This document is a Project Labor Agreement (PLA) Request for Information (RFI) for a water treatment facility construction project at Red Hill in Hawaii. Naval Facilities Engineering System Command (NAVFAC) Hawaii is seeking market feedback on implementing a Project Labor Agreement for a Design-Bid-Build project valued between $250-$500 million. The project involves constructing a new 10 million gallon per day water treatment facility, including water treatment granular activated carbon vessels, Red Hill Pump Station modifications, water shaft modifications, supporting structures, fencing, transmission piping, electrical distribution systems, and fire protection facilities. The anticipated contract performance period is 1,064 calendar days, with a solicitation expected to be issued around June 27, 2025.

The RFI includes a questionnaire for potential contractors, unions, and government entities to provide insights on labor availability, specialized construction requirements, potential project participation, union wage rates, and possible cost implications of a Project Labor Agreement. Responses are due by 10:00 AM HST on June 26, 2025, and must be submitted via email to specific NAVFAC contacts. The solicitation will be restricted to U.S. owned companies and will require a Statement of Affiliation for all prime contractors, subcontractors, and suppliers. The procurement will use a best-value source selection approach, with evaluation factors including experience, past performance, safety, small business utilization, and price.

View the file

Other files

File Type Posted
RFI Responses.pdf PDF
NDA-Revised_24Jun25.pdf PDF
NDA.pdf PDF
Statement of Affiliation Non-Disclosure.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Labor Agreement (PLA) Request for Information (RFI) for

Construction Project for P716 Red Hill Water Treatment Facility in the State of Hawaii]

Rev.2 June 3, 2025 1

This is a request for information/market survey. This is not a request for proposal, request for quote, or an invitation for bid. There will be no solicitation, specification, or drawings available at this time.

Naval Facilities Engineering System Command (NAVFAC) Hawaii is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for the following construction project. The construction project is for a Potable Water Treatment Facility. Construction may include, but is not limited to, a new 10 million gallon per day water treatment facility comprised of water treatment granular activated carbon vessels, modifications to the Red Hill Pump Station, modification to the water shaft, structures in support of the water treatment facility, fencing, transmission piping, electrical distribution system, and fire protection facilities located in the State of Hawaii. Project will be

Design-Bid-Build. NAICS Code: 237110 – Water and Sewer Line and Related Structures Construction.

The magnitude of construction is anticipated to be $250,000,000-$500,000,000. General period of performance is anticipated to be approximately 1,064 calendar days.

A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f). Federal Acquisition Regulation (FAR) policy states:

Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction projects with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.504(d) applies. Reference is made to: FAR Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects;

provision, FAR 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, FAR

52.222-34 Project Labor Agreement.

In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project utilizing the attached questionnaire.

This is not an announcement of the availability of a solicitation nor is it a means of generating a plan holder’s list. This survey is for planning purposes only and shall not be construed as a Request for

Proposal or as an obligation on the part of the Government. The Government does not intend to award a contract on the basis of this market survey or otherwise pay for the requested information. The

Government will not provide a debriefing on the results of this survey. All information will be held in a confidential manner and will only be used for the purposes intended.

Responses shall be submitted on the attached questionnaire via email to Jessica Shimoda and Jamie

Inouye at Jessica.a.shimoda.civ@us.navy.mil and jamie.m.inouye.civ@us.navy.mil no later than

10:00 AM, HST on June 26, 2025.

mailto:Jessica.a.shimoda.civ@us.navy.mil mailto:jamie.m.inouye.civ@us.navy.mil

Project Labor Agreement (PLA) Questionnaire

Questions Responses

1) Are you responding as a representative of a government entity, union, contractor (union or non-union) and/or qualified small business?

2) Would the work involve specialized construction that is available from only a limited number of contractors or subcontractors? Explain in detail.

3) What is your understanding of the availability of union labor and non-union labor in this area for this type of project? Are you otherwise aware of national, regional, or local interest in participating in this project by union or non-union contractors.

Explain in detail.

4) As a qualified contractor for a project of this type, would you be interested in participating in this project?

Would the requirement of a PLA under this project impact your interest in any way? If you have submitted an offer under this solicitation, would you continue to compete for this project if the solicitation is amended to require a PLA? (ONLY ask in

Option C scenario) Explain in detail.

5) Are you aware of PLAs having been used on other similar construction projects in the area and/or other nearby areas?

Explain in detail.

6) How do union wage rates compare to prevailing wage rates for this type of project and in this area, i.e., prevailing wage rates under the Construction Wage Rates Requirements statute

(formerly known as the Davis-Bacon Act). Explain in detail.

7) Are there any ways in which the requirement of a PLA might increase costs on a project of this type in this area? Explain in detail.