, 1" X 1" X 1/8"THK, 9B 9520 N 5258B059 20/FT 3.1

ANGLE STEEL, ASTM A36 002775986

017 M

ANGLE.STRUCTURAL, 1" X 1" X 1/8"THK, 9B 9520

N 5258B060 20/FT 3.1

ANGLE STEEL, ASTM A36 002775986

018 C SWITCH,SENSITIVE, PIN: 6984H27A

3B 5930 N 5258B061 1/EA

002598810 -

019 C STUFFING TUBE, NYST-2, SIZE 2, P/N: 9B 5975 N 5258B062 1/EA M19622/2-002 005034693

020 C

PACKING, PACKING ASSEMBLY, NYST-17, 9B 5330 N 5258B036 1/AY

SIZE 2E, P/N: M19622/17-0005 011082552 -

JON: 38NBA16905 A01

TITLE:

Prefabrication of Bow Ramp; accomplish

021 M

PLATE, METAL, 20.4 LB, 1/2" THK, ABS GR-A,

9B 9515 N 5339E502 1/EA 3.1

STEEL, 2 FT X 2 FT

022 M PLATE,METAL, 30.6 LB, 3/4" THK, ABS GR-B,

9B 9515 N 5339E503 1/EA 3.1 STEEL. 1 FT X 2 FT

023 C

PLATE, METAL, 1"THK (40.8LB) X 4FT X 8FT,

9B 9515 N 5339E504 1/PM -ASTMA36

024 C

PLATE, METAL, 1-1/4"THK (51 LB) X 1FT X

9B 9515 N 5339E505 1/EA -2FT, ASTM A36/ ABS GRADE

025 M SQUARE BAR, 1 INCH SIZE, ASTM A36/A36M

9B 9515

N 5332E700 1/EA 3.1

SA2201957

PLATE,METAL, PLATE,METAL, 12.75 LB, 9B 9515

501 1 2.2 M 5/16"THK, STEEL, ASTM A36, 6 FT X 20 FT (3 SAMS0031 N 5317E506 3/PM 3.1

PM REQUIRED) 2

PLATE .METAL, PLATE.METAL, 20.4 LB, 1/2"

9B 9515

502 2 2.2 M THK, ASTM A572, GRADE 50, STEEL, 5 FT X

SA2100640 N 5317E507 2/PM 3.1

15 FT (2 PM REQUIRED)

PLATE.METAL, PLATE, METAL, 25.5 LB, 5/8"

9B 9515

503 3 2.2 M THK, ASTM A572, GRADE 50, STEEL, 1 FT X 2

SA2202659

N 5237E210 2/SF 3.1

FT REQUIRED.

PLATE.METAL, PLATE.METAL, 40.8 LB, 1" 9B 9515

504 4 2.2 M THK, ASTM A36, STEEL, 4 FT X 4 FT SAMS0100 N 5239E954 16/SF 3.1

REQUIRED. 0

PLATE.METAL, PLATE.METAL, 61 .2 LB, 1-1/2"

9B 9515

505 5 2.2 M THK, ASTM A572, GRADE 50, STEEL, 2 FT X 2

SA2302053

N 5237E211 4/SF 3.1

FT REQUIRED.

PLATE.METAL, PLATE.METAL, 81 .6 LB, 2"

9B 9515

506 6 2.2 M THK, ASTM A36, STEEL, 1 FT X 2 FT

SA2202651

N 5237E212 2/SF 3.1

REQUIRED.

507 7 2.2 M

S-BEAM, S-BEAM, S15 X 42.9 (0.41" WEB X 9B 9520

N 5317E508 165/Fl 3.1 5.64" FLANGE), STEEL, ASTM A36 SA2201956

508 8 2.2 M C-CHANNEL, C-CHANNEL, C15 X 40.00(0.52" 9B 9540 N 5317E500 53/FT 3.1 WEB X 3.52" FLANGE), STEEL, ASTM A36 SA2201952

MC-CHANNEL, MC-CHANNEL, MC18 X 45.8

9B 9540

509 9 2.2 M (0.50" WEB X 4.0" FLANGE), STEEL, ASTM

SA2201953

N 5317E501 9/FT 3.1

A36

C-CHANNEL, C-CHANNEL, C15 X 50.0 (0.72"

9B 9540

510 10 2.2 M WEB X 3.72" FLANGE), ASTM A572 , GRADE

SA2201954

N 5317E502 18/FT 3.1

50 STEEL

511 11 2.2 M BAR.METAL, BAR.FLAT, 4" X 1/2" THK, 9B 9510 N 5232B029 12/FT 3.1 STEEL, ASTM A36 001891620

512 12 2.2 M FLAT BAR, FLAT BAR, 7" X 1/2" THK, STEEL, 9B 9530 N 5330E722 19/FT 3.1

ASTMA36 SA2201955

513 13 2.2 M PIPE,SCHED 80, PIPE, 6" NPS (SCHED 80) , 9B 4710

N 5330E723 22/FT 3.1 STEEL, ASTM A53 SA2201959

514 14 2.2 M PIPE, SCH ED 80, PIPE, 1 0" NPS (SCH ED 80), 9B 4710 N 5330E724 2/FT 3.1 STEEL, ASTM A53 SA2201960

515 15 2.2 M ANGLE.ST, ANGLE, 3" X 3" X 3/8", STEEL, 9B 9520

N 5231B015 18/FT 3.1 ASTMA36 002774948

516 16 2.2 M SQUARE BAR, SQUARE BAR, 1" X 1" X 8FT X 9B 9510 N 5317E503 50/EA 3.1

50 EA REQUIRED, STEEL, ASTM A36 SA2201957

Ship/HULL NO. Ship/HULL NAME ICN: I Rev: Key Op:

LCU-1651 NBU-7

JON: 38NBA16905 A01 !

TITLE:

Prefabrication of Bow Ramp; accomplish

517 17 2.2 M

ROUND BAR, ROUND BAR, 2-7/8" OD, CRES 98 9510

N 5240E953 2/FT 3.1 316, ASTM A276 SA2202647

518 18 2.2 M

BOLT.HEX HD, BOLT,HEX HD, 3/8"-16 UNC-2A 98 5305

N 5233E704 10/EA 3.1 X 3" LONG, CRES 316, ASTM F593 SA2202666

NUT,HEX,SLF-LKG, NUT,HEX, SELF-

98 5310

519 19 2.2 M LOCKING, 3/8"-16 UNC-38, NYLON-INSERT,

SA2202667

N 5233E705 10/EA 3.1

CRES 316, ASTM F594

520 20 2.2 M

WASHER FLAT, WASHER FLAT, 3/8" 98 5310 N 5232E704 20/EA 3.1

NOMINAL, CRES 316, 818.22.1 SA2402007

THRUST WASHER, THRUST WASHER, 2" X 4"

98 5310

521 21 2.2 M NOMINAL, 1/4" THK, BRONZE (OILITE PLUS

SA2202825

N 5232E705 20/EA 3.1

(3 .98" OD), P/N TP-4002

BUMPER.WING TYPE, BUMPER.WING TYPE,

522 22 2.2 M O-BORE, CODE NO. DB-405, EPDM, 400 98 5340 N 5232E706 60/FT 3.1 SERIES, WIDTH=5", THICKNESS(BT)=1/2", SA2301112

OUTSIDE DIAM(D)=2-1/2" BORE DIAM=1"

523 23 2.2 M FLAT BAR, FLAT BAR, 5" X 1/2" THK, STEEL, 98 9510 N 5339E705 60/FT 3.1

ASTMA36 SA2302052

PLATE,METAL, PLATE,METAL, 30.6#,

98 9515

524 24 2.2 M 3/4"THK, ASTM A572, GRADE 50, STEEL, 2 FT

SA2202660

N 5339E506 4/SF 3.1

X 2 FT REQUIRED.

525 11 2.2 M BAR.METAL, BAR.FLAT, 4" X 1/2" THK, 98 9510 N 52318008 30/FT 3.1 STEEL, ASTM A36 001891620

Ship/HULL NO. Ship/HULL NAME ICN: I Rev: Key Op:

JON: 38NBA16905 I A01

TITLE:

Prefabrication of Bow Ramp; accomplish

COST ESTIMATE SHEET

MAN HOUR/ TRADE

WORK Ship Sheet Welder Mactwne IIHldo Out-oldo Boller Pipe ll'IIUllter Painter Rigger MAN ITEM Fitter M ... I Burner Machin/II Machin/II M■ker Eleelrld■n Fitter Laggor Sand-81111 Laborer HOUR

PARA- X11 X17 X21 Xl10 XII XII X41 Xl1 XH XLQ XII X71 X72 XN QA SUB- GRAPH 111 117 121 111 Ill IH 411 111 IH 141 ... 171 172 411 1110 TOTAL

3.1 48 64 11 123

3.2 2320 1216 120 160 382 4198

3.3 96 10 106

3.4 16 96 11 123

SUB 2384 1216 120 96 320 414 4550

TOTAL

ITEM MAN DAY TOTAL 569

GFM TOTAL G&M COST: $ 76,076-

CFM TOTAL C&M COST: $ 35,380-

C&M BREAKDOWN

Crane Service $ 3,080 Barge Fee $ 6,800 Rigging Gear $ 3,000 OXY/ACE Gas $ 2,500 Grind MTL $ 1,000 Fabrication Work MISC $ 100 NDT Inspection Fee $ 15,500 Enclosure MTL $ 1,500 Sanding MTL $ 500 Construction Primer $ 1,200 Paint MISC $ 100 H/C $ 100

38NBA16905-00-AOJ

SRF ESTIMATE SRF CONT. NO

M/H 4,550 1301395981

LABOR $ 227,500

MATL $ 35,380

TOTAL $ 262,880

$ 263 K

Matsumoto, Kozo (S231) LN USN NAVSHIPREPFAC SAS JA (JPN)

From:

Sent:

To:

Cc:

Subject:

Signed By:

Matsu moto-sa n, Reyes, Avelino L Jr CIV (USA)

Wednesday, August 12, 2026 1 :37 PM Matsumoto, Kozo (S231) LN USN NAVSHIPREPFAC SAS JA (JPN); Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA); Murakami, Seiji (S225 Chief Planner) LN USN NAVSHIPREPFAC SAS JA (JPN); Morooka, Satoru (S231)

LN USN NAVSHIPREPFAC SAS JA (JPN)

Fujikawa, Cary S CIV USN COMFLEACT SASEBO JA (USA); Murakami, Seiji (S225 Chief Planner) LN USN NAVSHIPREPFAC SAS JA (JPN); Morooka, Satoru (S231) LN USN NAVSHIPREPFAC SAS JA (JPN); Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN);

Andujar, Franklin A CIV USN NAVSUP FLCY SASEBO (USA); Yamasaki, Fumika LN USN

NAVSUP FLCY SASEBO (JPN); Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA); Suenaga, Hiroki (S320 NBU-7 Ship Supt) LN USN NAVSHIPREPFAC SAS JA (JPN);

Barkey, James D CTR USN NAVSHIPREPFAC SAS JA (USA); Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN); Iida, Yoshizumi (S241) LN USN NAVSHIPREPFAC SAS JA (JPN); Matsuo, Daniel T CIV USN NAVSHIPREPFAC SAS JA (USA) RE: !!URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328 avelino.l.reyes.civ@us.navy.mil

RE: ! !URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Due to no KTRs biding for para 1.3.1.1 Outboard Side Surface of Bow Ramp

"Critical Coated Area". Request planner to issue REV SPEC to replace para 1.3.1.1 with "Structural Primer".

The preservation of Bow Ramp should be covered under ICN# 38NBA10013

Exterior Structure Corroded.

Please advise.

Thank you for support.

Very respectfully, Avelino L. Reyes Jr.

S310 SRF JRMC Det Sasebo

PM: NBU-7

Ema ii: Avelino. I. reyes.civ@us.navy.mil

DSN: (315) 252-8220

Cell phone#: +8190-1901-6861 / 090-1901-6861

-----Original Message----- From: Matsumoto, Kozo (S231) LN USN NAVSHIPREPFAC SAS JA (JPN) <kozo.matsumoto.ln@us.navy.mil>

Sent: Tuesday, August 11, 2026 9:12 AM

To: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS

JA (USA) <dasan.t.sparks.civ@us.navy.mil>

Cc: Fujikawa, Cary S CIV USN COMFLEACT SASEBO JA (USA) <cary.s.fujikawa.civ@us.navy.mil>; Murakami, Seiji (S225 Chief Planner) LN

USN NAVSHIPREPFAC SAS JA (JPN) <seiji.murakami.ln@us.navy.mil>; Morooka, Satoru (S231) LN USN NAVSHIPREPFAC SAS JA (JPN)

<satoru.morooka.ln@us.navy.mil>; Reyes, Avelino L Jr CIV (USA)

<avelino.l.reyes.civ@us.navy.mil>; Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA

(JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin.a.andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASEBO (JPN) <fumika.yamasaki2 .ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA)

<tanya .l.escritoryamada.civ@us.navy.mil>; Suenaga, Hiroki (S320 NBU-7 Ship

Supt) LN USN NAVSHIPREPFAC SAS JA (JPN) <hiroki.suenaga2 .ln@us.navy.mil>;

Barkey, James D CTR USN NAVSHIPREPFAC SAS JA (USA)

<james.d.barkey.ctr@us.navy.mil>; Kurita, Hiromi LN USN NAVSUP FLCY SASEBO

(JPN) <hiromi.kurita.ln@us.navy.mil>; Iida, Yoshizumi (S241) LN USN

NAVSHIPREPFAC SAS JA (JPN) <yoshizumi.iida.ln@us.navy.mil>; Matsuo, Daniel T

CIV USN NAVSHIPREPFAC SAS JA (USA) <daniel.t.matsuo.civ@us.navy.mil>

Subject: RE : ! ! URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905 , PT 26-6328

Good morning Sparks-san, I have wrong ICN below, sorry. I understood that to revise the A0l. Thank you very much.

V/R Kozo Matsumoto

Hull Planning

SRF JRMC DET, Sasebo

DSN 252-8095

*Disclaimer: Please be advised, I have no authority to contractually bind or obligate the Government. My correspondence is for coordination and information gathering purposes only. If the Government desires to issue a contract, a "warranted" Contracting Officer will do so.*

-----0 rigi na I Message-----

From: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC

SAS JA (USA) <dasan.t .sparks.civ@us.navy.mil>

Sent: Tuesday, August 11, 2026 9:06 AM

To: Matsumoto, Kozo (S231) LN USN NAVSHIPREPFAC SAS JA (JPN) <kozo.matsumoto.ln@us.navy.mil>

Cc: Fujikawa, Cary S CIV USN COMFLEACT SASE BO JA (USA)

<cary.s.fujikawa.civ@us.navy.mil>; Murakami, Seiji (S225 Chief Planner) LN

USN NAVSHIPREPFAC SAS JA (JPN) <seiji.murakami.ln@us.navy.mil>; Morooka, Satoru (S231) LN USN NAVSHIPREPFAC SAS JA (JPN)

<satoru.morooka.ln@us.navy.mil>; Reyes, Avelino L Jr CIV (USA)

<avelino.l.reyes.civ@us.navy.mil>; Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA

(JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin .a.andujar2 .civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASEBO (JPN) <fumika .yamasaki2.ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA)

<tanya.l.escritoryamada.civ@us.navy.mil>; Suenaga, Hiraki (S320 NBU-7 Ship

Supt) LN USN NAVSHIPREPFAC SAS JA (JPN) <hiroki.suenaga2.ln@us.navy.mil>;

Barkey, James D CTR USN NAVSHIPREPFAC SAS JA (USA)

<james.d.barkey.ctr@us.navy.mil>; Kurita, Hiromi LN USN NAVSUP FLCY SASEBO

(JPN) <hiromi.kurita.ln@us.navy.mil>; Iida, Yoshizumi (S241) LN USN

NAVSHIPREPFAC SAS JA (JPN) <yoshizumi.iida .ln@us.navy.mil>; Matsuo, Daniel T

CIV USN NAVSHIPREPFAC SAS JA (USA) <daniel.t.matsuo.civ@us.navy.mil>

Subject: RE: !!URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Matsumoto-san, 38E9366211 is a LSD47 SPEC.

Please revise the current 38NBA16905A01 to reflect the changes that were provided.

V/R, Dasan Sparks

S320/S330 Class Team Leader

MCM/NBU/APL/Visiting Ships

SRF-JRMC DET SASEBO

DESK DSN : 315-252-6791

CELL LOCAL: 090-1901-6999

-----Original Message-----

From: Matsumoto, Koza (S231) LN USN NAVSHIPREPFAC SAS JA (JPN) <kozo.matsumoto.ln@us.navy.mil>

Sent: Monday, August 10, 2026 2:47 PM

To: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA) <dasan.t.sparks.civ@us.navy.mil>

Cc: Fujikawa, Cary S CIV USN COMFLEACT SASEBO JA (USA)

<cary.s.fujikawa .civ@us.navy.mil>; Murakami, Seiji (S225 Chief Planner) LN

USN NAVSHIPREPFAC SAS JA (JPN) <seiji.murakami.ln@us.navy.mil>; Morooka, Satoru (S231) LN USN NAVSHIPREPFAC SAS JA (JPN)

<satoru .morooka.ln@us.navy.mil>; Reyes, Avelino L Jr CIV (USA)

<avelino.l.reyes.civ@us.navy.mil>; Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA

(JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin.a .andujar2 .civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASEBO (JPN) <fumika .yamasaki2.ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA)

<tanya .l.escritoryamada .civ@us.navy.mil>; Suenaga, Hiraki (S320 NBU-7 Ship

Supt) LN USN NAVSHIPREPFAC SAS JA (JPN) <hiroki.suenaga2 .ln@us.navy.mil>;

Barkey, James D CTR USN NAVSHIPREPFAC SAS JA (USA)

<james.d.barkey.ctr@us.navy.mil>; Kurita, Hiromi LN USN NAVSUP FLCY SASEBO

(JPN) <hiromi.kurita.ln@us.navy.mil>; Iida, Yoshizumi (S241) LN USN

NAVSHIPREPFAC SAS JA (JPN) <yoshizumi.iida.ln@us.navy.mil>; Matsuo, Daniel T

CIV USN NAVSHIPREPFAC SAS JA (USA) <daniel.t.matsuo.civ@us.navy.mil>

Subject: RE: !!URGENT!! RFQSolicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Importance: High

Sparks-san, I have a question about MT consideration for bow ramp prefabrication job.

Is the previous .38E9366211_A01 will be cancelled? If so, I will recreate job spec A02 as new one including necessity requirements of A0l. Please advise.

V/R Koza Matsumoto

Hull Planning

SRF JRMC DET, Sasebo

DSN 252-8095

*Disclaimer: Please be advised, I have no authority to contractually bind or obligate the Government. My correspondence is for coordination and information gathering purposes only. If the Government desires to issue a contract, a "warranted" Contracting Officer will do so.*

-----Original Message----- From: Morooka, Satoru (S231) LN USN NAVSHIPREPFAC SAS JA (JPN)

<satoru.morooka.ln@us.navy.mil> Sent: Friday, August 7, 2026 3:29 PM To: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS

JA (USA) <dasan.t.sparks.civ@us.navy.mil>; Matsumoto, Koza (S231) LN USN NAVSHIPREPFAC SAS JA (JPN) <kozo.matsumoto.ln@us.navy.mil>; Fujikawa, Cary S

CIV USN COMFLEACT SASE BO JA (USA) <cary.s.fujikawa.civ@us.navy.mil>;

Murakami, Seiji (S225 Chief Planner) LN USN NAVSHIPREPFAC SAS JA (JPN)

<seiji .murakami.ln@us.navy.mil> Cc: Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>;

Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY SASEBO (USA) <franklin.a.andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASEBO (JPN) <fumika .yamasaki2.ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA)

<tanya.l.escritoryamada.civ@us.navy.mil>; Suenaga, Hiraki (S320 NBU-7 Ship Supt) LN USN NAVSHIPREPFAC SAS JA (JPN) <hiroki.suenaga2.ln@us.navy.mil>;

Barkey, James D CTR USN NAVSHIPREPFAC SAS JA (USA) <james.d.barkey.ctr@us.navy.mil>; Kurita, Hiromi LN USN NAVSUP FLCY SASEBO

(JPN) <hiromi.kurita.ln@us.navy.mil>; Iida, Yoshizumi (S241) LN USN NAVSHIPREPFAC SAS JA (JPN) <yoshizumi.iida.ln@us.navy.mil>; Matsuo, Daniel T

CIV USN NAVSHIPREPFAC SAS JA (USA) <daniel.t.matsuo.civ@us.navy.mil>

Subject: RE: ! !URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Matsumoto san, As per CTL direction, please generate a rev spec with PSE recommendations.

Thank you.

v/r Satoru Morooka

S231 Hull Planning SEC

DSN: 252-8331

Mobile: 080-5881-9425

-----Original Message-----

From : Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC

SAS JA (USA) <dasan.t.sparks.civ@us.navy.mil>

Sent: Friday, August 7, 2026 3:16 PM To: Matsumoto, Kozo (S231) LN USN NAVSHIPREPFAC SAS JA (JPN)

<kozo.matsumoto.ln@us.navy.mil>; Fujikawa, Cary S CIV USN COMFLEACT SASEBO

JA (USA) <cary.s.fujikawa.civ@us.navy.mil>; Morooka, Satoru (S231) LN USN

NAVSHIPREPFAC SAS JA (JPN) <satoru.morooka .ln@us.navy.mil>; Murakami, Seiji

(S225 Chief Planner) LN USN NAVSHIPREPFAC SAS JA (JPN)

<seiji .murakami.ln@us.navy.mil>

Cc: Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>;

Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN)

<emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin.a.andujar2 .civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASEBO (JPN) <fumika.yamasaki2.ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA)

<tanya.l.escritoryamada.civ@us.navy.mil>; Suenaga, Hiraki (S320 NBU-7 Ship

Supt) LN USN NAVSHIPREPFAC SAS JA (JPN) <hiroki.suenaga2.ln@us.navy.mil>;

Barkey, James D CTR USN NAVSHIPREPFAC SAS JA (USA)

<james.d.barkey.ctr@us.navy.mil>; Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita.ln@us.navy.mil>; Iida, Yoshizumi (S241) LN USN

NAVSHIPREPFAC SAS JA (JPN) <yoshizumi.iida.ln@us.navy.mil>; Matsuo, Daniel T CIV USN NAVSHIPREPFAC SAS JA (USA) <daniel.t.matsuo.civ@us.navy.mil>

Subject: RE: !!URGENT!! RFQSolicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

+Correct Morooka-san

Sorry for the mistake on my part. See the request below.

V/R, Dasan Sparks

S320/S330 Class Team Leader

MCM/NBU/APL/Visiting Ships

SRF-JRMC DET SASE BO

DESK DSN: 315-252-6791

CELL LOCAL: 090-1901-6999

-----Original Message-----

From: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC

SAS JA (USA)

Sent: Friday, August 7, 2026 3:09 PM

To: Matsumoto, Kozo (S231) LN USN NAVSHIPREPFAC SAS JA (JPN)

<kozo.matsumoto.ln@us.navy.mil>; Fujikawa, Cary S CIV USN COMFLEACT SASEBO

JA (USA) <cary.s.fujikawa.civ@us.navy.mil>; Morooka, Hirohisa LN (JPN)

<hirohisa .morooka .ln@us.navy.mil>; Murakami, Seiji (S225 Chief Planner) LN

USN NAVSHIPREPFAC SAS JA (JPN) <seiji.murakami.ln@us.navy.mil>

Cc: Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>;

Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN)

<emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin.a .andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN NAVSUP FLCY SASEBO (JPN) <fumika .yamasaki2.ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA)

<tanya .l.escritoryamada.civ@us.navy.mil>; Suenaga, Hiroki (S320 NBU-7 Ship

Supt) LN USN NAVSHIPREPFAC SAS JA (JPN) <hiroki.suenaga2.ln@us.navy.mil>;

Barkey, James D CTR USN NAVSHIPREPFAC SAS JA (USA)

<james.d.barkey.ctr@us.navy.mil>; Kurita, Hiromi LN USN NAVSUP FLCY SASEBO

(JPN) <hiromi.kurita .ln@us.navy.mil>; Iida, Yoshizumi (S241) LN USN

NAVSHIPREPFAC SAS JA (JPN) <yoshizumi.iida.ln@us.navy.mil>; Matsuo, Daniel T

CIV USN NAVSHIPREPFAC SAS JA (USA) <daniel.t.matsuo.civ@us.navy.mil>

Subject: RE : !!URGENT!! RFQSolicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Morooka-san, See the request below for the BOW RAMP Pre-fabrication. Need planning support to provide a REV SPEC so that we can get this contracted . Need the revision by 14AUG26. Thank you.

V/R, Dasan Sparks S320/S330 Class Team Leader

MCM/NBU/APL/Visiting Ships

SRF-JRMC DET SASE BO

DESK DSN: 315-252-6791

CELL LOCAL: 090-1901-6999

-----Original Message-----

From: Matsumoto, Kozo (S231) LN USN NAVSHIPREPFAC SAS JA (JPN) <kozo.matsumoto.ln@us.navy.mil>

Sent: Friday, August 7, 2026 2:29 PM

To: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA) <dasan.t.sparks.civ@us.navy.mil>; Fujikawa, Cary S CIV USN

COMFLEACT SASEBO JA (USA) <cary.s.fujikawa.civ@us.navy.mil>

Cc: Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>;

Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN)

<emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin .a.andujar2 .civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASEBO (JPN) <fumika.yamasaki2.ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA)

<tanya.l.escritoryamada.civ@us.navy.mil>; Suenaga, Hiroki (S320 NBU-7 Ship

Supt) LN USN NAVSHIPREPFAC SAS JA (JPN) <hiroki.suenaga2.ln@us.navy.mil>;

Barkey, James D CTR USN NAVSHIPREPFAC SAS JA (USA)

<james.d .barkey.ctr@us.navy.mil>; Kurita, Hiromi LN USN NAVSUP FLCY SASE BO

(JPN) <hiromi.kurita.ln@us.navy.mil>; Iida, Yoshizumi (S241) LN USN NAVSHIPREPFAC SAS JA (JPN) <yoshizumi.iida .ln@us.navy.mil>; Matsuo, Daniel T

CIV USN NAVSHIPREPFAC SAS JA (USA) <daniel.t.matsuo.civ@us.navy.mil>

Subject: RE: ! !URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Importance: High

Spa rks-sa n, Please notify your request to planning supervisors. I am not able to do the action without our supervisor's dedications. Thank you for your understanding.

V/R Kozo Matsumoto

Hull Planning

SRF JRMC DET, Sasebo

DSN 252-8095

* Disclaimer: Please be advised, I have no authority to contractually bind or obligate the Government. My correspondence is for coordination and information gathering purposes only. If the Government desires to issue a contract, a "warranted " Contracting Officer will do so.*

-----Original Message----- From: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC

SAS JA (USA) <dasan.t.sparks.civ@us.navy.mil> Sent: Friday, August 7, 2026 2:21 PM To: Fujikawa, Cary S CIV USN COMFLEACT SASEBO JA (USA)

<cary.s.fujikawa.civ@us.navy.mil>; Matsumoto, Kozo (S231) LN USN

NAVSHIPREPFAC SAS JA (JPN) <kozo.matsumoto.ln@us.navy.mil> Cc: Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>;

Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN)

<emi.mizutori. ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin.a.andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASE BO (JPN) <fumika.yamasaki2.ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA) <tanya.l.escritoryamada .civ@us.navy.mil>; Suenaga, Hiroki (S320 NBU-7 Ship

Supt) LN USN NAVSHIPREPFAC SAS JA (JPN) <hiroki.suenaga2.ln@us.navy.mil>;

Barkey, James D CTR USN NAVSHIPREPFAC SAS JA (USA) <james.d.barkey.ctr@us.navy.mil>; Kurita, Hiromi LN USN NAVSUP FLCY SASE BO

(JPN) <hiromi.kurita .ln@us.navy.mil>; Iida, Yoshizumi (S241) LN USN

NAVSHIPREPFAC SAS JA (JPN) <yoshizumi.iida.ln@us.navy.mil>; Matsuo, Daniel T

CIV USN NAVSHIPREPFAC SAS JA (USA) <daniel.t.matsuo.civ@us.navy.mil>

Subject: RE : ! !URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Importance: High

Matsumoto-san, Please create a REV SPEC to reflect the changes outlined below. Kindly ask that we get this done by 14AUG26.

7.Concur

8. Concur

9. Plan for full preservation.

10. Thank you.

V/R, Dasan Sparks

S320/S330 Class Team Leader

MCM/NBU/APL/Visiting Ships

SRF-JRMC DET SASEBO

DESK DSN: 315-252-6791

CELL LOCAL: 090-1901-6999

-----Original Message-----

From: Fujikawa, Cary S CIV USN COMFLEACT SASEBO JA (USA)

<cary.s.fujikawa.civ@us.navy.mil>

Sent: Friday, August 7, 2026 1:40 PM

To: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS

JA (USA) <dasan.t.sparks.civ@us.navy.mil>

Cc: Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>;

Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN)

<emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY SASEBO (USA) <franklin .a.andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN NAVSUP FLCY SASEBO (JPN) <fumika.yamasaki2.ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA)

<tanya.l.escritoryamada.civ@us.navy.mil>; Suenaga, Hiraki (S320 NBU-7 Ship

Supt) LN USN NAVSHIPREPFAC SAS JA (JPN) <hiroki.suenaga2.ln@us.navy.mil>;

Barkey, James D CTR USN NAVSHIPREPFAC SAS JA (USA)

<james.d.barkey.ctr@us.navy.mil>; Kurita, Hiromi LN USN NAVSUP FLCY SASEBO

(JPN) <hiromi.kurita.ln@us.navy.mil>; Iida, Yoshizumi (S241) LN USN

NAVSHIPREPFAC SAS JA (JPN) <yoshizumi.iida.ln@us.navy.mil>; Matsumoto, Koza

(S231) LN USN NAVSHIPREPFAC SAS JA (JPN) <kozo.matsumoto.ln@us.navy.mil>;

Matsuo, Daniel T CIV USN NAVSHIPREPFAC SAS JA (USA)

<daniel.t.matsuo.civ@us.navy.mil>

Subject: RE: !!URGENT!! RFQSolicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Dasan, I made the rounds with Engineering and Planning for questions 7 through 10 as discussed:

7. Recommend to fabricate per drawing 169-5110389 Rev. B, excluding installation of the pocket padeyes. KTR should fabricate them, but final welding to the bow ramp can be done by installing activity unable to template properly from craft at this time. For hinge pads on bow ramp, those have to be installed in drawing locations as the bow ramp longitudinals provide structural support to them. Instead, please prepare for relocation and possibly fabrication of new hinge padeyes on the craft side to match the bow ramp. Material has not been ordered for the craft side hinge pads yet, but that can be on the installation work spec.

8. MT and VT are the requirements and what will be covered by the work spec. However, you can notify the KTR that engineering will accept proposals for PT NDT locations in a CFR. We will approve for locations where MT equipment cannot fit into and have it documented .

9. Current work spec only covers construction primer. However, we prefer full preservation as the primer will have to be removed prior to final preservation. The geometry of the exterior of the bow ramp has a lot of pockets to go redo later. If fully preserved from beginning, then only have to redo the small locations where hot work is to be done. It's a preference so I'll leave it up to the Maintenance Team.

10. We're okay with the proposal along with the comments from 7 above.

Understand that a revision spec may be needed to incorporate these changes.

Please let us know if you need anything else.

Respectfully, Cary Fujikawa, Jr.

U.S. Naval SRF-JRMC Sasebo Code S245 Project Engineer

DSN: 252-8208

OCONUS: 011-81-956-50-8208

Cell: 080-6522-9791

OCONUS: 011-81-80-6522-9791

cary.s.fujikawa .civ@us.navy.mil

-----Original Message----- From: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA) <dasan.t.sparks.civ@us.navy.mil> Sent: Friday, August 7, 2026 11:48 AM To: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita.ln@us.navy.mil>; Fujikawa, Cary S CIV USN COMFLEACT SASEBO JA (USA) <cary.s.fujikawa.civ@us.navy.mil>; Marumoto, Koshi LN (JPN) <koshi .marumoto.ln@army.mil> Cc: Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>;

Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY SASE BO (USA) <franklin.a.andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN NAVSUP FLCY SAS EBO (JPN) <fumika.yamasaki2.ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA) <tanya .l.escritoryamada .civ@us.navy.mil>; Suenaga, Hiroki (S320 NBU-7 Ship Supt) LN USN NAVSHIPREPFAC SAS JA (JPN) <hiroki.suenaga2.ln@us.navy.mil>;

Barkey, James D CTR USN NAVSHIPREPFAC SAS JA (USA) <james.d.barkey.ctr@us.navy.mil>

Subject: RE: !!URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Importance: High

Kurita-san, We will work with on engineering department to provide a REV SPEC and amend the solicitation by 14AUG26.

Cary and Matsumoto-san, We are looking to fabricate as much of the BOW Ramp as we can with it still being attached to LCU-1651. Remainder of the fabrication, load test, and final installation will be done under a different job during the DSRA starting in FEB2027. Can you please provide answers to the questions attached? Additionally can you validate what is best to be done by the installing contractor to best fit the bow ramp on LCU-1651 during the DSRA?

Initial look for the Maintenance Team is that we would hold off on the hinges, striker plate, and the chain hoists attachment points.

Looking to get the REV SPEC done by 14AUG26. Standing by to discuss.

V/R, Dasan Sparks S320/S330 Class Team Leader MCM/NBU/APL/Visiting Ships

SRF-JRMC DET SASE BO

DESK DSN: 315-252-6791

CELL LOCAL: 090-1901-6999

-----Original Message----- From: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita.ln@us.navy.mil> Sent: Friday, August 7, 2026 8:38 AM To: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA) <dasan.t.sparks.civ@us.navy.mil> Cc: Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>;

Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY SASEBO (USA) <franklin.a .andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN NAVSUP FLCY SASEBO (JPN) <fumika.yamasaki2.ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA) <tanya.l.escritoryamada.civ@us.navy.mil>

Subject: RE: !!URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Good morning Sparks-san, I received a response from KUBO.

Please find the attached and provide me the answers.

Regarding the bid due - 26 August is the earliest according to KUBO.

Thank you and stand by.

v/r, Hiromi Kurita

-----Original Message----- From: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC

SAS JA (USA) <dasan.t.sparks.civ@us.navy.mil>

Sent: Thursday, August 6, 2026 3:24 PM

To: Kurita, Hiromi LN USN NAVSUP FLCY SASE BO (JPN)

<hiromi.kurita.ln@us.navy.mil>

Cc: Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>;

Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN)

<emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin.a.andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN NAVSUP FLCY SASE BO (JPN) <fumika .yamasaki2 .ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA) <tanya.l.escritoryamada.civ@us.navy.mil> Subject: RE : !!URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Ku rita -sa n, Concur with allowing them enough time to prepare their proposal. We can change the SPEC dates based on proposal submission date and the time needed to settle the award. Please keep us informed.

V/R, Dasan Sparks

S320/S330 Class Team Leader

MCM/NBU/APL/Visiting Ships

SRF-JRMC DET SASEBO

DESK DSN: 315-252-6791

CELL LOCAL: 090-1901-6999

-----Original Message-----

From: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita .ln@us.navy.mil>

Sent: Thursday, August 6, 2026 1:37 PM

To: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS

JA (USA) <dasan.t.sparks.civ@us.navy.mil>

Cc: Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>;

Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY SASEBO (USA) <franklin.a.andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN NAVSUP FLCY SASEBO (JPN) <fumika.yamasaki2.ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA) <tanya.l.escritoryamada.civ@us.navy.mil> Subject: RE: ! !URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Hi again Sparks-san, I emailed KUBO immediately after receiving your last email. Their response is below.

"We are now entering the full -scale quotation preparation process.

If possible, we would appreciate it if you could grant us an extension until August 28 to submit our quotation.

Thank you for your understanding and consideration."

After I received the above email, I called KUBO to ask them to reconsider the August 28 deadline. This is because while the current IGE is SAT, there is a possibility it could exceed SAT. Given that it is the end of the fiscal year, I am asking if they can submit the proposal a bit earlier. Based on our phone conversation, it seems unlikely we will get their response today.

Although we will close the RFQ tomorrow at 10:00am as planned, I expect it will result in a No Bid. Therefore, I plan to reopen it as soon as we hear back from KUBO. They also expressed some concerns regarding the spec dates.

I will let you know about that as soon as I receive their response anyway.

This is a quick update for now.

Thank you.

v/r, Hiromi Kurita

They responded

-----Original Message----- From: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA) <dasan.t.sparks.civ@us.navy.mil> Sent: Thursday, August 6, 2026 12:24 PM To: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita.ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA) <tanya.l.escritoryamada.civ@us.navy.mil> Cc: Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>;

Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN)

<emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin.a .andujar2 .civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASEBO (JPN) <fumika.yamasaki2.ln@us.navy.mil>

Subject: RE: ! !URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Kurita-san, Roger standing by.

Thank you.

V/R, Dasan Sparks

S320/S330 Class Team Leader

MCM/NBU/APL/Visiting Ships

SRF-JRMC DET SASEBO

DESK DSN: 315-252-6791

CELL LOCAL: 090-1901-6999

-----0 rigi na I Message-----

From: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN)

<hiromi.kurita .ln@us.navy.mil>

Sent: Thursday, August 6, 2026 11:20 AM

To: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS

JA (USA) <dasan.t.sparks.civ@us.navy.mil>; Escritoryamada, Tanya L CIV USN

NAVSHIPREPFAC SAS JA (USA) <tanya.l.escritoryamada.civ@us.navy.mil>

Cc: Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>;

Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY SASEBO (USA) <franklin.a.andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASEBO (JPN) <fumika.yamasaki2.ln@us.navy.mil>

Subject: RE: ! ! URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Hi Sparks-san, lwill.

If KUBO says they cannot bid under the current spec, I will let you know again.

(start 8/10/2026, PCD 1/11/2027, CCD 1/29/2027)

Thank you.

v/r, Hiromi Kurita

-----0 rigi na I Message-----

Fro m: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC

SAS JA (USA) <dasan.t.sparks.civ@us.navy.mil>

Sent: Thursday, August 6, 2026 11:11 AM

T~: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN)

<hiromi.kurita .ln@us.navy.mil>; Escritoryamada, Tanya L CIV USN

NAVSHIPREPFAC SAS JA (USA) <tanya.l.escritoryamada.civ@us.navy.mil> Cc: Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>;

Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN)

<emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <frank1in.a.andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASEBO (JPN) <fumika.yamasaki2.ln@us.navy.mil>

Subject: RE : ! !URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Kurita-san, We will accept the 4 month additional POP that is required for them to do the work.

Additionally, we will accept them fabricating in accordance with the DWG or

SRF Design Guidance.

Finally the painting requirements are listed in the DWG and the NAVSEA Standard Item table and we can clarify the requirement post award via CFR submission.

Please relay these responses to them so that we can proceed with receiving their proposal and follow on award.

Thank you.

V/R, Dasan Sparks S320/S330 Class Team Leader

MCM/NBU/APL/Visiting Ships

SRF-JRMC DET SASEBO

DESK DSN: 315-252-6791

CELL LOCAL: 090-1901-6999

-----Original Message----- From: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita.ln@us.navy.mil>

Sent: Wednesday, August 5, 2026 1:49 PM

To: Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA) <tanya.l.escritoryamada.civ@us.navy.mil>

Cc: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA) <dasan.t .sparks.civ@us.navy.mil>; Reyes, Avelino L Jr CIV (USA)

<avelino.l.reyes.civ@us.navy.mil>; Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA

(JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin.a.andujar2 .civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASEBO (JPN) <fumika .yamasaki2.ln@us.navy.mil>

Subject: RE: !!URGENT!! RFQSolicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Good afternoon Ms. Tanya, Understood. While it is a bit unexpected, I will keep the solicitation open as directed.

Regarding KUBO's requirements, please note the following critical points.

- Period of Performance: A 4-month PoP is required, with the earliest estimated start date being this November/December.

- Critical Requirement for Bidding: The most vital condition is that either SRF provides accurate drawings, or the bow ramp must be removed for measurement. Without meeting one of these options, it will be extremely difficult for KUBO to bid.

I will stand by.

v/r, Hiromi Kurita

-----Original Message----- From: Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA) <tanya .l.escritoryamada.civ@us.navy.mil> Sent: Wednesday, August 5, 2026 1:22 PM To: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita.ln@us.navy.mil> Cc: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA) <dasan.t.sparks.civ@us.navy.mil>; Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>; Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY SASEBO (USA) <franklin.a .andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN NAVSUP FLCY SASE BO (JPN) <fumika.yamasaki2.ln@us.navy.mil> Subject: RE: !!URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Kurita-san, I was just informed by my leadership that we need to continue with this solicitation. We will NOT be cancelling. We will be answering the additional questions for the contractor. Please stand by.

V/r, Tanya Escritor-Yamada S320 Project Manager APL 40/Visiting Ships SRF-JRMC Det. SASEBO

DSN: 315-252-8272

Cell: 080-5881-9256 Email: tanya.l.escritoryamada.civ@us.navy.mil

-----Original Message-----

From: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi .kurita .ln@us.navy.mil>

Sent: Wednesday, August 5, 2026 10:37 AM

To: Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA) <tanya.l.escritoryamada.civ@us.navy.mil>

Cc: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS

JA (USA) <dasan.t.sparks.civ@us.navy.mil>; Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>; Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA

(JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin.a.andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASE BO (JPN) <fumika.yamasaki2.ln@us.navy.mil> Subject: RE : ! ! URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Hello Ms. Tanya, Thank you for the heads-up.

I will be standing by. :)

v/r, Hiromi Kurita

-----Original Message-----

From: Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA)

<tanya .l.escritoryamada.civ@us.navy.mil> Sent: Wednesday, August 5, 2026 10:23 AM

To: Kurita, Hiromi LN USN NAVSUP FLCY SAS EBO (JPN)

<hiromi.kurita.ln@us.navy.mil>

Cc: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA) <dasan.t.sparks.civ@us.navy.mil>; Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>; Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin.a.andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASEBO (JPN) <fumika.yamasaki2.ln@us.navy.mil> Subject: RE : !!URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Kurita -san, SRF would like to cancel this solicitation. We are not confident that this work will result in a bid. We will solicit this work during the next availability. Please stand by for the cancelation memo. Thank you for all your hard work you have done for this requirement.

V/r, Tanya Escritor-Yamada S320 Project Manager

APL 40/Visiting Ships SRF-JRMC Det. SASEBO

DSN: 315-252-8272

Cell: 080-5881-9256 Email: tanya.l.escritoryamada.civ@us.navy.mil

-----Original Message----- From: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN)

<hiromi .kurita .ln@us.navy.mil>

Sent: Wednesday, August 5, 2026 6:09 AM

To: Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA) <tanya .l.escritoryamada.civ@us.navy.mil>

Cc: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS

JA (USA) <dasan.t.sparks.civ@us.navy.mil>; Reyes, Avelino L Jr CIV (USA)

<avelino.l.reyes.civ@us.navy.mil>; Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA

(JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin.a .andujar2 .civ@us.navy.mil>; Yamasaki, Fumika LN USN NAVSUP FLCY SASE BO (JPN) <fumika.yamasaki2.ln@us.navy.mil>

Subject: RE: !!URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905 , PT 26-6328

Good morning.

In response to the answers you provided, KUBO forwarded additional questions.

The attached is the updated one.

Thank you in advance.

v/r, Hiromi Kurita

-----0 rigi na I Message-----

From: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) Sent: Tuesday, August 4, 2026 7:06 AM

To: Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA) <tanya.l.escritoryamada.civ@us.navy.mil>

Cc: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA) <dasan.t.sparks.civ@us.navy.mil>; Reyes, Avelino L Jr CIV (USA)

<avelino.l.reyes.civ@us.navy.mil>; Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA

(JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin .a.andujar2 .civ@us.navy.mil>; Yamasaki, Fumika LN USN NAVSUP FLCY SASEBO (JPN) <fumika .yamasaki2.ln@us.navy.m il>

Subject: RE : ! !URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Good morning Ms. T, Thank you for the answers.

I will forward them to Kubo, and issue the amendment once I receive all of the answers.

Please provide me the answers to #3 and #6 by noon, August 6 so that the amendment will be issued before the original closing date, August 7.

Separate note:

Below is from SHI.

"Regarding the bow ramp, 100% NDT is required for the welding. This means we must repeatedly perform QA-witnessed NDT after each welding session, which significantly slows down the work speed and requires a large amount of labor.

If we focus on other LCU tasks, we cannot allocate enough hands to the bow ramp, leaving us with no choice but to secure a separate team. However, the welding work requires certifies personnel, and it is currently very difficult to gather enough qualified workers. The reality is that we do not have enough certified welders to handle both the main LCU construction and the bow ramp at the same location.

Furthermore, regarding the location, there are very few sites in Sasebo that are close to the sea and suitable for loading onto a barge. SSK is technically the best location for this."

Thank you.

V/r, Hiromi Kurita

-----Original Message----- From: Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA) <tanya.l.escritoryamada.civ@us.navy.mil> Sent: Monday, August 3, 2026 12:21 PM To: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) <hiromi.kurita.ln@us.navy.mil> Cc: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS JA (USA) <dasan.t .sparks.civ@us.navy.mil>; Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>; Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA (JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY SASEBO (USA) <franklin.a.andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN NAVSUP FLCY SASEBO (JPN) <fumika.yamasaki2.ln@us.navy.mil> Subject: RE: !!URGENT!! RFQ Solicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905 , PT 26-6328

Kurita-san, Please see attached. I will need additional time to properly research answer to #3 and #6. Thank you .

V/r, Tanya Escritor-Yamada S320 Project Manager APL 40/Visiting Ships SRF-JRMC Det. SASEBO

DSN: 315-252-8272

Cell : 080-5881-9256 Email : tanya .l.escritoryamada.civ@us.navy.mil

-----Original Message----- From: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN)

<hiromi .kurita.ln@us.navy.mil> Sent: Monday, August 3, 2026 9:57 AM

To: Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA) <tanya.l.escritoryamada .civ@us.navy.mil>

Cc: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS

JA (USA) <dasan.t.sparks.civ@us.navy.mil>; Reyes, Avelino L Jr CIV (USA) <avelino.l.reyes.civ@us.navy.mil>; Mizutori, Emi LN USN NAVSHIPREPFAC SAS JA

(JPN) <emi.mizutori.ln@us.navy.mil>; Andujar, Franklin A CIV USN NAVSUP FLCY

SASEBO (USA) <franklin .a.andujar2.civ@us.navy.mil>; Yamasaki, Fumika LN USN

NAVSUP FLCY SASEBO (JPN) <fumika.yamasaki2 .ln@us.navy.mil> Subject: RE : !!URGENT!! RFQSolicitation Email, Close 1000 8/7/2026, N6264926Q0482, SRF/LCU-1651, ICN 38NBA16905, PT 26-6328

Hi again Ms. Tanya, Will you provide the answers to the attached questions at your soonest convenience?

Thank you.

v/r, Hiromi Kurita

-----Original Message-----

From: Kurita, Hiromi LN USN NAVSUP FLCY SASEBO (JPN) Sent: Monday, August 3, 2026 8:32 AM To: Escritoryamada, Tanya L CIV USN NAVSHIPREPFAC SAS JA (USA)

<tanya .l.escritoryamada.civ@us.navy.mil> Cc: Sparks, Dasan T (S320-S330 Class Team Leader) CIV USN NAVSHIPREPFAC SAS

JA (USA) ; Reyes, Avelino L Jr CIV (USA) ; Mizutori, Emi LN USN NAVSHIPREPFAC SAS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .