This solicitation requests proposals for a Design-Bid-Build Paving and Airfield Paving Multiple Award Construction Contract for various locations throughout the state of Hawaii. The scope of work includes asphaltic concrete pavement, airfield asphalt concrete pavement, roadway or parking lot asphaltic concrete pavement, airfield, roadway or parking lot concrete pavement, and other incidental related work such as sidewalks, curbs, pavement marking and striping, area lighting, drainage systems, grading, and miscellaneous drainage improvements. Work will be performed at Navy, Marine Corps, Air Force, and other federal facilities.

The proposed contract is unrestricted with full and open competition. The NAICS code is 237310 and the small business size standard is $39.5 million. This is a source selection procurement requiring non-cost/price, past performance, and price proposals, with the intent to award a minimum of three IDIQ contracts. Offerors must comply with FAR 52.204-7 and register in the SAM database to be eligible for award. The total contract value is $48 million over five years or 60 months.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RFP No. N62478-20-R-4041, Design-Bid-Build Paving and Airfield Paving Multiple Aw ard Construction Contract (DBB PAVING MACC), Various Locations, State of Haw aii.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Oct-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247820R4041

X 9B. DATED (SEE ITEM 11)

10-Sep-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Oct-2020

CODE

NAVFAC HAWAII

CONSTRUCTION CONTRACTS BRANCH (ACQ31)

400 MARSHALL ROAD

JBPHH HI

N62478 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247820R4041

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES (REVISED)

Revise Document 00110 Evaluation Factors for Award

Revise Requests for Information (RFIs) and Responses

(End of Summary of Changes)

DOCUMENT 00110

Amendment 0002

EVALUATION FACTORS FOR AWARD

TABLE OF CONTENTS

PART I. GENERAL

1.1 CONTRACT SCOPE

1.2 PREFERENCE FOR MAKING MULTIPLE AWARDS

1.3 MAGNITUDE OF THE ACQUISITION

1.4 PROPOSAL EVALUATION

1.5 ENFORCEABILITY OF THE PROPOSAL

PART II. EVALUATION CRITERIA

2.1 BASIS OF AWARD

2.2 EVALUATION FACTORS

ATTACHMENTS

C1 – CONSTRCUTION EXPERIENCE PROJECT DATA SHEET

C2 – PAST PERFORMANCE QUESTIONNAIRE

C3 – SMALL BUSINESS PARTICIPATION AND COMMITMENT STRATEGY

C4 – SMALL BUSINESS SUBCONTRACTING PLAN – DO NOT SUBMIT WITH YOUR PROPOSAL.

TO BE SUBMITTED UPON REQUEST BY THE CONTRACTING OFFICER.

EVALUATION FACTORS

PART I – GENERAL

1.1 CONTRACT SCOPE

The work includes labor, supervision, tools, materials, and equipment necessary to perform asphaltic concrete pavement, airfield asphalt concrete pavement, roadway or parking lot asphaltic concrete pavement, airfield, roadway or parking lot concrete pavement, and other incidental related work to include but not be limited to sidewalks and curbs, marking and striping of pavement, area lighting, drainage systems, grading, and miscellaneous drainage improvements within the State of Hawaii. The areas of consideration will include, but not be limited to, Navy, Marine Corps, Air Force, and miscellaneous Federal and other facilities.

1.2 PREFERENCE FOR MAKING MULTIPLE AWARDS

This acquisition is being advertised on an unrestricted basis as an indefinite delivery indefinite quantity (IDIQ), multiple award construction contract (MACC) with no pre-established fixed contract prices and is a source selection procurement requiring non-cost/price, past performance and price proposals. This procurement consists of one solicitation with the intent to award a minimum of three (3) IDIQ contracts.

1.3 MAGNITUDE OF THE ACQUISITION

The total dollar value of this acquisition is $48,000,000 over the life of the contract or 60 months, whichever occurs first. The Government may or may not award a Seed Project in place of a minimum guarantee to the lowest price technically acceptable offeror and a minimum guarantee of $5,000 to the other successful offerors for the base period only. The minimum guarantee for the other successful offerors may be met by the issuance of a task order during the base period or option period(s). Contractors are not guaranteed work in excess of the minimum guarantee. The task order minimum and maximum will be stated as $50,000 to $15,000,000, respectively.

1.4 PROPOSAL EVALUATION

a. The Government intends to award a minimum of three contracts resulting from this solicitation to the responsible offerors with the lowest price technically acceptable proposal based on the evaluation factors in the solicitation.

b. Proposals are evaluated for technical acceptability but not ranked using the non-cost/price factors.

Tradeoffs are not permitted.

c. The number of proposals to be evaluated for technical acceptability may be limited to the five lowest priced offers. Technical proposals shall be provided to the evaluator(s) without any identification of prices or any rank order of prices. The process described will be conducted as many times as necessary, until such time as the Government identifies an acceptable amount of technically acceptable proposals. If the contracting officer later determines that discussions are necessary, the procedures in FAR 15.306 shall be followed.

d. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contracts.

1.5 ENFORCEABILITY OF THE PROPOSAL

The proposals must set forth full, accurate and complete information as required by this solicitation. The Government will rely on such information in the award of the contracts. By submission of the offer, the Offeror agrees that all items proposed (e.g., key personnel, subcontractors, etc.) will be utilized for the duration of the contract and any substitutions will be equal or better than as proposed and accepted for contract award and shall require prior Contracting Officer's approval.

PART II – EVALUATION CRITERIA

2.1 BASIS OF AWARD

a. The Government intends to evaluate proposals and award a minimum of three contracts without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.

b. The number of proposals to be evaluated for technical acceptability may be limited to the five lowest priced offers at the discretion of the Contracting Officer.

c. An overall non-price factors rating must be at least “ACCEPTABLE” in order to be eligible for award. An “UNACCEPTABLE” rating in any factor results in the overall non-price factors proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall non-price factors rating of “UNACCEPTABLE” makes a proposal ineligible for award.

2.2 EVALUATION FACTORS

The solicitation requires the evaluation of price and the following non-cost/price factors:

Factor 1 – Experience

Factor 2 – Safety

Factor 3 – Past Performance

Factor 4 – Small Business Utilization

The distinction between experience and past performance is experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

a. Price Evaluation:

1. Price.

(a) Solicitation Submittal Requirements.

(1) Signed and completed Standard Form 1442 (Solicitation, Offer, and Award);

(2) Price Proposal Schedule for the Seed Project;

(3) Bid guarantee for the Seed Project – The original hard copy bid guarantee shall be forwarded to the contracting office (address shown in block 7 of the SF1442) following the electronic proposal submission;

(4) Representations and Certifications (Document 00600);

(5) FAR 52.204-8, Annual Representations and Certifications, which requires the offeror to complete the annual representations and certifications electronically via SAM. Ensure you also complete the DFARS provisions;

(6) Any teaming agreements, Joint Venture agreements, LLC Operating Agreements, see Document 00100, paragraph 1.5 JOINT VENTURES (JV), LIMITED LIABILITY COMPANIES (LLC), LIMITED PARTNERSHIPS (LTD), ETC.;

(7) Evidence of submission of VETS-4212 Report, entitled “Federal Contractor Veterans’ Employment Report (VETS-4212 Report),” as required by FAR 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans. (If not applicable, provide statement that Offeror has not had contracts subject to this requirement.);

(8) Current company balance sheets for the past three years (2017, 2018, and 2019) which will be used for responsibility determination, see Document 00100, paragraph 1.4, PREAWARD

SURVEY/RESPONSIBILITY DETERMINATION;

(9) and Small Business Subcontracting Plan per FAR 52.219-9 Alt. II (Large Businesses only)

(b) Basis of Evaluation: The Government will utilize the seed project as the basis of evaluation for price. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

(1) Comparison of proposed prices received in response to the RFP.

(2) Comparison of proposed prices with the Independent Government Estimate.

(3) Comparison of proposed prices with available historical information.

(4) Comparison of information reports obtained from Defense Contract Audit Agency (DCAA) or other outside agencies as required.

b. Non-Cost/Price Evaluation Factors:

1. Factor 1 – Experience

(a) Solicitation Submittal Requirements:

(1) Construction Experience.

i. Submit a maximum of five (5) construction projects in which the Offeror was the Prime Contractor that best demonstrates the Offeror's experience on recent and relevant projects that are similar in size, scope, and complexity to the RFP, using the Construction Experience Project Data Sheet (Attachment C1). For purposes of this evaluation, a recent and relevant project is defined as new construction and/or repair/resurfacing of

1) airfield asphaltic concrete pavement; 2) airfield concrete pavement; 3) roadway or parking lot asphaltic concrete pavement; 4) roadway or parking lot concrete pavement; or 5) improvements such as street or parking lot lighting, grading and drainage, utilities, and landscaping, valued at $300,000 or more, and completed within five (5) years of the date of issuance of this RFP. Contracts listed may include those entered into with Federal, State, or local governmental agencies, as well as contracts with commercial entities.

ii. A project is defined as a construction project performed under a single task order or contract. For multiple award and IDIQ type contracts, the contract as a whole shall not be submitted as a project;

rather Offerors shall submit the work performed under a task order as a project.

iii. The attached Construction Experience Project Data Sheet (Attachment C1) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Do not alter the Construction Experience Project Data Sheet (Attachment C1) with the exception of expanding the individual blocks on this form;

however, total length for each project data sheet shall not exceed one (1) double-sided 8.5” x 11” page (or two (2) single-sided 8.5” x 11” pages) and shall be size 11 font (minimum). Arial font is recommended but others may be used so long as it is legible.

iv. For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, complexities, construction means & methods). The description shall identify which type of paving work each submitted project represents.

v. If the Offeror is a JV or a participant of the Small Business Administration (SBA) Mentor-Protégé Program, relevant project experience should be submitted for projects completed by the JV entity or SBA Mentor-Protégé as the prime contractor. If the JV or SBA Mentor-Protégé does not have shared experience, relevant projects shall be submitted for each JV partner or for the Mentor and for the Protégé for which they were prime contractors. At least one (1) project from each JV partner, or at least one (1) project from the Mentor and one

(1) project from the Protégé, shall be submitted. Offerors are still limited to a total of five (5) projects combined.

vi. If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442) for this evaluation factor, the proposal shall clearly demonstrate the extent of the affiliate/subsidiary/parent firm involvement in the performance of the contract; and shall only be for those projects for which the affiliates/subsidiaries/parent/LLC/LTD member companies were prime contractors. In demonstrating construction experience for this factor, no more than two (2) projects shall be submitted from affiliates/subsidiaries/parent/LLC/LTD member companies.

vii. The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offeror must provide a letter of commitment and an explanation of the involvement the subcontractor will have in performance of this contract. In demonstrating construction experience for this factor, no more than two (2) projects shall be submitted from subcontractors. Projects utilizing experience of subcontractors shall only be for those projects for which the subcontractor was the prime contractor.

(b) Basis of Evaluation:

(1) The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects, in the order they were submitted in the proposal. Any projects submitted in excess of the first five (5) will not be considered.

(2) Proposals that do not contain any projects that demonstrate experience for the Offeror will not be considered.

2. Factor 2 – Safety

Solicitation Submittal Requirements:

The Offeror shall submit the following information: The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative, as described below. For a partnership or joint venture, the Offeror shall submit separate DART and TCR rates for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.

NOTE: DART and TCR shall not be submitted for subcontractors

1. DART Rate: Submit five (5) previous complete calendar years’ [CY2015, 2016, 2017, 2018, and 2019] worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why.

a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.

b. Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked

𝑫𝑨𝑹𝑻 𝑹𝑨𝑻𝑬

𝐍𝐮𝐦𝐛𝐞𝐫 𝐨𝐟 𝐃𝐀𝐑𝐓 𝐈𝐧𝐜𝐢𝐝𝐞𝐧𝐭𝐬 𝐱 𝟐𝟎𝟎,𝟎𝟎𝟎

𝐓𝐨𝐭𝐚𝐥 𝐍𝐮𝐦𝐛𝐞𝐫 𝐨𝐟 𝐄𝐦𝐩𝐥𝐨𝐲𝐞𝐞 𝐋𝐚𝐛𝐨𝐫 𝐇𝐨𝐮𝐫𝐬 𝐖𝐨𝐫𝐤𝐞𝐝

2. TCR Rate: Submit five (5) previous complete calendar years’ [CY2015, 2016, 2017, 2018, and 2019] worth of data (not an overall average). If the Offeror has no TCR rate, for any year, affirmatively state so and explain why.

a. TCR cases include injuries or illnesses resulting in death, days away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.

b. Calculation of TCR rate: Multiply the total number of TCR incidents by 200,000, and then divide by the number of employee labor hours worked

𝑻𝑪𝑹 𝑹𝑨𝑻𝑬

𝐍𝐮𝐦𝐛𝐞𝐫 𝐨𝐟 𝐓𝐂𝐑 𝐈𝐧𝐜𝐢𝐝𝐞𝐧𝐭𝐬 𝐱 𝟐𝟎𝟎,𝟎𝟎𝟎

𝐓𝐨𝐭𝐚𝐥 𝐍𝐮𝐦𝐛𝐞𝐫 𝐨𝐟 𝐄𝐦𝐩𝐥𝐨𝐲𝐞𝐞 𝐋𝐚𝐛𝐨𝐫 𝐇𝐨𝐮𝐫𝐬 𝐖𝐨𝐫𝐤𝐞𝐝

3. Technical Approach to Safety: Submit a narrative that addresses the following:

a. Describe the Offeror’ s approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describe the evaluation process used to select potential subcontractors.

c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).

d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page.

4. The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.

Basis of Evaluation:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. To meet the minimum requirements, the Offeror must demonstrate the following:

1. DART rates at or below 2.99

2. TCR Rates at or below 4.49

NOTE: If the Offeror’s rates exceed the established levels above for any of the five years, it will result in a deficiency.

3. Technical Approach to Safety

a. Offeror describes a viable SMS that addresses elements; such as Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Offeror describes a methodical process of evaluating subcontractor’s safety performance in their selection process.

c. Offeror describes a logical management plan to hold both themselves and their subcontractors accountable for adhering to the safety requirements of the contract.

4. The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.

3. Factor 3 – Past Performance

(a) Solicitation Submittal Requirements:

(1) If a completed Construction Contractor Appraisal Support System (CCASS)/Contractor Performance Assessment Report (CPAR) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 for construction experience. If a completed CCASS, ACASS, or CPAR evaluation is not available for a project that was submitted under Factor 1, the Offeror shall submit Past Performance Questionnaires (Attachment C2) for that project. Evidence of customer satisfaction shall be from the owner and/or their representative responsible for the construction contract administration of construction projects. It shall not be from a prime construction contractor for a subcontractor. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. All PPQs shall be complete, contain client’s signature, and include all information requested in Attachment C2, NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0) located the end of Document 00110. This does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Mr. Robert Wong, Robert.L.Wong1@navy.mil.

(2) Offerors shall provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Experience. Offerors shall also address any adverse past performance issues. Explanations shall not exceed two (2) double-sided 8.5” x 11” page (or four (4) single-sided 8.5” x 11” pages) and shall be size 11 font (minimum). Arial font is recommended but others may be used so long as it is legible.

(3) The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.

(4) Performance award or additional information submitted will not be considered.

(b) Basis of Evaluation:

(1) This evaluation focuses on how well the Offeror’s team performed on the relevant projects submitted under Factor 1 – Experience and may also consider past and/or current performance on other projects, interim and/or final, documented in known sources. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past and/or current performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or JV identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

(2) The Government may consider the currency and relevance of the information, the source of the information, context of the data, and general trends, interim and/or final, in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s past and/or current performance will be used as a means of evaluating the Offeror’s probability to successfully meet the requirements of the RFP.

(3) Offerors lacking relevant past performance history will not be evaluated favorably or unfavorably in past performance and will receive an unknown (or “neutral”) past performance rating. In the context of acceptability/unacceptability a neutral rating shall be considered “acceptable”.

4. Factor 4 – Small Business Utilization

It is the policy of the Government to provide maximum practicable opportunities in its acquisitions to small business (SB) concerns, including veteran-owned small business (VOSB), service-disabled veteran-owned small business (SDVOSB), historically underutilized business zone (HUBZone) small business, small disadvantaged business (SDB), and women-owned small business (WOSB) and other small business concerns. Further, it is the policy of the Government that such concerns will have the maximum practicable opportunity to participate in contract performance consistent with its efficient performance.

(a) All Offerors (both large and small businesses) shall use Attachment C3, Small Business Participation and Commitment Strategy to submit the following requested information for evaluation of this factor:

- To demonstrate commitment to use small business concerns in the performance of this contract, identify all planned subcontractors by name that will be used to support each specific small business category (i.e., SB, HUBZone SB, WOSB, SDB, VOSB, and SDVOSB). Identify the type of product/service to be subcontracted, the estimated subcontract value, and the type of commitment (i.e., teaming agreement, letter of commitment, etc.) to each subcontractor.

- To demonstrate maximum practicable participation of small businesses, identify (in terms of dollar value and percentage of the total contract value) the offeror’s total proposed small business participation (i.e. work to be performed by small business as the prime contractor and/or work to be performed by small business subcontractors). All offerors who are not able to meet the minimum total small business participation rate (20% of the total contract value) shall provide a detailed explanation why the minimum total small business participation rate cannot be achieved.

If the offeror does not intend to subcontract, provide a detailed explanation why subcontracting would not result in efficient contract performance.

Note: A large business offeror selected for award shall be required to submit an acceptable Small Business Subcontracting Plan (Attachment C4) incorporating the proposed subcontract values and small business concerns that are specifically identified in the offeror’s Small Business Participation Plan. The Small Business Subcontracting Plan shall aspire to meet the NAVFAC small business subcontracting goals stated below.

Note: The NAVFAC subcontracting targets for FY20 are as follows:

Small Business 40% Historically Underutilized Business Zone 3% Small Disadvantaged Business 5% Service Disabled Veteran Owned Small Business 3% Woman Owned Small Business 9%

(b) Basis of Evaluation:

This factor will be rated on an Acceptable or Unacceptable basis. The Government will evaluate the offeror’s Small Business Participation Plan to determine that the offeror has identified and demonstrated a commitment to use small business concerns in one or more small business categories (i.e., SB, HUBZone SB, WOSB, SDB, VOSB, and SDVOSB) in the performance of this contract.

- Proposals that fail to identify and commit to use small business concerns in the performance of this contract may be rated Unacceptable; however, the Government may take into account reasonable explanations why subcontracting would not result in efficient contract performance.

The Government will also evaluate the small business participation plan to determine that the offeror has demonstrated the maximum practicable participation of small businesses by meeting or exceeding the solicitation’s minimum total small business participate rate (i.e. work to be performed by small business as the prime contractor and/or work to be performed by small business subcontractors). The minimum total small business participation rate for this acquisition is 20% of the total contract value.

- Large business offerors may achieve the minimum total small business participation rate through subcontracting to small businesses.

- Small business offerors may achieve the minimum total small business participation rate through their own performance/participation as a prime and also through a joint venture, teaming arrangement, and/or subcontracting to other small businesses.

- Proposals that fail to demonstrate a total small business participation rate of at least 20% may be rated

Unacceptable; however, the Government may take into account reasonable explanations why the minimum total small business participation rate cannot be achieved.

Amendment No. 0002

RESPONSES TO QUESTIONS SUBMITTED FOR

RFP NO. N62478-20-R-4041 DESIGN-BID-BUILD PAVING AND AIRFIELD PAVING MULTIPLE AWARD

CONSTRUCTION CONTRACT (DBB PAVING MACC),

VARIOUS LOCATIONS, STATE OF HAWAII

Q1. We are considering submitting a proposal for this project but would like to get a little more information. If possible, does the government have a current list of projects with a relative size that are being contemplated for this contract?

A1. We do not have any information on upcoming projects other than what is published on the public NAVFAC

Hawaii website found at https://www.navfac.navy.mil/navfac_worldwide/pacific/fecs/hawaii/about_us/industry-engagement-opportunities.html.

Q2. RFP’s Instruction to Offerors requires Offerors to include “(2) Price Proposal Schedule for the Seed

Project”. However, the referenced price proposal schedule cannot be found in the RFP documents. Can you please clarify how we should include pricing for the seed project or provide referenced Price Proposal Schedule for use?

A2. Proposal schedule added in Amendment 0001.

Q3. Is the project site a known CERCLA site?

A3. No.

Q4. Will it be acceptable to the Government to use Form PPQ-0 forms completed for other RFPs?

A4. Offerors shall submit PPQ-0 forms (Attachment C2) in accordance with Document 00110. As indicated in

Attachment C2, Offerors may duplicate the PPQ-0 forms for future submission on NAVFAC solicitations.

Offerors directing the Government to look at PPQ-0 forms previously submitted will not be accepted.

Q5. Reference C-103. Please provide specification and details for Root Barrier requirements.

A5. Material to consist of spunbonded polypropylene geotextile fabric with imbedded composite nodules impregnated with a root controlling chemical. Provide and install the chemical root barrier to a minimum depth of 19.5 inches. Provide in accordance with manufacturer’s instructions. Submit manufacturer product data to the Contracting Officer for review and approval prior to the start of paving operations.

Q6. Reference C-101. The sliding gate that is called out to remain in the northern driveway will interfere with the Jointing Plan and Concrete Paving (C-102 and C-104). Is it acceptable to remove it temporarily and replace it after construction is done on that side?

A6. Yes

Q7. Reference C-101. On Sheet C-101, there is a call out for the existing gate rail to remain, but it will interfere with the Contraction Joint on Sheet C-104. Please provide a detail of the gate rail connecting to the existing pavement.

A7. Remove existing gate rail and provide new gate rail.

Q8. Reference C-101. The existing bollards are called to be removed, but there is no plan to replace them. Will the light poles that are present remain? Please confirm if the bollards will be replaced or if the intent is to remove the light poles as well.

A8. Provide new bollards. See attached detail. The existing light post shall remain.

Q9. Please provide specification for loop detectors.

A9. Loop detectors shall be constructed as shown on Detail 1/C-507.

Q10. Reference C-507, Please confirm cable type and the amount of loops required.

A10. Refer to Sensor Loop Notes on C-507. One loop detector.

Q11. Will the Government accept PPQ’s utilizing the same form from previously submitted NAVFAC RFP’s?

A11. See response to Q4.

Q12. Is there a Proposal Schedule for the Seed Project per Document 00840, Page 3 0f 6, Item No. 8?

A12. See response to Q2.

Q13. Please provide a copy of the final letter report entitled “Geotechnical Consultation FY16 Repave Parking

Lot Federal Fire Department Headquarters Building 284, JBPHH, Oahu, HI” dated June 2017 by Pacific Geotechnical Engineers.

A13. NAVFAC HI does not provide the soils report to the contractors.

Q14. Has existing soil been tested for reuse or removal from federal property to PVT Landfill?

A14. No.

Q15. Drawing C-101 states that the contractor shall notify the contracting officer to remove containers temporarily for repaving works. Please confirm that the government will be responsible for removing the containers, and that they will be removed completely out of the limits of the work for the duration of the project.

A15. The Government will remove the existing containers completely out of the limits of work for the duration of the project.

Q16. Per G-002, General Note 11, please provide the location of the “Temporary Grassed Parking Area”.

A16. The grassed area on the north side of the Fire Department compound will be used for temporary parking.

Q17. Per G-002, General Note 11, please provide a detail with regards to what is required for a “safe pedestrian path” from the temporary grassed parking area to building 284.

A17. There is no specific detail. The path shall provide a safe path for pedestrians from the parking area to the building. The contractor shall submit a detail of the path to the Contracting Officer for approval.

Q18. Please confirm that all surplus soil per specification section 01 74 19 must be disposed of at PVT Landfill, and that surplus soil from this jobsite cannot be recycled, disposed of on private property nor used on another project, federal or non-federal.

A18. Surplus soil shall be disposed of at PVT Landfill as indicated in Specification Section 01 74 19. Surplus soil shall not be recycled, disposed of on private property, or used on another project.

Q19. Per the boring logs provided on drawing C-107, the majority of the existing material below the AC and existing base course is classified “GC”. Per specification section 31 00 00, paragraph 1.2.2, this type of material is unsatisfactory and would have to be disposed of at the PVT Landfill. Please confirm that it is the intent of this project to remove & dispose of this type of material and replace it with imported material meeting the requirements in paragraph 1.2.12, Select Granular Material and/or 1.2.14, Aggregate Base Course Material.

A19. Yes.

Q20. Legend on sheet C-104 calls for “EJ” Dowled Expansion Joint, See detail 3/C-504. However, detail 3/C-

504 does not show dowels. Please clarify if the expansion joints require dowels.

20. Provide dowels similar to 2/C-504.

Q21. Please confirm whether electrical is live at the hand holes shown to be removed.

A21. Yes, electrical is live at the hand holes.

Q22. Please confirm the government is responsible for removing the containers.

A22. Yes, Government will remove the containers.

Q23. Reference sheet C-103. Please provide specifications & details for “Root Barrier” requirements.

A23. See response to Q5.

Q24. Will temporary water and power be available for the contractor to use?

A24. See requirements in Specification Section 01 50 00.

Q25. Does the government intend to uphold the requirement for a license Civil Engineer or a licensed

Geotechnical Engineer to visit the site at least 3 times a week during the progress of all portions of work listed in the table found in section 01 4500.0020 part 1.5.4 table?

A25. Yes.

Q26. Please indicate acceptable locations for the contractor laydown area.

A26. The contractor shall use the grassy area on the south side of the Fire Department compound lot for the laydown area.

Q27. Section 32 13 13.06, subsection 2.2.1.2 (5%) – we would like to request that the air entrainment be waived for this project. Air entrainment is primarily used for freeze-thaw protection (ACI 302.1R-96 “Guide for Concrete Floor and Slab Construction”, Section 5.6.1 Air-entraining admixtures), which is not an issue in Hawaii. The other positive side-effects of AE, water reduction and workability, are already achieved with less volatile methods including use of water reducer and optimized combined aggregate gradation.

A27. Delete Paragraph 2.2.1.2 in Specification Section 32 13 13.06.

Q28. Document 00110, Part II - Evaluation Criteria, seems to indicate that “Small Business Subcontracting Plan per FAR 52.219-9 Alt. II (Large Businesses only)” is to be included in both the Offeror’s Price Proposal, as well as the Offeror’s Technical Proposal (Factor 4). However, the “Instructions to Offerors” indicates that “Small Business Subcontracting Plan per FAR 52.219-9 Alt. II (Large Businesses only)” should only be included in the Offeror’s Price Proposal and does not outline a Factor 4 under the Techincal Proposal as called out in the Evaluation Criteria. Please clarify as to how the “Small Business Subcontracting Plan per FAR 52.219-9 Alt. II (Large Businesses only)” should be included in the Offeror’s proposal.

A28. The Small Business Subcontracting Plan (Large Businesses only) is not part of Factor 4 – Small Business Utilization and is to be provided separately upon request by the Contracting Officer. Documents 00100 and 00110 have been revised to remove that submittal requirement from the Price Proposal.

Q29. Referencing Sheet C-102 of the Seed Project and sensor loop details on Sheet C-507, please confirm that the existing loop detectors will be removed but will not need to be replaced for this project.

A29. Remove existing loop sensors and provide new loop detector as shown on the drawings.

Q30. Referencing Seed Project Spec Section 01 14 00, Part 1.2.d, please confirm which side of the building the semi-trailer truck will need access to. Will it be the side of Bldg 284 that is facing Center Drive or will it be the side facing Bldg 285?

A30. The east side of Building 284.

Q31. Please clarify the NAVFAC subcontracting targets for FY20 on Document 00110, page 9 of 10. The percentages for SB, HUBZONE, SDB, SDVOSB and WOSB add up to 108.5%

A31. The percentages do not equal 100% because companies can qualify in more than one category. Also see revised Document 00110 for corrected subcontracting targets.

Q32. In reference to Q&A8 and Q&A21 regarding the existing light posts and hand holes, please confirm if the existing light fixture, light pole and base are all to remain in place. If they are to remain in place, please clarify if the existing handholes (which service those light poles) marked for demolition on Drawing C-101 are also to remain in place.

A32. Existing electrical handholes indicated for demolition shall remain shall and not be demolished.

Q33. How many bid guarantees do we provide? One for the seed project and one for the overall contract?

A33. Submit a bid guarantee for the seed project only.

Q34. May we please receive the Attachment C1 – Construction Experience Project Data Sheet, Attachment C3 – Small Business Participation & Commitment Strategy & Attachment C4 – Small Business Subcontracting Plan in a typeable/original formatting. The RFP states that the document may be expanded however the PDF does not allow for that.

A34. Typeable formats provided in Amendment 0002, but keep within the size/page requirements of the RFP.

RFP N62478-20-R-4041 AMD 0002
Document 00110 (AMD 0002)
RFI Responses 10-07-20