AMENDMENT 001 RFP Letter - Solicitation N6247322R3201.pdf

PDF 378 KB Posted

Attached to
Relocate Electrical Equipment and Replace Transformer, Bldg. No. 339, Naval Support Activity Monterey (NSAM), Monterey, CA
Solicitation number
N6247322R3201
Issued by

About this file

This amendment to a solicitation modifies the requirements for a design-build construction project to relocate electrical equipment and replace a transformer at Building 339 at Naval Support Activity Monterey in California. The amendment extends the question submission deadline to July 27, 2022 and incorporates additional statements of work and technical attachments into the solicitation. Offerors are to provide proposals through the Procurement Integrated Enterprise Environment no later than August 8, 2022. The project scope includes demolishing and removing existing electrical equipment such as a selector switch, transformer, and load center, and installing new above-grade replacements. There are also two optional items to relocate a photovoltaic inverter above grade and provide temporary power to another building.

View the file

Other files

File Type Posted
Amendment No. 003 - Solicitation No. N6247322R3201.pdf PDF
PV Inverter Enclosure Example.jpg JPG image
B339 Single Line Diagram - Conceptual.JPG JPG image
6363561-E16.jpg JPG image
HVSS-10 and Switchboard Enclosure.JPG JPG image
6363565-E20.jpg JPG image
18048240-E0.50.pdf PDF
PV Inverter.jpg JPG image
Aerial View - Project Location.JPG JPG image
Basement Equipment.JPG JPG image
Electrical Distribution System Modified HV Electrical Site Plan.pdf PDF
T34.jpg JPG image
RFI 033.pdf PDF
T34 - Secondary Feeders.jpg JPG image
Amendment 002 - Solicitation N6247322R3201.pdf PDF
RFI 023.jpg JPG image
18048248-E8.50.pdf PDF
6363566-E21.jpg JPG image
T34 - Primary Feeders.jpg JPG image
MH4 Location.jpg JPG image
18048250-E9.01.pdf PDF
18048246-E7.01.pdf PDF
Desired Equipment Relocation.JPG JPG image
18048249-E8.51.pdf PDF
MH4 Interior.jpg JPG image
As built drawing P 197 Postgraduate Building Electrical Site Plan.pdf PDF
01 32 16.00 20 Small Project Design and Construction Schedules.pdf PDF
Part 2-6 SOW.pdf PDF
Rooftop Photovoltaic System As Builts.pdf PDF
As-built drawing Irrigation Plan.pdf PDF
As built drawing P 197 Postgraduate Building Site Plan.pdf PDF
01 31 23.13 20 Electronic Construction and Facility Support Contract Management System.pdf PDF
01 35 26.05 20 Government Safety Requirements for Design Build.pdf PDF
NPS Power Distribution - Single Line Diagram Model_6-21-2022.pdf PDF
NPS Power Distribution Connection Diagram_6-21-2022.pdf PDF
As built drawing Symbols Schedule Single Line Building No 339.pdf PDF
RFP Letter - N6247322R3201.pdf PDF
Wage Determination No. CA20220018.pdf PDF
PIEE Solicitation Module Vendor Access Instructions.pdf PDF
RFP - N6247322R3201.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25 July 2022

Subj: AMENDMENT 001 – Solicitation N6247322R3201: Relocate Electrical Panel and Replace

Transformer B339, Naval Support Activity Monterey (NSAM), CA 93943-5035

Question submission is extended from 25 July 2022 to 27 July 2022 @11:59pm Pacific Time.

The following documents are incorporated into the solicitation via Amendment 001:

Part 2-6 SOW Part 5 Attachments

01 31 23.13 20 Electronic Construction and Facility Support Contract Management System 01 32 16.00 20 Small Project Design and Construction Schedules 01 35 26.05 20 Government Safety Requirements for Design Build

Part 6 Attachments As-built drawing: Symbols, Schedule & Single Line Building No. 339 As-built drawing: Irrigation Plan As-built drawing: P-197 Postgraduate Building – Site Plan As-built drawing: P-197 Postgraduate Building – Electrical Site Plan NPS Power Distribution Connection Diagram_6-21-2022 NPS Power Distribution - Single Line Diagram Model_6-21-2022 Rooftop Photovoltaic System As Builts

The proposal due date and all attachments remain unchanged.

Proposal shall be received no later than 11:59 PM (PST) 08 August 2022 via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module to Ashley Thornton, Contracting Officer.

All responses to this solicitation shall be provided before the proposal due date and time.

Ashley N. Thornton Contracting Officer

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING COMMAND SOUTHWEST

FACILITIES ENGINEERING AND ACQUISITION DEPARTMENT

511 GARDNERS ROAD, BUILDING 426

MONTEREY, CA 93943-5035

2022-07-25T12:22:34-0700
THORNTON.ASHLEY.NICOLE.1274891625

File details come from the government source that posted it. Updated .