About this file

This document contains a solicitation for an indefinite delivery indefinite quantity multiple award construction contract by the Department of the Navy Naval Facilities Engineering Command. The solicitation seeks proposals for new construction, renovation, and repair projects at government installations located in California, Arizona, Nevada, Utah, Colorado, and New Mexico, with a maximum value of $1 billion over a potential eight-year period. Two of the contracts awarded will be reserved for highly qualified small businesses. The solicitation involves a two-phase selection process, with phase one evaluating technical approach, experience, and past performance, and phase two evaluating safety, technical solution, small business participation, and price based on a sample task order. Proposals are due by June 15, 2021, and award will be made to the offerors deemed most advantageous based on evaluation of the factors.

View the file

Other files

File Type Posted
RFI_RESPONSES_N6247321R1402_AS OF 24 AUG 2021_FINAL.pdf PDF
N6247321R1402_AMEND 0003.pdf PDF
N6247321R1402_AMEND 0002.pdf PDF
RFI_RESPONSES_N6247321R1402_AS OF 11 AUG 2021_FINAL.pdf PDF
HH MACC_Exhibit D_Past Performance_Small Business Participation REVISED 11AUG2021.docx DOCX document
Instructions for Viewing Interested Vendors List UPDATED 03AUG21.pdf PDF
RFI_RESPONSES_N6247321R1402_AS OF 03 AUG 2021.pdf PDF
N6247321R1402_AMEND 0001.pdf PDF
RFI_RESPONSES_N6247321R1402_AS OF 22 JUL 2021.pdf PDF
HH MACC_Exhibit F_Small Business Participation Plan.docx DOCX document
HH MACC_Exhibit B_Experience_Design_Firm.docx DOCX document
HH MACC Financial Questionnaire.doc DOC document
HH MACC_RFI Form.xlsx XLSX spreadsheet
MACC Frequently Asked Questions.pdf PDF
HH MACC _Section 00600 - Representations and Certifications.docx DOCX document
Instructions for Viewing Interested Vendors List.pdf PDF
HH MACC_Offerors Team Consent Form.doc DOC document
HH_MACC_Phase 1 RFP_N6247321R1402.pdf PDF
HH MACC_Exhibit B_Experience_Construction_Offeror.docx DOCX document
HH MACC_Exhibit D_Past Performance_Small Business Participation.docx DOCX document
HH MACC_ Surety Form.doc DOC document
HH MACC_Exhibit A_Team Composition.docx DOCX document
HH MACC_Exhibit C_PPQ_.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT “E”

SAFETY DATA SHEET

N62473-21-R-1402

This form is to be completed by the Offeror. Use this form to provide safety information for the Safety factor. DART rates and TCR shall not be submitted for subcontractors, except as noted (in Factor 4 – Safety) for Small Business Offerors utilizing first-tier Small Business subcontractor experience.

Joint Venture (JV) or Partnership: Complete Blocks 1 through 4 for each business entity who is part of the JV or partnership. Small Business Offerors utilizing first-tier Small Business subcontractor experience: Complete Blocks 1 – 4 for the Small Business Offeror and each first-tier Small Business subcontractor.

1. Offeror Name:

Name of JV member, partner, or first-tier Small Business subcontractor providing the information below (if applicable):

Offeror’s Five Previous Complete Calendar Years of Reported Safety Data:

Only complete year safety data will be considered. Indicate data rates as decimal figures, not whole numbers.

2. U.S. Dept. of Labor, OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate
2016
2017
2018
2019
2020

Instructions for calculating the DART rate can be found in the solicitation.

2a. For DART Rates of 3.0 or greater, explain any extenuating circumstances and corrective actions taken:

2b. Explain any negative DART Rate trends and any corrective actions taken for improvement:

2c. If you do not have a DART Rate for a given year, state so here and explain why:

3. U.S. Dept. of Labor, OSHA Total Case Rate (TCR)
2016
2017
2018
2019
2020

Instructions for calculating the TCR can be found in the solicitation.

3a. For TCR of 4.5 or greater, explain any extenuating circumstances and corrective actions taken:

3b. Explain any negative TCR trends and any corrective actions taken for improvement:

3c. If you do not have a TCR for a given year, state so here and explain why:

EXHIBIT “D” (continuation)

SAFETY DATA SHEET

N62473-21-R-4102

4. If any fatalities were experienced within the five (5) calendar years specified above, state so here and explain in detail, to include root cause and corrective actions:

Note: Form may be expanded.

EXHIBIT “D” (continuation)

SAFETY NARRATIVE

N62473-21-R-1402

Technical Approach to Safety: Provide the Safety Narrative using this form.

Do not exceed 2 pages. Any additional pages will not be considered.

5a. Describe the Offeror’s approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS:

EXHIBIT “D” (continuation)

SAFETY NARRATIVE

N62473-21-R-1402

5b. Describe the evaluation process used to select potential subcontractors:

5c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce):

Note: Form may be expanded.

Exhibit “D” – Safety Data Sheet/Safety Narrative, Page 1 of 1

(Rev 05/2021)

File details come from the government source that posted it. Updated .