This document summarizes a solicitation for an Environmental Multiple Award Contract for range sustainment and remediation environmental services. The solicitation seeks proposals for indefinite-delivery/indefinite-quantity, firm fixed price contracts with one two-year base period and two three-year options. Services will include clearance of unexploded ordnance from military ranges, and processing, recycling, demilitarization, and disposal of materials potentially presenting an explosive hazard. The Naval Facilities Engineering Command will award a minimum of three and maximum of six contracts for work at various Department of Defense installations in states including Alaska, Arizona, California, Colorado, Nevada, New Mexico, Oregon, Utah, Washington, and other locations. Proposals are due by 19 May 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Updated_DoD_Safe_Instructions.pdf | ||
| JL.2_Price_ModelwithAmend01_13MAY22.xlsx | XLSX spreadsheet | |
| JL1_Fully-burdened_Labor_Rate_Ceiling_withAmend01_13MAY22.xlsx | XLSX spreadsheet | |
| JL3_RFI_ANSWERS.04292022.xlsx | XLSX spreadsheet | |
| JL3_RFI_ANSWERS.04252022.xlsx | XLSX spreadsheet | |
| JL1_Fully-burdened_Labor_Rate_Ceiling_Amend01.xlsx | XLSX spreadsheet | |
| JL.2_Price_Model_Amend01.xlsx | XLSX spreadsheet | |
| JL3_RFI_ANSWERS.04222022.xlsx | XLSX spreadsheet | |
| Copy of JL3_RFI_ANSWERS.04182022.xlsx | XLSX spreadsheet | |
| JL3_RFI_ANSWERS.040822.xlsx | XLSX spreadsheet | |
| JL3_RFI_ANSWERS.040622.xlsx | XLSX spreadsheet | |
| JL2_Price_Model.xlsx | XLSX spreadsheet | |
| Exhibit_C_Project.docx | DOCX document | |
| JL1_Fully-burdened_Labor_Rate_Ceiling.xlsx | XLSX spreadsheet | |
| JL3_RFI_FORM.xlsx | XLSX spreadsheet | |
| Exhibit_B_Financial.docx | DOCX document | |
| Exhibit_A_PPQ.docx | DOCX document | |
| N6247322R3432_Solicitation.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Formalize changes made based on answ ers to Requests for Information (RFIs).
Proposal due date is 19 May 2022 at 1400 PDT.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 32
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-May-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247322R3432
X 9B. DATED (SEE ITEM 11)
25-Mar-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Apr-2022
CODE
NAVFAC SOUTHWEST
ENVIRONMENTAL CONTRACTS CORE
CODE: EREST
750 PACIFIC HIGHWAY
SAN DIEGO CA 92132-0001
N62473 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247322R3432
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION G - CONTRACT ADMINISTRATION DATA
The following have been modified:
G1 CONTRACT ADMINISTRATION DATA
The Contracting Officer for this contract is:
JENNIFER L. MATTIVI, Code ACQ4.JM
Naval Facilities Engineering Systems Command, Southwest
750 Pacific Highway, 11th Floor
San Diego CA 92132-5190 jennifer.l.mattivi.civ@us.navy.mil
The Contract Specialist for this contract is:
COURTNEY SEVERINO, Code ACQ4.CS
Naval Facilities Engineering Systems Command, Southwest
750 Pacific Highway, 11th Floor courtney.w.severino.civ@us.navy.mil
The Contracting Officer's Representative (COR) for the resulting contract is:
R. MICHAEL QUESADA, Code EV44
Naval Facilities Engineering Systems Command, Southwest
750 Pacific Highway, 11th 12th Floor richard.m.quesada.civ@us.navy.mil
The Environmental Safety & Health Manager for the resulting contract is:
ALMARIO ERASQUIN
Naval Facilities Engineering Systems Command, Southwest
750 Pacific Highway, 11th Floor almario.a.erasquin.civ@us.navy.mil
Payment will be made by: To be designated on each individual Task Order.
G2 TASK ORDER PROCEDURES
(1) GENERAL:
mailto:courtney.w.severino.civ@us.navy.mil mailto:richard.m.quesada.civ@us.navy.mil
(a) Work under this contract will be ordered by written Task Order on DD Form 1155 (Order for
Supplies or Services) to the contractor by the Procuring Contracting Officer/Ordering
Officer/Administrative Contracting Officer. For task orders awarded under this contract the terms "Contracting Officer" and "Ordering Officer" are interchangeable and carry the same meaning.
(b) Each award as a result of this solicitation will cite an individual contract number. Individual
Task Orders will be placed in a sequential numbering system, which relate back to the basic contract and their assigned Proposed Task Order (PTO) Number.
(c) The Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs except as authorized by duly executed Task Orders.
(d) Task Orders will be competitively-bid, firm fixed price, and clearly define the specific services to be performed or the performance desired. Each Task Order will contain applicable clauses and provisions. Each Task Order shall include as a minimum:
(1) Date of the order;
(2) Contract and Task Order number;
(3) Statement of Work, Performance Work Statement, or Statement of Objectives including references to applicable specifications, and deliverables;
(4) The delivery date or period of performance;
(5) Accounting and appropriation data;
(6) Price
(7) The place and manner of inspection and acceptance;
(8) Any Government-furnished property, material, or facilities to be made available for performance of the order;
(9) The names, addresses and phone numbers of the applicable Contracting Officer and its representatives, as well as any other necessary points of contact;
(10) Any other information deemed necessary to the performance of the order.
(e) Task orders may be modified by the Ordering Officer. Modifications to task orders will be issued on Standard Form (SF) 30 and will cite the Task Order Number and Contract Number.
(f) Firms are required to contact the Contracting Officer within two days of notification if a firm cannot participate in the site walk or submit a proposal on a Task Order.
(2) REQUEST FOR PROPOSAL (RFP) REQUIREMENTS:
(a) If a Request for Proposal (RFP) is issued, the request shall include:
(1) A description of the specified work required, (including a designation of whether the work is service or construction),
(2) The desired delivery schedule,
(3) The anticipated performance period and critical milestones,
(4) The place and manner of inspection and acceptance,
(5) The basis for award (low price, technically acceptable; price only; or best value), and
(6) Requirement for the contractor’s guarantee and indemnification, if applicable. If insurance is required and/or will be accepted, state the terms under which the insurance is to be proposed (e.g., attachment point, excluded contamination list, guarantee limit parameters, self-insured retention, etc.)
(7) A phased-based Environmental Cost Element Structure (ECES) Work Breakdown
Structure (WBS) breakdown of the contractor's price proposals may be required on a case-by-case basis for selected Task Orders. This requirement will be specified in the
Request for Proposal and may require a cost breakdown to the 3rd WBS level. The ECES
WBS may be found at Internet address: www.em.doe.gov/aceteam. In addition, the
Contracting Officer may designate which WBS items are to be used by the contractors in their proposal.
(8) Any other pertinent information (such as applicable Davis-Bacon Act or Service
Contract Act wage determinations).
(9) In circumstances where the Government receives only one offer, additional cost and pricing data may be requested and compared against the burdened ceiling rates established in the basic contract.
(3) REQUIREMENTS FOR PROPOSALS
(a) The Contractor shall, within the time specified in the RFP, provide an original and copies (as specified) of the proposal to the Contracting Officer/Ordering Officer with:
(1) Price
(2) Proposed schedule for completing the task order
(3) Other information as requested in the task order RFP
(b) Technical Proposals, if required, may address one or more of the following factors:
(1) The contractor’s technical understanding of the work
(2) The most efficient and effective plan to accomplish the work
(3) Rationale for proposed labor and materials
(4) Sustainable design features
(5) Optimization
(6) Schedule
(c) Most contract task orders will be awarded based on Price Only. In some circumstances, one or more of the following criteria in addition to Price or Cost may be considered when Contractors compete for award of a Task Order:
(1) Past Performance – Task Order past performance under this contract.
(2) Safety Past Performance
(3) Potential impact on other orders placed with the contractor
NOTE: In accordance with FAR 52.228-15 (DEVIATION 2020-O0016), Performance and
Payment Bonds will be required for construction task orders. Bonds shall be submitted for approval to the Contracting Officer within 15 days of award of the task order (unless otherwise stipulated on the individual order). Commencement of construction is contingent upon approval of the required bonds.
(4) SELECTION CRITERIA
(a) Upon receipt of proposals, the Government will review and evaluate the proposals in accordance with the evaluation criteria stated in the task order RFP.
(b) Discussions/Negotiations - Upon receipt of the proposal, the Contract Specialist and
Project Manager (PM), as needed, will review the proposal to ensure acceptability to the
Government, enter into such discussions with the contractor as may be necessary to correct and/or revise the proposed order estimate, and effect whatever internal review processes are required.
(c) Award - Upon completion of this process, the Contracting Officer shall execute a task order issued on a DD Form 1155 and forward it to the contractor (Facsimile transmission signatures may be utilized). Only upon receipt of such an executed order, signed by the
Contracting Officer, shall the contractor commence work.
(d) Unsuccessful offerors will be notified.
G3 AWARDING ORDERS UNDER MULTIPLE AWARD CONTRACTS
(a) Issuance of Task Orders is limited to those awardees under this contract. All awardees will be given a fair opportunity to be considered for each Task Order in excess of $3,000 pursuant to the procedures established in FAR Subpart 16.505 (b) (2), unless the Contracting Officer determines that (1) The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays; (2) Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized; (3) The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity for the original order; or
(4) It is necessary to place an order to satisfy a minimum guarantee.
G4 CONTRACT OMSBUDSMAN
(a) In accordance with FAR 16.505(a)(10)(i)(B); No protest under Subpart 33.1 is authorized in connection with the issuance or proposed issuance of an order under a task-order contract or delivery-order contract, except for—
(1) A protest on the grounds that the order increases the scope, period, or maximum value of the contract; or
(2) A protest of an order valued in excess of $10 million. Protests of orders in excess of $10 million may only be filed with the Government Accountability Office, in accordance with the procedures at 33.104.
(b) For this contract, the designated Task Order ombudsman is
Commanding Officer
NAVFAC SW
750 Pacific Highway
San Diego, CA 92132
The Task Order ombudsman is responsible for reviewing complaints from multiple award
Contractors and ensuring that all of the Contractors are afforded a fair opportunity to be considered for Task Orders in excess of $3,000, consistent with procedures in the contract.
However, it is not within the designated Task Order contract ombudsman’s authority to prevent the issuance of an order or disturb an existing order.
(c) This clause does not guarantee the Contractor issuance of any Task Orders above the minimum guarantee stated in this contract.
G5 DELEGATION OF AUTHORITY TO ADMINISTRATIVE CONTRACTING
OFFICER (ACO)
The Contracting Officer may delegate Ordering Officer authority on individual contract task orders (CTOs). Contract administration functions will be retained by the issuing office.
G6 CONTRACTING OFFICER’S REPRESENTATIVE (COR)
The Contracting Officer shall appoint a Contracting Officer’s Representative (COR) in writing for this contract at time of award. A COR is NOT a Contracting or Ordering Officer and DOES
NOT have authority to take any action, either directly or indirectly, that would change the pricing, quantity, quality, place of performance, delivery schedule, or any other terms and conditions of the contract (or task order), or to direct the accomplishment of effort which goes beyond the scope of the Statement of Work in the contract (or task order).
The COR is technically responsible for monitoring of contractor performance and is the sole technical point of contact. However, a Navy Technical Point of Contact (TPOC) may be assigned by the Contracting Officer to assist the COR in executing field safety and health oversight, inspection, and monitoring duties wherein the surveillance and monitoring burden of the contract is significant or when a project includes potentially hazardous activities. The NTRs will be appointed in writing citing the applicable task order number(s), as required. The Contracting
Officer may also appoint, in writing, an alternate COR to perform the responsibilities and functions of the COR.
G7 TECHNICAL DIRECTION
(a) As provided by the contract provision, “CONTRACTING OFFICER’S REPRESENTATIVE
(COR),” performance of work under this contract is subject to the written technical direction of the Contracting Officer’s Representative (COR), who shall be specifically appointed by the
Contracting Officer in writing. “Technical Direction” means a directive to the Contractor that approves approaches, solutions, designs, or refinements; fills in details or otherwise completes the general description of the work or documentation items; shifts emphasis among work areas or tasks; or furnishes similar instructions to the Contractor. Technical direction includes requiring studies and pursuit of certain lines of inquiry regarding matters within the general tasks and requirements in the Statement of Work of the task order.
(b) The COR does not have the authority to, and shall not, issue any instruction purporting to be technical direction which:
(1) Constitutes an assignment of additional work outside the Statement of Work;
(2) Constitutes a change as defined in the Changes Clause;
(3) In any manner causes an increase or decrease in the total estimated cost, or the time required for task order performance;
(4) Changes any of the expressed terms, conditions, or specifications of the task order;
(5) Interferes with the Contractor’s rights to perform the terms and conditions of the order, or;
(6) Authorizes the Contractor to incur costs in excess of the estimated cost or other limitations on costs or funds set forth in this contract.
(c) All technical direction shall be issued in writing by the COR.
(d) When, in the opinion of the contractor, the COR or any other Government official other than the Contracting Officer, requests effort outside the existing scope of the contract (or task order), the contractor shall promptly notify the Contracting Officer in writing. No action shall be taken by the contractor under such direction until the Contracting Officer has issued a modification to the contract (or task order) or has otherwise resolved the issue.
G8 STAFFING/PHASE-IN
Contract task orders may be issued on the date the contract becomes effective. The contractor is required to be fully staffed and operational 15 days after the effective date of the contract task order. The contractor shall provide a balanced workforce as needed to accomplish work as required under each contract task order issued.
G9 INVOICING INSTRUCTIONS
Additional invoicing instructions, if required, will be provided at the task order level. All invoices will be processed through Wide Area Work Flow (WAWF) pursuant to DFARS
252.232-7003 Electronic Submission of Payment Requests and Reciving Reports (June 2012).
Specific instructions will be provided in the task orders pursuant to DFARS 252.232-7006, Wide
Area Work Flow Payment Instructions (Dec 2018).
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H1 HOLIDAYS
All or a portion of the effort under this contract will be performed on a Government installation.
Listed below are the holidays observed by the Federal Government. The Contractor will not be allowed to work on the Government installation on these days. CTOs may require crews to be available for work during major holiday timeframes, evenings and/or weekends.
NAME OF HOLIDAY TIME OF OBSERVANCE
New Year’s Day (1 January)
Martin Luther King, Jr. Day (Third Monday in January)
President’s Day (Third Monday in February)
Memorial Day (Last Monday in May)
Juneteenth National Independence Day (19 June)
Independence Day (4 July)
Labor Day (First Monday in September)
Columbus Day (Second Monday in October)
Veteran’s Day (11 November)
Thanksgiving Day (Fourth Thursday in November)
Christmas Day (25 December)
H2 NOTICE OF CONSTRUCTIVE CHANGES
No order, statement or direction of the Contracting Officer or the authorized representative of the
Contracting Officer, whether or not acting within the limits of this authority, or any other representative of the Government, shall constitute a change under the “Changes” clause of this contract or entitle the Contractor to an equitable adjustment of the contract price or delivery schedule, unless such a change is issued in writing and signed by the Contracting
Officer. No representative of the Contracting Officer shall be authorized to issue a written change order under the “Changes” clause of this contract. The Contractor shall be under no obligation to comply with any orders or directions not issued in writing and signed by the
Contracting Officer.
H3 GOVERNMENT FURNISHED/CONTRACTOR ACQUIRED PROPERTY
In accordance with FAR 52.245-2, the Government may furnish to the Contractor or direct the
Contractor to purchase, for use in connection with this contract, various property items to be identified on the individual contract task orders. Each contract task order, as applicable, will identify the property, quantity, original or estimated acquisition value, and place of delivery.
H4 SECURITY WARNING
The contract, or the performance thereof, may involve access to information affecting the national defense of the United States within the meaning of the Espionage Laws, Title 18, U.S.C.
Sections 793 and 794. The transmission or the revelation of the classified contents, of the classified matter to which access may be had, in any manner to an unauthorized person is prohibited by law. NOTE: The prospective contractor's attention is particularly invited to FAR
52.204-2 entitled "Security Requirements."
H5 PERFORMANCE AND PAYMENT BONDS FOR CONSTRUCTION TASK
ORDERS
Contract FAR Clause 52.228-15 (DEVIATION 2020 – O0016) will apply to all Task Orders identified as construction, unless otherwise directed by the Contracting Officer. Revisions to the clause may be made by the Contracting Officer as described in the Clause narrative.
H6 SERVICE CONTRACT ACT AND DAVIS-BACON ACT WAGES
The SCA and DBA Wage Determination’s will vary according to task order. For the purposes of setting fully-burdened labor rate ceilings to applicable categories, use Davis Bacon Act WD#
CA20220018 published 24 February 2022 and Service Contract Act WD# 2015-5641 published
26 December 2021.
H7 DIRECTIVES
Applicable directives, instructions, and regulations are listed in Section C as applicable. This list is not all inclusive.
H8 REQUIRED INSURANCE
(a) Within 15 days after award of this contract, the Contractor shall furnish the Contracting
Officer a Certificate of Insurance as evidence of the existence of the following insurance coverage in amounts not less than the amount specified below in accordance with FAR 52.228-5, “INSURANCE – WORK ON AGOVERNMENT INSTALLATION (JAN 1997)” incorporated in Section I. This insurance must be maintained during the entire performance period.
COVERAGE
Comprehensive General Liability: Minimum limits of $500,000 per occurrence Liability for bodily injury.
Automobile Liability: $200,000 per person; $500,000 per occurrence for bodily injury; $20,000 per occurrence for property damage.
Workmen’s Compensation: As required by law, except that if this contract is to be performed in a state, which does not require or permit private insurance, the compliance with the statutory or administrative requirement in any such state will be satisfactory. The required workman’s compensation insurance shall extend to cover employer’s liability of accidental bodily or death and for occupational disease with a minimum liability of $100,000.
Other insurance as required by state law.
(b) Above insurance coverages are to extend to Contractor personnel operating Government owned equipment and vehicles.
(c) The Certificate of Insurance shall provide for 30 days written notice to the Contracting
Officer by the insurance company prior to cancellation or material change in policy coverage.
Other requirements and information are contained in the aforementioned “Insurance” clause.
H9 STRIKE CONTINGENCY PLAN
Within 15 working days after award, the Contractor shall prepare and submit to the Contracting
Officer or his designated representative for approval, a detailed contingency plan for performing the contract requirements in the event of a work disruption or stoppage by Contractor employees.
H10 RELEASE OF INFORMATION
(a) The Contractor shall not make public release of any information relating to all or any part of this contract without prior approval of either the Procurement Contracting Officer or the
Administrative Contracting Officer, as applicable.
(b) For the purpose of this clause, “information” includes but is not limited to news releases, articles, manuscripts, brochures, advertisements, still and motion pictures, speeches, trade association meetings, symposia, published professional papers, internet web pages, etc.
(c) Two copies of any information proposed to be released must be submitted to the Contracting
Officer for security and policy review and clearance 45 days prior to release. Information copies will be sent to the administrative Contracting Officer.
(d) Nothing in the foregoing shall affect compliance with the requirements of the clause of this contract entitled "Security Requirements."
(e) The Contractor further agrees to include this clause in any subcontract awarded as a result of this contract.
H11 EXPERT TESTIMONY SERVICES
(a) During or subsequent to the performance of this contract, the need may arise to provide expert testimony during hearings and/or court proceedings involving site-specific activities or other matters, with regard to which personnel provided by the Contractor under this contract
(including subcontractor personnel) would have gained expertise as a result of tasks performed under this contract. Such efforts shall be considered within the scope of this contract if expert testimony is required during the performance period of the contract. The individual(s) selected to testify shall be fully knowledgeable of the details of the site under litigation, shall be credible, and be an expert in their field. The testimony shall normally relate to what actions the Contractor took at the site.
(b) In the event such services are required after the performance period of this contract, the
Contractor agrees to make available expert testimony services in support of such future proceedings. The Contractor further agrees to enter into intent agreements as necessary with subcontractors to ensure the availability of subcontractor personnel provided under this contract to provide future expert consulting services. These future expert-consulting services would be provided by a separate negotiated procurement action instituted with the Contractor.
H12 INDEMNIFICATION
As of the date of contract execution, the Contractor will not be indemnified for third party liability. If the Navy changes its policy to indemnify Contractors for third party liability on hazardous waste contracts of this type, such policy will apply to this contract. An equitable adjustment shall be negotiated in exchange for the inclusion of such indemnification.
H13 FABRICATION OR ACQUISITION OF NONEXPENDABLE PROPERTY
The Contractor shall not fabricate nor acquire under this contract, either directly or indirectly through a subcontract, any item of nonexpendable property without written approval from the
Contracting Officer. The equipment is subject to the provisions of FAR 52.245-2, “GOVERNMENT PROPERTY (April 2012)”, incorporated by reference in Section H.
H14 NMCARS 5237.102, (90) ENTERPRISE-WIDE CONTRACTOR MANPOWER
REPORTING APPLICATION (ECMRA) REQUIREMENTS
(a) The following information pertains: The contractor shall report ALL contractor labor hours
(including subcontractor labor hours) required for performance of services provided under this contract for the Naval Facilities Engineering Systems Command, Southwest via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.
(b) Reporting inputs will be for the labor executed during the period of performance during each
Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.
H15 CONTRACTOR PERFORMANCE ASSESSMENT REPORTS SYSTEM (CPARS)
Contractor's performance will be evaluated using the respective contractor performance evaluation report entry system located on the website http://www.cpars.gov/ Prior to commencement of work the contractor is required to provide the government with the name, phone number and e-mail address of the "Contractor's Representative" that will be responsible for receipt and review of draft performance evaluations prepared by the government in the appropriate system. It is the contractor's responsibility to keep this contact information current.
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
The following have been added by full text:
252.225-7968, Restriction on Acquisition of Personal Protective Equipment and Certain Other Items from Non-
Allied Foreign Nations (DEVIATION 2022-O0008, dated 18 March 2022)
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
INSTRUCTIONS TO OFFERORS
L1 PRE-PROPOSAL MEETING/SITE VISIT
A pre-proposal meeting/site visit is not required. There is no seed project for this Request for
Proposal (RFP). A price model will be followed in accordance with the instructions below.
L2 INQUIRIES OR QUESTIONS
Inquiries and questions on this RFP shall be submitted in writing via Attachment JL.3, electronically, to the Contract Specialist as follows:
Courtney Severino courtney.w.severino.civ@us.navy.mil
All inquiries must state the solicitation number and clearly state the question and reference.
All inquiries concerning the attached RFP must be received electronically by 20 April 2022 at 1400 Pacific Standard Time in order to permit adequate time to reply to the inquiry.
L3 PROPOSAL SUBMISSION REQUIREMENTS
1) General: Proposals submitted in response to the solicitation shall be formatted as follows and furnished in the number of copies stated herein. Any proposal submitted that does not conform to the proposal submission requirements will not be considered. Firms shall submit proposals via email to courtney.w.severino.civ@us.navy.mil upload to Procurement
Integrated Enterprise Environment (PIEE) Solicitation Module. If proposals are too large for email transmission, Offerors shall create an individual DoD Safe link to upload proposals and email the link to the above referenced email address. The acceptable electronic formats for proposals include Adobe PDF 6.0 or later version, and Microsoft Office 2010 version for
Factor 5 – Price and all related price modeling reference documents (Attachments JL.1 and
JL.2). All formulas and links to detail worksheets for the Attachments should be intact. Do not submit Attachments JL.1 and JL.2 in a PDF format; they must be submitted as Excel
Spreadsheets.
2) Electronic mail proposals are not acceptable. If access to proposal data is prohibited due to viruses, passwords, or wrong format, the proposal will be rejected.
3) Proposal Submission Requirements:
a. All proposals shall be labeled with the Volume Number and Title, Solicitation Number, name, address, phone number, email address, and Unique Entity Identifier Number for the offeror.
b. The proposals shall be submitted in separately-names Volumes. The following information shall be included in each Volume and shall be tabbed and labeled accordingly:
VOLUME I: PRICE PROPOSAL
(1) Proposal Submission Requirements:
General
A cover letter shall accompany the proposal as required by FAR 52.215-01(c)(2), Instruction to Offerors – Competitive Acquisition. The first page shall include:
The solicitation number, name of the Offeror, address of the Offeror, point of contact information (telephone number and email address), Unique Entity
Identifier Number, Cage Code, and the Tax Identification Number (TIN) of the offeror.
mailto:courtney.w.severino.civ@us.navy.mil
A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the prices stated for each item.
A statement specifying that the contractor can comply with the appropriate bonding capabilities and specific requirements for projects that have construction elements. Any construction-specific requirements will be addressed at the task order level.
The names, titles, and signatures of persons authorized to sign the proposal.
Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office. This page will not be included in the page count of the proposal.
If a Joint Venture, a statement explaining what percentage of the work each member is expecting to accomplish.
The solicitation package will include spreadsheets pre-populated with labor hours (see JL.2) and contractors will be asked to complete the equations by entering their proposed maximum labor rates per profession, occupation, or role (see JL.1). These rates will be the ceiling for future task order awards.
Subcontractor costs and travel will be pre-populated with fixed amounts and
Offerors will be required to propose combined General & Administrative
(G&A) and Profit rates. These rates will be the ceiling for future task order awards.
Volume 1, Price Proposal, shall be tabbed as follows:
TAB A
Offerors shall include Standard Form (SF) 33 (Solicitation, Offer and Award), page 1 with blocks 12-18 completed and Section B of the RFP, Supplies or Services and
Prices under Tab A. Offerors shall submit bonding capabilities in the form of a certification from the surety company that the offeror has financial capability to bond up to $5,000,000.00 (per task order). Offerors shall complete the following attachments:
JL.1 Burdened Labor Rates Spreadsheet
JL.2 Price Model
Financial Questionnaire – RFP Exhibit B
Surety Certification – Bonding Capabilities up to $5,000,000.00 (per task order)
VOLUME II: (NON-COST) TECHNICAL PROPOSAL:
General Information: A cover letter shall accompany the proposal as required by FAR
52.215-1(c)(2), INSTRUCTIONS TO OFFERORS - COMPETITIVE ACQUISITION. The first page shall include the Solicitation Number, name, address, phone number, email address, and Unique Entity Identifier Number for the offeror. This page will not be included in the page count of the proposal.
File naming of proposal information: The file naming convention of Volume II – Technical
Proposal - shall be as follows:
FACTOR 1 – RECENT, RELEVANT EXPERIENCE OF THE FIRM
Project Data Sheet, RFP Exhibit C
The Offeror shall submit a minimum of eight (8) projects with 100% fieldwork complete
(within the past ten five (5) years from the date of the RFP issuance proposal submittal) that best demonstrate specialized experience on relevant projects that are similar in size, scope, and complexity to the work described in Section C of the Performance Work
Statement. At least six (6) of the projects must demonstrate specialized experience under component 1 listed below, Operational Range Clearance of Unexploded Ordnance (UXO) and Material Presenting a Potential Explosive Hazard (MPPEH). The remaining two (2) projects may be any combination of the 3 components.
For purposes of this evaluation, relevant projects are defined as the Offeror having specialized experience in the following three components:
(1) Operational Range Clearance of Unexploded Ordnance (UXO) and Material Presenting a
Potential Explosive Hazard (MPPEH) from active military ranges.
(2) Inspection, Demilitarization/Mutilation, Certification/Verification and Recycling or
Disposal of munitions, munitions debris, target scrap and material considered MPPEH which has been certified as Material Documented as Safe (MDAS) from an operational military range.
(3) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)
Military Munitions Response Program (MMRP) clearance of UXO, Discarded Military
Munitions (DMMs), and/or MPPEH from active or inactive military or other than operational ranges.
Note: Experience described shall be projects whereby the Offeror as the Prime Contractor self-performed the work or the Offeror as a Subcontractor self-performed the work.
“Self-perform” is defined as when the Offeror’s own employees performed the types of work under components 1-3 above. For example, experience should demonstrate that the
Offeror managed its own employees in clearance of UXO and materials considered
MPPEH from operational active military ranges and/or CERCLA MMRP sites, as well as performing inspection, demilitarization/mutilation, certification/verification and recycling of munitions, munitions debris, target scrap and all material considered MPPEH and certifying it as MDAS from operational ranges. Any projects submitted where the
Offeror’s participation was limited to the overall management of subcontractors or teaming members who performed the fieldwork will not be considered relevant experience. Projects where only small arms or small arms ranges are cleared/processed will not be considered specialized experience.
Projects submitted by the Offeror shall be at least 100% physically complete with fieldwork (not counting final report deliverables) within the past ten five (5) years of the date of issuance of this RFP submittal of proposals.
A project is defined as a project self-performed under a single task order or single contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work self-performed under a task order as a project. Additionally, for purposes of this evaluation, a project is defined as:
(i) Work performed for a federal agency and meeting at least one of three requirements in paragraphs (ii), (iii), and/or (iv) below:
(ii) Work performed pursuant to one specific task order of an indefinite delivery/indefinite quantity (ID/IQ) type contract at one site or multiple sites at a single installation or facility; or
(iii) Work performed pursuant to a site specific contract (i.e. a non-ID/IQ contract) for one site or multiple sites within a single installation or facility; or
(iv) Work performed pursuant to a single contract that is not an ID/IQ contract or pursuant to one specific task order of an ID/IQ type contract at multiple installations or facilities.
Offeror refers to the Contractor submitting the proposal as Offeror, including Joint
Ventures, whose name appears in Block 14 of Standard Form (SF) 33 (Solicitation, Offer and Award).
The attached Project Data Sheet, RFP Exhibit C, is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, the page limit for Tab A, Project Data Sheets, will be a maximum of 24 single-sided pages (or 12 double sided pages).
Project Data Sheets shall clearly state all of the following information:
(i) Contract Information: Name and address, contract number and task order number; title; place of performance; award date; contract /task order type
(fixed price, cost reimbursable, etc.); name and address of procuring organization, procuring organization point of contact (POC) name, phone number and email address; technical or program manager’s name, phone number and email address
(ii) Cost: Project dollars; value of award, and final project amount
(iii) Contract Role: Specify if contract/task order was a prime contract/task order or a subcontract to a prime contract. If a subcontract, include prime contractor’s company name, point of contact phone number and email address.
(iv) Description of work performed: Offeror shall clearly describe its primary role/duties in execution of the work (i.e. the major components of the project which were completed by the prime’s staff and major components which were subcontracted). If the Offeror subcontracted portions of the work, describe the oversight performed of the subcontractor(s) on work relevant to this solicitation. If the Offeror was a subcontractor on the project, the description, duration, and cost of the work provided should reflect the work performed by the Offeror as the subcontractor, and not work under the project as a whole.
Description of work performed should include as applicable (a) technical and administrative functions – describe the complexity of functions performed; (b) distinctive and/or unique features of the project; (c) type of action performed;
(d) interaction with range management section/range scheduling; (e) summary of work accomplished and how it relates to work required by this solicitation.
(v) Whether or not the project is 100% fieldwork complete, and the date upon which 100% fieldwork completion was achieved.
For all submitted projects, the description of the project shall clearly describe the scope of work the Offeror self-performed and the relevancy to the project requirements of this
RFP.
If the Offeror is submitting project experience where the Offeror was the subcontractor, the proposal shall clearly identify the work that the Offeror self-performed on the project.
If the Offeror is submitting project experience where the Offeror subcontracted portions of the project to other firms, the Offeror shall clearly identify what work was subcontracted and what work was self-performed.
If the Offeror is proposing as a Joint Venture (JV) or other entity consisting of more than one company, relevant project experience shall be submitted for projects completed by the JV or other entity consisting of more than one company. If the offeror is a JV, and the
JV does not have shared experience, at least one relevant project shall be submitted for each JV member. JV offerors with no shared experience that fail to submit at least one relevant project for each JV member will be rated Unacceptable. If the offeror is not a JV, but the offeror is an entity consisting of more than one company, and the offeror entity has no shared relevant experience, provide at least one relevant project for each individual business entity that makes up the offeror. Offeror entities made up of more than one company, that do not have any shared experience, that fail to submit at least one relevant project for each individual entity that makes up the offeror will be rated
Unacceptable. Refer to 13 CFR §121.103-106 and 13 CFR §125.6 for applicable small business size standards and requirements. Offerors are still required to submit eight (8) projects combined.
FACTOR 2 - SAFETY
(1) Solicitation Submittal Requirements:
The Offeror shall submit the following information: The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative, as described further below. For a partnership or joint venture, the Offeror shall submit separate DART rates and TCR for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.
NOTE: DART and TCR shall not be submitted for subcontractors.
Volume 2 – Safety shall be tabbed as follows:
OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:
DART Rate: Submit five (5) previous complete calendar years’ (CY2017, CY2018, CY2019, CY2020, and CY2021) worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement. Lower OSHA DART Rates will be given greater weight in the evaluation. There are no page limitations for submissions under Tab A.
a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.
b. Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked.
DART RATE = Number of DART Incidents x 200,000
Total Number of Employee Labor Hours Worked
TAB B
Total Case Rate (TCR):
TCR Rate: Submit five (5) previous complete calendar years’ (CY2017, CY2018, CY2019, CY2020, and CY2021) worth of data (not an overall average). If the Offeror has no TCR rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement. Lower TCR Rates will be given greater weight in the evaluation. There are no page limitations for submissions under Tab
B.
a. TCR cases include injuries or illnesses resulting in death, days away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.
b. Calculation of TCR rate: Multiply the total number of TCR incidents by 200,000, and then divide by the number of employee labor hours worked.
TCR RATE = Number of TCR Incidents x 200,000
Total Number of Employee Labor Hours Worked
TAB C
Technical Approach for Safety:
Technical Approach to Safety: Submit a narrative that addresses the following:
a. Describe the Offeror’s approach to implementing and executing a Safety
Management System (SMS) including Management/Leadership Involvement, Employee Involvement, Hazard Prevention, Hazard Control, Worksite Analysis, and Safety and Health Training, to include the standard(s) used to benchmark the
SMS.
b. Describe the evaluation process used to select potential subcontractors.
c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the
Offeror’s own in-house workforce).
d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page.
FACTOR 3 – MANAGEMENT APPROACH
Volume 2 – Management Approach shall be tabbed as follows:
Contract Management:
The offeror shall submit a contract management plan that details the following:
a. Organization:
Organizational Chart: The proposed program management organizational structure, lines of authority for key personnel, and organizational relationships with any proposed subcontractors.
Roles and Responsibilities: The Offeror shall describe the roles and responsibilities for each of the key personnel.
Subcontractors: Firms shall indicate the extent of their previous working relationship with any proposed subcontractors. In the event that the use of sub-contractor(s) in a
“team” approach is proposed, wherein the sub(s) will accomplish significant portions of a clearly identifiable scope of work on a consistent basis, a “team” relationship will be considered. In such instances, the prime shall clearly identify the limits of responsibility for each team subcontractor.
b. Quality Control System:
The offeror shall include the proposed contract quality control system in support of the resulting contract. This includes, but is not limited to; completion of field work, maintenance of employee qualifications, verification of subcontractor qualifications, ensuring adherence to regulatory requirements, and adherence to DoD and DoN policy and guidance related to Range Sustainment work. See Section C 5.1 (References).
c. Staffing and Resources:
The offeror shall include the proposed plan for staffing/resourcing this contract to include all locations covered by this contract. The plan shall detail the offeror’s workforce by number and labor category. The plan shall describe how staffing and equipment needed to perform this contract will be acquired. The plan shall include how the Offeror plans to perform multiple task orders simultaneously over different geographic locations. The plan shall demonstrate the efficiency and cost effectiveness of the plan.
d. How and to what extent the proposed program management organization will interact with the home office organization and other supporting offices under the contract.
The page limit for Tab A will be a maximum of five (5) pages, single sided.
Key Personnel:
The Offeror shall submit a detailed resume for each of the following proposed key personnel;
UXO Program Director, Project Manager (minimum of two), Senior Unexploded Ordnance
Supervisors (SUXOSs) (minimum of two), UXO Safety Officers (UXOSO) (minimum of two) and Program Quality Control (QC) Manager. All proposed Unexploded Ordnance
Qualified Personnel (UXOQP) must meet the requirements outlined in Department of
Defense Explosive Safety Board (DDESB) Technical Paper Number 18 (TP-18) and be employed by the Prime contractor. If the offeror is a JV, key personnel must be an employee of the JV or of a JV member at the time of award. The resumes shall specify the number of years the employee has worked for the Offeror. If experience/qualifications were obtained under contracts listed under Factor 1, Experience, indicate the contract number. All resumes shall have the signature of the current employee. The following positions are considered Key
Personnel and must meet the following experience and educational requirements:
UXO Program Director – Responsibilities and duties include: 1) overall management of this contract; 2) ensuring compliance with all applicable Federal, State, Local, DoD and
Navy/Marine Corps regulations, instructions, guidance and policy, as well as the contract terms and conditions; 3) monitoring and controlling project costs and quality control; 4) assigning personnel consistent with contract requirements; 5) ensuring all employees engaging in UXO related work are properly trained and qualified in accordance with DDESB
TP-18 to safely perform each task.
Minimal qualifications include the following:
- A 4-year undergraduate degree in engineering, physical science or business;
- Ten (10) years of experience in the direct management of large single award and/or multiple award task orders involving multiple UXO teams working concurrently at multiple locations;
- Five (5) years of which as a senior manager in the direct management role and working on large scale UXO clearance and processing projects similar in scope, size and complexity as those contemplated under this solicitation.
Project Manager (PM) – Minimum of two (2) personnel. Responsibilities and duties include: 1) overall project management; 2) ensuring that all work is accomplished to industry standards with adequate internal controls to safely and effectively complete all work; 3) act as the Contractor’s single point of contact for the individual contract task order; 4) interpreting and planning overall work effort; 5) reviewing and approving all submittals; 6) defining resource needs and secure staff and equipment; 7) monitoring subcontractor performance, schedules, budgets and invoices; 8) developing, reviewing and meeting work schedule and budget objectives; 9) ensuring technical adequacy of field, laboratory and data management tasks; 10) attending meetings with Government personnel as required; 11) documenting the need for required contract modifications.
- Minimum of 5 years of experience involving the direct management of employees working on operational range clearance projects of similar size, complexity…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .