Consolidated RFI Log Secure Spaces MACC 4.28.21.xlsx XLSX spreadsheet
Amendment 0004.pdf PDF
Financial Questionnaire revised.doc DOC document
Consolidated RFI Log Secure Spaces MACC 4.27.21.xlsx XLSX spreadsheet
Amendment 0003.pdf PDF
Copy of Consolidated RFI Log Secure Spaces MACC 4.22.21.xlsx XLSX spreadsheet
AMENDMENT 0002 - SECURE SPACES MACC.pdf PDF
Secure Spaces MACC - Exhibit D - Past Performance - Small Business Utilization REVISED.docx DOCX document
Secure Spaces MACC - Exhibit B - Experience - Designer.docx DOCX document
Amendment 0001 _Secure Spaces MACC.pdf PDF
Secure Spaces MACC - Exhibit F - Small Business Participation Plan REVISED.docx DOCX document
Consolidated RFI Log Secure Spaces MACC 4-1-21.xlsx XLSX spreadsheet
Secure Spaces MACC - Exhibit B - Experience - Offeror REVISED.docx DOCX document
MACC Frequently Asked Questions.pdf PDF
Secure Spaces MACC - Surety Form.doc DOC document
Secure Spaces MACC - Offerors Team Consent Form.doc DOC document
Secure Spaces MACC - Section 00600 - Representations and Certifications.docx DOCX document
N62473-21-R-1011 PHASE 1 Secure Spaces MACC RFP.pdf PDF
Secure Spaces MACC- Exhibit A - Offeror Team Composition and Management.docx DOCX document
Instructions for Viewing Interested Vendors List.pdf PDF
Helpful Tips for Exhibit F.pdf PDF
Secure Spaces MACC - Exhibit E Safety Data.docx DOCX document
Secure Spaces MACC - RFI Form.xlsx XLSX spreadsheet
Secure Spaces MACC - Financial Questionnaire.doc DOC document
Secure Spaces MACC - Exhibit F - Small Business Participation Plan.docx DOCX document
Secure Spaces MACC - Exhibit B - Experience - Offeror.docx DOCX document
Secure Spaces MACC - Exhibit D - Past Performance - Small Business Utilization.docx DOCX document
Secure Spaces MACC - Exhibit C - PPQ.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI (pre-award) Form_For KTR

SOLICITATION: N62473-21-R-1011

IDIQ UNRESTRICTED SECURE SPACES MACC NAVFAC SW AOR

DOCUMENT DATE: 14 APRIL 2021

TO BE FILLED OUT BY THE BIDDING KTRTO BE FILLED OUT BY THE GOV'T
RFI #RFP Part #Chapter or SectionSub-Section #CLARIFICATION REQUESTRFI reason from KTR's PerspectiveComment [fill out if "Other" was chosen, specify reason(s)]RFI Topic most closely relevant to:Government ResponseDATE RECEIVEDDATE TO KTRAmendment Number
1Part 1Instruction to Offerors
2. Proposal Submittal RequirementsUnder Proposal Submittal Requirements section on page 6 of 117, it states, "Proposals shall be submitted in three ring binders or bound, with tabs or separators. Page limits, if stipulated, must

be adhered to. Proposals shall be submitted on 8.5” X 11” paper, utilizing both sides of the paper."

The following page 7 of 117 states that proposals shall be submitted using DODSAFE, and "Submissions outside of DoD SAFE will not be considered."

Please confirm that proposals are only to be submitted electronically via DODSAFE, and hard copy proposals are not required.Intent needs clarificationOther/UnsureConfirmed, the submission instructions for the Phase One proposal are revised to reflect the electronic submission of Phase One proposals using DoD SAFE only and hard copies are not required. Changes incorporated in Amendment 0001.3/26/214/1/210001
2Part 1Factor 2: Experience
(2) Design ExperiencePlease confirm that Design Experience projects should be 100% design complete within the required timeframe.Intent needs clarificationProjects submitted for the Offeror shall be 100% complete (see definition) within the past seven (7) years (see definition) of the date of issuance of this RFP. Definition of 100% COMPLETE: The facility is completely constructed and ready for the intended use. Due to the importance of evaluating a design that has achieved ICD/ICS 705 accreditation, it is allowable for the design to be completed prior to the seven year period, assuming the construction portion of the project was completed (including achieving ICD/ICS 705 accreditation) within the seven year period.3/26/214/1/21N/A
3Part 1Factor 3: Past PerformanceIf a project featured meets completion requirements but has not yet received a CPARS evaluation marked as "Final" under Evaluation Type, will an Interim CPARS evaluation with Contract Percent Complete over a certain percentage (ex: 90%) be acceptable or should a PPQ instead be provided?Intent needs clarificationOther/UnsureIf there is not a completed CCASS, ACASS, or CPARS evaluation, submit a Past Performance Questionnaire (Exhibit “C”) for each project included in Factor 2 for both Construction Experience and Design Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal.3/29/214/1/21N/A
4Part 1Factor 3: Past PerformanceIf the Offeror was both the Prime Contractor and Designer of Record on a project and was not issued a separate AE CPARS evaluating the DOR effort, shall the same CPARS be provided for both Construction and Design Experience – or – is it preferred that a PPQ evaluating solely Design performance be provided?Intent needs clarificationOther/UnsureIf the CPARS specifically discusses the design effort and it’s clear as to who the designer is, then a single CPARS can be used to evaluate the Offeror and designer for that project. Otherwise a PPQ is needed.3/29/214/1/21N/A
5Part 1Factor 2: Experience(a)Our firm has almost 20 ICD/ICS 705 completed and accredited NAVFAC projects, however our past project experience is with new design and construction. The process needed to ensure that a project is able to be accredited for ICD/ICS 705 is the same whether the project is new construction or renovation. In order to increase the competition within this MACC program, please consider deleting the baseline requirement for both design and construction which states; “-Submit at least one (1) relevant project demonstrating experience with primarily renovation/repair (see definition).”
(b)If the Government will not consider deleting this baseline relevancy item, will the Government please consider adjusting this item to be considered as a higher rating and not a baseline requirement?Other; Please specify in the next columnRequestOther/Unsure(a) No Change
(b) No change3/29/214/1/21N/A
6Part 1Factor 2: ExperienceReference: Factor 2 Experience

(a) Our firm has completed a significant amount of NAVFAC projects which were designed and built in accordance with ICD/ICS 705 requirements however as the project is being built the end user made the decision to not implement the process of accreditation. In order to increase competition within this MACC program will the Government please consider allowing Offerors to submit acceptable projects in which the projects were designed and built to ICD/ICS 705 requirements but were not accredited due to the end user decision to not implement the accreditation process?

(b) If the Government will not consider this allowance, please consider adjusting the experience requirements to allow the Offeror to submit acceptable projects in which the projects were designed and built according to ICD/ICS 705 but did not receive accreditation.

(c) If the Government will not adjust any of the requirements as requested above, will the Government please allow the Offeror’s to submit past experience of a key subcontractor to be counted towards the Offeror’s experience, similar to the allowance that is given to the design qualifications portion of this Factor? Other; Please specify in the next column Request Other/Unsure (a) Projects shall have been constructed and accredited in accordance with ICD/ICS 705.

(b) Projects shall have been constructed and accredited in accordance with ICD/ICS 705.

(c) Reference Factor 2: EXPERIENCE, a. Proposal Submission Requirements, (1) Construction Experience: "A small business Offeror may utilize the experience of a small business first tier subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor if that small business Offeror cannot independently demonstrate its own experience. The small business Offeror shall provide a letter of commitment from the first tier small business subcontractor that expressly commits them for the entirety of the contract (all task orders awarded). The letter shall also provide an explanation of the meaningful involvement that the first tier small business subcontractor will have in performance of PTO 0001. Note: Small Business Concerns may not utilize the experience of large business concerns to demonstrate construction experience under this evaluation factor."3/29/214/1/21N/A
7Part 1Chapter-100210 Basis of AwardFactor 2: Design Experience
Please clarify whether offeror is to submit design experience, (5) projects for each primary design firm or (5) aggregate projects from all primary design firmsIntent needs clarificationContractingReference Factor 2: EXPERIENCE, (a) Proposal Submission Requirements, (2) Design Experience: "Submit a maximum of five (5) relevant design projects for the design team that best demonstrate design experience on projects that are similar in size, scope, and complexity to projects that may be ordered under this contract. The relevant scope of work shall have been performed by the proposed lead design firm(s). Failure to submit relevant projects for all proposed Lead Design Firms/Design Teams may result in a lower
rating for this factor." A maximum of five (5) relevant design projects for the design team shall be submitted. Ensure all Lead Design Firms/Design Teams are represented in the design projects submitted (maximum of 5 design projects in aggregate).4/1/21N/A
8Part 2Factor 2, (1), p. 14The RFP says, "For purposes of this evaluation, relevant projects . . . shall have been constructed and accredited in

accordance with ICD/ICS 705." Later on p. 17 under the basis of evaluation, the RFP says, "Relevant projects that demonstrate additional experience with projects that have been constructed and accredited in accordance with ICD/ICS 705, beyond the two (2) required projects (one (1) primarily new construction and one (1) primarily renovation/repair), may be considered more favorably than those that do not demonstrate additional experience of facilities that have been constructed and accredited in accordance with ICD/ICS 705."

How many of the 5 projects need to be in accordance with ICD/ICS 705? (This question also applies to the design experience section)Intent needs clarificationSCIF/SAPFAll projects submitted for experience shall have been constructed and accredited in accordance with ICD/ICS 705. A maximum of five (5) projects may be submitted to demonstrate design experience and a maximum of five (5) projects may be submitted to demonstrate construction experience.3/30/214/1/21N/A
9Pre-SolicitationWill there be a pre-bid for this project? Also, will these be split into the individual locations or stay as one?A pre-proposal conference and site visit will not be conducted at this time. Please refer to Instructions for Viewing the “Interested Vendors List” for a Solicitation on Contract Opportunities. There will no be a split into individual locations, construction projects will be at various Government installations located in California, Arizona, Nevada, Utah, Colorado, and New Mexico. The area of coverage may also extend to the entire NAVFAC area of responsibility (AOR) as approved by the NAVFAC Southwest (SW) Chief of Contracting Officer (CCO). However, it is anticipated that the majority of the work will be performed in California.3/31/214/1/21N/A
10Part 1Pre-SolicitationIs there going to be a pre-bid or, pre-proposal meeting for subcontractors like us to understand who the Primes will be?A pre-proposal conference and site visit will not be conducted at this time. Please refer to Instructions for Viewing the “Interested Vendors List” for a Solicitation on Contract Opportunities.3/31/214/1/21N/A
11Part 1FACTOR 2Under Factor 2 : Experience it call to Submit Exhibit “B” (Construction & Design Experience Project Data Sheet)

Are we to only Submit for Offeror’s Experience for both Construction & Design Experience in Exhibit B?

So there isn’t anything required from our Design Team ( Architects or DoR) for us to Submit?

Exhibit B for Design Experience has been incorporated as attachment to Amendment 0001 and Exhibit B Construction Experience has been revised and incorporated as part of the attachment.3/31/214/1/210001
12Part 1RFI 8: The RFP says, "For purposes of this evaluation, relevant projects . . . shall have been constructed and accredited in accordance with ICD/ICS 705." Later on p. 17 under the basis of evaluation, the RFP says, "Relevant projects that demonstrate additional experience with projects that have been constructed and accredited in accordance with ICD/ICS 705, beyond the two (2) required projects (one (1) primarily new construction and one (1) primarily renovation/repair), may be considered more favorably than those that do not demonstrate additional experience of facilities that have been constructed and accredited in accordance with ICD/ICS 705." How many of the 5 projects need to be in accordance with ICD/ICS 705? (This question also applies to the design experience section)

ANSWER: All projects submitted for experience shall have been constructed and accredited in accordance with ICD/ICS 705. A maximum of five (5) projects may be submitted to demonstrate design experience and a maximum of five (5) projects may be submitted to demonstrate construction experience.

Question. Is the ICD/ICS 705 accreditation a hard requirement? We have done a number of private projects but do not have ICD/ICS 705 projects since this is a intelligence community specific requirement. In your solicitation on page 14 it does state examples of relevant commercial projects we can submit as experience that meet projects requirements similar to ICD/ICS 705. Is the requirements extra points for relevancy here, or a hard requirement?

ICD/ICS 705 is a hard requirement.4/9/21
13If "Others" - include info under Column E Clarification Requestif Others include info under Column EAmendment 0001With regard to the Government Response to RFI #6 posted with Amendment 0001: The RFI requests that Offerors be permitted to submit past experience of a key subcontractor within construction experience. The Government’s response under (c) is directed at small business Offerors and does not include Other than Small Business (OTSB/large business) Offerors. In the spirit of fairness to all Offerors, will the Government please extend this opportunity to feature the experience of a key subcontractor to OTSB (LB) Offerors as well?Intent needs clarificationOther/UnsureThe LB Offerors may not utilize experience of a subcontractor to demonstrate construction experience under this evaluation factor. PART 1 – FACTOR 2: EXPERIENCE a. Proposal Submission Requirements section has been revised in Amendment 0002.
4/14/210002
14If "Others" - include info under Column E Clarification Requestif Others include info under Column EAmendment 0001Per Amendment 0001, RFI #6, the response to (c) is in reference to small business offerors. In efforts to increase competition, will the Government please consider allowing large business offerors to feature the construction experience of a first tier subcontractor that will perform major or critical aspects, with the appropriate letter of commitment and explanation of meaningful involvement?Intent needs clarificationOther/UnsureSee response to RFI #134/9/214/14/210002
15SECTION 00210 BASIS OF AWARD, Part 4 Evaluation Factors, Factor 2Can the “Relevant Project” definition include projects constructed and accredited in accordance with JAFAN 6/9?No. Follow requirements as stated in the RFP.4/9/214/14/21N/A
16SECTION 00210 BASIS OF AWARD, Part 4 Evaluation Factors, Factor 2Can the requirement in the solicitation for projects to be 100% complete within the past seven (7) years be extended to 10 years?No. Follow requirements as stated in the RFP.4/9/214/14/21N/A
17Part 2if Others include info under Column EAPage 14 - Factor 2: Construction Experience: Projects shall have been constructed and accedited in accordance with ICD/ICS 705. Would NAVFAC accept similar secure spaces for state and county agencies for past performance?Other; Please specify in the next columnContractingFollow requirements of the RFP. Projects shall have been constructed and accredited in accordance with ICD/ICS 705.4/9/214/14/21N/A
18Part 2if Others include info under Column EAPage 15 - Factor 2: Design Experience: Projects shall have been constructed and accredured in accredited with ICD/ICS 705. Would NAVFAC accept design projects that have been 100% designed in accordance with ICD/ICS 705, yet not constructed?Other; Please specify in the next columnArchitectural-relatedFollow requirements of the RFP. Projects shall have been constructed and accredited in accordance with ICD/ICS 705. Projects must be constructed in order to be accredited.4/9/214/14/21N/A
19Part 2Factor 2, (1), p. 14The RFP says, "For purposes of this evaluation, relevant projects . . . shall have been constructed and accredited in

accordance with ICD/ICS 705." Later on p. 17 under the basis of evaluation, the RFP says, "Relevant projects that demonstrate additional experience with projects that have been constructed and accredited in accordance with ICD/ICS 705, beyond the two (2) required projects (one (1) primarily new construction and one (1) primarily renovation/repair), may be considered more favorably than those that do not demonstrate additional experience of facilities that have been constructed and accredited in accordance with ICD/ICS 705."

How many of the 5 projects need to be in accordance with ICD/ICS 705? (This question also applies to the design experience section)Intent needs clarificationSCIF/SAPFSee response to RFI #84/9/214/14/21N/A
20Factor 2Under FACTOR 2: EXPERIENCE, a relevant project is defined, and includes the requirement that the project “shall have been constructed and accredited in accordance with ICD/ICS 705.” Typically relevant experience requirements do not allow for the Lead Design Firm to include PCAS phase services, and often times the Lead Design Firm is not included in accreditation activities. Question: For the Lead Design Firm, can the relevant project definition be revised to state “ shall be 100% Design complete in accordance with ICD/ICS 705” rather than “shall have been constructed and accredited in accordance with ICD/ICS 705.” ?No. Follow requirements as stated in the RFP.4/9/21
21Part 1Chapter-1Factor 2 ExperienceUnder FACTOR 2: EXPERIENCE, relevant project criteria is defined, and includes the requirement that the project “shall have been constructed and accredited in accordance with ICD/ICS 705.” This requirement is significantly disadvantaging to those contractors who do not have ICD/ICS 705 experience also meeting the additional minimum requirements listed ($1,000,000 min. project size, $5,000,000 or above project size, primarily new construction, renovation/repair). Will the government revise the relevant project requirements to delete “shall be constructed and accredited in accordance with ICD/ICS 705” and instead state “shall include projects with secure spaces, which features shall be clearly outlined in the Exhibit “B” for each relevant project.”See Response to RFI #12.4/9/214/14/21N/A
22Is the ICD/ICS 705 accreditation a hard requirement?ICD/ICS 705 is a hard requirement.4/9/214/14/21N/A
23Would the government be willing to extend the past performance period to 10 years?No. Follow requirements as stated in the RFP.4/9/214/14/21N/A
24

In an effort to provide you with RFI responses as quickly as possible we will be issuing a RFI Response Log regularly, similar to the final document in the list above. If an answer field is currently blank, then the Government is still researching a response for the RFI. If a response does not result in a change to the RFP, then the RFI Response Log will be issued without an amendment. We request that you review other unanswered RFIs before you send in your RFIs to see if it is already on the list. In addition, we request that any future RFIs for all solicitations use the provided RFI Form.

Drop Down List

RFI Topic Relevant to:RFP Part #RFI Reason (for QA) - from KTR perspecrive
Architectural-relatedPart 1Outdated Reference
Civil EngineeringPart 2Conflicting Information
ContractingPart 3Attachments are referenced but missing/not provided
Electrical EngineeringPart 4Intent needs clarification
EnvironmentalPart 5Typo
Fire ProtectionPart 6Other; Please specify in the next column
Geotechnical EngineeringIf "Others" - include info under Column E Clarification Request
Interior Design
Landscape
Mechanical Engineering
Structural Engineering
Other/Unsure