This document is Amendment Three (3) to a Request for Interest (RFI) for a potential long-term lease under Title 10, United States Code 2667 for the development and operation of critical energy resiliency infrastructure and/or water utility options on 11,000 +/- acres of underutilized, non-excess agriculture land aboard Naval Air Station Lemoore.

The amendment provides the government's responses to industry questions on topics including cybersecurity requirements, land valuation/appraisal, in-kind consideration project priorities, cultural/environmental requirements, electrical project details, on-base expertise access, water sources and usage, and energy usage and resiliency at the installation. The amendment also clarifies that the government will not provide certain data related to historic water sources, uses, and costs, or energy use and related costs. Overall, the amendment aims to provide additional details and clarifications to assist interested parties in preparing responses to the RFI, which is due on May 1, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES I

3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

SOUTHWEST DIVISION

NAVAL FACILITIES ENGINEERING COMMAND

CONTRACTS DEPARTMENT

1220 PACIFIC HIGHWAY

SAN D I EGO, CA 92132-5187

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county State and ZIP Code)

FACILITY CODECODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is extended, is not extended.The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning______ copies of the amendment; (b) By acknowledging receipt of this amendment on each copx of the offer submitted; or (c) By separate letter or telegram which includes a reference of the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIED THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Except as provided herein, at/ terms and conditions of the document referenced in Item 19A or 10A, as heretofore changed, remains unchanged and In full force and effect

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

BYBY

(Signature of Contracting Officer)(Signature of Person Authorized to Sign)

STANDARD FORM 30 (REV. 10-83)

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDERED IS MODIFIED TO REFLECTTHE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) erin.wilson Line erin.wilson Line

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification) .

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

Total contract price increased by $

Total contract price decreased by $

Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

A reference to the letter determination; and

A statement of the net amount determined to be due in settlement of the contract.

(g)

(h)

(i)

(ii)

(1)

(2)

(3)

(4)

(5)

(6)

(i)

(ii)

(iii)

STANDARD FORM 30 (REV. 10-83) BACK

(1) Accounting classification Net increase $

April 24, 2024

GOVERNMENT RESPONSES TO INDUSTRY QUESTIONS

REQUEST FOR INTEREST (RFI) No. N6247324RP00064

AMENDMENT THREE (3)

The Navy held an Industry Day and Site Tour for interested industry entities on February 29, 2024 at Naval Air Station, Lemoore (NASL). The Industry Day provided an opportunity for representatives of the government and industry to meet for presentations and a site tour.

If you submitted a clarifying question on the RFI to NAVFACHQNavySWEULs@us.navy.mil, please note that it has been received and all comments and questions will be reviewed for appropriate action.

Individual responses may not be provided. The Government retains the right to respond to all, a portion of or provide no response to interested proposer’s questions. The Government will post any prepared response(s) to written questions via SAM.gov.

INDUSTRY CLARIFYING

QUESTION:

DEPARTMENT OF NAVY (DoN)

RESPONSE:

Request for Interest N6247324RP00064 – Naval Air Station Lemoore Energy Enhanced Use Lease

Request for Additional Information

Are there any cybersecurity requirements for DON projects that industry should be aware of/incorporate into our proposals?

Any specific project requirement will be defined in potential future solicitation.

Will the land valuation/appraisal be provided at the time of the RFP? Any land valuation/appraisal can help inform our IKC projects. Will the land appraisal/valuation equivalent be pro-rated for buildable area?

No. The Appraisal is for the sole use of the Government and will not be made available to proposers.

Of the list of IKC project ideas, does the DON have priorities or preferences?

Any specific project requirement will be defined in potential future solicitation. Final in-kind consideration projects(s) will be negotiated with the selected proposer during the exclusive negotiation phase.

Are there specific cultural resources and environmental policy management requirements that should be considered to successfully integrate development activities with?

in potential future solicitation. There are no cultural or environmental resource issues that limit development. However, development must not create a Bird/Wildlife Aircraft Strike Hazzard (BASH) or Foreign Object Debris (FOD). National Environmental Policy Act and National Historic Preservation Act analysis will be required prior to potential Lease execution.

Question 7 in the RFI requests respondents, “Please provide a concept design that includes project type, size, ratings etc.” What is “ratings” referencing/what specific information is DON hoping to obtain regarding rating?

The Government wants to obtain as much information as possible about any proposed electrical project concept. The term “rating” is referring to any electrical equipment rating.

To what extent will industry have access to on-base expertise in this process (i.e. the team(s) responsible for energy today)?

The Government will answer questions regarding on-base energy availability, consumption, requirements, etc., to the extent possible, but industry will need to retain its own “energy” experts.

The phrase ‘non-excess land’ is used in the RFI. Is that a reference to the Bureau of Reclamation’s categorization of excess and non-excess lands? Or some other reference?

Any potential long-term lease will be in accordance with Title 10 United States Code §2667 for Leases: non-excess property of military departments and Defense Agencies.

Has the DON done any analysis on the recharge suitability of the soils in the surrounding land?

No, the Government has not conducted any analysis to date. Westlands Water District website may have some data available to the public.

Can the In-Kind Consideration payment be in the form of clean energy? If so, will the value be set at contracted values per unit or intended to be market based? OR can the payment be in the form of water? If so, will the value be set at contracted values per unit or intended to be market based?

Please refer to Amendment Two (2), #9.

Value of in-kind consideration shall be market based.

What are the direct payment of energy costs? The direct payment of water costs (i.e. water assessments and rates to Westlands, SWP or other water source?)

Energy rates are not publicly available.

Westlands Water District’s website may provide details on water rates.

Would the DON consider a joint venture whereby the DON’s assets are contributed to a joint venture and the energy and/or water developer contributes capital to develop projects and/or manage the energy and water assets as a service?

This is not a concept that the Government has been considering. Any potential solicitation will provide additional details on acceptable requirements.

Can IKC cover capital costs associated with developing new infrastructure?

Any specific project requirement will be defined in potential future solicitation. Final in-kind consideration projects(s) will be negotiated with the selected proposer during the exclusive negotiation phase. All in-kind consideration must be for the exclusive benefit of the Government.

Interconnection/Third Party Off-takers

The RFI indicates that ‘DON does not intend to purchase energy or water from any commercial development’. Would a structure whereby a developer delivers energy or water to offset the need for the DON to pay for energy or water from another source be considered?

Please refer to Amendment Two (2), #9.

Does the DON source energy and water from another source that could be replaced/substituted (in whole or in part)? If so, what are these sources?

Are there any physical or contractual constraints to doing so?

The goal of any potential in-kind consideration project(s) is to bolster Installation resiliency and redundancy; it is not to replace existing utility contracts.

Water Usage

Does the DON have data relating to NAS Lemoore’s historic water sources and uses and its related cost? If so, will this be available for review in this process?

The Government will not be providing historic water sources, uses, and related cost data at this time.

To what extent will industry have access to on-base expertise in this process (i.e. the team(s) responsible for managing water and water today)?

The Government will answer questions regarding on-base water availability, management, requirements, etc., to the extent possible, but industry will need to retain its own “water” experts.

What water supplies are currently used for NAS Lemoore operations?

Surface water for NAS Lemoore operations is provided through Westands Water District.

Does NAS Lemoore have a SWP water contract with the state government? No, not at this time.

Does NAS Lemoore have a CVP water contract with the federal government? No, not at this time.

Is the water supply for NAS Lemoore sourced through Westlands? If so, is it part of Westlands’ CVP water contract? Or does NAS Lemoore have a separate SWP contract (or other block of water) allocated specifically for NAS Lemoore operations that is managed through Westlands?

Yes, NAS Lemoore water supply is sourced through Westlands Water District.

For any water supply sourced from the federal or state governments, is the cost the same (or substantially the same) as the cost for CVP/SWP water available to private landowners?

No, water supply sourced from different sources do not have the same costs.

Does NAS Lemoore receive water under a contract in a higher priority than other CVP contractors?

No, NAS Lemoore receives Municipal & Industrial water to support Installation operations.

Does the surrounding land have a surface water allocation (CVP, SWP or otherwise)? If so, is it part of the WWD CVP contract? Or separate and higher priority?

Any future surface water allocation and priority for the potential Leased Premises will be categorized based on land use not priority of the surrounding land. Therefore, any response(s) to your questions are not yet available.

For historic farming on the surrounding land, are there records showing (a) the ratio of groundwater to surface water and(b) crop types?

No, these records are not available.

Does NAS Lemoore (or its tenants) have the right to acquire supplemental water through Westlands?

Yes, potential developers can individually request supplemental water through Westlands Water District.

Can NAS Lemoore (or its tenants) acquire surface water on the spot market within (or transferred through) Westlands for farming the surrounding land? Can NAS Lemoore (or its tenants) acquire transfer water from outside of Westlands for transfer to NAS Lemoore (or into Westlands for delivery to NAS Lemoore)?

No, these are not available options.

What groundwater basin is NAS Lemoore a part of? Westside GSA or otherwise?

NAS Lemoore is part of the Westside GSA groundwater basin.

Is NAS Lemoore subject to the limitations imposed by a GSA performing its duties under SGMA? Or due to its authority as a federal agency and for national security reasons, is NAS Lemoore exempt from SGMA requirements?

The Navy is exempt from Sustainable Groundwater Management Act (SGMA), while non-federal water users, including any potential Lessee, are subject to SGMA.

Does the surrounding land have a groundwater allocation from the Westside GSA or another GSA?

There are restrictions on pumping as defined by Westside, SGMA.

Does NAS Lemoore have the right to participate in Westlands recharge programs? If so, did NAS Lemoore recharge any water in 2023? If not, has NAS Lemoore ever recharged water (in 2023 or otherwise)?

Yes, while NAS Lemoore can participate in a recharge program, this has not yet occurred to date.

NASL Energy Usage

What is the critical load peak consumption (MW) expected to be served by a renewable plant in the event of a grid outage?

Depending on the proposed interconnection plan of the renewable generation asset, the Government intends to receive whole base resiliency using the renewable generation in case of electrical utility grid outage.

What is the expected backup duration to serve critical loads during a grid outage?

Is there a load shedding scheme in place that can be leveraged during grid outages for the generation and storage facility to support critical loads?

Is there any interest in load peak shaving to avoid demand charges that may be incurred by the base during normal operations?

Are there any power quality issues experienced by the base that a renewable energy BTM plant can support through frequency and voltage regulation services?

Yes, there are opportunities that can be discussed with the selected proposer during the exclusive negotiation period of any potential future solicitation.

Where does NAS Lemoore source its power from historically? Currently? Are you a full requirements customer of PG&E and/or does another party procure your energy requirements?

Power is procured through Western Area Power Administration and provided through Pacific Gas & Electric’s transmission system.

How does NAS Lemoore create reliability/resiliency of its electricity supply today? Are you seeking to increase/diversify resiliency?

The Government is seeking to build whole base resiliency using the renewable generation in case of electrical utility grid outage.

Does the DON have data relating to NAS Lemoore’s historic energy use and its related cost? If so, will this be available for review in this process?

No, the Government will not be providing any data related to NAS Lemoore’s historic energy use and related costs.

Is there a desire/intent to have on-site and/or dedicated energy supply in the future?

Wastewater Treatment

How is wastewater at NAS Lemoore currently handled? What is the treatment level? What is the quantity of discharge water available after treatment that could be used for other beneficial uses (i.e., recharge)?

The Government will not be providing wastewater treatment level data at this time. It may be provided to the selected proposer during the exclusive negotiation phase, as applicable.

The average daily discharge from NAS Lemoore to our evaporation ponds is .78 million gallons per day.

Amendment Three (3) - N6247324RP00064 24 April 2024
Amendment One (1) - N6247324RP00064 12 March 24
Amendment Five (5) - N6247323RP00008 30 Jan 23
Amendment Three (3) - N6247323RP00008 19 Dec 2022
Amendment 2 - N6247323RP00008 Combined
Amendment 2 - N6247323RP00008
Lemoore Phase 2-Goverment Responses to RFIs 24 April 24
Any potential long-term lease will be in accordance with Title 10 United States Code §2667 for Leases: non-excess property of military departments and Defense Agencies.
1_CONTRACT_ID_CODE: N6247324RP00064
Page: 1
of Pages: 8
2_AMENDMENT/MODIFICATION NO: Three (3)
3_EFFECTIVE DATE: 04/24/2024
4_REQUISITIONPURCHASE_REQ:
1_5_PROJECT_NO_11appitcab:
6_ISSUED_BY: NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND SOUTHWEST

REAL ESTATE DEPARTMENT

750 PACIFIC HIGHWAY

SAN DIEGO, CA 92132-5190

CODE: REBL.EG
7_ADMINISTERED_BY:
CODE1:
8_NAME_AND_ADDRESS_OF_CON: N/A
CODE2:
FACILITY_CODE:
9A_AMENDMENT_OF_SOLICITAT:
9B_DATED_SEE_ITEM_1_1:
10A_MODIFICATION_OF_CONTR:
10B_DATED_SEE_ITEM_13:
The_above_numbered_solici: Off
is_extended: Off
12_ACCOUNTING_AND_APPROPR:
13A: Off
13B: Off
13C: Off
C_THIS_SUPPLEMENTAL_AGREE:
13D: Yes
D_OTHER_Specify_type_of_m: Amendment Three (3) to Solicitation N6247324RP00064
E:
Contractor: Off
# of copies:
14 DESCRIPTION_OF_AMENDMENT/MODIFICATION: The intent of this amendment is to make the following update/change:

1) Government responses to industry questions as attached hereto on pages 3-8.

15A_NAME_AND_TITLE_OF_SIG:
BY2:
15C_DATE_SIGNED:
16A_NAME_AND_TITLE_OF_CON: LINDSEY E. GREEN, Real Estate Contracting Officer
BY1:
16C_DATE_SIGNED:
RESET:
Act ClaIn:
NetInc:
ActClaDe:
NetDec:
PriceInc:
PriceDec:
2024-04-24T11:12:51-0700
GREEN.LINDSEY.E.1265653045

File details come from the government source that posted it. Updated .