N62478-14-R-2419_RFP_without_drawings.pdf

PDF 5 MB Posted

Attached to
Grounds and Tree Maintenance Services, Central and West Oahu, Hawaii
Solicitation number
N62478-14-R-2419
Issued by

About this file

Solicitation

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 11 Jun 2014

X

A X B

C D

EX

X G F 54 - 56

57 - 67 X H 68 - 71 julie.shimoda@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-C3 1 71

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N62478 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

Building A12 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

JULIE M. SHIMODA (808) 471-1563

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 9

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT

PACKAGING AND MARKING

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

10 - 12 13 - 15

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 16 - 21 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 22 - 25 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

26 - 53

PART II - CONTRACT CLAUSES

NAVFAC HAWAII

SERVICES ACQUISITION DIVISION (PRJ233)

400 MARSHALL ROAD

JBPHH HI 96860-3139

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

12 May 2014

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N62478-14-R-2419

14-14-2419

PART I - THE SCHEDULE

SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 CONTRACT LINE ITEMS AND EXHIBIT LINE ITEMS

a. Offerors shall enter unit prices and amounts for contract line items (CLINs) and exhibit line items (ELINs) in the following attachments.

(1) Price Schedule

(2) Schedule of Firm Fixed-Price Work and Schedule of Indefinite Delivery Indefinite

Quantity Work.

(a) Attachment J-0200000-08, Exhibit A (Base Period).

(b) Attachment J-0200000-09, Exhibit B (Option Period One).

(c) Attachment J-0200000-10, Exhibit C (Option Period Two).

(d) Attachment J-0200000-11, Exhibit D (Option Period Three).

(e) Attachment J-0200000-12, Exhibit E (Option Period Four).

b. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended offer and the total of the CLINs, or ELINs, will be recomputed accordingly. The CLINs which includes recomputed ELINs will also be recomputed to take into account the change in the contract ELINs. If the offeror provides a total amount for an ELIN but fails to enter the unit price, the total amount divided by the respective ELIN quantity will be held to be the intended unit price.

c. The Schedule of Firm Fixed-Price Work and the Schedule of Indefinite Delivery Indefinite

Quantity Work Exhibit will be used as the basis for payment and for deductions pursuant to the

CONSEQUENCES OF CONTRACTOR'S FAILURE TO PERFORM REQUIRED SERVICES

Clause.

B.2 INDEFINITE DELIVERY INDEFINITE QUANTITY INDIVIDUAL CONTRACT EXHIBIT LINE

ITEM QUANTITIES. Once the estimated quantities for individual contract ELINs shown in the accompanying exhibits have been ordered, the Government may order additional quantities as long as the overall not-to-exceed amount of the contract per year is not exceeded and the Contractor accepts the order by performing the DOD EMALL order or by signing the task order.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

FIRM FIXED-PRICE WORK (FFP) - BASE PD

FFP

Price to perform FFP work, for the 12-month Base Period, in accordance with all the terms of this contract.

FOB: Destination

NET AMT

INDEF DEL INDEF QTY (IDIQ) - BASE PD.

FFP

Price to perform IDIQ work, for the 12-month Base Period, in accordance with all the terms of this contract.

OPTION FIRM FIXED-PRICE WORK (FFP) - OPT PD 1

FFP

Price to perform FFP work, for the 12-month Option Period One, in accordance with all the terms of this contract.

OPTION INDEF DEL INDEF QTY (IDIQ) - OPT PD. 1

FFP

Price to perform IDIQ work, for the 12-month Option Period One, in accordance

OPTION FIRM FIXED-PRICE WORK (FFP) - OPT PD 2

FFP

Price to perform FFP work, for the 12-month Option Period Two, in accordance

OPTION INDEF DEL INDEF QTY (IDIQ) - OPT PD. 2

FFP

Price to perform IDIQ work, for the 12-month Option Period Two, in accordance

OPTION FIRM FIXED-PRICE WORK (FFP) - OPT PD 3

FFP

Price to perform FFP work, for the 12-month Option Period Three, in accordance

OPTION INDEF DEL INDEF QTY (IDIQ) - OPT PD. 3

FFP

Price to perform IDIQ work, for the 12-month Option Period Three, in accordance

OPTION FIRM FIXED-PRICE WORK (FFP) - OPT PD 4

FFP

Price to perform FFP work, for the 12-month Option Period Four, in accordance

OPTION INDEF DEL INDEF QTY (IDIQ) - OPT PD. 4

FFP

Price to perform IDIQ work, for the 12-month Option Period Four, in accordance

ELINS Base Period

FFP

See Attachment J-0200000-08, Exhibit Line Item Numbers, Firm Fixed-Price and Indefinite Delivery Indefinite Quantity Work

OPTION ELINS Option Period 1

FFP

See Attachment J-0200000-09, Exhibit Line Item Numbers, Firm Fixed-Price and

OPTION ELINS OptionPeriod 2

FFP

See Attachment J-0200000-10, Exhibit Line Item Numbers, Firm Fixed-Price and

OPTION ELINS Option Period 3

FFP

See Attachment J-0200000-11, Exhibit Line Item Numbers, Firm Fixed-Price and

OPTION ELINS OptionPeriod 4

FFP

See Attachment J-0200000-12, Exhibit Line Item Numbers, Firm Fixed-Price and

0100000 – General Information Spec Item Title Description 1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) for GROUNDS AND TREE MAINTENANCE SERVICES at CENTRAL AND WEST OAHU, HAWAII by means of a combination firm-fixed price (FFP) and indefinite delivery-indefinite quantity (IDIQ) contract. The PWS is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements. The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).

Annex 1 General Information Annex 2 Management and Administration Annex 3 through Annex 14 (Not Applicable) Annex 15 Facilities Investment 1503020 Pest Control 1503050 Grounds Maintenance and Landscaping Annex 16 through Annex 18 (Not Applicable)

1.2 Project Location The work shall be performed at various locations and could vary from location to location in the Central and West parts of Oahu, HI.

1.3 Acquisition of

Additional Work

The Government reserves the right to acquire additional grounds maintenance and landscaping services on Oahu in addition to areas identified in the Firm-Fixed Price requirements of this contract.

Additional services will be incorporated into the contract in accordance with the FAR Clause 52.212-4. Contract Terms and Conditions – Commercial Items.

1.4 Background Information This contract consists of services to be performed for the various commands at various locations in the Central and West Oahu areas. All of the services are to be performed on the island of Oahu.

1.5 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in the attachments which may include data such as maps and tables to represent the type, quantity and location of services are provided.

However, offerors are encouraged to visit the project site during the site visit for its due diligence to assess the nature of work and conditions under which work is to be performed.

1.6 Climate Patterns Moderate temperatures and weather conditions throughout the year.

Typical island climatic conditions: daytime temperatures in the mid to high 80’s F with trade winds from the North North-East. Afternoon clouding at higher elevations, with a chance of light early morning and evening showers. Central Pacific Hurricane season: June through November.

Daily weather forecasts are available at the National Oceanic Atmospheric Administration (NOAA), National Weather Service Forecast Office at http://www.prh.noaa.gov/hnl/.

1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional

14-14-2419 0100000 Page 1 of 3 http://www.prh.noaa.gov/hnl/ information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.8 Navy Approach to

Service Contracting

The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.

The Navy also supports the following principles:

1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion.

Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.

1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle.

Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).

1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and

0100000 Page 2 of 3 expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.

Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract.

Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized.

Specification item 1 will always contain General Information.

Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Firm Fixed-Price (FFP) requirements. Specification item 4 will always contain the Indefinite Delivery-Indefinite Quantity (IDIQ) requirements.

All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 3 of Annexes 3 through 18.

1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.

1.11 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference including, but not limited to, proposed approaches, staffing, methodology, or work plans, will meet the performance objectives set forth in this contract during execution thereof. The Contractor is not excused from meeting such performance objectives in the event such proposal proves inadequate as conceived or executed to meet such performance objectives.

The Contractor understands that it bears all of the cost and performance risk associated with adopting acceptable additional (and/or alternative) means or methods of meeting the performance objective.

0100000 Page 3 of 3

0200000 – Management and Administration Table of Contents

Spec Item Title 2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment

2.3.3 Partnering

2.3.3.1 Informal Partnering

2.3.3.2 Contract Partnering Administration

2.3.3.3 Contract Partnering Session Attendees

2.3.4 Permits and Licenses

2.3.5 Insurance

2.3.5.1 Certificate of Insurance

2.3.5.2 Minimum Insurance Amounts

2.3.6 Protection of Government Property

2.3.7 Government Information Technology (IT) System

2.3.8 Directives, Instructions, and References

2.3.9 Invoicing Procedures

2.3.10 Forms

2.4 Government-Furnished Property, Materials and Services

2.4.1 Government-Furnished Facilities (GFF)

2.4.2 Government-Furnished Utilities

2.4.2.1 Use of Fire Hydrant

2.4.3 Government-Furnished Materials (GFM)

2.4.4 Government-Furnished Equipment (GFE)

2.4.5 Government-Furnished Services (GFS)

2.5 Contractor-Furnished Items

2.5.1 Dielectric Certification

2.6 Management

2.6.1 Work Reception

2.6.2 Work Control

2.6.3 Work Schedule

2.6.4 Deliverables

2.6.5 Service Interruptions

2.6.6 Government’s Computerized Maintenance Management Systems (CMMS)

2.6.7 Quality Management System (QMS)

2.6.7.1 Quality Management (QM) Plan

2.6.7.2 Quality Inspection and Surveillance

2.6.7.3 Quality Inspection and Surveillance Report

2.6.8 Property Management Plan

2.6.9 System and Equipment Replacement

2.6.10 Irrigation System File

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

0200000 Page 1 of 26

Spec Item Title

2.7.1.2 Quality Manager

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.2 Employee Requirements

2.7.2.1 Employee Certification and Training

2.7.2.1.1 Personnel Performing Arboricultural Work

2.7.2.1.2 Personnel Performing In-Wire Tree Work

2.7.2.1.3 Personnel Performing Work on Backflow Preventers

2.7.2.1.4 Pesticide Applicator

2.7.2.2 Employee Appearance

2.7.2.3 Employee Conduct

2.7.2.4 Identification as Contractor Employee

2.7.2.5 Removal of Employees

2.7.2.6 Proof of Legal Residency

2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation

2.8.4.1 NCACS Program

2.8.4.2 One-Day Passes

2.8.5 Access to Buildings

2.8.6 Access Arrangements

2.8.6.1 Escort Arrangement for Secured Areas

2.8.7 Security Clearances

2.8.8 Access to Sensitive Unclassified Information

2.9 Contractor Safety Program

2.9.1 Accident Prevention Plan (APP)

2.9.2 Activity Hazard Analysis (AHA)

2.9.3 Occupational Risk and Compliance Plans

2.9.3.1 Alcohol and Drug Abuse Prevention Plan

2.9.3.2 Chemical Hazard Communication Program

2.9.3.3 Emergency Response Plans

2.9.3.4 Fall Prevention and Protection Plan

2.9.3.5 Fire Prevention Program

2.9.3.6 Hazardous Energy Control Program

2.9.3.7 Health Hazard Control Program and Hazard Communication Program

2.9.3.8 Respiratory Protection Program

2.9.4 Accident and Damage Reporting

2.9.4.1 Accident Reporting and Notification Criteria

2.9.5 Fire Protection

2.9.6 Monthly On-Site Labor Report

2.9.7 OSHA Citations and Violations

2.9.8 Safety Inspections and Monitoring

2.9.9 Safety Certification

2.9.10 Safety Apparel on Jobsites

2.10 Environmental Management and Sustainability

2.10.1 Energy Management Program

2.10.1.1 Water Conservation Plan

2.10.1.2 Energy Efficient Products

0200000 Page 2 of 26

Spec Item Title

2.10.2 Environmental Protection

2.10.2.1 Non-Hazardous Waste Disposal

2.10.2.1.1 Waste Report

2.10.2.2 Hazardous Waste Disposal

2.10.2.3 Spill Prevention, Containment, and Clean-up

2.10.2.4 Hazardous Material Management

2.10.2.5 Protection of Endangered and Threatened Species (Flora and Fauna)

2.10.2.6 Noise Control

2.10.2.7 Land Use Control

2.10.3 Sustainable Procurement and Practices

2.10.3.1 Environmentally Preferable Products

2.10.3.2 Use of Recovered Materials

2.10.3.3 Use of Biobased Products

2.11 Disaster Preparedness

2.12 Technical Library

2.13 Warranty Management

2.14 FFP Work Procedures

2.14.1 Notification to the Government for Work Above the FFP Limitations

2.14.2 FFP Exhibit Line Item Numbers (ELINs)

2.14.3 Additional Initial Effort

2.15 IDIQ Work

2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)

2.15.1.1 Acceptance and Performance

2.15.1.2 Invoicing and Receiving Payment

2.15.2 Unit Priced Labor (UPL)Work (Negotiated)

2.15.2.1 IDIQ Preparation of Proposals

2.15.2.1.1 Labor Requirements

2.15.2.1.2 Material and Equipment Requirements

2.15.2.2 Issuance of Final Task Order

2.15.3 Method of Measurement for IDIQ Work

2.15.3.1 Measurement of Trees by Diameter at Breast Height (DBH) Criterion for Pruning and

Removal

2.15.3.2 Measurement of Trees by Height for Pruning and Removal

2.15.3.3 Measurement of Limbs and Branches for Removal

2.15.4 IDIQ ELINS

0200000 Page 3 of 26

0200000 - Management and Administration

2 Management and

Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in Attachment J-0200000-01.

2.2 General Information

2.2.1 Government Regular

Working Hours The Government's regular working hours are from 0700-1600, five days per week, Monday through Friday, except observed Federal holidays.

Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.

2.2.1.1 Observed Federal

Holidays

The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.

2.2.1.2 Restriction to

Contractor Working Hours

If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Attachment J-0200000-07, Deliverables. Excludes work to be performed during specified hours.

2.2.2 Wage Determinations Wage Determinations are included in J-0200000-02.

2.2.3 Requirements

Hierarchy Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e., spec items 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.

2.3 General Administrative

Requirements

2.3.1 Required Conferences

and Meetings

The Contractor may be required to attend administrative and coordination meetings. The Contractor shall attend meetings as scheduled by the KO.

2.3.2 Training for

Maintenance and Operation of New and Replacement Systems and Equipment

When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

2.3.3 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and subcontractors teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

0200000 Page 4 of 26

Partnering should accomplish three goals:

• The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.

• The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.

• The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.

2.3.3.1 Informal Partnering The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.

The Initial Informal Partnering Session will be conducted and facilitated using electronic media (video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions.

2.3.3.2 Contract Partnering

Administration

Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.

Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3 Contract Partnering

Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

President/Vice President

* Project Manager

* Quality Manager

* Site Safety and Health Officer

2.3.4 Permits and Licenses The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Attachment J-0200000-07.

2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Attachment J- 0200000-07 as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A

0200000 Page 5 of 26

GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.

2.3.5.1 Certificate of Insurance The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

2.3.5.2 Minimum Insurance

Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

Other as required by state law.

2.3.6 Protection of

Government Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.

2.3.7 Government

Information Technology (IT) System

Additional information about NMCI may be obtained at http://www.eds.com/nmci.

2.3.8 Directives, Instructions, and References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in Attachment J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.9 Invoicing Procedures Refer to contract for invoicing instructions. Refer to Invoice Form in Attachment J-0200000-04 for sample.

2.3.10 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in Attachment J-0200000-05.

2.4 Government-Furnished

Property, Materials and Services

See below sub-paragraph on Government-Furnished Utilities.

2.4.1 Government-Furnished

Facilities (GFF)

None.

2.4.2 Government-Furnished

Utilities

The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract at no cost to the Contractor. Information concerning the location of existing outlets may be secured from the KO. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and

0200000 Page 6 of 26 electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.

2.4.2.1 Use of Fire Hydrant The Contractor may use fire hydrants where available and upon approval by the Government. Submit a request to the KO a minimum of one month prior to the desired use. Include a schedule for the Fire Marshal and for NAVFAC HI Utilities Department indicating which fire hydrants and proposed usage dates. Use of fire hydrants are subject to the following restrictions:

• Use only proper tools and connections (e.g., fire hydrant operating wrench, proper hose connections) when operating the fire hydrants. Install a backflow prevention device at each hydrant connection. Coordinate with NAVFAC HI Utilities Department for the Government to inspect, test, and certify all backflow prevention devices prior to the devices being placed in service. Provide a minimum of 14-calendar day notice prior to the date when the inspection and testing are required. Perform all repairs and other work required to make a device certifiable.

Ensure that all devices have a current certification of approval from the Foundation for Cross-Connection Control and Hydraulic Research, University of Southern California. Furnish proof that each make, model/design, and size of backflow prevention device used is approved and has a current certificate of approval from the Foundation. All relocated and reconnected devices must be re-tested and re-certified by the Government prior to being placed back in service. Reimburse the Government for all inspection, testing and certification work at the prevailing rate charged by the Steam, Air and Water Division.

• Use proper equipment in the watering operations (e.g., equipment that will efficiently distribute water over areas to be irrigated).

Direct application of water from hydrant, fire hose, and nozzles that cause flooding, soil erosion, water runoff, etc., are not permitted.

• Prevent excessive use and waste of water.

• Open and close valves slowly to prevent water hammer and damage to mains and appurtenances.

• Permanent installations of irrigation equipment to fire hydrants are not permissible. Remove all irrigation devices and backflow prevention devices from fire hydrants upon completion of area watering and replace all connections/operating valve covers.

Note that each time a backflow prevention device is reconnected to the fire hydrant; inspection, testing and re-certification of the device are required.

• Repair any damage to the fire hydrants caused by the Contractor (e.g., using pipe wrenches to open valves, stripping threads on the hose connections, etc.) to the satisfaction of the KO, at no additional cost to the Government.

The Fire Marshall and NAVFAC HI Utilities Department will grant approval upon satisfactory evidence that the Contractor will comply with these requirements. Failure to comply with any of the requirements, after approval has been granted, will result in denial of further use of fire hydrants. The Government will notify the Contractor of approval/disapproval.

0200000 Page 7 of 26

2.4.3 Government-Furnished

Materials (GFM) None.

2.4.4 Government-Furnished

Equipment (GFE)

None.

2.4.5 Government-Furnished

Services (GFS)

None.

2.5 Contractor-Furnished

Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Material Safety Data Sheets (MSDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

2.5.1 Dielectric Certification The Contractor shall possess a current Dielectric Certification of test for all tools, equipment, and vehicle-mounted aerial devices that require insulation for use near power lines and facilities. Submit the certificates to the KO within 15 calendar days after contract award. Work under this contract near power lines and facilities shall not commence before acceptance of the certifications from the KO.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards.

Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.

2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business. In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.

2.6.4 Deliverables Records and reports are specified in this annex and sub-annexes listed as deliverables in Attachment J-0200000-07. The Contractor shall submit

0200000 Page 8 of 26 accurate and complete documents within the required timeframes as specified in Attachment J-0200000-07.

Government acceptance of deliverables will not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.

2.6.5 Service Interruptions If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers in accordance with local procedures If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.

2.6.6 Government’s

Computerized Maintenance Management Systems

(CMMS)

Not applicable.

2.6.7 Quality Management

System (QMS)

The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

• Accurate documentation of work processes, procedures, and output measures.

• A systematic procedure for assessing compliance with performance objectives and standards.

• Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

• Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

2.6.7.1 Quality Management

(QM) Plan

The Contractor shall develop and submit a QM Plan per Attachment J- 0200000-07. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.

2.6.7.2 Quality Inspection and

Surveillance

The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file, QC Inspection File, shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of termination of the contract.

2.6.7.3 Quality Inspection and

Surveillance Report

The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Attachment J-0200000-07. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.

0200000 Page 9 of 26

2.6.8 Property Management

Plan The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4, Government-Furnished Property, Materials and Services, of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession. The Property Management Plan shall be submitted per Attachment J-0200000-07.

2.6.9 System and Equipment

Replacement

The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced.

Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.

2.6.10 Irrigation System File Provide and maintain a file for irrigation systems in maintenance areas covered under this contract. Verify accuracy of and incorporate information provided in Attachment J-1503050-05. The Irrigation System File shall be submitted per Attachment J-0200000-07 Deliverables. The file shall be the property of the Government and made available to the KO during regular working hours. At the completion/termination of the contract, files turned over to the KO shall include drawings and information for the following in a format approved by the KO:

- Areas covered by sprinkler systems; and

- Sprinkler systems with automatic controllers and rain sensors, location of the controllers and rain sensors, and timer settings.

2.7 Personnel

Requirements The Contractor shall comply with the personnel requirements stated below.

2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per Attachment J-0200000-07. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.

The Contractor shall submit an Organizational Chart per Attachment J- 0200000-07 showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.

2.7.1.1 Project Manager (PM) The Contractor shall provide a PM and designated alternate, as applicable, who has full authority to act for the Contractor on all contract matters relating to this contract. PM or alternate shall be available during the Government's regular working hours and shall be available within one hour after the Government's regular working hours.

The PM shall have at least three years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.

2.7.1.2 Quality Manager The Contractor shall provide a Quality Manager or designated alternate who shall be on-site within during the Government's regular working hours and shall be available on-site within two hours after the

0200000 Page 10 of 26

Government’s regular working hours. The Quality Manager must report directly to a senior corporate official and shall not report directly to the Project Manager.

The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract: The Quality Manager shall have at least three years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager shall not be the same person as the SSHO or Project Manager.

2.7.1.3 Site Safety and Health

Officer (SSHO)

The SSHO must meet the requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project.

Provide a Safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO shall be available at all times when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.

A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.

The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:

The SSHO shall have completed five years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past or three years experience if he possesses a Certified Safety Professional (CSP) or safety and health degree. The SSHO shall have completed the OSHA 30-hour construction safety class or equivalent and maintain competency through 24 hours of formal safety and health related coursework every four years. The SSHO may be the same person as the project manager if the pre-requisite qualification and experience for each position is fulfilled.

2.7.2 Employee

Requirements

The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can read and understand printed regulations, detailed written orders, operating procedures, training instructions and materials in order to perform the contract requirements as well as comply with installation emergency procedures.

2.7.2.1 Employee Certification The Contractor shall maintain personnel certification, training, and

0200000 Page 11 of 26 and Training licensing records for employee requirements specified herein and within all technical annexes/sub-annexes. Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for Government review within 4 hours of request.

2.7.2.1.1 Personnel Performing

Arboricultural Work

Certified Arborists or Certified Tree Workers shall perform arboricultural work, unless otherwise stated in the contract. Qualified Tree Workers and Qualified Tree Worker Trainees, as defined by ANSI A300, may perform tree pruning or removal work only when work is performed under the direct supervision of an Arborist or Certified Tree Worker. The supervising Arborist or Certified Tree Worker shall be present at the work site at all times.

2.7.2.1.2 Personnel Performing

In-Wire Tree Work

Qualified line clearance trained and experienced Arborists or Certified Tree Workers shall perform all in-wire tree services. At a minimum, training shall include the successful completion of safety and hazard awareness training for arboricultural work around electrical utility lines and structures. Training shall also include demonstration of ability in the performance of special techniques involved with in-wire tree services.

2.7.2.1.3 Personnel Performing

Work on Backflow Preventers

A certified backflow-preventer tester shall perform disinfections, repairs, and other work on backflow preventers.

2.7.2.1.4 Pesticide Applicator All personnel who apply pesticides on DoD property shall be State of Hawaii pesticide applicator certified as a Commercial 3 (Ornamental & Turf Pest Control) pesticide applicator and Commercial 6 (Right-Of-Way Pest Control) pesticide applicator.

2.7.2.2 Employee Appearance The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.

2.7.2.3 Employee Conduct Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.

2.7.2.4 Identification as

Contractor Employee

Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .