14-2419_PRICING_SCHEDULE_(AMD_0002)_6182014.xlsx
XLSX spreadsheet 192 KB Posted
- Solicitation number
- N62478-14-R-2419
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
08 FFP-BASE
ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62478-14-R-2419
EXHIBIT A - CLIN 9000 Offeror Proposed Unit Price Enter proposed unit price in this column. Price will automatically copy to the unit price cell rounded to two decimal places.
Line Item 0001 Base Period - Firm Fixed-Price Work
PROVIDE PRICES TO PERFORM FIRM FIXED-PRICE WORK IN ACCORDANCE WITH SPEC ITEM 3
| Exhibit Line Item No. | Supplies/Services | Recurring Work | ||||||
| Requirements(1) | Pricing for Firm Fixed-Price Work | |||||||
| Estimated Quantity | Unit | Quantity | Unit | Unit Price | Total Amount |
| A001 | CNRH | |||||||||
| A001AA | Prestige | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A001AB | COL 3 Base Measures (NCTAMS CDC ONLY) | 60,000 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A001AC | COL 4 AM2 | 14,505,362 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A001AD | Grass Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A001AE | Brush Maintenance | 16,305 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A001AF | Brush/Grass Maintenance | 10,368,629 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A001AG | Herbiciding | 325,764 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A001AH | Firebreak Maintenance | 6,505,228 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A001AJ | Vegetation Control | 5,830,923 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A001AK | Sewer Pond Weed Removal | 260,770 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A001AL | Tree Trimming - Palmaceous Only | 2,825,336 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A001AM | Cutting Back Trees and Brush (NAVMAG LLL ONLY) | 265,500 | LF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A001AN | Cutting Back Trees and Brush (NAVMAG LLL ONLY) | 290,337 | LF | 12 | MO | $ | 0.00 | $ | 0.00 |
A001 Total $ 0.00
| A002 | DISA PAC | |||||||||
| A002AA | Prestige | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A002AB | COL 3 Base Measures | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A002AC | COL 4 AM2 | 90,921 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A002AD | Grass Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A002AE | Brush Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A002AF | Brush/Grass Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A002AG | Herbiciding | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A002AH | Firebreak Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A002AJ | Vegetation Control | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A002AK | Sewer Pond Weed Removal | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A002AL | Tree Trimming - Palmaceous Only | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A002AM | Cutting Back Trees and Brush (NAVMAG LLL ONLY) | --- | LF | 12 | MO | $ | N/A | $ | N/A | N/A |
A002 Total $ 0.00
| A003 | SDVT (COMNAV REG) | |||||||||
| A003AA | Prestige | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A003AB | COL 3 Base Measures | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A003AC | COL 4 AM2 | 102,050 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A003AD | Grass Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A003AE | Brush Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A003AF | Brush/Grass Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A003AG | Herbiciding | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A003AH | Firebreak Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A003AJ | Vegetation Control | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A003AK | Sewer Pond Weed Removal | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A003AL | Tree Trimming - Palmaceous Only | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A003AM | Cutting Back Trees and Brush (NAVMAG LLL ONLY) | --- | LF | 12 | MO | $ | N/A | $ | N/A | N/A |
A003 Total $ 0.00
| A004 | SPAWARS | |||||||||
| A004AA | Prestige | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A004AB | COL 3 Base Measures | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A004AC | COL 4 AM2 | 63,947 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A004AD | Grass Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A004AE | Brush Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A004AF | Brush/Grass Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A004AG | Herbiciding | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A004AH | Firebreak Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A004AJ | Vegetation Control | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A004AK | Sewer Pond Weed Removal | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A004AL | Tree Trimming - Palmaceous Only | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A004AM | Cutting Back Trees and Brush (NAVMAG LLL ONLY) | --- | LF | 12 | MO | $ | N/A | $ | N/A | N/A |
A004 Total $ 0.00
| A005 | NAVFACHI OPHP61 | |||||||||
| A005AA | Prestige | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A005AB | COL 3 Base Measures | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A005AC | COL 4 AM2 | 554,331 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A005AD | Grass Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A005AE | Brush Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A005AF | Brush/Grass Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A005AG | Herbiciding | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A005AH | Firebreak Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A005AJ | Vegetation Control | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A005AK | Sewer Pond Weed Removal | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A005AL | Tree Trimming - Palmaceous Only | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A005AM | Cutting Back Trees and Brush (NAVMAG LLL ONLY) | --- | LF | 12 | MO | $ | N/A | $ | N/A | N/A |
A005 Total $ 0.00
| A006 | CNRH-MWR | |||||||||
| A006AA | Prestige | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A006AB | COL 3 Base Measures | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A006AC | COL 4 AM2 | 97,108 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A006AD | Grass Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A006AE | Brush Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A006AF | Brush/Grass Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A006AG | Herbiciding | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A006AH | Firebreak Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A006AJ | Vegetation Control | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A006AK | Sewer Pond Weed Removal | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A006AL | Tree Trimming - Palmaceous Only | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A006AM | Cutting Back Trees and Brush (NAVMAG LLL ONLY) | --- | LF | 12 | MO | $ | N/A | $ | N/A | N/A |
A006 Total $ 0.00
| A007 | JBPHH/CATM | |||||||||
| A007AA | Prestige | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A007AB | COL 3 Base Measures | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A007AC | COL 4 AM2 | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A007AD | Grass Maintenance | 130,680 | SF | 12 | MO | $ | 0.00 | $ | 0.00 | |
| A007AE | Brush Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A007AF | Brush/Grass Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A007AG | Herbiciding | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A007AH | Firebreak Maintenance | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A007AJ | Vegetation Control | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A007AK | Sewer Pond Weed Removal | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A007AL | Tree Trimming - Palmaceous Only | --- | SF | 12 | MO | $ | N/A | $ | N/A | N/A |
| A007AM | Cutting Back Trees and Brush (NAVMAG LLL ONLY) | --- | LF | 12 | MO | $ | N/A | $ | N/A | N/A |
A007 Total $ 0.00
| A008 | DELETED |
| A008AA | DELETED |
| A008AB | DELETED |
| A008AC | DELETED |
| A008AD | DELETED |
| A008AE | DELETED |
| A008AF | DELETED |
| A008AG | DELETED |
| A008AH | DELETED |
| A008AJ | DELETED |
| A008AK | DELETED |
| A008AL | DELETED |
| A008AM | DELETED |
| TOTAL FFP LINE ITEMS A001 THROUGH A007 | $ | 0.00 |
| (Enter this amount into the Schedule of Work, Item No. 0001, Net Amount) |
&"Times New Roman,Regular"&10 14-14-2419 Attachment J-0200000-08 Page &P Amendment No. 0002
08 IQ-BASE
ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62478-14-R-2419
EXHIBIT A - CLIN 9000 Offeror Proposed Unit Price Enter proposed unit price in this column. Price will automatically copy to the unit price cell rounded to four decimal places.
Line Item 0002 Base Period- Indefinite Delivery Indefinite Quantity Work
PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK IN ACCORDANCE WITH 1503050, SPEC ITEM 4
| EST | UNIT OF | UNIT | TOTAL | |||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT | |
| A700 | --- | Composite Hourly Rate Work: Grounds Planting and Maintenance Work(2) | Composite Hourly Rate Work shall be based on labor hours. Provide labor for grounds maintenance composite hourly rate work. Labor hours shall be based on the productive hours expended on the site for the performance of the work. | 350 | HR | 0.0000 | $ - 0 | |
| A701 | --- | Composite Hourly Rate Work: Tree Planting/Prunning/ Maintenance Work(2) | Composite Hourly Rate Work shall be based on labor hours. Provide labor for tree planting/pruning/maintenance composite hourly rate work. Labor hours shall be based on the productive hours expended on the site for the performance of the work. | 150 | HR | 0.0000 | $ - 0 | |
| A702 | --- | Composite Hourly Rate Work: Irrigation System Maintenance Work(2) | Composite Hourly Rate Work shall be based on labor hours. Provide labor for irrigation system maintenance composite hourly rate work. Labor hours shall be based on the productive hours expended on the site for the performance of the work. | 150 | HR | 0.0000 | $ - 0 | |
| A703 | --- | Composite Hourly Rate Work: Direct material costs to support ELIN A700, A701 and A702(3) | Composite Hourly Rate Work. Provide material for composite hourly rate work. The Contractor will be compensated the direct cost of materials. | 5,000 | EA | 1.0000 | $ 5,000.00 | |
| A704 | --- | Special Events and Urgent Response Work Surcharge | Surcharge unit price to be added to each order requiring response as special events and urgent work. Included in this category are work requirements in preparation for special events; i.e., parades, Change of Command ceremonies, and requests by Admiral or Flag personnel. Respond and be on the job site within 24 hours after issuance of an order and complete work within 48 consecutive hours after issuance of the order. | 20 | EA | 0.0000 | $ - 0 | |
| A705 | --- | Emergency Response Work Surcharge | Surcharge unit price to be added to each order requiring response as emergency work. Included in this category are work requirements classified as emergency when the work consists of correcting items which constitute an immediate danger to personnel and equipment, threaten to damage property, or preclude fulfillment of station operational requirements. Respond and be on the job site within two hours after issuance of an order. Work continuously without interruption and arrest the emergency condition. Prior to leaving the job site, ensure that the job site, including surrounding areas affected by the emergency work is habitable, safe, sanitary, and secured. If further work is required after the emergency condition is arrested, continue the work no later than the following workday and prosecute continuously until the work is completed. | 10 | EA | 0.0000 | $ - 0 | |
| A706 | --- | Mowing, Trimming, and Edging | Mow and trim grass to a uniform height of 2 inches. Trim grass areas along edge of buildings; around trees, shrubs, planter/shrub beds, cultivated areas, poles, walls, fences, sprinkler heads, valves and other obstructions to match the height and appearance of surrounding cut grass. Edge where grass meets any concrete or asphalt surface, where grass abuts planter beds, or wherever needed to maintain grass delineation. Remove vegetation (e.g., grass, weed, vine, unwanted growth) adhering to or protruding through fences and walls. Remove and dispose all clippings and trimmings. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 1,000,000 | SF | 0.0000 | $ - 0 | |
| A707 | --- | Grass Cutting | Cut grass to a uniform height of 4 to 6 inches. Remove and dispose all clippings. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 250,000 | SF | 0.0000 | $ - 0 | |
| A708 | --- | Shrub, Bush, or Cultivated Plant Pruning | Prune shrubs, bush, and cultivated plants to a uniform, well shaped appearance and to prevent interference with pedestrians, vehicular traffic, and building encroachment. Remove and dispose all clippings and debris. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 100 | EA | 0.0000 | $ - 0 | |
| A709 | --- | Hedge Pruning | Prune hedges to a uniform, well shaped appearance and to prevent interference with pedestrians, vehicular traffic, and building encroachment. Remove and dispose all clippings and debris. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 1,000 | LF | 0.0000 | $ - 0 | |
| A710 | --- | Plant and Bed Cultivating | Cultivate plants and beds to provide a neat appearance and promote plant health. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 2,500 | SF | 0.0000 | $ - 0 | |
| A711 | --- | Watering (Irrigation) | Perform watering in a way that promotes deep rooting, proper health, growth, color, and appearance of vegetation. Apply a minimum of one inch of water. Includes the use of irrigation systems and hand watering. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 10,000 | SF | 0.0000 | $ - 0 | |
| A712 | --- | Fertilizing | Fertilize vegetation in a manner that promotes health, growth, color and appearance. Apply fertilizer in accordance with the manufacturer's printed instructions. The Government may determine fertilizer type on soil analysis test results of the respective area, adjacent area, or similar areas. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 2,500 | SF | 0.0000 | $ - 0 | |
| A713 | --- | Lawn and Garden Pest Control: Lawn | Eradicate disease, parasites, insect and fungus on vegetation. Application of appropriate pesticide in accordance with the manufacturer's printed instructions. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 10,000 | SF | 0.0000 | $ - 0 | |
| A714 | --- | Lawn and Garden Pest Control: Shrub, Bush, or Cultivated Plant | Eradicate disease, parasites, insect and fungus on vegetation. Application of appropriate pesticide in accordance with the manufacturer's printed instructions. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 10 | EA | 0.0000 | $ - 0 | |
| A715 | --- | Lawn and Garden Pest Control: Hedge | Eradicate disease, parasites, insect and fungus on vegetation. Application of appropriate pesticide in accordance with the manufacturer's printed instructions. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 2,500 | LF | 0.0000 | $ - 0 | |
| A716 | --- | Herbiciding: Broadcast Treatment | Herbicide to eliminate unwanted growth. Cut all treated vegetation flush to the finished grade after it dies and dispose. Remove vegetation (e.g., grass, weed, vine, unwanted growth) adhering to or protruding through fences and walls. Apply herbicide over the entire maintenance area. Quantity specified is that of the entire maintenance area. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 75,000 | SF | 0.0000 | $ - 0 | |
| A717 | --- | Herbiciding: Basal (Spot) Treatment | Herbicide to eliminate unwanted growth. Cut all treated vegetation flush to the finished grade after it dies and dispose. Remove vegetation (e.g., grass, weed, vine, unwanted growth) adhering to or protruding through fences and walls. Spot apply herbicide on unwanted growth within a maintenance area. Quantity specified is the total of the actual areas to receive treatment. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 20,000 | SF | 0.0000 | $ - 0 | |
| A718 | --- | Brush/Grass Cutting | Cut brush, small trees (3 inches and less in diameter at ground level), shrubs, grass, weed, and other similar growth to a uniform height between 4 and 6 inches. Remove vegetation (e.g., grass, weed, vine, unwanted growth) adhering to or protruding through fences and walls. Remove all debris. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 15,000 | SF | 0.0000 | $ - 0 | |
| A719 | --- | Debris Removal | Remove and dispose litter and debris. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 15,000 | SF | 0.0000 | $ - 0 | |
| A720 | --- | Overgrown-Grass Cutting | Cut overgrown grass, including but not limited to, grass, weed, and other similar growth to a uniform height between 4 and 6 inches. The height of the overgrowth may vary between one foot and six feet high. Remove vegetation (e.g., grass, weed, vine, unwanted growth) adhering to or protruding through fences and walls. Remove and dispose clippings and debris. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 1,000,000 | SF | 0.0000 | $ - 0 | |
| A721 | --- | Brush Clearing | Clear all brush, small trees (3 inches and less in diameter at ground level), shrubs, and other unwanted vegetation. Remove the vegetation to bare ground, and take all precautions to prevent present and future soil erosion. Remove vegetation (e.g., grass, weed, vine, unwanted growth) adhering to or protruding through fences and walls. Remove all debris. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 1,000,000 | SF | 0.0000 | $ - 0 | |
| A722 | --- | Unwanted Growth Removal | Remove unwanted growth. The definition of "unwanted growth" may vary from site to site. Unwanted growth shall include, but not be limited to, vines, grasses, weeds, haole koa, brush, and shrubs. Unwanted growth removal shall be conducted in a way that removes both the above ground growth and roots. Take precautions to avoid unnecessary damage to the existing ground area, and avoid damaging other desirable remaining growth, and all obstacles and structures in the area. Cut and remove unwanted growth such as vines and overgrown grass within 2 feet, unless specified otherwise, on each side of perimeter fence lines to a maximum height of 6 inches above ground and to avoid pointed protrusions. Remove all vines, brush, and grass adhering to or protruding through fences. Remove all debris. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | 1,000,000 | SF | 0.0000 | $ - 0 | |
| A723 | --- | Turf Grass Installation: Seed Sowing | The type of grass species will be specified on the order and will normally match the existing surrounding species such as, but not limited to, Common Bermuda (Cynodon dactylon) or chinch bug resistant variety of St. Augustine (Stenotaphrum secundatum). Prepare the area to receive the new turf grass to include tasks such as eradicate existing vegetation, perform soil analysis tests, provide soil amendments (determined by results of soil analysis tests) to improve the existing soil, and fine grade area for positive water drainage. Sow seed and cover over the seeds to an average depth of 1/4 inch. Perform maintenance during the turf establishment period which shall be the longer of 60 calendar days after planting or until a minimum 95 percent stand of installed turf species covering the ground. | 5,000 | SF | 0.0000 | $ - 0 | |
| Maintenance tasks shall include mowing, edging, eradicating weeds, watering, fertilizing and other operations as necessary to promote grass growth. Replant all areas where the grass dies or does not germinate and establish during the turf establishment period, at no additional cost to the Government. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | ||||||||
| A724 | --- | Turf Grass Installation: Hydroseeding; For orders up to 43,560 square feet | The type of grass species will be specified on the order and will normally match the existing surrounding species such as, but not limited to, Common Bermuda (Cynodon dactylon) or chinch bug resistant variety of St. Augustine (Stenotaphrum secundatum). Prepare the area to receive the new turf grass to include tasks such as eradicate existing vegetation, perform soil analysis tests, provide soil amendments (determined by results of soil analysis tests) to improve the existing soil, and fine grade area for positive water drainage. Uniformly apply a homogeneous hydroseed slurry consisting of fiber mulch, grass seed, fertilizer, tactifier, and water. Perform maintenance during the turf establishment period which shall be the longer of 60 calendar days after planting or until a minimum 95 percent stand of installed turf species covering the ground. | 50,000 | SF | 0.0000 | $ - 0 | |
| Maintenance tasks shall include mowing, edging, eradicating weeds, watering, fertilizing and other operations as necessary to promote grass growth. Replant all areas where the grass dies or does not germinate and establish during the turf establishment period, at no additional cost to the Government. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | ||||||||
| A725 | --- | Turf Grass Installation: Hydroseeding; For orders over one acre | The type of grass species will be specified on the order and will normally match the existing surrounding species such as, but not limited to, Common Bermuda (Cynodon dactylon) or chinch bug resistant variety of St. Augustine (Stenotaphrum secundatum). Prepare the area to receive the new turf grass to include tasks such as eradicate existing vegetation, perform soil analysis tests, provide soil amendments (determined by results of soil analysis tests) to improve the existing soil, and fine grade area for positive water drainage. Uniformly apply a homogeneous hydroseed slurry consisting of fiber mulch, grass seed, fertilizer, tactifier, and water. Perform maintenance during the turf establishment period which shall be the longer of 60 calendar days after planting or until a minimum 95 percent stand of installed turf species covering the ground. | 150,000 | SF | 0.0000 | $ - 0 | |
| Maintenance tasks shall include mowing, edging, eradicating weeds, watering, fertilizing and other operations as necessary to promote grass growth. Replant all areas where the grass dies or does not germinate and establish during the turf establishment period, at no additional cost to the Government. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | ||||||||
| A726 | --- | Turf Grass Installation: Hydrosprigging | The type of grass species will be specified on the order and will normally match the existing surrounding species such as, but not limited to, Common Bermuda (Cynodon dactylon) or chinch bug resistant variety of St. Augustine (Stenotaphrum secundatum). Prepare the area to receive the new turf grass to include tasks such as eradicate existing vegetation, perform soil analysis tests, provide soil amendments (determined by results of soil analysis tests) to improve the existing soil, and fine grade area for positive water drainage. Uniformly apply a homogeneous hydrosprig slurry consisting of fiber mulch, grass sprig, fertilizer, tactifier, and water. Perform maintenance during the turf establishment period which shall be the longer of 60 calendar days after planting or until a minimum 95 percent stand of installed turf species covering the ground. | 500 | SF | 0.0000 | $ - 0 | |
| Maintenance tasks shall include mowing, edging, eradicating weeds, watering, fertilizing and other operations as necessary to promote grass growth. Replant all areas where the grass dies or does not germinate and establish during the turf establishment period, at no additional cost to the Government. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | ||||||||
| A727 | --- | Turf Grass Installation: Sod Plugging | The type of grass species will be specified on the order and will normally match the existing surrounding species such as, but not limited to, Common Bermuda (Cynodon dactylon) or chinch bug resistant variety of St. Augustine (Stenotaphrum secundatum). Prepare the area to receive the new turf grass to include tasks such as eradicate existing vegetation, perform soil analysis tests, provide soil amendments (determined by results of soil analysis tests) to improve the existing soil, and fine grade area for positive water drainage. Plant sod plugs. Perform maintenance during the turf establishment period which shall be the longer of 60 calendar days after planting or until a minimum 95 percent stand of installed turf species covering the ground. | 500 | SF | 0.0000 | $ - 0 | |
| Maintenance tasks shall include mowing, edging, eradicating weeds, watering, fertilizing and other operations as necessary to promote grass growth. Replant all areas where the grass dies or does not germinate and establish during the turf establishment period, at no additional cost to the Government. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | ||||||||
| A728 | --- | Turf Grass Installation: Sodding | The type of grass species will be specified on the order and will normally match the existing surrounding species such as, but not limited to, Common Bermuda (Cynodon dactylon) or chinch bug resistant variety of St. Augustine (Stenotaphrum secundatum). Prepare the area to receive the new turf grass to include tasks such as eradicate existing vegetation, perform soil analysis tests, provide soil amendments (determined by results of soil analysis tests) to improve the existing soil, and fine grade area for positive water drainage. Place sod blocks in rows butting each piece firmly against the last. Stagger joints in successive rows. Finished grade of newly planted sod shall match existing height of surrounding lawn. Fill any voids with approved amended topsoil. | 500 | SF | 0.0000 | $ - 0 | |
| Perform maintenance during the turf establishment period which shall be the longer of 15 calendar days after planting or until a minimum 95 percent stand of installed turf species covering the ground. Maintenance tasks shall include mowing, edging, eradicating weeds, watering, fertilizing and other operations as necessary to promote grass growth. Replant all areas where the grass dies or does not germinate and establish during the turf establishment period, at no additional cost to the Government. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | ||||||||
| A729 | --- | Ground Cover Planting | Species of plant shall be as specified on the order. Prepare the area to receive the new plant to include tasks as eradicate existing vegetation, perform soil analysis tests, and provide soil amendments (determined by results of soil analysis tests) to improve the existing soil. Ground cover shall be of the proper age for the grade of plants indicated, furnished in removable containers, integral containers, or formed homogeneous soil section. Plant wedelia cuttings at a maximum spacing of 12 inches. Provide the necessary care during the plant establishment period: the longer of 90 calendar days after planting or until the plant growth is firmly established and will survive under the maintenance program currently in effect for the area concerned. | 250 | SF | 0.0000 | $ - 0 | |
| Water, fertilize, prune, mulch, eradicate weeds and perform other operations necessary to promote plant growth. Replace dead or unhealthy plants with plants of the same species and sizes as originally ordered, at no additional cost to the Government. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | ||||||||
| A730 | --- | Providing Topsoil | Provide topsoil at the site indicated on the task order.The topsoil shall be free of any vegetation, bottles, litter and other deleterious material. The topsoil shall also be free of any foreign matter, either chemical or organic, that would be detrimental to the survival of the vegetation on which it is applied or used in conjunction with. The topsoil shall be soil representative of productive soils in the vicinity. Modify the topsoil, if necessary, to meet the following composition: Containing from 5 to 20% organic matter as determined by the topsoil composition tests of the Organic Carbon, 6A, Chemical Analysis Method described in the Department of Agriculture "Soil Survey Investigation Report No. 1, Soil Survey Laboratory Methods and Procedures for Collecting Soil Samples, Soil Conservation Service." | 10 | CD | 0.0000 | $ - 0 | |
| Maximum particle size, 3/4 inch, with maximum 3 percent retained on 1/4-inch screen. Other components shall be within the following percentages: Silt - 25-50%; Clay - 10-30%; Sand - 20-35%; pH - 5 to 7.6%; Soluble Salts - 600 PPM maximum. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. | ||||||||
| A731 | --- | Deciduous Tree Pruning: Up to 1' Diameter | Prune trees to preserve the natural character of the tree, leaving trees well shaped and balanced, and to maintain required clearances. Trees shall exhibit a healthy appearance, and color, free of disease, pests, broken branches and limbs. Minimum vertical clearance over roadways, driveways, parking areas, and roofs shall be 20 feet. Minimum vertical clearance over lawns and sidewalks shall be 15 feet. Remove from banyan trees all aerial roots that have not established themselves into the ground. Remove water sprouts growing within utility line clearance zone at its point of attachment to the main limb. Directionally prune trees to promote future growth away from power lines. Trim large branches outside the minimum clearance zone to avoid development of fast growing water sprouts. | 400 | EA | 0.0000 | $ - 0 | |
| During the performance of tree pruning/maintenance, assess for tree trunk structural integrity by using nondestructive methods such as visual inspection and mallet sounding test. Submit a written report to the KO within 7 calendar days after the inspection. The report shall include, but not limited to, date of inspection and test; type, size and location of tree; inspection and test results; and recommendations for increment boring and resistograph tests, tree removal, or other further action. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. ELIN A741 will be ordered together with this catalog item for pruning in close proximity of electrical and miscellaneous utility lines. | ||||||||
| A732 | --- | Deciduous Tree Pruning; Over 1' up to 2' Diameter | Prune trees to preserve the natural character of the tree, leaving trees well shaped and balanced, and to maintain required clearances. Trees shall exhibit a healthy appearance, and color, free of disease, pests, broken branches and limbs. Minimum vertical clearance over roadways, driveways, parking areas, and roofs shall be 20 feet. Minimum vertical clearance over lawns and sidewalks shall be 15 feet. Remove from banyan trees all aerial roots that have not established themselves into the ground. Remove water sprouts growing within utility line clearance zone at its point of attachment to the main limb. Directionally prune trees to promote future growth away from power lines. Trim large branches outside the minimum clearance zone to avoid development of fast growing water sprouts. | 200 | EA | 0.0000 | $ - 0 | |
| During the performance of tree pruning/maintenance, assess for tree trunk structural integrity by using nondestructive methods such as visual inspection and mallet sounding test. Submit a written report to the Contracting Officer within 7 calendar days after the inspection. The report shall include, but not limited to, date of inspection and test; type, size and location of tree; inspection and test results; and recommendations for increment boring and resistograph tests, tree removal, or other further action. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. ELIN A741 will be ordered together with this catalog item for pruning in close proximity of electrical and miscellaneous utility lines. | ||||||||
| A733 | --- | Deciduous Tree Pruning: Over 2' up to 3' Diameter | Prune trees to preserve the natural character of the tree, leaving trees well shaped and balanced, and to maintain required clearances. Trees shall exhibit a healthy appearance, and color, free of disease, pests, broken branches and limbs. Minimum vertical clearance over roadways, driveways, parking areas, and roofs shall be 20 feet. Minimum vertical clearance over lawns and sidewalks shall be 15 feet. Remove from banyan trees all aerial roots that have not established themselves into the ground. Remove water sprouts growing within utility line clearance zone at its point of attachment to the main limb. Directionally prune trees to promote future growth away from power lines. Trim large branches outside the minimum clearance zone to avoid development of fast growing water sprouts. | 25 | EA | 0.0000 | $ - 0 | |
| During the performance of tree pruning/maintenance, assess for tree trunk structural integrity by using nondestructive methods such as visual inspection and mallet sounding test. Submit a written report to the Contracting Officer within 7 calendar days after the inspection. The report shall include, but not limited to, date of inspection and test; type, size and location of tree; inspection and test results; and recommendations for increment boring and resistograph tests, tree removal, or other further action. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. ELIN A741 will be ordered together with this catalog item for pruning in close proximity of electrical and miscellaneous utility lines. | ||||||||
| A734 | --- | Deciduous Tree Pruning: Over 3' up to 4' Diameter | Prune trees to preserve the natural character of the tree, leaving trees well shaped and balanced, and to maintain required clearances. Trees shall exhibit a healthy appearance, and color, free of disease, pests, broken branches and limbs. Minimum vertical clearance over roadways, driveways, parking areas, and roofs shall be 20 feet. Minimum vertical clearance over lawns and sidewalks shall be 15 feet. Remove from banyan trees all aerial roots that have not established themselves into the ground. Remove water sprouts growing within utility line clearance zone at its point of attachment to the main limb. Directionally prune trees to promote future growth away from power lines. Trim large branches outside the minimum clearance zone to avoid development of fast growing water sprouts. | 25 | EA | 0.0000 | $ - 0 | |
| During the performance of tree pruning/maintenance, assess for tree trunk structural integrity by using nondestructive methods such as visual inspection and mallet sounding test. Submit a written report to the Contracting Officer within 7 calendar days after the inspection. The report shall include, but not limited to, date of inspection and test; type, size and location of tree; inspection and test results; and recommendations for increment boring and resistograph tests, tree removal, or other further action. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. ELIN A741 will be ordered together with this catalog item for pruning in close proximity of electrical and miscellaneous utility lines. | ||||||||
| A735 | --- | Deciduous Tree Pruning: Over 4 ' up to 5' Diameter | Prune trees to preserve the natural character of the tree, leaving trees well shaped and balanced, and to maintain required clearances. Trees shall exhibit a healthy appearance, and color, free of disease, pests, broken branches and limbs. Minimum vertical clearance over roadways, driveways, parking areas, and roofs shall be 20 feet. Minimum vertical clearance over lawns and sidewalks shall be 15 feet. Remove from banyan trees all aerial roots that have not established themselves into the ground. Remove water sprouts growing within utility line clearance zone at its point of attachment to the main limb. Directionally prune trees to promote future growth away from power lines. Trim large branches outside the minimum clearance zone to avoid development of fast growing water sprouts. | 25 | EA | 0.0000 | $ - 0 | |
| During the performance of tree pruning/maintenance, assess for tree trunk structural integrity by using nondestructive methods such as visual inspection and mallet sounding test. Submit a written report to the Contracting Officer within 7 calendar days after the inspection. The report shall include, but not limited to, date of inspection and test; type, size and location of tree; inspection and test results; and recommendations for increment boring and resistograph tests, tree removal, or other further action. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. ELIN A741 will be ordered together with this catalog item for pruning in close proximity of electrical and miscellaneous utility lines. | ||||||||
| A736 | --- | Deciduous Tree Pruning: Over 5' Up to 6' Diameter | Prune trees to preserve the natural character of the tree, leaving trees well shaped and balanced, and to maintain required clearances. Trees shall exhibit a healthy appearance, and color, free of disease, pests, broken branches and limbs. Minimum vertical clearance over roadways, driveways, parking areas, and roofs shall be 20 feet. Minimum vertical clearance over lawns and sidewalks shall be 15 feet. Remove from banyan trees all aerial roots that have not established themselves into the ground. Remove water sprouts growing within utility line clearance zone at its point of attachment to the main limb. Directionally prune trees to promote future growth away from power lines. Trim large branches outside the minimum clearance zone to avoid development of fast growing water sprouts. | 10 | EA | 0.0000 | $ - 0 | |
| During the performance of tree pruning/maintenance, assess for tree trunk structural integrity by using nondestructive methods such as visual inspection and mallet sounding test. Submit a written report to the Contracting Officer within 7 calendar days after the inspection. The report shall include, but not limited to, date of inspection and test; type, size and location of tree; inspection and test results; and recommendations for increment boring and resistograph tests, tree removal, or other further action. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. ELIN A741 will be ordered together with this catalog item for pruning in close proximity of electrical and miscellaneous utility lines. | ||||||||
| A737 | --- | Deciduous Tree Pruning: Over 6' Up to 7' Diameter | Prune trees to preserve the natural character of the tree, leaving trees well shaped and balanced, and to maintain required clearances. Trees shall exhibit a healthy appearance, and color, free of disease, pests, broken branches and limbs. Minimum vertical clearance over roadways, driveways, parking areas, and roofs shall be 20 feet. Minimum vertical clearance over lawns and sidewalks shall be 15 feet. Remove from banyan trees all aerial roots that have not established themselves into the ground. Remove water sprouts growing within utility line clearance zone at its point of attachment to the main limb. Directionally prune trees to promote future growth away from power lines. Trim large branches outside the minimum clearance zone to avoid development of fast growing water sprouts. | 10 | EA | 0.0000 | $ - 0 | |
| During the performance of tree pruning/maintenance, assess for tree trunk structural integrity by using nondestructive methods such as visual inspection and mallet sounding test. Submit a written report to the Contracting Officer within 7 calendar days after the inspection. The report shall include, but not limited to, date of inspection and test; type, size and location of tree; inspection and test results; and recommendations for increment boring and resistograph tests, tree removal, or other further action. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. ELIN A741 will be ordered together with this catalog item for pruning in close proximity of electrical and miscellaneous utility lines. | ||||||||
| A738 | --- | Deciduous Tree Pruning: Over 7' Up to 8' Diameter | Prune trees to preserve the natural character of the tree, leaving trees well shaped and balanced, and to maintain required clearances. Trees shall exhibit a healthy appearance, and color, free of disease, pests, broken branches and limbs. Minimum vertical clearance over roadways, driveways, parking areas, and roofs shall be 20 feet. Minimum vertical clearance over lawns and sidewalks shall be 15 feet. Remove from banyan trees all aerial roots that have not established themselves into the ground. Remove water sprouts growing within utility line clearance zone at its point of attachment to the main limb. Directionally prune trees to promote future growth away from power lines. Trim large branches outside the minimum clearance zone to avoid development of fast growing water sprouts. | 10 | EA | 0.0000 | $ - 0 | |
| During the performance of tree pruning/maintenance, assess for tree trunk structural integrity by using nondestructive methods such as visual inspection and mallet sounding test. Submit a written report to the Contracting Officer within 7 calendar days after the inspection. The report shall include, but not limited to, date of inspection and test; type, size and location of tree; inspection and test results; and recommendations for increment boring and resistograph tests, tree removal, or other further action. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. ELIN A741 will be ordered together with this catalog item for pruning in close proximity of electrical and miscellaneous utility lines. | ||||||||
| A739 | --- | Deciduous Tree Pruning: Over 8' Up to 9' Diameter | Prune trees to preserve the natural character of the tree, leaving trees well shaped and balanced, and to maintain required clearances. Trees shall exhibit a healthy appearance, and color, free of disease, pests, broken branches and limbs. Minimum vertical clearance over roadways, driveways, parking areas, and roofs shall be 20 feet. Minimum vertical clearance over lawns and sidewalks shall be 15 feet. Remove from banyan trees all aerial roots that have not established themselves into the ground. Remove water sprouts growing within utility line clearance zone at its point of attachment to the main limb. Directionally prune trees to promote future growth away from power lines. Trim large branches outside the minimum clearance zone to avoid development of fast growing water sprouts. | 10 | EA | 0.0000 | $ - 0 | |
| During the performance of tree pruning/maintenance, assess for tree trunk structural integrity by using nondestructive methods such as visual inspection and mallet sounding test. Submit a written report to the Contracting Officer within 7 calendar days after the inspection. The report shall include, but not limited to, date of inspection and test; type, size and location of tree; inspection and test results; and recommendations for increment boring and resistograph tests, tree removal, or other further action. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. ELIN A741 will be ordered together with this catalog item for pruning in close proximity of electrical and miscellaneous utility lines. | ||||||||
| A740 | --- | Deciduous Tree Pruning: Over 9' Up to 10' Diameter | Prune trees to preserve the natural character of the tree, leaving trees well shaped and balanced, and to maintain required clearances. Trees shall exhibit a healthy appearance, and color, free of disease, pests, broken branches and limbs. Minimum vertical clearance over roadways, driveways, parking areas, and roofs shall be 20 feet. Minimum vertical clearance over lawns and sidewalks shall be 15 feet. Remove from banyan trees all aerial roots that have not established themselves into the ground. Remove water sprouts growing within utility line clearance zone at its point of attachment to the main limb. Directionally prune trees to promote future growth away from power lines. Trim large branches outside the minimum clearance zone to avoid development of fast growing water sprouts. | 10 | EA | 0.0000 | $ - 0 | |
| During the performance of tree pruning/maintenance, assess for tree trunk structural integrity by using nondestructive methods such as visual inspection and mallet sounding test. Submit a written report to the Contracting Officer within 7 calendar days after the inspection. The report shall include, but not limited to, date of inspection and test; type, size and location of tree; inspection and test results; and recommendations for increment boring and resistograph tests, tree removal, or other further action. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. ELIN A741 will be ordered together with this catalog item for pruning in close proximity of electrical and miscellaneous utility lines. | ||||||||
| A741 | --- | Deciduous Tree Pruning: Additional charge for trimming in close proximity of electrical and miscellaneous utility lines | Additional charge per tree for trimming in close proximity of electrical and miscellaneous utility lines. Use extreme caution in conducting operations around energized high voltage lines. Perform all work according to the State of Hawaii, Division of Occupational Safety and Health, Department of Labor and Industrial Relations, Chapter 94. In addition, take all precautions to ensure that no damage to private or public property will result from its operations. No scheduled electrical outages will be granted for tree pruning work. Prune the trees while power lines are energized. If the Contractor decides the work condition jeopardizes the safety of personnel, the Contractor shall not proceed with the pruning in that specific area. Notify the Contracting Officer in writing about the hazardous work condition and plan with the Contracting Officer a course of action to complete the work. This catalog item will be ordered together with the appropriate deciduous tree pruning catalog item for trimming in close proximity of electrical and miscellaneous utility lines. | 25 | EA | 0.0000 | $ - 0 | |
| A742 | --- | Coniferous Tree Pruning: Up to 20' Height Trees | Prune trees to preserve the natural character of the tree, leaving trees well shaped and balanced, and to maintain required clearances. Trees shall exhibit a healthy appearance, and color, free of disease, pests, broken branches and limbs. Minimum vertical clearance over roadways, driveways, parking areas, and roofs shall be 20 feet. Minimum vertical clearance over lawns and sidewalks shall be 15 feet. Remove from banyan trees all aerial roots that have not established themselves into the ground. Remove water sprouts growing within utility line clearance zone at its point of attachment to the main limb. Directionally prune trees to promote future growth away from power lines. Trim large branches outside the minimum clearance zone to avoid development of fast growing water sprouts. | 2 | EA | 0.0000 | $ - 0 | |
| During the performance of tree pruning/maintenance, assess for tree trunk structural integrity by using nondestructive methods such as visual inspection and mallet sounding test. Submit a written report to the Contracting Officer within 7 calendar days after the inspection. The report shall include, but not limited to, date of inspection and test; type, size and location of tree; inspection and test results; and recommendations for increment boring and resistograph tests, tree removal, or other further action. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. ELIN A745 will be ordered together with this catalog item for pruning in close proximity of electrical and miscellaneous utility lines. | ||||||||
| A743 | --- | Coniferous Tree Pruning: Over 20' up to 50' Height Trees | Prune trees to preserve the natural character of the tree, leaving trees well shaped and balanced, and to maintain required clearances. Trees shall exhibit a healthy appearance, and color, free of disease, pests, broken branches and limbs. Minimum vertical clearance over roadways, driveways, parking areas, and roofs shall be 20 feet. Minimum vertical clearance over lawns and sidewalks shall be 15 feet. Remove from banyan trees all aerial roots that have not established themselves into the ground. Remove water sprouts growing within utility line clearance zone at its point of attachment to the main limb. Directionally prune trees to promote future growth away from power lines. Trim large branches outside the minimum clearance zone to avoid development of fast growing water sprouts. | 2 | EA | 0.0000 | $ - 0 | |
| During the performance of tree pruning/maintenance, assess for tree trunk structural integrity by using nondestructive methods such as visual inspection and mallet sounding test. Submit a written report to the Contracting Officer within 7 calendar days after the inspection. The report shall include, but not limited to, date of inspection and test; type, size and location of tree; inspection and test results; and recommendations for increment boring and resistograph tests, tree removal, or other further action. Commence normal work within five calendar days and complete within 14 calendar days after issuance of a order unless otherwise indicated on the order. ELIN A745 will be ordered together with this catalog item for pruning in close proximity of electrical and miscellaneous utility lines. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .