This amendment to a solicitation modifies the requirements for a design-build construction project to relocate electrical equipment and replace a transformer at Building 339 at Naval Support Activity Monterey in California. The amendment extends the question submission deadline to July 27, 2022 and incorporates additional statements of work and technical attachments into the solicitation. Offerors are to provide proposals through the Procurement Integrated Enterprise Environment no later than August 8, 2022. The project scope includes demolishing and removing existing electrical equipment such as a selector switch, transformer, and load center, and installing new above-grade replacements. There are also two optional items to relocate a photovoltaic inverter above grade and provide temporary power to another building.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
25 July 2022
Subj: AMENDMENT 001 – Solicitation N6247322R3201: Relocate Electrical Panel and Replace
Transformer B339, Naval Support Activity Monterey (NSAM), CA 93943-5035
Question submission is extended from 25 July 2022 to 27 July 2022 @11:59pm Pacific Time.
The following documents are incorporated into the solicitation via Amendment 001:
Part 2-6 SOW Part 5 Attachments
01 31 23.13 20 Electronic Construction and Facility Support Contract Management System 01 32 16.00 20 Small Project Design and Construction Schedules 01 35 26.05 20 Government Safety Requirements for Design Build
Part 6 Attachments As-built drawing: Symbols, Schedule & Single Line Building No. 339 As-built drawing: Irrigation Plan As-built drawing: P-197 Postgraduate Building – Site Plan As-built drawing: P-197 Postgraduate Building – Electrical Site Plan NPS Power Distribution Connection Diagram_6-21-2022 NPS Power Distribution - Single Line Diagram Model_6-21-2022 Rooftop Photovoltaic System As Builts
The proposal due date and all attachments remain unchanged.
Proposal shall be received no later than 11:59 PM (PST) 08 August 2022 via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module to Ashley Thornton, Contracting Officer.
All responses to this solicitation shall be provided before the proposal due date and time.
Ashley N. Thornton Contracting Officer
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND SOUTHWEST
FACILITIES ENGINEERING AND ACQUISITION DEPARTMENT
511 GARDNERS ROAD, BUILDING 426
MONTEREY, CA 93943-5035