This document outlines a contract administration plan and delegated duties for H-60 maintenance and repair services. Fleet Logistics Center Yokosuka will rely on Defense Contract Management Agency and the Program Management Office for routine contract administration, while retaining high-level functions such as contract terminations and property management. The Program Management Office will provide program support including technical evaluations, production monitoring, and task order development. Defense Contract Management Agency Japan will administer financial, accounting, and quality assurance responsibilities.

A related federal contract opportunity notice seeks information from contractors interested in providing depot-level maintenance for nine MH-60R/MH-60S aircraft per year under a firm-fixed-price contract with a base year and four option years. Interested parties are requested to describe their facilities, past performance, and ability to transport aircraft and complete Planned Maintenance Intervals within 120 to 135 calendar days. Comments are due by the fourth quarter of 2016, and award is scheduled for the fourth quarter of 2017. The services will be performed at the contractor's facility in Japan.

Draft Attachment (1g) Contract Administration Plan (CAP)

View the file

Other files for this federal contract opportunity

Other files attached to H-60 Maintenance & Repair Services, newest first.
File Type Posted
Att_1e_PEMA_Specs.pdf PDF
Att_1d_Fac_Req.docx DOCX document
N62649-16-R-0294_DRAFT_RFP_2_May_2017.docx DOCX document
Exhibit_A_7_Mar_2017.pdf PDF
Att_1_H-60_PWS_20170330_KJD.docx DOCX document
Exhibit_B_7_Mar_2017.pdf PDF
Att_1f_QASP_20170301_KJD.docx DOCX document
Exhibit_C_7_Mar_2017.pdf PDF
Att_1b_List_of_GFE.pdf PDF
Att_1c_Acronyms_&_Definitions.docx DOCX document
Exhibit_F_7_Mar_2017.pdf PDF
Att_1a_Safety_Req.docx DOCX document
Exhibit_D_7_Mar_2017.pdf PDF
N6264916R0294_CLIN_Structure_Summary.xlsx XLSX spreadsheet
N6264916R0294_N62649-16-R-0294_DRAFT_RFP.docx DOCX document
N6264916R0294_H-60_PWS_Industry_Day_Draft.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment (1g)

CONTRACT ADMINISTRATION PLAN (CAP)

8 April 2017

In order to expedite administration of the H-60 IMP requirement, the following delineation of duties by FLCY, by FRCWP, and designated DCMA is provided. The activity designated as having responsibility should be contacted for any questions, clarifications or information regarding the functions assigned.

1. The FLCY Procurement Contracting Officer (PCO) will rely largely on the activities of DCMA and the PMO in carrying out most administrative duties. However, the PCO will retain the following high-level administrative functions:

FAR/DFAR Cite
Functional Description
42.302(a)(24)
Negotiate and execute contractual documents for settlement of partial and complete contract terminations for convenience, except as otherwise prescribed by Part 49.
42.302(a)(25)
Negotiate and execute contractual documents settling cancellation charges under multiyear contracts.
42.302(a)(30)(v)
When contractors request Government property—

Modify contracts to reflect the addition of Government-furnished property and ensure appropriate consideration.

42.302(b)(1)
Negotiate or negotiate and execute supplemental agreements incorporating contractor proposals resulting from change orders issued under the Changes clause. Before completing negotiations, coordinate any delivery schedule change with the contracting office.
242.302(a)(13)
(A) Do not delegate the responsibility to make payments to the Defense Contract Management Agency (DCMA).

(B) Follow the procedures at PGI 242.302(a)(13)(B) for designation of payment offices.

2. FRCWP, as the PMO, will be delegated certain administrative duties that require daily and routine interaction with the Contractor. The PMO will assist the PCO by providing technical evaluations of Contractors requests for Government Furnished Property and Contractor proposals resulting from change orders. The PMO will advise the PCO when contract changes are required, providing scope of work and cost estimates to support Requests for Proposals (RFP). The PMO will provide Contractor surveillance and production status tracking with an emphasis on quality and delivery, alerting the PCO and ACO when either element is at risk. The PMO will develop and process task order requests to the ACO for execution (modifications, in-service repairs, customer service, etc.) and coordinate with the ACO and DCMA in matters of contract surveillance and task order modifications. The PMO will provide comprehensive supply and technical data support (i.e. technical publications library), as well as engineering assistance for work not covered by specification. In order to implement its delegated responsibilities, FRCWP will provide a PMTR, Engineers, and a COR. FRCWP is hereby delegated the responsibility for administering the following functions:

FAR/DFAR Cite
Function Description
42.302(a)(31)
Perform production support, surveillance, and status reporting, including timely reporting of potential and actual slippages in contract delivery schedules.
42.302(a)(40)
Perform engineering surveillance to assess compliance with contractual terms for schedule, cost, and technical performance in the areas of design, development, and production.
42.302(a)(41)
Evaluate for adequacy and perform surveillance of contractor engineering efforts and management systems that relate to design, development, production, engineering changes, subcontractors, tests, management of engineering resources, reliability and maintainability, data control systems, configuration management, and independent research and development.
42.302(a)(42)
Review and evaluate for technical adequacy the contractor’s logistics support, maintenance, and modification programs.
42.302(a)(43)
Report to the contracting office any inadequacies noted in specifications.
42.302(a)(44)
Perform engineering analyses of contractor cost proposals.
42.302(a)(45)
Review and analyze contractor-proposed engineering and design studies and submit comments and recommendations to the contracting office, as required.
42.302(a)(46)
Review engineering change proposals for proper classification, and when required, for need, technical adequacy of design, producibility, and impact on quality, reliability, schedule, and cost; submit comments to the contracting office.
42.302(a)(49)
Monitor the contractor’s value engineering program.

Furthermore, and in order to implement these responsibilities, FRCWP is responsible for providing Program Manager Technical Representatives (PMTRs), Engineers, and Contracting Officer Representative (COR).

Program Manager Technical Representatives (PMTRs) DFARS 242.7401 allows the PMO to designate PMTRs for each depot level aircraft repair program. The PMTRs are a representative of a DoD program, project, or system office performing non-CAS technical duties at a Contractor’s facility. PMTRs will be responsible for liaison, guidance, and assistance to the ACO and Contractor providing;

1) Technical Assistance

a) Interpretation of skill qualification requirements;

b) Engineering support;

c) Determination of work content in technical directives;

d) Approval of deviation and waiver or engineering change request of specification; and

2) MRO Line Coordination

a) Maintains liaison with aircraft custodians on all production issues;

b) Serves as focal point for providing future induction plans;

c) Coordinates with FRCWP Supply Management Representative to provide parts in timely manner to mitigate work slowdowns or stoppages;

d) Works in conjunction with FRCWP Engineering on coordinating acquisition of special tooling and providing specialized field team support; and

e) Plans and schedules aircraft repair services.

3) Airframes Changes (AFC), aircraft modifications and Customer Service:

a) Responsible for determining appropriate contractor man-hours and O&A hours.

b) Provides funding to the Ordering Officer/ACO for the incorporation of AFCs, aircraft modifications, and customer service.

4) Examinations and Evaluations (E&E)

a) Resolves technical questions arising from work specification requirements;

b) Reviews, validates, and approves/disapproves all discrepancies identified; and

c) Works in conjunction with FRCWP Site Coordinator to resolve production issues.

Engineers FRCWP is responsible for providing Engineers who assist in implementing the administration functions identified above. To such end, Engineers are responsible for the following:

1) Interpretation of skill qualification requirements;

2) Engineering assistance;

3) Determination of work content in technical directives;

4) Approval of deviation and waiver or engineering change request of specification;

5) Inspection and verification of defects.

Contracting Officer Representative (COR) FRCWP is responsible for providing the Contracting Officer Representative (COR) who assists FRCWP in implementing the administration functions identified above. To such end, the COR is responsible for:

1) Verifies the contractor performs the technical requirements of the contract in accordance with the contract terms, conditions and specifications;

2) Technical guidance to contractor during performance;

3) Inspection and verification of defects and forward recommendations to PCO;

4) Data entry for Contracting Officer Representative Tracking (CORT) Tool;

5) Coordination with ACO for over and above work.

6) Monitoring Contractor Performance in accordance with the Quality Assurance Surveillance Plan (QASP)

3. Defense Contract Management Agency (DCMA) Japan will be responsible for routine administrative functions such as issuing and administering task orders and providing quality assurance functions. DCMA will perform pre-award surveys and the post-award orientation conference. In covering the Government’s risks, the DCMA ACO will play a major role in monitoring, reviewing, evaluating and making determinations regarding various financial, accounting and invoicing activities of the Contractor. The ACO will also play a major role in resolving disputes between the Contractor and the Government. The ACO will issue, negotiate, and execute task orders under the contract (PMI inductions, in-service requests, customer service, and modifications) and will negotiate and execute supplemental agreements providing for the extension of contract delivery dates. The ACO will make certain other contract modifications as in the following examples: novation and change of name agreements; agreements for spare parts; packing, crating, and handling services on excess Government property; administrative changes; etc. Overall, DCMA will also be responsible for monitoring the Contractor’s property administration, quality assurance and safety programs in relation to the contract. DCMA Japan is hereby delegated the responsibility for administering the following functions:

FAR/DFAR Cite
Functional Description
42.302(a)(1)
Review the contractor’s compensation structure.
42.302(a)(2)
Review the contractor’s insurance plans.
42.302(a)(3)
Conduct post-award orientation conferences.
42.302(a)(4)
Review and evaluate contractors’ proposals under Subpart 15.4 and, when negotiation will be accomplished by the contracting officer, furnish comments and recommendations to that officer.
42.302(a)(5)
Negotiate forward pricing rate agreements (see 15.407-3).
42.302(a)(6)
Negotiate advance agreements applicable to treatment of costs under contracts currently assigned for administration (see 31.109).
42.302(a)(7)
Determine the allowability of costs suspended or disapproved as required (see Subpart 42.8), direct the suspension or disapproval of costs when there is reason to believe they should be suspended or disapproved, and approve final vouchers.
42.302(a)(8)
Issue Notices of Intent to Disallow or not Recognize Costs (see Subpart 42.8).
42.302(a)(9)
Establish final indirect cost rates and billing rates for those contractors meeting the criteria for contracting officer determination in Subpart 42.7.
42.302(a)(10)
Attempt to resolve issues in controversy, using ADR procedures when appropriate (see Subpart 33.2); prepare findings of fact and issue decisions under the Disputes clause on matters in which the administrative contracting officer (ACO) has the authority to take definitive action.
42.302(a)(11)
In connection with Cost Accounting Standards (see 30.601 and 48 CFR Chapter 99 (FAR Appendix))--

(i) Determine the adequacy of the contractor’s disclosure statements;

(ii) Determine whether disclosure statements are in compliance with Cost Accounting Standards and Part 31;

(iii) Determine the contractor’s compliance with Cost Accounting Standards and disclosure statements, if applicable; and

(iv) Negotiate price adjustments and execute supplemental agreements under the Cost Accounting Standards clauses at 52.230-2, 52.230-3, 52.230-4, 52.230-5, and 52.230-6.

42.302(a)(12)
Determine the adequacy of the contractor's accounting system. The contractor's accounting system should be adequate during the entire period of contract performance. The adequacy of the contractor's accounting system and its associated internal control system, as well as contractor compliance with the Cost Accounting Standards (CAS), affect the quality and validity of the contractor data upon which the Government must rely for its management oversight of the contractor and contract performance.
42.302(a)(13)
Review and approve or disapprove the contractor’s requests for payments under the progress payments or performance-based payments clauses.
42.302(a)(14)
Make payments on assigned contracts when prescribed in agency acquisition regulations.
42.302(a)(15)
Manage special bank accounts.
42.302(a)(16)
Ensure timely notification by the contractor of any anticipated overrun or underrun of the estimated cost under cost-reimbursement contracts.
42.302(a)(17)
Monitor the contractor’s financial condition and advise the contracting officer when it jeopardizes contract performance.
42.302(a)(18)
Analyze quarterly limitation on payments statements and take action in accordance with Subpart 32.6 to recover overpayments from the contractor.
42.302(a)(19)
Issue tax exemption forms.
42.302(a)(20)
Ensure processing and execution of duty-free entry certificates.
42.302(a)(21)
For classified contracts, administer those portions of the applicable industrial security program delegated to the CAO (see Subpart 4.4).
42.302(a)(22)
Issue work requests under maintenance, overhaul, and modification contracts.
42.302(a)(23)
Negotiate prices and execute supplemental agreements for spare parts and other items selected through provisioning procedures when prescribed by agency acquisition regulations.
42.302(a)(26)
Process and execute novation and change of name agreements under Subpart 42.12.
42.302(a)(27)
Perform property administration (see Part 45).
42.302(a)(28)
Perform necessary screening, redistribution, and disposal of contractor inventory.
42.302(a)(29)
Issue contract modifications requiring the contractor to provide packing, crating, and handling services on excess Government property. When the ACO determines it to be in the Government’s interests, the services may be secured from a contractor other than the contractor in possession of the property.
42.302(a)(30)(i)-(iv)
When contractors request Government property—

(i) Evaluate the contractor’s requests for Government property and for changes to existing Government property and provide appropriate recommendations to the contracting officer;

(ii) Ensure required screening of Government property before acquisition by the contractor;

(iii) Evaluate the use of Government property on a non-interference basis in accordance with the clause at 52.245-9, Use and Charges;

(iv) Ensure payment by the contractor of any rental due

42.302(a)(32)
Perform preaward surveys (see Subpart 9.1).
42.302(a)(33)
Advise and assist contractors regarding their priorities and allocations responsibilities and assist contracting offices in processing requests for special assistance and for priority ratings for privately owned capital equipment.
42.302(a)(34)
Monitor contractor industrial labor relations matters under the contract; apprise the contracting officer and, if designated by the agency, the cognizant labor relations advisor, of actual or potential labor disputes; and coordinate the removal of urgently required material from the strikebound contractor’s plant upon instruction from, and authorization of, the contracting officer.
42.302(a)(35)
Perform traffic management services, including issuance and control of Government bills of lading and other transportation documents.
42.302(a)(36)
Review the adequacy of the contractor’s traffic operations.
42.302(a)(37)
Review and evaluate preservation, packaging, and packing.
42.302(a)(38)
Ensure contractor compliance with contractual quality assurance requirements (see Part 46).
42.302(a)(39)
Ensure contractor compliance with contractual safety requirements.
42.302(a)(47)
Assist in evaluating and make recommendations for acceptance or rejection of waivers and deviations.
42.302(a)(48)
Evaluate and monitor the contractor’s procedures for complying with procedures regarding restrictive markings on data.
42.302(a)(50)
Review, approve or disapprove, and maintain surveillance of the contractor’s purchasing system (see Part 44).
42.302(a)(51)
Consent to the placement of subcontracts.
42.302(a)(52)
Review, evaluate, and approve plant or division-wide small, small disadvantaged, women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business master subcontracting plans.
42.302(a)(53)
Obtain the contractor's currently approved company- or division-wide plans for small, small disadvantaged, women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business subcontracting for its commercial products, or, if there is no currently approved plan, assist the contracting officer in evaluating the plans for those products.
42.302(a)(54)
Assist the contracting officer, upon request, in evaluating an offeror's proposed small, small disadvantaged, women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business subcontracting plans, including documentation of compliance with similar plans under prior contracts.
42.302(a)(55)
By periodic surveillance, ensure the contractor's compliance with small, small disadvantaged, women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business subcontracting plans and any labor surplus area contractual requirements; maintain documentation of the contractor's performance under and compliance with these plans and requirements; and provide advice and assistance to the firms involved, as appropriate.
42.302(a)(56)
Maintain surveillance of flight operations.
42.302(a)(57)
Assign and perform supporting contract administration.
42.302(a)(58)
Ensure timely submission of required reports.
42.302(a)(59)
Issue administrative changes, correcting errors or omissions in typing, contractor address, facility or activity code, remittance address, computations which do not require additional contract funds, and other such changes (see 43.101).
42.302(a)(60)
Cause release of shipments from contractor’s plants according to the shipping instructions. When applicable, the order of assigned priority shall be followed; shipments within the same priority shall be determined by date of the instruction.
42.302(a)(61)
Obtain contractor proposals for any contract price adjustments resulting from amended shipping instructions. Review all amended shipping instructions on a periodic, consolidated basis to ensure that adjustments are timely made. Except when the ACO has settlement authority, the ACO shall forward the proposal to the contracting officer for contract modification. The ACO shall not delay shipments pending completion and formalization of negotiations of revised shipping instructions.
42.302(a)(62)
Negotiate and/or execute supplemental agreements, as required, making changes in packaging subcontractors or contract shipping points.
42.302(a)(63)
Cancel unilateral purchase orders when notified of nonacceptance by the contractor. The CAO shall notify the contracting officer when the purchase order is canceled.
42.302(a)(64)
Negotiate and execute one-time supplemental agreements providing for the extension of contract delivery schedules up to 90 days on contracts with an assigned Criticality Designator of C (see 42.1105). Notification that the contract delivery schedule is being extended shall be provided to the contracting office. Subsequent extensions on any individual contract shall be authorized only upon concurrence of the contracting office.
42.302(a)(65)
Accomplish administrative closeout procedures (see 4.804-5).
42.302(a)(66)
Determine that the contractor has a drug-free workplace program and drug-free awareness program (see Subpart 23.5).
42.302(a)(67)
Support the program, product, and project offices regarding program reviews, program status, program performance and actual or anticipated program problems.
42.302(a)(68)
Monitor the contractor’s environmental practices for adverse impact on contract performance or contract cost, and for compliance with environmental requirements specified in the contract. ACO responsibilities include--

(i) Requesting environmental technical assistance, if needed;

(ii) Monitoring contractor compliance with specifications requiring the delivery or use of environmentally preferable products, energy-efficient products, products containing recovered materials, and biobased products. This must occur as part of the quality assurance procedures set forth in Part 46; and

(iii) As required in the contract, ensuring that the contractor complies with the reporting requirements relating to recovered material content utilized in contract performance (see Subpart 23.4).

42.302(a)(69)
Administer commercial financing provisions and monitor contractor security to ensure its continued adequacy to cover outstanding payments, when on-site review is required.
42.302(a)(70)
Deobligate excess funds after final price determination.
42.302(a)(71)
Ensure that the contractor has implemented the requirements of 52.203-13, Contractor Code of Business Ethics and Conduct.
42.302(b)(2)
Negotiate prices and execute priced exhibits for unpriced orders issued by the contracting officer under basic ordering agreements.
42.302(b)(3)
Negotiate or negotiate and execute supplemental agreements changing contract delivery schedules.
42.302(b)(4)
Negotiate or negotiate and execute supplemental agreements providing for the deobligation of unexpended dollar balances considered excess to known contract requirements.
42.302(b)(5)
Issue amended shipping instructions and, when necessary, negotiate and execute supplemental agreements incorporating contractor proposals resulting from these instructions.
42.302(b)(6)
Negotiate changes to interim billing prices.
42.302(b)(7)
Negotiate and definitize adjustments to contract prices resulting from exercise of an economic price adjustment clause (see Subpart 16.2).
42.302(b)(8)
Issue change orders and negotiate and execute resulting supplemental agreements under contracts for ship construction, conversion, and repair.
42.302(b)(9)
Execute supplemental agreements on firm-fixed-price supply contracts to reduce required contract line item quantities and deobligate excess funds when notified by the contractor of an inconsequential delivery shortage, and it is determined that such action is in the best interests of the Government, notwithstanding the default provisions of the contract. Such action will be taken only upon the written request of the contractor and, in no event, shall the total downward contract price adjustment resulting from an inconsequential delivery shortage exceed $250.00 or 5 percent of the contract price, whichever is less.
42.302(b)(10)
Execute supplemental agreements to permit a change in place of inspection at origin specified in firm-fixed-price supply contracts awarded to nonmanufacturers, as deemed necessary to protect the Government’s interests.
42.302(b)(11)
Prepare evaluations of contractor performance in accordance with Subpart 42.15.
242.302(a)(7)
See 242.7502 for ACO responsibilities with regard to receipt of an audit report identifying significant accounting system or related internal control deficiencies.
242.302(a)(9)
For additional contract administration functions related to IR&D/B&P projects performed by major contractors, see 242.771-3(a).
242.302(a)(12)
Also perform all payment administration in accordance with any applicable payment clauses.
242.302(a)(39)
See 223.370 for contract administration responsibilities on contracts for ammunition and explosives.
242.302(a)(67)
Also support program offices and buying activities in precontractual efforts leading to a solicitation or award.
242.302(a)(S-70)
Serve as the single point of contact for all Single Process Initiative (SPI) Management Council activities. The ACO shall negotiate and execute facilitywide class modifications and agreements for SPI processes, when authorized by the affected components.
242.302(a)(S-71)
DCMA has responsibility for reviewing earned value management system (EVMS) plans and for verifying initial and continuing contractor compliance with DoD EVMS criteria. The contracting officer shall not retain this function.
242.302(a)(S-72)
Ensure implementation of the Synchronized Predeployment and Operational Tracker (SPOT) by the contractor and maintain surveillance over contractor compliance with SPOT business rules available at the website provided at PGI 207.105(b)(20)(C)(9) for contracts incorporating the clause at 252.225-7040, Contractor Personnel Supporting U.S. Armed Forces Deployed Outside the United States. See PGI 242.302(a)(S-72) for guidance on assessing contractor’s implementation of SPOT.
242.302(a)(S-73)
Maintain surveillance over contractor compliance with trafficking in persons requirements for all DoD contracts for services incorporating the clause at FAR 52.222-50, Combating Trafficking in Persons, and, when necessary, its Alternate I, as identified in the clause prescription at FAR 22.1705. (See PGI 222.1703.)
242.302(a)(S-74)
Approve or disapprove contractor business systems, as identified in the clause at 252.242-7005, Contractor Business Systems.
242.302(a)(S-75)
See PGI 242.302(a)(S-75) for guidelines for monitoring contractor costs.
242.302(b)(S-70)
Issue, negotiate, and execute orders under basic ordering agreements for overhaul, maintenance, and repair.

File details come from the government source that posted it. Updated .