JL2_Price_Model.xlsx

XLSX spreadsheet 51 KB Posted

Attached to
RANGE SUSTAINMENT AND REMEDIATION ENVIRONMENTAL SERVICES AT DEPARTMENT OF DEFENSE AND OTHER GOVERNMENTAL AGENCIES
Solicitation number
N6247322R3432
Issued by

About this file

This document contains pricing templates for a Navy range sustainment contract solicitation. The templates provide ceiling rates for labor categories, other direct costs, subcontractors, and multipliers to be applied for two base years and two option periods. Labor hours are predetermined. The solicitation seeks environmental services including unexploded ordnance clearance and materials potentially presenting explosive hazards processing at ranges in Alaska, Arizona, California, Colorado, Nevada, New Mexico, Oregon, Utah, Washington and other Navy installations. The resulting contracts will have a one two-year base period and two three-year options awarded on an ID/IQ basis to multiple contractors.

View the file

Other files

File Type Posted
Updated_DoD_Safe_Instructions.pdf PDF
JL.2_Price_ModelwithAmend01_13MAY22.xlsx XLSX spreadsheet
N6247322R3432_Amendment01.pdf PDF
JL1_Fully-burdened_Labor_Rate_Ceiling_withAmend01_13MAY22.xlsx XLSX spreadsheet
JL3_RFI_ANSWERS.04292022.xlsx XLSX spreadsheet
JL3_RFI_ANSWERS.04252022.xlsx XLSX spreadsheet
JL1_Fully-burdened_Labor_Rate_Ceiling_Amend01.xlsx XLSX spreadsheet
JL.2_Price_Model_Amend01.xlsx XLSX spreadsheet
JL3_RFI_ANSWERS.04222022.xlsx XLSX spreadsheet
Copy of JL3_RFI_ANSWERS.04182022.xlsx XLSX spreadsheet
JL3_RFI_ANSWERS.040822.xlsx XLSX spreadsheet
JL3_RFI_ANSWERS.040622.xlsx XLSX spreadsheet
Exhibit_C_Project.docx DOCX document
JL1_Fully-burdened_Labor_Rate_Ceiling.xlsx XLSX spreadsheet
JL3_RFI_FORM.xlsx XLSX spreadsheet
Exhibit_B_Financial.docx DOCX document
Exhibit_A_PPQ.docx DOCX document
N6247322R3432_Solicitation.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

NAVY RANGE SUSTAINMENT CONTRACT SOLICITATION NUMBER
CONTRACTOR NAMEEngineeringDesignGrand Total
Base Year 1$ - 0$ - 0$ 6,750,000
Base Year 2$ - 0$ - 0$ 6,750,000
Option 1, Year 1$ - 0$ - 0$ 7,250,000
Option 1, Year 2$ - 0$ 7,250,000
Option 1, Year 3$ - 0$ - 0$ 7,250,000
Option 2, Year 1$ - 0$ 7,250,000
Option 2, Year 2$ - 0$ 7,250,000
Option 2, Year 3$ - 0$ 7,250,000
TOTAL BASE YEAR$ - 0$ - 0$ 13,500,00035,250,000(21,750,000)
TOTAL ALL OPTION YEARS$ - 0$ - 0$ 43,500,00014,500,00029,000,000
TOTAL BASE + OPTION$ - 0$ 57,000,00057,000,000- 0

JL2_Base Year 1

BASE YEAR 1 PRICE MODEL WORKSHEET JL.2
LABOR CATEGORIES, RATES AND HOURS- Table 12080
Labor Category- ABMaximum Rate ($/hr)- CDHours E

samuel.f.castronuevo: samuel.f.castronuevo:

Are these hours pre-determined? By whom?Total ($) F
UXO Program Directorx2080$0.00
Project Managerx4160$0.00
SUXOSx4160$0.00
UXOSOx4160$0.00
Program Quality Control (QC) Managerx2080$0.00
Site Managerx1248$0.00
UXOQCx2080$0.00
UXO Tech IIIx1248$0.00
UXO Tech IIx1248$0.00
UXO Tech Ix1248$0.00
Equipment Operatorx1248$0.00
Senior Engineerx208$0.00
Senior Geologistx104$0.00
Senior Geophysicistx208$0.00
Senior Biologistx42$0.00
Senior Chemistx104$0.00
Cert Ind Hygx104$0.00
H&S Managerx104$0.00
GIS Specialistx312$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
TOTAL TABLE 1(BURDENED LABOR)26146$0.00
BASE YEAR 1
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$500,000.00
Maximum Burden (multiplier) applied to Other Direct Costs (%)x$500,000.00$0.00
Subcontractors$6,000,000.00
Maximum Burden (Multiplier) applied to Subcontractors (%)x$6,000,000.00$0.00

Travel $250,000.00 samuel.f.castronuevo: samuel.f.castronuevo:

predetermined amount?

General & Administrative (Multiplier) applied to travel (%) x $250,000.00 $0.00

TOTAL TABLE 2 $6,750,000.00

TOTAL BASE YEAR 1 (Burdened Labor, "Other Direct Costs," and Subcontractors)$6,750,000.00
Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. Service Contract Labor Standards (SCA) or Wage Rate Requirements Construction (DBA) will apply where applicable. For the purposes of this bid, the offeror shall use use Davis Bacon Act WD# CA20220018 published 24 February 2022 and Service Contract Act WD# 2015-5641 published 26 December 2021.
3. The only entries shall be in column "C". No other columns shall be changed, modified or deleted.
4. Offeror shall only use listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
5. The contractor need only submit electronic Excel version and Adobe PDF of the JL1 and JL2.
6. The fully burdened labor rates and maximum burden rates listed above will be incorporated into the basic contract as maximum/ceiling rates to be applied to task order awards.
7. % applied to Travel shall only consist of G&A

SOLICITATION N62470-18-R-7009

ATTACHMENT JL.3

JL2_Base Year 2

BASE YEAR 2 PRICE MODEL WORKSHEET JL.2A
LABOR CATEGORIES, RATES AND HOURS- Table 12080
Labor Category- ABMaximum Rate ($/hr)- CDHours ETotal ($) F
UXO Program Directorx2080$0.00
Project Managerx4160$0.00
SUXOSx4160$0.00
UXOSOx4160$0.00
Program Quality Control (QC) Managerx2080$0.00
Site Managerx1248$0.00
UXOQCx2080$0.00
UXO Tech IIIx1248$0.00
UXO Tech IIx1248$0.00
UXO Tech Ix1248$0.00
Equipment Operatorx1248$0.00
Senior Engineerx208$0.00
Senior Geologistx104$0.00
Senior Geophysicistx208$0.00
Senior Biologistx42$0.00
Senior Chemistx104$0.00
Cert Ind Hygx104$0.00
H&S Managerx104$0.00
GIS Specialistx312$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
TOTAL TABLE 1(BURDENED LABOR)26146$0.00
BASE YEAR 2
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$500,000.00
Maximum Burden (multiplier) applied to Other Direct Costs (%)x$500,000.00$0.00
Subcontractors$6,000,000.00
Maximum Burden (Multiplier) applied to Subcontractors (%)x$6,000,000.00$0.00
Travel$250,000.00
General & Administrative (Multiplier) applied to travel (%)x$250,000.00$0.00

TOTAL TABLE 2 $6,750,000.00

TOTAL BASE YEAR 2 (Burdened Labor, "Other Direct Costs," and Subcontractors)$6,750,000.00
Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. Service Contract Labor Standards (SCA) or Wage Rate Requirements Construction (DBA) will apply where applicable. For the purposes of this bid, the offeror shall use use Davis Bacon Act WD# CA20220018 published 24 February 2022 and Service Contract Act WD# 2015-5641 published 26 December 2021.
3. The only entries shall be in column "C". No other columns shall be changed, modified or deleted.
4. Offeror shall only use listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
5. The contractor need only submit electronic Excel version and Adobe PDF of the JL1 and JL2.
6. The fully burdened labor rates and maximum burden rates listed above will be incorporated into the basic contract as maximum/ceiling rates to be applied to task order awards.
7. % applied to Travel shall only consist of G&A

JL2_Option 1 - Year 1

OPTION 1 YEAR 1 PRICE MODEL WORKSHEET JL.2
LABOR CATEGORIES, RATES AND HOURS- Table 12080
Labor Category- ABRate ($/hr)- CDHours ETotal ($) F
UXO Program Directorx2080$0.00
Project Managerx4160$0.00
SUXOSx4160$0.00
UXOSOx4160$0.00
Program Quality Control (QC) Managerx2080$0.00
Site Managerx1248$0.00
UXOQCx2080$0.00
UXO Tech IIIx1248$0.00
UXO Tech IIx1248$0.00
UXO Tech Ix1248$0.00
Equipment Operatorx1248$0.00
Senior Engineerx208$0.00
Senior Geologistx104$0.00
Senior Geophysicistx208$0.00
Senior Biologistx42$0.00
Senior Chemistx104$0.00
Cert Ind Hygx104$0.00
H&S Managerx104$0.00
GIS Specialistx312$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
TOTAL TABLE 1(BURDENED LABOR)26146$0.00
OPTION 1 YEAR 1
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$500,000.00
Maximum Burden (multiplier) applied to Other Direct Costs (%)x$500,000.00$0.00
Subcontractors$6,000,000.00
Maximum Burden (Multiplier) applied to Subcontractors (%)x$6,000,000.00$0.00
Travel$250,000.00
General & Administrative (Multiplier) applied to travel (%)x$250,000.00$0.00

TOTAL TABLE 2 $6,750,000.00

TOTAL OPTION 1 YEAR 1 (Burdened Labor, "Other Direct Costs," and Subcontractors)$7,250,000.00
Notes:
Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. Service Contract Labor Standards (SCA) or Wage Rate Requirements Construction (DBA) will apply where applicable. For the purposes of this bid, the offeror shall use use Davis Bacon Act WD# CA20220018 published 24 February 2022 and Service Contract Act WD# 2015-5641 published 26 December 2021.
3. The only entries shall be in column "C". No other columns shall be changed, modified or deleted.
4. Offeror shall only use listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
5. The contractor need only submit electronic Excel version and Adobe PDF of the JL1 and JL2.
6. The fully burdened labor rates and maximum burden rates listed above will be incorporated into the basic contract as maximum/ceiling rates to be applied to task order awards.
7. % applied to Travel shall only consist of G&A

ATTACHMENT JL.3

JL2_Option 1 - Year 2

OPTION 1 YEAR 2 PRICE MODEL WORKSHEET JL.2
LABOR CATEGORIES, RATES AND HOURS- Table 12080
Labor Category- ABRate ($/hr)- CDHours ETotal ($) F
UXO Program Directorx2080$0.00
Project Managerx4160$0.00
SUXOSx4160$0.00
UXOSOx4160$0.00
Program Quality Control (QC) Managerx2080$0.00
Site Managerx1248$0.00
UXOQCx2080$0.00
UXO Tech IIIx1248$0.00
UXO Tech IIx1248$0.00
UXO Tech Ix1248$0.00
Equipment Operatorx1248$0.00
Senior Engineerx208$0.00
Senior Geologistx104$0.00
Senior Geophysicistx208$0.00
Senior Biologistx42$0.00
Senior Chemistx104$0.00
Cert Ind Hygx104$0.00
H&S Managerx104$0.00
GIS Specialistx312$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
TOTAL TABLE 1(BURDENED LABOR)26146$0.00
OPTION 1 YEAR 2
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$500,000.00
Maximum Burden (multiplier) applied to Other Direct Costs (%)x$500,000.00$0.00
Subcontractors$6,000,000.00
Maximum Burden (Multiplier) applied to Subcontractors (%)x$6,000,000.00$0.00
Travel$250,000.00
General & Administrative (Multiplier) applied to travel (%)x$250,000.00$0.00

TOTAL TABLE 2 $6,750,000.00

TOTAL OPTION 1 YEAR 2 (Burdened Labor, "Other Direct Costs," and Subcontractors)$7,250,000.00
Notes:
Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. Service Contract Labor Standards (SCA) or Wage Rate Requirements Construction (DBA) will apply where applicable. For the purposes of this bid, the offeror shall use use Davis Bacon Act WD# CA20220018 published 24 February 2022 and Service Contract Act WD# 2015-5641 published 26 December 2021.
3. The only entries shall be in column "C". No other columns shall be changed, modified or deleted.
4. Offeror shall only use listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
5. The contractor need only submit electronic Excel version and Adobe PDF of the JL1 and JL2.
6. The fully burdened labor rates and maximum burden rates listed above will be incorporated into the basic contract as maximum/ceiling rates to be applied to task order awards.
7. % applied to Travel shall only consist of G&A

JL2_Option 1 _ Year 3

OPTION 1 YEAR 3 PRICE MODEL WORKSHEET JL.2
LABOR CATEGORIES, RATES AND HOURS- Table 12080
Labor Category- ABRate ($/hr)- CDHours ETotal ($) F
UXO Program Directorx2080$0.00
Project Managerx4160$0.00
SUXOSx4160$0.00
UXOSOx4160$0.00
Program Quality Control (QC) Managerx2080$0.00
Site Managerx1248$0.00
UXOQCx2080$0.00
UXO Tech IIIx1248$0.00
UXO Tech IIx1248$0.00
UXO Tech Ix1248$0.00
Equipment Operatorx1248$0.00
Senior Engineerx208$0.00
Senior Geologistx104$0.00
Senior Geophysicistx208$0.00
Senior Biologistx42$0.00
Senior Chemistx104$0.00
Cert Ind Hygx104$0.00
H&S Managerx104$0.00
GIS Specialistx312$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
TOTAL TABLE 1(BURDENED LABOR)26146$0.00
OPTION 1 YEAR 3
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$500,000.00
Maximum Burden (multiplier) applied to Other Direct Costs (%)x$500,000.00$0.00
Subcontractors$6,000,000.00
Maximum Burden (Multiplier) applied to Subcontractors (%)x$6,000,000.00$0.00
Travel$250,000.00
General & Administrative (Multiplier) applied to travel (%)x$250,000.00$0.00

TOTAL TABLE 2 $6,750,000.00

TOTAL OPTION 1 YEAR 3 (Burdened Labor, "Other Direct Costs," and Subcontractors)$7,250,000.00
Notes:
Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. Service Contract Labor Standards (SCA) or Wage Rate Requirements Construction (DBA) will apply where applicable. For the purposes of this bid, the offeror shall use use Davis Bacon Act WD# CA20220018 published 24 February 2022 and Service Contract Act WD# 2015-5641 published 26 December 2021.
3. The only entries shall be in column "C". No other columns shall be changed, modified or deleted.
4. Offeror shall only use listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
5. The contractor need only submit electronic Excel version and Adobe PDF of the JL1 and JL2.
6. The fully burdened labor rates and maximum burden rates listed above will be incorporated into the basic contract as maximum/ceiling rates to be applied to task order awards.
7. % applied to Travel shall only consist of G&A

JL2_Option 2 - Year 1

OPTION 1 YEAR 1 PRICE MODEL WORKSHEET JL.2
LABOR CATEGORIES, RATES AND HOURS- Table 12080
Labor Category- ABRate ($/hr)- CDHours ETotal ($) F
UXO Program Directorx2080$0.00
Project Managerx4160$0.00
SUXOSx4160$0.00
UXOSOx4160$0.00
Program Quality Control (QC) Managerx2080$0.00
Site Managerx1248$0.00
UXOQCx2080$0.00
UXO Tech IIIx1248$0.00
UXO Tech IIx1248$0.00
UXO Tech Ix1248$0.00
Equipment Operatorx1248$0.00
Senior Engineerx208$0.00
Senior Geologistx104$0.00
Senior Geophysicistx208$0.00
Senior Biologistx42$0.00
Senior Chemistx104$0.00
Cert Ind Hygx104$0.00
H&S Managerx104$0.00
GIS Specialistx312$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
TOTAL TABLE 1(BURDENED LABOR)26146$0.00
OPTION 1 YEAR 1
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$500,000.00
Maximum Burden (multiplier) applied to Other Direct Costs (%)x$500,000.00$0.00
Subcontractors$6,000,000.00
Maximum Burden (Multiplier) applied to Subcontractors (%)x$6,000,000.00$0.00
Travel$250,000.00
General & Administrative (Multiplier) applied to travel (%)x$250,000.00$0.00

TOTAL TABLE 2 $6,750,000.00

TOTALOPTION 1 YEAR 1 (Burdened Labor, "Other Direct Costs," and Subcontractors)$7,250,000.00
Notes:
Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. Service Contract Labor Standards (SCA) or Wage Rate Requirements Construction (DBA) will apply where applicable. For the purposes of this bid, the offeror shall use use Davis Bacon Act WD# CA20220018 published 24 February 2022 and Service Contract Act WD# 2015-5641 published 26 December 2021.
3. The only entries shall be in column "C". No other columns shall be changed, modified or deleted.
4. Offeror shall only use listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
5. The contractor need only submit electronic Excel version and Adobe PDF of the JL1 and JL2.
6. The fully burdened labor rates and maximum burden rates listed above will be incorporated into the basic contract as maximum/ceiling rates to be applied to task order awards.
7. % applied to Travel shall only consist of G&A

ATTACHMENT JL.3

JL2_Option 2 - Year 2

OPTION 2 YEAR 2 PRICE MODEL WORKSHEET JL.2
LABOR CATEGORIES, RATES AND HOURS- Table 12080
Labor Category- ABRate ($/hr)- CDHours ETotal ($) F
UXO Program Directorx2080$0.00
Project Managerx4160$0.00
SUXOSx4160$0.00
UXOSOx4160$0.00
Program Quality Control (QC) Managerx2080$0.00
Site Managerx1248$0.00
UXOQCx2080$0.00
UXO Tech IIIx1248$0.00
UXO Tech IIx1248$0.00
UXO Tech Ix1248$0.00
Equipment Operatorx1248$0.00
Senior Engineerx208$0.00
Senior Geologistx104$0.00
Senior Geophysicistx208$0.00
Senior Biologistx42$0.00
Senior Chemistx104$0.00
Cert Ind Hygx104$0.00
H&S Managerx104$0.00
GIS Specialistx312$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
TOTAL TABLE 1(BURDENED LABOR)26146$0.00
OPTION 2 YEAR 2
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$500,000.00
Maximum Burden (multiplier) applied to Other Direct Costs (%)x$500,000.00$0.00
Subcontractors$6,000,000.00
Maximum Burden (Multiplier) applied to Subcontractors (%)x$6,000,000.00$0.00
Travel$250,000.00
General & Administrative (Multiplier) applied to travel (%)x$250,000.00$0.00

TOTAL TABLE 2 $6,750,000.00

TOTALOPTION 2 YEAR 2 (Burdened Labor, "Other Direct Costs," and Subcontractors)$7,250,000.00
Notes:
Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. Service Contract Labor Standards (SCA) or Wage Rate Requirements Construction (DBA) will apply where applicable. For the purposes of this bid, the offeror shall use use Davis Bacon Act WD# CA20220018 published 24 February 2022 and Service Contract Act WD# 2015-5641 published 26 December 2021.
3. The only entries shall be in column "C". No other columns shall be changed, modified or deleted.
4. Offeror shall only use listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
5. The contractor need only submit electronic Excel version and Adobe PDF of the JL1 and JL2.
6. The fully burdened labor rates and maximum burden rates listed above will be incorporated into the basic contract as maximum/ceiling rates to be applied to task order awards.
7. % applied to Travel shall only consist of G&A

JL2_Option 2 Year 3

OPTION 2 YEAR 3 PRICE MODEL WORKSHEET JL.2
LABOR CATEGORIES, RATES AND HOURS- Table 12080
Labor Category- ABRate ($/hr)- CDHours ETotal ($) F
UXO Program Directorx2080$0.00
Project Managerx4160$0.00
SUXOSx4160$0.00
UXOSOx4160$0.00
Program Quality Control (QC) Managerx2080$0.00
Site Managerx1248$0.00
UXOQCx2080$0.00
UXO Tech IIIx1248$0.00
UXO Tech IIx1248$0.00
UXO Tech Ix1248$0.00
Equipment Operatorx1248$0.00
Senior Engineerx208$0.00
Senior Geologistx104$0.00
Senior Geophysicistx208$0.00
Senior Biologistx42$0.00
Senior Chemistx104$0.00
Cert Ind Hygx104$0.00
H&S Managerx104$0.00
GIS Specialistx312$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
x$0.00
TOTAL TABLE 1(BURDENED LABOR)26146$0.00
OPTION 2 YEAR 3
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$500,000.00
Maximum Burden (multiplier) applied to Other Direct Costs (%)x$500,000.00$0.00
Subcontractors$6,000,000.00
Maximum Burden (Multiplier) applied to Subcontractors (%)x$6,000,000.00$0.00
Travel$250,000.00
General & Administrative (Multiplier) applied to travel (%)x$250,000.00$0.00

TOTAL TABLE 2 $6,750,000.00

TOTAL OPTION 2 YEAR 3 (Burdened Labor, "Other Direct Costs," and Subcontractors)$7,250,000.00
Notes:
Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. Service Contract Labor Standards (SCA) or Wage Rate Requirements Construction (DBA) will apply where applicable. For the purposes of this bid, the offeror shall use use Davis Bacon Act WD# CA20220018 published 24 February 2022 and Service Contract Act WD# 2015-5641 published 26 December 2021.
3. The only entries shall be in column "C". No other columns shall be changed, modified or deleted.
4. Offeror shall only use listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
5. The contractor need only submit electronic Excel version and Adobe PDF of the JL1 and JL2.
6. The fully burdened labor rates and maximum burden rates listed above will be incorporated into the basic contract as maximum/ceiling rates to be applied to task order awards.
7. % applied to Travel shall only consist of G&A

File details come from the government source that posted it. Updated .