View the file

Other files

File Type Posted
Consolidated RFI Log Secure Spaces MACC 4.28.21.xlsx XLSX spreadsheet
Amendment 0004.pdf PDF
Financial Questionnaire revised.doc DOC document
Consolidated RFI Log Secure Spaces MACC 4.27.21.xlsx XLSX spreadsheet
Amendment 0003.pdf PDF
Copy of Consolidated RFI Log Secure Spaces MACC 4.22.21.xlsx XLSX spreadsheet
AMENDMENT 0002 - SECURE SPACES MACC.pdf PDF
Consolidated RFI Log Secure Spaces MACC 4.14.21.xlsx XLSX spreadsheet
Secure Spaces MACC - Exhibit D - Past Performance - Small Business Utilization REVISED.docx DOCX document
Secure Spaces MACC - Exhibit B - Experience - Designer.docx DOCX document
Secure Spaces MACC - Exhibit F - Small Business Participation Plan REVISED.docx DOCX document
Consolidated RFI Log Secure Spaces MACC 4-1-21.xlsx XLSX spreadsheet
Secure Spaces MACC - Exhibit B - Experience - Offeror REVISED.docx DOCX document
MACC Frequently Asked Questions.pdf PDF
Secure Spaces MACC - Surety Form.doc DOC document
Secure Spaces MACC - Offerors Team Consent Form.doc DOC document
Secure Spaces MACC - Section 00600 - Representations and Certifications.docx DOCX document
N62473-21-R-1011 PHASE 1 Secure Spaces MACC RFP.pdf PDF
Secure Spaces MACC- Exhibit A - Offeror Team Composition and Management.docx DOCX document
Instructions for Viewing Interested Vendors List.pdf PDF
Helpful Tips for Exhibit F.pdf PDF
Secure Spaces MACC - Exhibit E Safety Data.docx DOCX document
Secure Spaces MACC - RFI Form.xlsx XLSX spreadsheet
Secure Spaces MACC - Financial Questionnaire.doc DOC document
Secure Spaces MACC - Exhibit F - Small Business Participation Plan.docx DOCX document
Secure Spaces MACC - Exhibit B - Experience - Offeror.docx DOCX document
Secure Spaces MACC - Exhibit D - Past Performance - Small Business Utilization.docx DOCX document
Secure Spaces MACC - Exhibit C - PPQ.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6247320R1011

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) UNRESTRICTIVE MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW CONSTRUCTION, RENOVATION, AND REPAIR OF GENERAL BUILDING CONSTRUCTION WITH SECURE SPACES AT VARIOUS GOVERNMENT INSTALLATIONS LOCATED IN CALIFORNIA, ARIZONA, NEVADA, UTAH, COLORADO, AND NEW MEXICO

This amendment is issued to revise Part 1 and incorporate RFIs Log.

See page 2 of this amendment for revisions to the RFP.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247321R1011

X 9B. DATED (SEE ITEM 11)

23-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Apr-2021

CODE

NAVFAC SOUTHWEST

DESIGN & CONSTRUCTION CONTRACTING DESERT

CODE: DCDES

750 PACIFIC HIGHWAY

SAN DIEGO CA 92132-0001

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247321R1011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

MACC RFP:

Date and time for receipt of proposal remains unchanged.

1. PART 1 – CONTRACT REQUIREMENTS - SUMMARY OF CHANGES

Section 00100, “Instruction to Offerors,” is revised as shown below:

The submission instructions for the Phase One proposal are revised to reflect the electronic submission of Phase One proposals using DoD SAFE.

DELETE:

2. Proposal Submittal Requirements The following paragraph has been removed in its entirety “Proposals shall be submitted in three ring binders or bound, with tabs or separators. Page limits, if stipulated, must be adhered to. Proposals shall be submitted on 8.5” X 11” paper, utilizing both sides of the paper”.

2. PART 1- FACTOR 2: EXPERIENCE - SUMMARY OF CHANGES

First paragraph for the Proposal submission requirement for Design Experience is revised as shown below:

FROM:

(a) Proposal Submission Requirements:

(2) Design Experience:

Submit a maximum of five (5) relevant design projects for the design team that best demonstrate design experience on projects that are similar in size, scope, and complexity to projects that may be ordered under this contract. The relevant scope of work shall have been performed by the proposed lead design firm(s). Failure to submit relevant projects for all proposed Lead Design Firms/Design Teams may result in a lower rating for this factor.

TO:

(a) Proposal Submission Requirements,

(2) Design Experience:

Submit a maximum of five (5) relevant design projects for the design team that best demonstrate design experience on projects that are similar in size, scope, and complexity to projects that may be ordered under this contract. The relevant scope of work shall have been performed by the proposed lead design firm(s). Failure to submit relevant projects for all proposed Lead Design Firms/Design Teams may result in a lower rating for this factor." A maximum of five (5) relevant design projects for the design team shall be submitted. Ensure all Lead Design Firms/Design Teams are represented in the design projects submitted (maximum of 5 design projects in aggregate).

3. PART 1 - FACTOR 4: SAFETY - SUMMARY OF CHANGES

(b) Basis of Evaluation, is revised as shown below:

FROM:

(b) Basis of Evaluation:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation.

The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.

1. DART Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.

a. Missing data without an explanation is considered a deficiency.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.

c. An increasing DART rate trend could be considered a weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.

2. TCR Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.

c. An increasing TCR rate trend could be considered a weakness (i.e. MR or better to

TO:

(b) Basis of Evaluation:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation.

The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.

1. DART Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.

c. An increasing DART rate trend could be considered a weakness (i.e. MR or better to

d. This chart correlates the DART rate to the level of risk:

Risk DART Rate

Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0

Extremely High Risk Greater than 4.0

2. TCR Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.

c. An increasing TCR rate trend could be considered a weakness (i.e. MR or better to

d. This chart correlates the TCR rate to the level of risk:

Risk TCR Rate Very Low Risk Less Than 2.49 Low Risk From 2.5 to 3.49 Moderate Risk From 3.5 to 4.49 High Risk From 4.5 to 5.99

Extremely High Risk Greater than 6.0

4. Update the following Exhibits:

• Provide Exhibit B – Designer form

• Exhibit B- Construction form REVISED

• Exhibit D - Past Performance - Small Business Utilization REVISED

• Exhibit F - Small Business Participation Plan REVISED

5. Provide responses to Request for Information (RFI) by incorporating the RFI log as attachment to this amendment.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .