TGI_3819P12389A01_c0v0_FY26.pdf

PDF 1 MB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 3 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA024
Issued by

About this file

This is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19) detailing repair work on a potable water tank and vertical ladder. The specific task involves repairing a vertical ladder and an incomplete weld on a bracket in the potable water tank (9-83-2-W), located between frames 84 and 85, and longitudinals 7P and 8P. The work includes removing existing fasteners and installing new CRES screws, nuts, and washers, as well as performing weld repairs on two steel brackets. The contractor work is scheduled to start on 7/21/2026 and complete by 11/21/2027. SRF-JRMC (Ship Repair Facility - Japan Regional Maintenance Center) will provide supporting services including crane rigging, utility services, safety inspections, and quality assurance inspections. The task is in response to a condition report from Sumitomo Heavy Industries, Ltd., dated 26 JUN 2021.

View the file

Other files

File Type Posted
EXHIBIT - Contract Data Requirements List (CDRL)_R2.pdf PDF
N6264925RA024-0003.pdf PDF
TGI_3819P12349_A01_c0v0_FY26.pdf PDF
TGI_3819P12351A01_c0v0_FY26.pdf PDF
TGI_3819P12347_A01_c0v0_FY26.pdf PDF
TGI_3819P12334A01_c0v0_FY26.pdf PDF
TGI_3819P12315A01_c0v0_FY26.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf PDF
TGI_3819P12331A01_c1v1_FY26.pdf PDF
TGI_3819P26201A01_c0v0_FY26.pdf PDF
Attachment II Price Proposal Form N6264925RA024(R1).xlsx XLSX spreadsheet
TGI_3819P12322_A01_c2v1_FY26.pdf PDF
TGI_3819P12313A01_c0v0_FY26.pdf PDF
TGI_3819P22102_A01_c0v0_FY26.pdf PDF
TGI_3819P14205A01_c2v2_FY26.pdf PDF
TGI_3819P25502_A01_c0v0_FY26.pdf PDF
TGI_3819P13505A01_c0v0_FY26.pdf PDF
TGI_3819P12352A01_c1v0_FY26.pdf PDF
TGI_3819P12345_A01_c1v3_FY26.pdf PDF
TGI_3819P12330A01_c1v1_FY26.pdf PDF
TGI_3819P65425A02_c0v0_FY26.pdf PDF
TGI_3819P14208A01_c1v1_FY26.pdf PDF
TGI_3819P12328A01_c1v1_FY26.pdf PDF
TGI_3819P14113A01_c0v0_FY26.pdf PDF
TGI_3819P51403A01_c0v0_FY26.pdf PDF
TGI_3819P12302A01_c2v2_FY26.pdf PDF
TGI_3819P14121A01_c0v0_FY26.pdf PDF
TGI_3819P16719A02_c0v0_FY26.pdf PDF
TGI_3819P12348_A01_c0v0_FY26.pdf PDF
TGI_3819P14207_A01_c1v2_FY26.pdf PDF
TGI_3819P13411A01_c1v1_FY26.pdf PDF
TGI_3819P12329A01_c1v1_FY26.pdf PDF
TGI_3819P14204A01_c0v0_FY26.pdf PDF
TGI_3819P12350A01_c0v0_FY26.pdf PDF
TGI_3819P14114A01_c0v0_FY26.pdf PDF
TGI_3819P12343A01_c1v1_FY26.pdf PDF
TGI_3819P12307A01_c0v0_FY26.pdf PDF
TGI_3819P22101_A01_c0v0_FY26.pdf PDF
TGI_3819P13339A01_c0v0_FY26.pdf PDF
TGI_3819P26202_A01_c0v0_FY26.pdf PDF
TGI_3819P25604A01_c1v1_FY26.pdf PDF
TGI_3819P14116A01_c0v0_FY26.pdf PDF
TGI_3819P12346_A01_c0v0_FY26.pdf PDF
TGI_3819P12325_A01_c0v01_FY26.pdf PDF
TGI_3819P12326_A01_c1v0_FY26.pdf PDF
TGI_3819P22103A01_c0v0_FY26.pdf PDF
TGI_3819P12309A01_c1v0_FY26.pdf PDF
TGI_3819P12308A01_c0v0_FY26.pdf PDF
TGI_3819P13507A01_c0v0_FY26.pdf PDF
TGI_3819P12303A01_c1v0_FY26.pdf PDF
Show 40 more

Latest 50 of 162 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

23-AUG-2024 1034

20.14.15.0.8993 (August 2024) ICN: 3819P12389 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: POT WTR 9-83-2-W TK A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 12314

CU PHASE TITLE: F/O - REPAIR VERTICAL LADDER AND INCOMPLETE WELD ON BRACKET IN 9-83-2-W

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

ES01NP95 * ES01NP96

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TAKEUCHI, NORIYUKI 231B 3152439983 30-NOV-2023

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 30-NOV-2023

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ES01-NP95 * ES01-NP96

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 9-83-2-W U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A1489

1. SCOPE/PURPOSE:

1.1 Title: Vertical Ladder and Incomplete Weld on Bracket in 9-83-2-W; repair

1.2 Location of Work:

1.2.1 Portable Water Tank (9-83-2-W)

1.2.2 Fire Room (8-76-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), Potable Water Tank

Tank No.: 9-83-2-W Capacity: 18,531 Gallons

TGI Short Form

23-AUG-2024 1034

20.14.15.0.8993 (August 2024) (Continued) ICN: 3819P12389 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: POT WTR 9-83-2-W TK A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 12314

CU PHASE TITLE: F/O - REPAIR VERTICAL LADDER AND INCOMPLETE WELD ON BRACKET IN 9-83-2-W

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.3.2 Quantity (One EA), Vertical Ladder in 9-83-2-W, between Frames 84 and 85, and Longitudinals 7P and 8P

Remarks: See Sketch Enclosure-01 for location detail

1.3.3 Quantity (2 EA), Bracket for Vertical Ladder in 9-83-2-W, between Frames 84 and 85, and Longitudinals 7P and 8P

Base Material: Steel Remarks: See Sheet 6 Detail 6-D of Ref. No. 4 for detail and Sketch Enclosure-01 for location detail

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date: 7/21/2026

1.7 Contractor work completion date: 11/21/2027

2. PROCEDURE:

2.1 Accomplish the requirements of 099-902YO of Ref. No. 2 for each tank listed in 1.3.1.

2.1.1 Accomplish the requirements of 009-107 of Ref. No. One.

2.1.1.1 Accomplish the requirements of 009-09 of Ref. No. One.

2.1.1.2 Ensure General Cleaning must be Level II.

2.2 Remove existing and install new fasteners of each existing vertical ladder listed in 1.3.2 in accordance with Ref. No. 3, using new CRES screws conforming to MIL-DTL-1222, Type I, Grade 316, new nuts conforming to MIL-DTL-1222, Type I, Grade 316, and new washers conforming to NASM35338, CRES 300 series.

2.3 Accomplish weld repair of incomplete weld on each existing bracket listed in 1.3.3 in accordance with Ref. No. 4, using Ref.

No. 5 for guidance.

2.3.1 Accomplish the requirements of 009-12 of Ref. No. One, including Table 2, Column(s) A, Lines One through 7.

2.4 Accomplish the requirements of 009-87 of Ref. No. One.

2.4.1 Accomplish the requirements of 009-09 of Ref. No. One, for chlorination and bacteriological tests. Analysis and testing conducted by a qualified Japanese laboratory (accredited by ISO 17025 or equal) are authorized by the SUPERVISOR.

2.4.2 Record results of chlorination and bacteriological tests on a Laboratory Analysis Record(s) and DD Form 686, and submit one legible copy, in hard copy or approved transferrable media, of completed record(s) and form(s) to the SUPERVISOR.

2.5 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.6 Notes:

2.6.1 Planner: Code 231B N. Takeuchi, 243-9983

23-AUG-2024 1034

20.14.15.0.8993 (August 2024) (Continued) ICN: 3819P12389 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: POT WTR 9-83-2-W TK A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 12314

CU PHASE TITLE: F/O - REPAIR VERTICAL LADDER AND INCOMPLETE WELD ON BRACKET IN 9-83-2-W

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

2.6.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.6.3 SRF-JRMC Code 134 will provide laboratory analysis and test service for disinfectant solution used for portable water tank when requested by the WIM Code 333.

2.6.4 This TGI is in response to Condition Report No. NNR01072-3-02 from Sumitomo Heavy Industries, Ltd. Dated 26 JUN 2021.

2.6.5 JCNs ES01-NP95 and ES01-NP96 are related to this TGI.

2.7 Government Furnished Material (GFM): None.

2.8 SRF-JRMC will provide the following service work: (TGI No. 3819P12389S02).

2.8.1 [C740] Crane and crane rigging service.

2.8.2 [X99E] Utility service, electrical.

2.8.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.8.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.8.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.8.6 [C133] QA inspection for (G) symbol(s).

23-AUG-2024 1034

20.14.15.0.8993 (August 2024) (Continued) ICN: 3819P12389 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: POT WTR 9-83-2-W TK A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 12314

CU PHASE TITLE: F/O - REPAIR VERTICAL LADDER AND INCOMPLETE WELD ON BRACKET IN 9-83-2-W

FOUO Pg 4 of 5

OTHER SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 DWG 805-1360280 LADDERS, VERTICAL

ASSEMBLIES & DETAILS

(ALUMINUM)

H N

4 DWG 603-2491411 LADDERS VERTICAL 5 TH &

BEL

G Y 5A, 5 DWG 101-2491012 CVK & Shell Long AFT FR 51 1/2

L Y ALL

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 LBR HRs, QA HRs 22/KE PC N

2.2 SFTR HRs 22/KE PC N

2.3 WELD HRs, PNTR HRs, QA HRs 22/KE PC N

2.4 LBR HRs, QA HRs 22/KE PC N

2.5 PNTR HRs, QA HRs 22/KE PC N

Dewatering and Cleaning Work CFM: $ for marine chemist cost, tank watch cost, chemical, laboratory analysis cost, gaskets, fasteners, and misc such as other consumable.

22/MQ CS N

Structural Work CFM: $ for all paints, thinner, fire watch cost, tank watch cost, fasteners, and misc such as electrode, covering materials, and other consumable.

22/MQ CS N

Process Funding Document. 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P12389 KEY OP: A01

23-AUG-2024 1034

20.14.15.0.8993 (August 2024) (Continued) ICN: 3819P12389 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: POT WTR 9-83-2-W TK A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 12314

CU PHASE TITLE: F/O - REPAIR VERTICAL LADDER AND INCOMPLETE WELD ON BRACKET IN 9-83-2-W

FOUO Pg 5 of 5

ENCLOSURE-01 3819P12389A01-Sketch.pdf 30-NOV-2023 0000

Noriyuki.Takeuchi.ja Text Box

LOCATION DETAIL FOR REPAIR VERTICAL LADDER AND BRACKET

Noriyuki.Takeuchi.ja_1 Polygon

Noriyuki.Takeuchi.ja_2 Rectangle

Noriyuki.Takeuchi.ja_3 Rectangle

Noriyuki.Takeuchi.ja_4 Text Box

PLAN VIEW

INNER BOTTOM, FR 76-97, PORT

Noriyuki.Takeuchi.ja_5 Polygonal Line

Noriyuki.Takeuchi.ja_6 Polygonal Line

Noriyuki.Takeuchi.ja_7 Text Box

SEE DET-1

Noriyuki.Takeuchi.ja_8 Polygonal Line

Noriyuki.Takeuchi.ja_9 Line

Noriyuki.Takeuchi.ja_10 Text Box

DET-1

VERTICAL LADDER, LKG INBD

Noriyuki.Takeuchi.ja_11 Text Box

DET-2

VERTICAL LADDER, LKG INBD

Noriyuki.Takeuchi.ja_12 Polygonal Line

Noriyuki.Takeuchi.ja_13 Polygonal Line

Noriyuki.Takeuchi.ja_14 Text Box

DET

Noriyuki.Takeuchi.ja_15 Text Box -2

Noriyuki.Takeuchi.ja_16 Line

Noriyuki.Takeuchi.ja_17 Line

Noriyuki.Takeuchi.ja_18 Polygonal Line

Noriyuki.Takeuchi.ja_19 Polygonal Line

Noriyuki.Takeuchi.ja_20 Oval

Noriyuki.Takeuchi.ja_21 Oval

Noriyuki.Takeuchi.ja_22 Text Box

INCOMPLETE WELD

Noriyuki.Takeuchi.ja_23 Text Box

MISSING & LOOSENED FASTENERS

Noriyuki.Takeuchi.ja_24 Line

Noriyuki.Takeuchi.ja_25 Line

Noriyuki.Takeuchi.ja_26 Line

Noriyuki.Takeuchi.ja_27 Line

Noriyuki.Takeuchi.ja_28 Text Box

SKETCH

ENCLOSURE-01

Noriyuki.Takeuchi.ja_29 Text Box 3819P12389A01

Noriyuki.Takeuchi.ja_30 Text Box

SHEET 1 OF 1

Noriyuki.Takeuchi.ja_31 Line

File details come from the government source that posted it. Updated .