About this file

This document provides details on a federal contract opportunity for indefinite delivery indefinite quantity multiple award construction contracts. The solicitation seeks proposals for the award of three or more IDIQ contracts for new construction, renovation, and repair projects at government installations in California, Arizona, Nevada, Utah, Colorado, and New Mexico. Examples of relevant project types include ranges, dams, erosion control basins, earthworks, magazines, irrigation, recreational facilities, and tunneling. The basic contract period is two years with two three-year option periods, for a maximum eight-year term. The estimated maximum value for all contracts combined is $1 billion. Task orders will range from $300,000 to $100 million. Selection will evaluate technical approach, experience, past performance, safety, technical solution, small business participation, and price. Award may be made to the offeror whose proposal represents the best value. The solicitation is available electronically from the SAM website from June 15, 2021.

View the file

Other files

File Type Posted
RFI_RESPONSES_N6247321R1402_AS OF 24 AUG 2021_FINAL.pdf PDF
N6247321R1402_AMEND 0002.pdf PDF
RFI_RESPONSES_N6247321R1402_AS OF 11 AUG 2021_FINAL.pdf PDF
HH MACC_Exhibit D_Past Performance_Small Business Participation REVISED 11AUG2021.docx DOCX document
Instructions for Viewing Interested Vendors List UPDATED 03AUG21.pdf PDF
RFI_RESPONSES_N6247321R1402_AS OF 03 AUG 2021.pdf PDF
N6247321R1402_AMEND 0001.pdf PDF
RFI_RESPONSES_N6247321R1402_AS OF 22 JUL 2021.pdf PDF
HH MACC_Exhibit F_Small Business Participation Plan.docx DOCX document
HH MACC_Exhibit B_Experience_Design_Firm.docx DOCX document
HH MACC Financial Questionnaire.doc DOC document
HH MACC_RFI Form.xlsx XLSX spreadsheet
MACC Frequently Asked Questions.pdf PDF
HH MACC _Section 00600 - Representations and Certifications.docx DOCX document
Instructions for Viewing Interested Vendors List.pdf PDF
HH MACC_Offerors Team Consent Form.doc DOC document
HH_MACC_Phase 1 RFP_N6247321R1402.pdf PDF
HH MACC_Exhibit B_Experience_Construction_Offeror.docx DOCX document
HH MACC_Exhibit D_Past Performance_Small Business Participation.docx DOCX document
HH MACC_ Surety Form.doc DOC document
HH MACC_Exhibit A_Team Composition.docx DOCX document
HH MACC_Exhibit E_Safety Data Sheet.docx DOCX document
HH MACC_Exhibit C_PPQ_.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5791894

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

AMENDMENT 0003; INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) UNRESTRICTED MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW CONSTRUCTION, RENOVATION, AND REPAIR OF VARIOUS HEAVY HORIZONTAL AND CIVIL ENGINEERING CONSTRUCTION PROJECTS AT VARIOUS GOVERNMENT INSTALLATIONS LOCATED IN CALIFORNIA, ARIZONA, NEVADA, UTAH, COLORADO, AND NEW MEXICO; See continuation page 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6247321R1402

X 9B. DATED (SEE ITEM 11)

19-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Aug-2021

CODE

NAVFAC SOUTHWEST

DESIGN & CONSTRUCTION CONTRACTING NAVY

CODE: DCNAV

750 PACIFIC HIGHWAY

SAN DIEGO CA 92132-0001

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247321R1402

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

1. The purpose of this amendment is to incorporate the following additional definitions in Item 2.

“Definitions” under Section 00210, “Basis of Award and Evaluation Factors”:

PROJECT: A design-build or design-bid-build construction activity or task, with a single starting point and a single ending point.

RENOVATION AND REPAIR PROJECT TYPES: Refers to projects where the work modifies existing structure. Projects that only modify supporting facilities (including but not limited to electrical, exterior utilities, sidewalks, roofing, HVAC repairs/replacements, and equipment replacements) will not be considered relevant.

SELF-PERFORMED: Refers to performing relevant and major construction trade work in-house without subcontractors. This does not include project administration or management functions (such as quality control or safety program) and miscellaneous work (such as housekeeping or cleanup).

Relevant and major construction trade work is that which is the same or similar to the work that may be ordered under this contract.

SEVEN-YEAR PERIOD: The prescribed timeframe for this solicitation that refers to the period of time for which projects may be submitted for experience, past performance, or for prior support for small business. The seven-year period is calculated by counting back seven years from the initial Request for Proposal (RFP) issuance date.

SIGNIFICANT WEAKNESS: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.

STRENGTH: An aspect of a proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

SUSTAINABLE FEATURES: Features in the design, construction, and operation of facilities with the goal of conserving resources and minimizing adverse effects on the environment while enhancing occupant productivity, minimizing energy use, improving quality and durability of materials, increasing recycling and use of recycled products, waste reduction, etc. Relevant sustainable features are those that are the same or similar to those recognized by the Third Party Certification entities.

WEAKNESS: A flaw in the proposal that increases the risk of unsuccessful contract performance.

N6247321R1402

2. ALL OTHER PARAGRAPHS, PROVISIONS, AND CONDITIONS TO N62473-21-R-1402

REMAIN UNCHANGED. THE OFFEROR MUST ACKNOWLEDGE RECEIPT OF ALL

AMENDMENTS

(End of Summary of Changes)

File details come from the government source that posted it. Updated .