This quality assurance surveillance plan outlines performance standards and monitoring procedures for a maintenance services contract for H-60 aircraft. The contractor will be responsible for inducting approximately nine aircraft per year for depot-level maintenance at their facility and meeting turnaround times of 120 days for PMI-1N and 135 days for PMI-2N. The surveillance plan details eight performance requirements including on-time delivery, management of maintenance schedules, availability of parts, safety of flight standards, use of technical documentation, safety and environmental compliance, reporting procedures, and delivery of a quality product. The government will use a surveillance matrix and performance ratings to evaluate contractor performance on a continuing basis.
This sources sought notice requests information from contractors interested in providing depot-level maintenance for MH-60R/MH-60S aircraft stationed in Japan. The proposed firm fixed-price contract would have a one-year base period and four option years. Contractors must have the capacity to accept, transport, and return up to nine aircraft per year within required turnaround times of 120 or 135 days. Repair facilities must meet specified criteria. The solicitation is expected in the fourth quarter of 2016 with award scheduled for the fourth quarter of 2017. Interested contractors are requested to provide company and capability information by a tentative due date in August or September 2016.
Draft Attachment (1f) Quality Assurance Surveillance Plan (QASP)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Att_1e_PEMA_Specs.pdf | ||
| Att_1d_Fac_Req.docx | DOCX document | |
| N62649-16-R-0294_DRAFT_RFP_2_May_2017.docx | DOCX document | |
| Exhibit_F_7_Mar_2017.pdf | ||
| Att_1a_Safety_Req.docx | DOCX document | |
| Exhibit_D_7_Mar_2017.pdf | ||
| Exhibit_A_7_Mar_2017.pdf | ||
| Att_1_H-60_PWS_20170330_KJD.docx | DOCX document | |
| Exhibit_B_7_Mar_2017.pdf | ||
| Att_1g_CAP_20170408_KJD.docx | DOCX document | |
| Exhibit_C_7_Mar_2017.pdf | ||
| Att_1b_List_of_GFE.pdf | ||
| Att_1c_Acronyms_&_Definitions.docx | DOCX document | |
| N6264916R0294_CLIN_Structure_Summary.xlsx | XLSX spreadsheet | |
| N6264916R0294_N62649-16-R-0294_DRAFT_RFP.docx | DOCX document | |
| N6264916R0294_H-60_PWS_Industry_Day_Draft.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment (1f) Quality Assurance Surveillance Plan 1 March 2017
PURPOSE
This Quality Assurance Surveillance Plan is a Government-developed document used to determine if the Contractor's performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:
· What will be monitored
· How monitoring will take place
· Who will conduct the monitoring
· How monitoring efforts and results will be documented The Contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the Government's surveillance of the Contractor's performance to assure that it meets contract standards. It is the Government's responsibility to be objective, fair and consistent in evaluating Contractor performance.
The QASP is not part of the contract nor is it intended to duplicate the Contractor's quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on Contractor performance.
The Government may provide a copy of the QASP to the Contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the Contractor.
Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.
AUTHORITY
Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provides for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.
ROLES AND RESPONSIBILITIES
The personnel assigned to oversee and coordinate surveillance activities are identified and their roles and responsibilities are defined in the Contract Administration Plan.
PERFORMANCE REQUIREMENTS AND METHOD OF SURVEILLANCE
Contract Surveillance The goal of the QASP is to ensure that Contractor performance is effectively monitored and documented. The COR’s contribution is their professional, non-adversarial relationships with the KO, PM and the Contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of Contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the Contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the Contractor’s performance. Additionally, this QASP is based on the premise that the Contractor, not the Government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
Surveillance Matrix The Surveillance Matrix (Exhibit A) is the list of performance objectives and standards that must be performed by the Contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the Contractor’s performance as it relates to the performance element standards. The Surveillance Matrix should be used to form the foundation of the COR’s inspection checklist.
Performance Rating Definitions In evaluating the quality of Contractor’s performance, the following performance ratings may be used.
| Rating |
| Criteria |
| Exceptional |
| Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
PERFORMANCE REPORTING
Contractor Performance Assessment Reporting System (CPARS) The Government will comply with FAR 42.1502(b) and formally evaluate the Contractor’s performance at least annually using the Contractor Performance Assessment System (CPARS). In addition, the Government will formally evaluate the Contractor’s performance at the completion of each task order that exceeds that Simplified Acquisition Threshold (SAT) using CPARS as required by FAR 42.1502(b). The Assessing Official will be the PM. The Assessing Official Representative will be the COR.
Performance Concern Report (PCR) The COR will document deficient performance using Exhibit B, Performance Concern Report, and will submit to the Contractor for corrective action and COR to document results.
EXHIBIT A – Surveillance Matrix
| Performance Objective |
| Performance Standard |
| Surveillance Method |
| PRS #1: Inducted aircraft are delivered on time. |
| Meet Contract Delivery Date / Turn Around Time |
| Upon delivery, compare Acceptance Date on DD-250 to Section F of Task Order |
| PRS #2: Contractor effectively manages and tracks inducted aircraft. |
| The Production Plan (CDRL A005) shall be up to date/current at each weekly Production Meeting |
| Monitor distribution of CDRL, attend Production Meetings, and conduct Floor Checks to ensure Production Plan is implemented appropriately |
| PRS # 3: Material, parts, and components are available when needed. |
| Submit Supply Requisitions IAW the PWS and CDRL B001 |
| Monitor distribution of CDRL, monitor actual receipt dates of material, and conduct Floor Checks |
| PRS# 4: Delivered aircraft are safe to fly |
| 0 Safety of Flight defects |
| Review results of DCMA QAR Safety of Flight Checks and conduct Floor Checks |
| PRS #5: Work is performed following the latest specifications and technical data. |
| Maintain all technical documents as required by PWS and submit CDRLs A001 & A002 |
| Monitor distribution of CDRL and conduct Floor Checks |
| PRS #6: Work is performed safely and impact to the environment is mitigated. |
| Contractor operations are in compliance with applicable Safety, Health and Environmental instructions, regulations, and requirements. |
| Conduct Floor Checks |
| PRS# 7: Contractor provides necessary documentation and reports. |
| CDRLS are submitted as required. |
| Monitor distribution of all CDRLs |
| PRS#8: The Contractor shall deliver a quality product |
| AIDRs do not identify any critical or major discrepancies |
| Review AIDRs and conduct Floor Checks |
Exhibit B Performance Concern Report (PCR)
| Contract / Task Order Number: |
| PWS Paragraph Item Reviewed: |
| Control Number: |
| Reviewed By: |
| Reviewer Phone: |
| Reviewer Email: |
I. PERFORMANCE REVIEW & IDENTIFICATION OF DEFICIENCIES
Repeat Deficiency?
☐ Yes ☐ No Deficiency Category:
☐ Major ☐ Minor Required Date of Correction:
Description of Deficiency:
Impact of Deficiency:
| Signature of Reviewer: |
| Date of Signature: |
II. CONTRACTOR CONCURRENCE & CORRECTIVE ACTION PLAN
☐ Concur ☐ Non-Concur Estimated Date of Correction
Corrective Action Plan OR Reason for Non-Concurrence:
| Signature of Contractor Representative: |
| Date of Signature: |
III. ACTION CORRECTED
☐ Deficiency Corrected ☐ Deficiency Not Corrected Actual Date of Correction
COR Remarks:
| Signature of COR: |
| Date of Signature: |