Atch (1) to RFQ Questions.docx

DOCX document 43 KB Posted

Attached to
NBU-7 (LCU-1651) Prefabrication of Bow Ramp, accomplish
Solicitation number
N6264926Q0482
Issued by

About this file

This file is an attachment to a Request for Quotation (RFQ) containing vendor pre-quotation questions and responses related to the NBU-7 (LCU-1651) Bow Ramp Prefabrication solicitation (N6264926Q0482) issued by the Department of the Navy Naval Supply Systems Command. The document addresses two primary technical inquiries from the vendor regarding fabrication specifications and field measurement procedures for bow ramp components.

The vendor requests approval to apply JIS "Very Coarse" general dimensional tolerances for fabrication work and seeks clarification on measurement and installation procedures for PLAN 47-A and DETAIL 45-A components. Notably, the vendor indicates that final measurements and installation locations for these components will be determined on-site (shipboard) following field measurements, and requests liability exemption for any dimensional discrepancies, alignment issues, or installation defects that may result from post-fabrication conditions attributed to measuring constraints while the existing Bow Ramp remains installed. The vendor stipulates that under these field measurement conditions, they cannot guarantee sufficient accuracy and should not be held liable for resulting rework, modifications, or re-fabrication. This file serves as a technical clarification document supporting the solicitation process for prefabrication work in the Japan Region, which requires offerors to maintain current U.S. Navy MSRA/ABR Agreements and comply with DFARS 252.225-7042.

View the file

Other files

File Type Posted
Atch (2) to RFQ REVISED 38NBA16905_00_A01.pdf PDF
N6264926Q0482 Amendment 0002.pdf PDF
N6264926Q04820001.pdf PDF
Atch (A) Q and A.pdf PDF
Atch (B) 38NBA16905_00_A01_REVISED SPEC-2.pdf PDF
38NBA16905_00_A01.pdf PDF
N6264926Q0482.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

1. Dimensional Tolerances on Drawings We request approval to apply JIS "Very Coarse" general dimensional tolerances for the fabrication work. Please confirm if this is acceptable.

2. Measurement and Installation Locations for PLAN 47-A and DETAIL 45-A The components referenced in PLAN 47-A and DETAIL 45-A will be measured on-site (shipboard), and their final installation locations will be determined based on these field measurement results. However, taking field measurements while the existing Bow Ramp remains installed on the vessel poses significant technical constraints, making it extremely difficult to guarantee sufficient accuracy. Consequently, should any dimensional discrepancies, alignment issues, or installation defects arise post-fabrication as a result of measuring under these conditions, our company shall not be held liable for any resulting re-work, modifications, or re-fabrication.

CUI