This document summarizes a request for proposals for an indefinite delivery indefinite quantity multiple award construction contract from the Department of the Navy Naval Facilities Engineering Command. The solicitation seeks proposals for new construction, renovation, and repair projects within California, Arizona, Nevada, Utah, Colorado, and New Mexico under NAICS code 237990. The contract has a maximum value of $1 billion over eight years and will result in awards to at least three contractors. Examples of relevant construction projects include ranges, canals, erosion control basins, earthwork, landfills, magazines, landscaping, and tunneling. The Phase One evaluation will assess technical approach, experience, and past performance, while Phase Two will evaluate safety, technical solution, small business participation, and price based on a sample task order. Proposals are due by September 2, 2021, and awards will be made without discussions to the most advantageous offers considering price and non-price factors.
View the file
Who attaches OF 24
| Agency | Files |
|---|---|
| Department of the Navy Naval Facilities Engineering Command | 1 |
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI # RFP Part # Chapter or
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
If "Others" -include info under Column E Clarification Request
In question 5 of the MACC Frequently ask questions, it states both Jv partners must have reletive experience. Does this apply to Mentor Protégé JV offerors? If so it is direct conflict with CFR 13 CFR 125.8 (e) which clearly states "A procuring activity may not require the protégé firm to individually meet the same evaluation or responsibility criteria as that required of other offerors generally." We respectfully ask for this provision for Mentor Proteges to be incorporated into the evaluation criteria as to not disadvantage Mentor Protege offers.
Conflicting Information Other/Unsure
The Government has revised the response to this RFI. Please see Amendment 0001 of the solicitation. In accordance with 13 C.F.R. 125.8(e), if the joint venture is an SBA approved Mentor-Protégé joint venture, the partners of the joint venture in aggregate must demonstrate the relevant project experience necessary to perform the contract.
7/20/2021 8/3/2021 0001
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
If "Others" -include info under Column E Clarification Request
Factor 2 Would the renovation of an existing tunnel be considered relevant under the criteria for this solicitation?
Other; Please specify in the next column Clairification Other/Unsure
The renovation of an existing tunnel may be considered relevant. The project would have to meet all the relevancy requirements specified in the RFP for it to be considered relevant. Please see RFP Factor 2, Experience.
7/20/2021 8/3/2021 NONE
If "Others" -include info under Column E Clarification Request
We are unable to locate PTO 0001 Attachments are referenced but missing/not provided
Need for bid and also need site visit information
Contracting PTO 0001 will be provided in Phase II of this solicitation.
7/23/2021 8/3/2021 NONE
If "Others" -include info under Column E Clarification Request
Is an Interested Vendors List is available for this Solicitation / Notice ID:
N62473-21-R-1402 ?
Yes, please see updated "Instructions For Viewing Interested Vendors List" dtaed 29 July 2021 uploaded to sam.gov. Once logged in to the sam.gov site, navigate to the specific solicitation page and you can view the the “Interested Vendors List” link at the bottom of the menu on the left-hand side of the screen.
7/26/2021 8/3/2021 NONE
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
If "Others" -include info under Column E Clarification Request
Per Factor 2: Experience, para. a.(1)Construction Experience. states, “ Note: A single project may satisfy more than one of the above minimum requirements. Exhibit “B” must clearly address how the project meets the above requirements. Projects submitted for the Offeror shall be 100% complete (see definition) within the past seven
(7) years of the date of issuance of this RFP.” Due to the numerous types of work for relevant construction projects and complexity of the projects, we are requesting to have the “past seven (7) years of the date of issuance of this RFP” change to “past ten (10) years of the date of issuance of this RFP”. Please confirm change is acceptable.
Intent needs clarification Other/Unsure There will be no change to the RFP. 7/27/2021 8/3/2021 NONE
If "Others" -include info under Column E Clarification Request
Will an “Interested Vendors List” for this solicitation be provided?
There is an attachment titled "Instructions for Viewing Interested Vendors List', but the icon references and directions within the instructions appear outdated?
Outdated Reference Other/Unsure Please see the Government response to RFI# 4 above.
7/28/2021 8/3/2021 NONE
If "Others" -include info under Column E Clarification Request if Others include info under Column E
Secton 00210, Factor 3
Factor 3 – Past Performance states, “All Offerors (both large and small businesses) shall submit, on Exhibit “D” (Past Performance – Small Business Participation) under Tab “3,” the requested information for each project submitted in Factor 2 (Experience) in order to validate their prior utilization of small business subcontracting.” Please confirm this is limited to all “Offeror” projects in Factor 2 (Experience) and that an Exhibit D does NOT need to be provided for design projects submitted by the lead design firm (LDF) in Factor 2 (Experience) that have limited subcontracting activity and typically, are not required to meet SB subcontracting goals.
Intent needs clarification Contracting
Yes, submission of Exhibit “D” (Past Performance – Small Business Participation) is limited to all “Offeror” projects in Factor 2 (Experience) and does NOT need to be provided for design projects submitted by the lead design firm (LDF) in Factor 2 (Experience) that have limited subcontracting activity and typically, are not required to meet SB subcontracting goals.
7/28/2021 8/3/2021 NONE
8 Part 1 Chapter-3 Exhibit D
Please confirm that Exhibit "D" Small Business Participation form is only required from the "Offeror" (Prime Contractor by definition) on the Factor 2 projects submitted by the "Offeror" and not required for the Factor 2 projects submitted by the Design Firm.
Intent needs clarification Contracting Yes, please see the Government response to RFI# 7 above.
7/28/2021 8/3/2021 NONE
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
If "Others" -include info under Column E Clarification Request
Factor 3 Due to the impact associated with COVID, it has become inherently difficult to get responses for past performance, would it be possible to include previously completed PPQs directly in the proposal?
Other; Please specify in the next column PPQs Other/Unsure
Yes, the Offeror may include previously completed Past Performance Questionnaires in the proposal for each project the Offeror includes in its proposal for Factor 2, Experience. Please review Factor 3, Past Performance in the RFP for further instructions.
7/30/2021 8/3/2021 NONE
If "Others" -include info under Column E Clarification Request
Factor 2 If we have performed construction services listed in the NAICS 237990 description in support of another NAICS code project, would those projects be considered applicable?
Intent needs clarification Other/Unsure
As stated in the RFP (Section 00801), Item 5, "The work to be acquired under this contract is for new construction, renovation, and repair of heavy horizontal and civil engineering construction projects within the NAICS code listed." Please remember to review the NAICS codes listed in your SAM record and make sure that you have listed the NAICS code for this procurement, which is 237990.
7/30/2021 8/3/2021 NONE
11 Part 1 Section 00100
The Instruction to Offerors states "The Government does not intend to respond to inquiries submitted less than 10 days before the proposal receipt date." Please clarify whether this statement refers to business days, which would set the RFI deadline for Wednesday, August 4, 2021, or calendar days, which would set the RFI deadline for Sunday, August 8, 2021.
Intent needs clarification Other/Unsure
The Government has revised the response to this RFI. Please see Amendment 0002 of the solicitation. The Government does not intend to respond to inquiries submitted less than 15 calendar days before the proposal receipt date.
8/2/2021 8/11/2021 0002
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
If "Others" -include info under Column E Clarification Request if Others include info under Column E
This solicitation contains DFARS 252.204-7012. As of November 30, 2020, three new DFARS clauses have been issued: 252.204-7019, Notice of NIST SP 800-171 DoD Assessment Requirements; 252.204- 7020, NIST SO 800-1717 DoD Assessment Requirements; and 252.204- 7021, Contractor Compliance with Cybersecurity Maturity Model Certification (CMMC) Level Requirements. In order for offerors to ensure compliance with these DFARS in order to be eligible for award, the procuring agency must notify offerors whether or not this contract contains Controlled Unclassified Information (CUI) also referred to as Covered Defense Information (CDI). If the procuring official is not sure as to whether this contract includes CUI/CDI, please contact the DoD CUI office at osd.pentagon.ousd-intel-sec.mbx.dod-cui@mail.mil.
Intent needs clarification
Offerors will be notified in Phase II for the seed project. After award of the basic MACC IDIQ, Contractors will be notified on the task order level if a project will contain Controlled Unclassified Information (CUI) or Covered Defense Information (CDI).
8/2/2021 8/3/2021 NONE
13 Part 1 Section 00100
Please consider accepting Airfield Concrete Pavement Construction to demonstrate self-performed construction experience for both construction and design experience factors. There are many factors in DoD Airfield Concrete Pavement Construction that can demonstrate competency in projects similar to what are described as relevant to this contract.
Intent needs clarification
Allow broader range of Heavy Civil experience to be considered relevant.
Contracting
There will be no change to the RFP. Airifeld paving, or any type of paving, is not found in the NAICS 237990 description for Other Heavy and Civil Engineering Construction.
8/2/2021 8/3/2021 NONE
14 Part 1 Section 00100 -
FACTOR 2:
EXPERIENCE
Please consider accepting single projects submitted that are at least 50% complete with an accompanying interim CPAR.
Intent needs clarification Contracting There will be no change to the RFP. 8/2/2021 8/3/2021 NONE
15 Part 1 Section 00100 -
FACTOR 2:
EXPERIENCE
Please consider accepting single projects submitted that were completed within the past eight (8) years of the date of issuance of this
RFP.
Intent needs clarification Contracting There will be no change to the RFP. 8/2/2021 8/3/2021 NONE
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
16 Part 4 if Others include info under Column E
The RFP requires the representations and certifications to be completed and submitted as part of Phase 1 proposals. Section 00600 is provided in both the solicitation documents and as an attachment/exhibit in word form. (a) Does the government have a preference as to which document is filled out and submitted? (ie..one is considered the same as the other) Also, in this document there are references to certification clauses that are not made part of either document (52.204-17 Ownership or Control of Offeror and 252.209- 7002, Disclosure of Ownership or Control by a Foreign Government).
(b) Is it understood that by submitting a Phase 1 proposal that the contractor does not have an immediate owner or is not owned in any part by a Foreign Government?
Intent needs clarification
RFP not defined by options/sectio ns defined in the drop down list within this document.
Contracting
(a) With regard to Section 00600, Representations and Certifications, the Government does not have a preference as to which document is filled out and submitted by the Offeror as long as the required documents are completed as stated in the RFP. The attachment/exhibit of Section 00600 is provided for the Offeror's convenience. (b) The standard provision 52.204-17 is incorporated by reference under FAR 52.204-8. The standard provision 252.209-7002 is incorporated by reference under provision 252.204-7007. The Offeror must review these provisions (available on the acquisition.gov site) and disclose the required information, as applicable, along with the Commercial and Government Entity (CAGE) code to the Government as part of the proposal where stated.
8/3/2021 8/11/2021 NONE
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
17 Part 4 if Others include info under Column E
Secondly, the discussion for teaming with a Design Partner to the Contractor or vice versa is not defined by the manner of the teaming arrangement. (a) Will a letter of intent be sufficient to define the teaming arrangement between designer and contractor? Section 00801 Special Contract Requirements, paragraph 29 Partnering defines “Key Personnel” as Project Manager, Assistant Project Manager, Superintendent, CQC representative, major subcontractors, and specialized supplementary personnel. The Phase 1 proposal requirements only dictate that teaming members are companies/entities that the Offeror intends to utilize for this contract.
(b) Are we to also define these “Key Personnel” within Exhibit A? If so, is there specific list of Key Personnel that is to be shown for the Designer of Record?
Intent needs clarification
RFP not defined by options/sectio ns defined in the drop down list within this document.
Contracting
(a) As stated in Factor 1, Technical Approach of the RFP, the Offeror shall submit a signed copy of any joint venture agreement, partnership agreement, teaming agreement, approved mentor-protégé agreement (MPA), or letter of commitment for each member of the Offeror’s Team identified in the technical approach narrative describing primary construction firm(s) and primary design firm(s) (e.g., joint venture member, partner, team member, first-tier Small Business subcontractor, parent company, subsidiary, or other affiliated company, etc.). (b)Yes, as stated in in Factor 1, Technical Approach of the RFP, use Exhibit "A", Offeror Team Composition and Management. Offer shall be responsible to identify all key personnel of the primary/lead design firm.
8/3/2021 8/11/2021 NONE
18 Part 1
Section 00100 - Instructions to Offerors pg. 6 of
At the bottome of page 6 of 123, it states, "…DO NOT SUBMIT TABS 5 THROUGH 7 IN PHASE ONE PROPOSALS." On page 7 of 123, Phase Two consists of TABS 4 through 7. Please clarify that Phase Two - TAB 4 - Factor 4, Safety (Exhibit "E") is not supposed to be submitted along with TABS 1 through 3 in Phase One.
Typo Other/Unsure
This information is corrected in the RFP to state, "DO NOT SUBMIT TABS 4 THROUGH 7 IN PHASE ONE PROPOSALS." See Amendment 0002 of the solicitation.
8/3/2021 8/11/2021 0002
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
If "Others" -include info under Column E Clarification Request
Section 00803 -
1. General
In Section 00803 - 1. GENERAL (f) regarding the Offeror proposing on every task order, the requirement states, "Each contractor is required to submits a reasonable number of good faith proposals for PTOs…."
Please elaborate on what constitutes a "reasonable" number.
Intent needs clarification Contracting
Each awarded Contractor shall make every effort to compete and submit a proposal for task orders issued under this MACC. As stated in Section 00803 , 1. GENERAL (f) of the RFP, the Contractor must contact the Contracting Officer at least two days prior to the site visit if they cannot participate in the walk through, or within five days of the proposal due date if they cannot submit an offer. Failure to provide this notification may impact future consideration for proposed task orders and exercise of an option.
8/3/2021 8/11/2021 NONE
If "Others" -include info under Column E Clarification Request
SF1442
Based on the description of the scope of this MACC, please consider the addition of NAICS Code 237310 Highway Street and Bridge Construction to its classification.
Other; Please specify in the next column Addition Requested
Contracting There will be no change to the RFP. Please see response to RFI #10.
8/3/2021 8/11/2021 NONE
If "Others" -include info under Column E Clarification Request if Others include info under Column E
Section 00100 Will Design Build task order RFP's include 30% Design (Bridging) documents?
Other; Please specify in the next column
Small business design firms are asking before committing to teaming agreements.
No bridging docs means more cost for pre-bid design work which is harder to absorb for small businesses.
Civil Engineering
A portion of the design-build task order RFP's will include 30% design documents and a portion of the design-build task order RFP's will not include 30% design documents. Often times, larger dollar value projects and more complex projects may have 30% design documents included in the design-build RFP, but smaller dollar value projects (especially ones awarded by the FEADs/PWDs) may not have 30% Design documents included in the design-build RFP.
8/4/2021 8/11/2021 NONE
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
If "Others" -include info under Column E Clarification Request
Can a firm's experience be used as an affiliate member of a prime contractor submitting on this RFP (with meaningful involvement/major subcontractor for the performance of the contract) and also submit as part of a Joint Venture team submitting as a prime contractor?
Other; Please specify in the next column Clarification needed
Contracting
As stated in Factor 2, Experience, this section is applicable to Small Business Offerors only: "If a Small Business Offeror cannot independently demonstrate its own experience, the Small Business Offeror may utilize the experience of a first-tier Small Business subcontractor that will perform major or critical aspects of the requirement in order to demonstrate relevant construction experience under this evaluation factor. Please see RFP and Amendment 0001 for further details regarding submittal requirements.
8/4/2021 8/11/2021 NONE
23 Part 1 if Others include info under Column E
Secton 00210, Factor 2 and FAQ
In the MACC FAQ, question 9 states "Only projects within the NAICS code shown on the SF1442 are within the scope of this MACC...Projects outside of the NAICS shown on the SF1442 are not considered within the scope of this MACC and will not be considered for evaluation."
Please confirm that projects outside of the 237990 NAICS shown on the SF1442 but possessing extensive amounts of civil/site work as listed on RFP page 15 of 123 (Factor 2) would still be considered relevant according to the basis of evaluation for Factor 2, Experience.
For example, would a large infrastructure + vertical construction project under NAICS code 236220 that included extensive site/civil development and, specifically, more than 100,000 CY of earthwork and grading and a combat training range complete with military targets, an infantry trench and machine gun bunkers be considered relevant?
Conflicting Information Contracting
Projects submitted for construction or design experience that meet the requirements as mentioned in "Factor 2:
Experience" of the RFP may be considered relevant.
7/28/2021 8/11/2021 NONE
If "Others" -include info under Column E Clarification Request if Others include info under Column E
We respectfully request a three week extension to the solicitation due date. An extension would allow sufficient time for Proposers to provide a comprehensive submittal.
Other; Please specify in the next column
The proposal due date for Phase 1 of this RFP is extended to no later than 2:00 PM on Thursday, 02 September 2021 (local time). See Amendment 0002 of this solicitation.
8/4/2021 8/11/2021 0002
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
25 Part 1 if Others include info under Column E
Attachement:
MACC+Frequentl y+Asked+Questi ons - Page 2, Question #9
Question #9 notes that all projects used as past experience must be completed under the NAICS code shown on the SF 1442 (NAICS 237990). Our team has completed projects that are similar to the experience required within the RFP however they were completed under a different NAICS code. Please confirm that if an Offeror has projects that meet the requirements as listed in the RFP however were not completed under the NAICS code 237990, that these projects may still be seen as acceptable.
*Please note that we are not trying to confirm that our firm needs to have the NAICS 237990 code registered in SAM, we are attempting to confirm that Offerors can show past experience in our proposal submission that is similar in the scope required per the RFP yet completed under a different NAICS code.
Intent needs clarification Other/Unsure See response to RFI #23. 8/4/2021 8/11/2021 NONE
26 Part 1 if Others include info under Column E
Factor 3: Past Performance, Pages 18-19
RFP Part 1, Factor 3: Past performance it states, “If a completed CPARS evaluation is available, it shall be submitted with the proposal”. If a project featured meets the 100% construction complete definition but has not yet received a CPARS evaluation marked “Final”, is a CPARS evaluation marked “Interim” desired? Please specify if a certain percentage (ex: 90%) Interim is required or if a PPQ should instead be provided.
Intent needs clarification Other/Unsure
As stated in Factor 3, Past Performance, IF
THERE IS NOT A COMPLETED CPARS
EVALUATION, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal for Factor 2- Experience.
8/4/2021 8/11/2021 NONE
27 Part 1 if Others include info under Column E
In regards to STANDARD FORM 1442 No. 13.A.:
We respectfully request that the Phase 1 proposal preparation period be extended by two weeks. We believe the current proposal preparation period is very tight and may not be feasible considering the requirements of the RFP. In particular, establishing and securing final teaming arrangements, and/or registering a joint venture entity are challenging within the current allotted timeframe.
Other; Please specify in the next column Request for time extension.
Contracting See Government response to RFI #24. 8/4/2021 8/11/2021 0002
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
28 Part 1 if Others include info under Column E
SECTION 00100, 6. System for Award Management
52.204-16(b) COMMERCIAL AND GOVERNMENT ENTITY CODE
REPORTING
The very short Phase 1 proposal preparation period presents significant challenges in registering a joint venture entity on SAM and receiving the CAGE code by the time of Phase 1 submittal. Since Phase 1 does not include the award of a contract and a formal "offer" doesn't occur until Phase 2, please confirm that a SAM registration and CAGE code for a joint venture can be submitted at Phase 2 proposal as long as each joint venture member individually has a SAM registration and CAGE at Phase 1.
Other; Please specify in the next column
No contract will be awarded upon Phase 1 submission
Contracting The SAM registration and CAGE code for a joint venture must be submitted in Phase 1.
8/4/2021 8/11/2021 NONE
29 Part 1 if Others include info under Column E
In regards to SECTION 00100, 3. Pre-Proposal Conference (a):
This section references "Part 1 of the seed project RFP" but it is not included as an attachment. Please provide this document.
Attachments are referenced but missing/not provided
Part 1 of the seed project RFP is not provided as an attachment.
Contracting The seed project information will be provided in Phase II of the solicitation.
8/4/2021 8/11/2021 NONE
30 Part 1 if Others include info under Column E
The RFP Section 00100, page 17/123 asks Offerors to "demonstrate experience in at least three (3)" types of work, and then lists eight types of work.
Please clarify - Offerors should demonstrate experience in at least 3 types of work across all projects submitted, and not that each project submitted must demonstrate 3 types of work.
Intent needs clarification Other/Unsure
Offerors should demonstrate self-performed construction experience in at least three (3) types of work as stated in the RFP across all projects submitted.
8/5/2021 8/11/2021 NONE
31 Part 1 Attachment:
FAQ, Page 2, Question 9
Question No. 9 Specifies that all projects used as past experience must be completed under the NAICS code 237990. Our team has completed projects that are identical to the experience criteria listed within the RFP however, they were listed under an alternate NAICS code. Please confirm that if a project can meet the requirements listed in the RFP, but is not listed under NAICS 237990, that the project may be deemed acceptable.
Intent needs clarification Contracting See Government response to RFI #23. 8/5/2021 8/11/2021 NONE
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
32 Part 1 if Others include info under Column E
Instructions to Offerors
Reference Instructions to Offerors, 7. Federal Contractor Reporting. In regard to VETS-4212 Reports, this section instructs offerors to "…include a copy of their confirmation notification email in their proposal…" Please confirm, should offeror also include copies of report confirmations for any Joint Venture projects that have been filed?
Intent needs clarification
As stated in the RFP, Offerors shall include a copy of their VETS-4212 confirmation notification email in their proposal as verification of submission for the current reporting period. If the Offeror is a Joint Venture (JV), each JV partner shall provide their VETS-4212 confirmation notification email in the proposal if there is no VETS-4212 report available for the JV as a single entity.
8/5/2021 8/11/2021 NONE
33 Part 1 if Others include info under Column E
Factor 2 - Experience notes that Projects submitted for the Offeror shall be 100% complete within the past seven (7) years of the date of issuance of this RFP.Would the government consider expanding the time period for projects to be complete to be within the past (10) years?
Intent needs clarification
Other/Unsure There will be no change to the RFP. 8/6/2021 8/11/2021 NONE
34 Part 1 if Others include info under Column E
Factor 2 - Experience notes that Projects submitted for the Offeror shall be 100% complete of the date of issuance of this RFP.Would the government consider allowing for projects at 90% completion?
We have a current design/build project that we are interested in using as a reference. The Design portion of this reference is 100% complete and the construction is 90% complete. The project meets the Landfill, Earthwork, Design Build, and is over $3million dollars.
It also includes sustainable features- (retention basins) and others. This is a relevant project that we would like to use as reference.
Intent needs clarification
Other/Unsure There will be no change to the RFP. 8/6/2021 8/11/2021 NONE
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
35 Part 1 if Others include info under Column E
The Government requires thatall Offerors (both large and small businesses) shall submit, on Exhibit “D” (Past Performance – Small Business Participation) under Tab “3,” the requested information for each project submitted in Factor 2 (Experience) in order to validate their prior utilization of small business subcontracting. Past performance information submitted for projects other than those submitted in Factor 2 will not be considered. Because our company is a small business, our previous projects did not require that we meet small business participation goals. We would like to request that the Government not require Exhibit D to be completed by small businesses.
Intent needs clarification
Other/Unsure
There will be no change to the RFP. As stated in the RFP under Factor 3, Past Performance, "Note: Small business Offerors shall clearly identify their small business category for each project submitted. On Exhibit “D” (Past Performance – Small Business Participation), items
(a) – (h) are for SUBCONTRACTED values only. Do not include self-performed work under these items." Please also see Government response to RFI #7 and updated Exhibit "D" in the solicitation (see sam.gov site) dated 11 August 2021 to correct typographical error from "Factor 2: Past Performance" to "Factor 3: Past Performance".
8/6/2021 8/11/2021 NONE
if Others include info under Column E
4. Evaluation Factors
Reference Section 4. Evaluation Factors, Factor 3: Past Performance, paragraph 2 (pg 19 of 123). In regard to direction for submittal of an incomplete PPQ form at the time of the proposal closing date " If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ (Exhibit “C”), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires." Please confirm, offeror does not need to submit a complete copy of the executed PPQ post-proposal closing date?
Intent needs clarification
As stated in Factor 3, Past Performance, If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ (Exhibit “C”).
8/10/2021 8/11/2021 NONE
Section Sub-Section # CLARIFICATION REQUEST RFI reason from KTR's Perspective
Comment [fill out if "Other" was chosen, specify reason(s)]
RFI Topic most closely relevant to:
Government Response
DATE
RECEIVED
DATE TO
KTR
Amendment
Number
TO BE FILLED OUT BY THE BIDDING KTR
SOLICITATION: N62473-21-R-1402
IDIQ UNRESTRICTED HEAVY HORIZONTAL MACC NAVFAC SW AOR
DOCUMENT DATE: 24 AUG 2021
TO BE FILLED OUT BY THE GOV'T
If "Others" -include info under Column E Clarification Request
SECTION
00210
FACTOR 2:
EXPERIENCE
Factor 2: Experience states "In addition, the description shall also address any sustainable features (see definition)"
Please define "Sustainable features."
Intent needs clarification Other/Unsure
Features in the design, construction, and operation of facilities with the goal of conserving resources and minimizing adverse effects on the environment while enhancing occupant productivity, minimizing energy use, improving quality and durability of materials, increasing recycling and use of recycled products, waste reduction, etc. Relevant sustainable features are those that are the same or similar to those recognized by the Third Party Certification entities. Please see Amendment 0003 of the RFP.
8/17/2021 8/24/2021 0003
38 Part 1 if Others include info under Column E
Secton 00210, Factor 1 and Exhibit A
The response to Question 17 indicates “Yes, as stated in Factor 1, Technical Approach of the RFP, use Exhibit "A", Offeror Team Composition and Management. Offer shall be responsible to identify all key personnel of the primary/lead design firm.”
The Tab 1 - Factor 1, Technical Approach submission requirements and evaluation criteria reference identification and discussion of firms as well as a simple organization chart listing entities. The Tab 1 – Exhibit A instructions do not state to include names of key personnel for construction or design. Furthermore, given the nature of this MACC contract, construction and design personnel are likely to be identified for specific task orders based on location and scope of work. Based on these factors, please confirm that offerors are NOT required to identify key personnel names for construction and/or design on the Exhibit A format submitted in Tab 1 – Factor 1, Technical Approach.
Conflicting Information Contracting Please see the Government response to RFI# 17 above.
8/17/2021 8/24/2021 NONE