View the file

Other files

File Type Posted
Amendment 11_21R0011_9.15.21.pdf PDF
Amendment 10_21R0011_9.14.21.zip ZIP file
Amendment 09_21R0011_9.9.21.zip ZIP file
Amendment 08_9.3.21.zip ZIP file
Amendment 07_9.2.21.zip ZIP file
Amendment 06_21R0011_8.30.21.pdf PDF
Amendment 05_21R0011_8.27.21.pdf PDF
Amendment 04_8.26.21.zip ZIP file
Pre-Proposal Conf-Site Visit and Sign in sheet_8.11.21.zip ZIP file
Amendment 02_8.12.21.zip ZIP file
Amendment 01_8.3.21.zip ZIP file
Other Section J Attachments.zip ZIP file
Solicitation Submittal Documents.zip ZIP file
Section C - PWS.zip ZIP file
Section F - Deliveries or Performance.zip ZIP file
SF 33.zip ZIP file
Wage Determination.zip ZIP file
Section J - List of Attachments.zip ZIP file
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJ: N62473-21-R-0011, BASE OPERATIONS SUPPORT CONTRACT FOR THE MARINE CORP AIR GROUND COMBAT CENTER AND NAVAL

HOSPITAL TWENTYNINE PALMS, CALIFORNIA

The purpose of this amendment is to provide RFI questions. Government responses to RFI questions are pending. Additional RFIs have also been received and are being processed and w ill be included in subsequent amendments.

See continuation pages for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247321R0011

X 9B. DATED (SEE ITEM 11)

30-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Aug-2021

CODE

NAVFAC SOUTHWEST

PW CONTRACTS CORE - FSC

CODE RAQ10-FSC

750 PACIFIC HIGHWAY

SAN DIEGO CA 92132-0001

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247321R0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 03

RFI #01: We understand that the solicitation N6247321R0011 is 100% set aside for 8(a) businesses. If a 8(a) company bids as the prime with a subcontractor, who they have a Joint Venture with, will the subcontractor’s or the JV’s experience count towards rating? The 8(a) company does not necessarily have the facilities investment experience on its own but the JV partner does and would be joining this bid as one of the major subcontractors. We would appreciate your directions on this.

RESPONSE: Pending.

RFI #02: Section of the Request for Proposal: SF33, Paragraph: L.5, Volume 1, (a), 1; L.5, Volume 2, (b), (1), (d), and (f), Page number: 59 of 79; 61 of 79, and 62 of 79J:

[REDACTED] is a wholly-owned Subsidiary of [REDACTED], an AbilityOne contractor. As such, we are not registered with the SBA under any SB category and are therefore large. Per 10 U.S. Code § 2410d, AbilityOne nonprofit agencies, such as [REDACTED], may count towards the small business subcontracting plan goals, but to be clear, we are not a SB. Additionally, there is no SB subcontracting plan required for 29 Palms, so it is our understanding that our ability to count towards a SB subcontracting plan is not what you intended in the above referenced statements.

Therefore, are we to understand that as an 8(a) set-aside procurement, you are limiting the major subcontractors (first-tier sub) that the prime 8(a) selects, to small businesses, only? Notwithstanding the 8(a) prime would self-perform at least 51% of the work, the ONLY major subcontractors they can use in actual performance, and reference in past performance, are small businesses? This arrangement excludes in totality the use of large companies, which is unnecessary given the 8(a) set aside.

RESPONSE: Pending.

RFI #03: Section of the Request for Proposal: Section 2J. 0200000 Management & Administration v2.7

18FEB2021:

The contents of this attachment are actually Pest Control, not Mgt & Admin Please re-post with corrected contents RESPONSE: Pending.

RFI #04: Section of the Request for Proposal: 1800000 Environmental, Paragraph: Spec Item 3.3.2, Page number:

5 and 6 of 8:

How many unscheduled pickups have been accomplished during duty hours and after duty hours?

RESPONSE: Pending.

RFI #05: Section of the Request for Proposal: ATTACHMENT J-1800000-03j, Paragraph: HM/HW/ORM DISPOSAL HISTORICAL DATA, Page number: 5 of 7:

Workload data is from 2010 and 2011 which is over 10 yrs old, Will the Government provide updated workload?

RESPONSE: Pending.

RFI #06: Section of the Request for Proposal: ATTACHMENT J-1800000-04, Paragraph: HM/HW/ORW ACCUMULATION AREAS AND STORAGE FACILITIES, Page number: 6 of 7:

Since the map wont be provided until after award, How many locations does the contractor have to pick up from?

This is needed to be able to staff and price this work and give the incumbent an unfair advantage as they are currently doing it.

RESPONSE: Pending.

RFI #07: Section of the Request for Proposal: ATTACHMENT J-1503060-03, Paragraph: SWEEPING FREQUENCY AND LOCATIONS, Page number: 5 of 5:

What does AMCC stand for and where is it located and what is size of the area to be swept ? This is needed to be able to staff and price this work and give the incumbent an unfair advantage as they are currently doing it.

RESPONSE: Pending.

RFI #08: Section of the Request for Proposal: ATTACHMENT J-1503060-03, Paragraph: SWEEPING FREQUENCY AND LOCATIONS, Page number: 5 of 5:

What is the size of each of the areas listed in this attachment? This is needed to be able to staff and price this work and give the incumbent an unfair advantage as they are currenty doing the work.

RESPONSE: Pending.

RFI #09: Section of the Request for Proposal: ATTACHMENT J-1503060-03, Paragraph: SWEEPING FREQUENCY AND LOCATIONS, Page number: 5 of 5:

How many adjacent streets are there and what is the lenght of each one to be swept? This is needed to be able to staff and price this work and give the incumbent an unfair advantage as they are currenty doing the work.

RESPONSE: Pending.

RFI #10: Section of the Request for Proposal: ATTACHMENT J-1503060-03, Paragraph: SWEEPING FREQUENCY AND LOCATIONS, Page number: 5 of 5:

There is no helicopter pad listed but Google Maps shows one, it is part of the contract? This is needed to be able to staff and price this work and give the incumbent an unfair advantage if they are currenty doing the work.

RESPONSE: Pending.

RFI #11: Section of the Request for Proposal: PWS 1503050 Ground Maint & Landscaping, Paragraph: 3.1.4, Page number: 10 of 15:

Will the Government provide Workload data for Plant and Plant Bed maintenance as there is none on the J Attachments for 1503050 ? This is needed to be able to staff and price this work and give the incumbent an unfair advantage as they are currenty doing the work.

RESPONSE: Pending.

RFI #12: Section of the Request for Proposal: PWS 1503050 Ground Maint & Landscaping, Paragraph: 3.1.7, Page number: 11 of 15:

Will the Government provide Workload data for Vegatition Control as there is none on the J Attachments for 1503050 ? This is needed to be able to staff and price this work and give the incumbent an unfair advantage as they are currenty doing the work.

RESPONSE: Pending.

RFI #13: Section of the Request for Proposal: PWS 1503050 Ground Maint & Landscaping, Paragraph: 3.3, Page number: 12 of 15:

Will the Government provide Workload data for Storm Drainage System as there is none on the J Attachments for 1503050 ? This is needed to be able to staff and price this work and give the incumbent an unfair advantage as they are currenty doing the work.

RESPONSE: Pending.

RFI #14: Section of the Request for Proposal: 1503030 C Solid Waste Management, Paragraph: 3.1.2.3 Bulky Waste, Page number: 5 of 7:

Will the Government provide the historical workload for Bulky Waste as there is not listed in the J documents and it is requirement? This is needed to be able to staff and price this work and give the incumbent an unfair advantage as they are currenty doing the work.

RESPONSE: Pending.

RFI #15: Section of the Request for Proposal: 1503030 C Intergrated Solid Waste Management, Paragraph: 3.2.1 Non-Recyclable, Page number: 5 of 7:

PWS States the following : Prior to disposal, all solid wastes shall be sorted to remove recyclable materials. But Para 3.2.2 Recyclable is NA NA Na. What is done with the recyclable materials once sorted? Please clarify.

RESPONSE: Pending.

RFI #16: Section of the Request for Proposal: ATTACHMENT J-1503030-03, Paragraph: Inventory Page number: 4 of 4:

Where are the 9 containers and 7 Cigarette Butt Receptacles located at the Hospital ? This is needed to be able to staff and price this work and give the incumbent an unfair advantage as they are currenty doing the work.

RESPONSE: Pending.

RFI #17: Section of the Request for Proposal: 1503020 C Pest Control, Paragraph: 3.3 Pest Management Reporting, Page number: 12 of 13:

Where is this to be staffed and priced in the ELINs as currently there is no ELIN in CLIN x001 to cover Para 3.3?

RESPONSE: Pending.

RFI #18: Section of the Request for Proposal: 0200000 J Management & Administration, Paragraph: Whole file, Page number: All Pages:

Will the Government provide a new J Attachment for 020000 Management & Administration as current file once opened is all PEST CONTROL and not Management & Adminsitration?

RESPONSE: Pending.

RFI #19: Section of the Request for Proposal: 1606000 J Water Treatment Plant Inventory, Paragraph: List Number 57 and 63, Page number: N/A:

Will the Govermnent populate System and Description for each of these items as they are currently blank?

RESPONSE: Pending.

RFI #20: Section of the Request for Proposal: 1606000 J Water Treatment Plant Inventory, Paragraph: List Number 23, 27, 31 and 35, Page number: N/A:

Will the Govermnent populate System for each of these items as they are currently blank?

RESPONSE: Pending.

RFI #21: Section of the Request for Proposal: 1606000 J Water Treatment Plant Inventory, Paragraph: Column P & ID, Page number: N/A:

Will the Government explain what P & ID means and what DI’s with numbers mean ? Will the DI’s be provided for reference to help in staffing and pricing?

RESPONSE: Pending.

RFI #22: Section of the Request for Proposal: 1606000 C Water Treatment Plant, Paragraph: 3.2.1 Page number: 8 of 11:

Will the Goverment provide a list of items to be PM’ed for Chemical Feed System as they are not provided or identifed in J-1606000 Water Treatment Plant Inventory?

RESPONSE: Pending.

RFI #23: Section of the Request for Proposal: 1606000 C Water Treatment Plant, Paragraph: 3.2.2 Page number: 9 of 11:

Will the Goverment provide a list of items to be PM’ed for Reverse Osmosis System as they are not provided or identifed in J-1606000 Water Treatment Plant Inventory?

RESPONSE: Pending.

RFI #24: Section of the Request for Proposal: 1606000 C Water Treatment Plant, Paragraph: 3.2.3, Page number:

9 of 11:

Will the Goverment provide a list of items to be PM’ed for Closed Circuit Deslanination System as they are not provided or identifed in J-1606000 Water Treatment Plant Inventory?

RESPONSE: Pending.

RFI #25: Section of the Request for Proposal: 1606000 C Water Treatment Plant, Paragraph: 3.2.4, Page number:

8 of 11:

Will the Goverment provide a list of items to be PM’ed for Water Instrumentation System as they are not provided or identifed in J-1606000 Water Treatment Plant Inventory?

RESPONSE: Pending.

RFI #26: Section of the Request for Proposal: 1606000 C Water Treatment Plant, Paragraph: 3.4_Inspection, Testing, and Certification Program, Page number: 10 of 11:

Will the Goverment provide a J Attachment with a complete list of items that require Inspection, Testing and Certification as there is currently none?

RESPONSE: Pending.

RFI #27: Section of the Request for Proposal: 1606000 J Water Treatment Plant v2.0, Paragraph: Page number:

Pages 12, 13 and 15:

Will the Government correct the Attachment numbers at the top of the page from 1605000-08, 09 and 10 to 1606000 -08, 09 and 10?

RESPONSE: Pending.

RFI #28: Section of the Request for Proposal: 1606000 J Water Treatment Plant v2.0, Paragraph: 1st Sentence on the Page, Page number: Pages 14:

Will the Government correct the reference from 1602000 to 1606000?

RESPONSE: Pending.

RFI #29: Section of the Request for Proposal: J-1606000-09, Paragraph: 1.8.1 Power Failure, Page number: 106 of 200:

States facility P-192 has 900kW diesel generator but it does not appear in J-1502000 Generator Tab or J-1606000 Plant Inventory. Will this be listed along with the automatic transfer switch and any other items requiring PM?

RESPONSE: Pending.

RFI #30: Section of the Request for Proposal: J-1606000-09, Paragraph: 10.1 HVAC Systems, Page number: 169 of 200:

States facility P-192 has heating and cooling systems but it does not appear in J-1502000 Tabs or J-1606000 Plant Inventory. Will this be listed along with any other items requiring PM or are we to use what is listed in para 10.3 starting on page 173? Please advise?

RESPONSE: Pending.

RFI #31: Section of the Request for Proposal: J-1606000-09, Paragraph: 11 Electrical Systems, Page number:

178 of 200:

States facility P-192 has electrical power but it does not appear in J-1502000 Tabs or J-1606000 Plant Inventory.

Will this be listed along with any other items requiring PM or are we to use what is listed in Section 11 starting on page 178? Please advise?

RESPONSE: Pending.

RFI #32: Section of the Request for Proposal: J-L-RFI Form:

What is the due date that questions must be submitted by?

RESPONSE: Pending.

RFI #33: Will the Government provide a complete list of all building with sq ft, date of construction, type of facility, value in an attachment to Annex 0200000?

RESPONSE: Pending.

RFI #34: Section of the Request for Proposal: J-0200000-11 Exhibit Line Numbers (ELINS) and J-1503010-06 MCAGCC Custodial Inventory and Frequency:

In J-0200000-11 Exhibit Line Numbers (ELINS), x002CQ lists building 1523 but there is no associated inventory in J-1503010-06 MCAGCC Custodial Inventory and Frequency. Will the inventory be provided or the building number deleted?

RESPONSE: Pending.

RFI #35: Section of the Request for Proposal: J-0200000-11 Exhibit Line Numbers (ELINS) and J-1503010-06 MCAGCC Custodial Inventory and Frequency:

In J-0200000-11 Exhibit Line Numbers (ELINS), x002CU lists building 1551 but there is no associated inventory in J-1503010-06 MCAGCC Custodial Inventory and Frequency. Will the inventory be provided or the building number deleted?

RESPONSE: Pending.

RFI #36: Section of the Request for Proposal: J-0200000-11 Exhibit Line Numbers (ELINS) and J-1503010-06 MCAGCC Custodial Inventory and Frequency:

In J-0200000-11 Exhibit Line Numbers (ELINS), x002CV lists building 1551(FSVC) and 1551 (MCCS) but there is no associated inventory in J-1503010-06 MCAGCC Custodial Inventory and Frequency. Will the inventory be provided or the building number deleted?

RESPONSE: Pending.

RFI #37: Section of the Request for Proposal: J-0200000-11 Exhibit Line Numbers (ELINS) and J-1503010-06 MCAGCC Custodial Inventory and Frequency:

In J-0200000-11 Exhibit Line Numbers (ELINS), x002DD lists building 1551but there is no associated inventory in J-1503010-06 MCAGCC Custodial Inventory and Frequency. Will the inventory be provided or the building number deleted?

RESPONSE: Pending.

RFI #38: Section of the Request for Proposal: J-0200000-11 Exhibit Line Numbers (ELINS) and J-1503010-06 MCAGCC Custodial Inventory and Frequency:

Building 1551 is listed for x002CU, x002CV and x002DD but no inventory at all in J-1503010-06 MCAGCC Custodial Inventory and Frequency. Is this building split out between 3 ELINs? If so will the inventory be broken out by each ELIN and provided? If not will the ELIN sheet be updated and have building 1551 removed?

RESPONSE: Pending.

RFI #39: Section of the Request for Proposal: J-1503010-06 MCAGCC Custodial Inventory and Frequency and J- 0200000-11 Exhibit Line Numbers (ELINS):

Building # 1577 workload is provided in J-1503010-06 MCAGCC Custodial Inventory and Frequency but there is no associated ELIN in J-0200000-11 Exhibit Line Numbers (ELINS). Will the inventory be deleted or will it be assigned a current ELIN or a new ELIN in J-0200000-11 Exhibit Line Numbers (ELINS)?

RESPONSE: Pending.

RFI #40: Section of the Request for Proposal: J-1503010-06 MCAGCC Custodial Inventory and Frequency and J- 0200000-11 Exhibit Line Numbers (ELINS):

Building # 1428N workload is provided in J-1503010-06 MCAGCC Custodial Inventory and Frequency but there is no associated ELIN in J-0200000-11 Exhibit Line Numbers (ELINS). Will the inventory be deleted or will it be assigned a current ELIN or a new ELIN in J-0200000-11 Exhibit Line Numbers (ELINS)?

RESPONSE: Pending.

RFI #41: Section of the Request for Proposal: J-1503010-06 MCAGCC Custodial Inventory and Frequency and J- 0200000-11 Exhibit Line Numbers (ELINS):

Building # 1433N workload is provided in J-1503010-06 MCAGCC Custodial Inventory and Frequency but there is no associated ELIN in J-0200000-11 Exhibit Line Numbers (ELINS). Will the inventory be deleted or will it be assigned a current ELIN or a new ELIN in J-0200000-11 Exhibit Line Numbers (ELINS)?

RESPONSE: Pending.

RFI #42: Section of the Request for Proposal: J-1503010-06 MCAGCC Custodial Inventory and Frequency and J- 0200000-11 Exhibit Line Numbers (ELINS):

Building # 1447N workload is provided in J-1503010-06 MCAGCC Custodial Inventory and Frequency but there is no associated ELIN in J-0200000-11 Exhibit Line Numbers (ELINS). Will the inventory be deleted or will it be assigned a current ELIN or a new ELIN in J-0200000-11 Exhibit Line Numbers (ELINS)?

RESPONSE: Pending.

RFI #43: Section of the Request for Proposal: J-1503010-06 MCAGCC Custodial Inventory and Frequency and J- 0200000-11 Exhibit Line Numbers (ELINS):

Building # 1447S workload is provided in J-1503010-06 MCAGCC Custodial Inventory and Frequency but there is no associated ELIN in J-0200000-11 Exhibit Line Numbers (ELINS). Will the inventory be deleted or will it be assigned a current ELIN or a new ELIN in J-0200000-11 Exhibit Line Numbers (ELINS)?

RESPONSE: Pending.

RFI #44: Section of the Request for Proposal: J-1503010-06 MCAGCC Custodial Inventory and Frequency and J- 0200000-11 Exhibit Line Numbers (ELINS):

Building # 1458S workload is provided in J-1503010-06 MCAGCC Custodial Inventory and Frequency but there is no associated ELIN in J-0200000-11 Exhibit Line Numbers (ELINS). Will the inventory be deleted or will it be assigned a current ELIN or a new ELIN in J-0200000-11 Exhibit Line Numbers (ELINS)?

RESPONSE: Pending.

RFI #45: Section of the Request for Proposal: J-1503010-06 MCAGCC Custodial Inventory and Frequency and J- 0200000-11 Exhibit Line Numbers (ELINS):

Building # 1523N workload is provided in J-1503010-06 MCAGCC Custodial Inventory and Frequency but there is no associated ELIN in J-0200000-11 Exhibit Line Numbers (ELINS). Will the inventory be deleted or will it be assigned a current ELIN or a new ELIN in J-0200000-11 Exhibit Line Numbers (ELINS)?

RESPONSE: Pending.

RFI #46: Section of the Request for Proposal: J-1503010-06 MCAGCC Custodial Inventory and Frequency and J- 0200000-11 Exhibit Line Numbers (ELINS):

Building # 1523S workload is provided in J-1503010-06 MCAGCC Custodial Inventory and Frequency but there is no associated ELIN in J-0200000-11 Exhibit Line Numbers (ELINS). Will the inventory be deleted or will it be assigned a current ELIN or a new ELIN in J-0200000-11 Exhibit Line Numbers (ELINS)?

RESPONSE: Pending.

RFI #47: Section of the Request for Proposal: J-1503010-06 MCAGCC Custodial Inventory and Frequency and J- 0200000-11 Exhibit Line Numbers (ELINS):

Building # 1525N workload is provided in J-1503010-06 MCAGCC Custodial Inventory and Frequency but there is no associated ELIN in J-0200000-11 Exhibit Line Numbers (ELINS). Will the inventory be deleted or will it be assigned a current ELIN or a new ELIN in J-0200000-11 Exhibit Line Numbers (ELINS)?

RESPONSE: Pending.

RFI #48: Section of the Request for Proposal: J-1503010-06 MCAGCC Custodial Inventory and Frequency, Paragraph: Column K and L:

What is purpose of Cost per UOM in Column K and Annual Cost in Column L ? Are they to be populated and submitted or not? Please clarify.

RESPONSE: Pending.

RFI #49: Section of the Request for Proposal: J-1503010-05 Twentynine Palms Naval Hospital Custodial Inventory, Page number: 9 – 27 of 29:

Will the Government provide J-1503010-05 Twentynine Palms Naval Hospital Custodial Inventory in the same format as J-1503010-06 MCAGCC Custodial Inventory and Frequency? This will ensure staffing and pricing acceptable and not give the incumbent an unfair advantage.

RESPONSE: Pending.

RFI #50: Please confirm that Annexs1503020, 1503030, 1503050, 1503060, and 1800000 are only in BUMED and not in MCAGGC?

RESPONSE: Pending.

RFI #51: Section of the Request for Proposal: C and J Documents 15020000, Paragraph: 3.5.1 and ELIN x002CC:

Will the government specifically identify which Grease Traps are on the 2 year permit in order to staff and price ELIN x002CC ? This gives the incumbent an unfair advantage.

RFI #52: Section of the Request for Proposal: ATTACHMENT J-1502000-111, Page number: 291 of 319:

Why is the historial data not availabe as this gives the incumbent an unfair advantage in staffing and pricing?

RESPONSE: Pending.

RFI #53: Section of the Request for Proposal: ATTACHMENT J-1502000-108, Page number: 2861 of 319:

Why is the historial data not availabe as this gives the incumbent an unfair advantage in staffing and pricing?

RESPONSE: Pending.

RFI #54: Section of the Request for Proposal: 1502000 J Facility Investment, Paragraph: Fire Supp Riser Sprinklers Tab:

Government states the following : « The contractor shall fill in the missing information (yellow-filled cells) and submit a digital copy of an updated inventory to the Government after completion of their initial inspection; file to be in Microsoft Excel format. « The contractor need all the information to be able to staff and price as 57% of the lines are missing information which is 113 of the 197 shown and of that 113 over 50 of them have very critical information missing that makes it extremely hard to estimate.

Will the Government provide an updated exhibit or provide a plug number of folks for everyone to staff and price as currently the incumbent has an extreme unfair advantage on this area?

RESPONSE: Pending.

RFI #55: Section of the Request for Proposal: 1502000 J Facility Investment, Tabs Named: Close Loop and CNG:

Both of these tabs are exactly the same information. Is this correct? Please clarify. Does either expecially the CLOSED LOOP Tab need to be updated with the correct data?

RESPONSE: Pending.

RFI #56: Section of the Request for Proposal: 1502000 J Facility Investment, Paragraph: Fire Supp Riser Sprinklers Tab:

Who is responsible for missing information in the NON Yellow highlighted cell for exampe in Lines 185, 188, 191, 192, 193, 194, 195 and 196 as examples ? Please clarify.

RESPONSE: Pending.

RFI #57: Section of the Request for Proposal: 1502000 C Facility Investment, Paragraph: 2.2.1, Page number: 5:

Are the certification, training and licensing requirements called out in PWS 2.2.1 currently required by the existing contracts listed in Solicitation, Section B, paragraph B12?

RESPONSE: Pending.

RFI #58:

Background to Question 1:

Section F - Deliveries or Performance: 5F. 1503020 F Pest Control v2.4 - 29 Palms BOS 18FEB2021: Annex/Spec Item 1503020/2.3.5: Form J-1503020-02 : Planned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS) are due ‘With the proposal.’Note: Any proposed changes in pesticide usage shall be submitted for approval at least 10 business days in advance of pesticide use.’

QUESTION 1:

Will the Government allow Form J-1503020-02 to be submitted after award notification in order for non-incumbent offerors an opportunity to fully evaluate the installation requirements?

RFI #59:

Background to Question 2:

Section F - Deliveries or Performance: 5F. 1503020 F Pest Control v2.4 - 29 Palms BOS 18FEB2021 : Annex/Spec Item 1503020/3 Contractor’s Work Plan is due with proposal.

QUESTION 2:

Will the Government consider making the Contractor’s Work Plan due 15 days after award in order to ensure accuracy and for non-incumbent offerors an opportunity to fully evaluate the installation requirements?

RESPONSE: Pending.

RFI #60:

Background to Question 3:

J-0200000 Attachments In Annex 0200000, there are 16 references to J-0200000 attachments. None of the J-0200000 attachments were on SAM.Gov to download. Additional J-0200000 attachment comments:

• 2.9.4.4, Critical Lift Plan: The Crane Operating Checklist for Critical Lifts is in J-0200000-XX.

• 2.9.6 Accident and Damage Reporting: Required Special Forms are provided within J-0200000-XX

• 2.10.2.3 Solid Waste Management and Recycling: Solid Waste Management Reports Form is in J-

0200000-XX

• 2.8.3 Passes and Badges: there is reference to J-200000-07; this attachment is not in the solicitation. In Annex 0200000, Spec Item 2.6.8 references J-0200000-07 to Data Reporting guidance for USMCmax.

QUESTION 3: Will the Government update and post all the J-0200000 attachments?

RESPONSE: Pending.

RFI #61:

Background to Question 4:

2J.J-0200000-11 Exhibit Line Numbers (ELINs) – NOT POPULATED (2AUG2021).xlsx.

• ELIN X001AP Backflow Prevention Devices lists PWS Spec Item as 3.4.4. Based upon the PWS, it should be 3.4.3. This is the same for each Recurring Period

• ELIN X001AQ Vertical Transportation Equipment (VTE) lists PWS Spec Item 3.4.5. Based upon the PWS it Should be 3.4.4. This is the same for each Recurring Period

QUESTION 4: Will the Government be making this correction in an upcoming amendment?

RESPONSE: Pending.

RFI #62:

Background to Question 5:

Annex 0200000, Spec Item 2.7.1.2 – Quality Manager. The Quality Manager or designated alternate shall have a current CMQ/OE certification and at least five years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity.

The CMQ/OE certification is geared for mass manufacturing, chemical treatment plants, and engineering design type requirements. FAR Subpart 46.2 Contract Quality Requirements does not include this certification.

QUESTION 5: As the CMQ/OE certifications does not appear applicable to any of the work or scope of this contract, will the Government remove the CMQ/OE certification requirement?

RESPONSE: Pending.

RFI #63:

Background to Question 6:

Annex 0200000, Spec Item 2.7.1 Key Personnel states, ‘For the purposes of this contract, the responsibility of the QCM and SSHO may be the same person, but not same as the PM.’, however Spec Item 2.7.1.2 states, ‘The Quality Manager or designated alternate shall not be the same person as the SSHO.’

QUESTION 6: Would the Government please clarify?

RFI #64:

Background to Question 7:

Pg. 62 Section L.5, Volume 2 Technical Proposal, (1) Factor 1, paragraph (g) states “Exhibit B submitted that exceed the maximum, four (4) single-sided page limit will be removed prior to evaluation.” Two (2) paragraphs below in the same section it also states “Individual blocks on Exhibit B may be expanded; however, total page limit for each project data sheet shall not exceed three (3) single-sided pages.”

The instructions provided on Exhibit B also state the limit is 4 pages.

QUESTION 7: Would the Government please confirm the page limit is four (4) and not three (3) pages?

RESPONSE: Pending.

RFI #65:

Background to Question 8:

Section C – PWS: 9C. 1606000 C Water Treatment Plant v2.0 – 29 Palms BOS 14 APRIL 2021 ; Spec Item 3.1.1, Water Quality: ‘The Contractor shall perform routine operational sampling; sampling shall be conducted in accordance with Operations manual/SOP’s and ESOPS.’

QUESTION 8: Will the Government please provide the ESOPS?

RESPONSE: Pending.

RFI #66:

Background to Question 9:

Section F - Deliveries or Performance: 6F. 1503030 F Integrated Solid Waste Management v2.3 – 29 Palms BOS 18FEB2021: Annex/Spec Item 1503030/3.1: Solid Waste Collection Schedule is due 15 days after award/Annually.

QUESTION 9: Will the Government please condsider making the schedule due 15 days prior to contract start in order for non-incumbent offerors an opportunity to fully evaluate the installation requirements?

RESPONSE: Pending.

RFI #67:

Background to Question 10:

Section F - Deliveries or Performance: 9F. 1606000 F Water Treatment Plant v2.0 – 29 Palms BOS 14APRIL2021 :

Annex/Spec Item 1606000/3.2: Preventive Maintenance Program due ‘Within 15 days after award’

QUESTIONS 10 : Will the Government consider making this due 15 days prior to contract start in order for non-incumbent offerors an opportunity to fully evaluate the installation requirements?

RESPONSE: Pending.

RFI #68:

Background to Question 11:

In Annex 0200000, Spec Item 2.10.2.1 Sampling, Testing, and Laboratory Services ; it states, ‘The Contractor shall provide collection and analytical testing of samples in accordance with the latest version of the test methods set forth in 40 CFR 261, 40 CFR 262 or Test Methods for evaluating Solid Waste, Physical/Chemical Methods, EPA Publication SW0846 and State of Florida, Department of Environmental Protection Sampling SOPs.

‘ Laboratory shall be certified by the State of Florida Department of Health for the specific analytical procedure in accordance with all Federal and State regulations. Analytical reports shall be in the format described in the Florida Administrative Code (FAC) 62-160’ QUESTION 11: Does the Government mean the State of California ? If so, what is the California Administrative Code reference?

RESPONSE: Pending.

RFI #69:

Background to Question 12:

In Annex 0200000, Spec Item 2.10.2.6 Universal Waste ; it states, ‘Universal Waste shall be disposed of through the installation’s Part B Facility. The Contractor shall reimburse the Government for all waste disposed of via the installation’s permitted Part B Facility, as described in Spec Item 2.10.2.X.’

QUESTION 12: We did not find the specific Spec Item as show by 2.10.2.X. Would the Government Proivde the details of this Spec Item?

RFI #70:

Background to Question 13:

In Annex 0200000, Spec Item 2.14.3 Recurring Work Exhibit Line Item Numbers (ELINSs), the referenced J attachment is J-0200000-09.

QUESTION 13 : Is the correct J attachment 2J. J-0200000-11 Exhibit Line Numbers (ELINs) - NOT POPULATED (12JUL2021).xlsx?

RESPONSE: Pending.

RFI #71:

Background to Question 14:

Section F – Deliveries and Performance : 10F.1606000 F Environmental v2.2 – 29 Palms BOS 14APRIL2021 :

Annex/Spec Item 1800000/2.2.1 : Training Plan is due 15 days after award/Annually QUESTIONS 15: Will the Government consider making this due 30 days prior to contract start in order for non-incumbent offerors an opportunity to fully evaluate the training requirements?

RESPONSE: Pending.

RFI #72:

Background to Question 15:

Section F – Deliveries and Performance : 10F.1606000 F Environmental v2.2 – 29 Palms BOS 14APRIL2021 :

Annex/Spec Item 1800000/2.2.1 : Training Documentation is due 15 days after award/Annually

QUESTIONS 15: Will the Government consider making this due 10 days prior to contract start in order for non-incumbent offerors an opportunity to fully train and collection the training documents?

RESPONSE: Pending.

RFI #73:

Background to Question 16 :

PWS 3C.1502000 C Facility Investment ver 2.4 – 29 Palms BOS 18FEB2021, Spec Item 3.1.3 Routine Service Orders references Attachment J-0200000-09 ELINs

QUESTION 16: Did the Government mean this should be J-0200000-11 ELINs ?

RESPONSE: Pending.

RFI #74:

Background to Question 17:

2J. J-0200000-11 Exhibit Line Numbers (ELINs) - NOT POPULATED (12JUL2021) :, ELIN/Sub-ELIN A002BL, B002BL, and C002BL,Spec Item 3.4.4, ‘Vertical Transportation Equipment (VTE) - 5-Year - Performed in Option Year 3’ is not grayed out for Recurring Bsae Period, Recurring Opt1, and Recurring Opt 2 tabs. It is greyed out for Recurring Option Periods starting with Recurring Opt Periods 4, 5, 6 and 7

QUESTION 17: Will the Government correct this Sub-ELIN for the first three periods?

RESPONSE: Pending.

RFI #75:

Backup to Question 17:

2J. J-0200000-11 Exhibit Line Numbers (ELINs) - NOT POPULATED (12JUL2021) :, ELIN/Sub-ELIN A002CC, Annext/SubAnnex Spec Item 1502000/3.5.1, ‘Grease Traps (2-Year Permit) - Performed in Option Year 1, 3, 5 & 7’ is not grayed out for the Recurring Base Period, but is correct for the remainder of the Recurring Periods.

QUESTION 17 :

Will the Government correct this Sub-ELIN for the Recurring Base Period ?

RFI #76:

Backup to Question 18:

2J. J-0200000-11 Exhibit Line Numbers (ELINs) - NOT POPULATED (12JUL2021):, ELIN/Sub-ELIN A002CP, Annext/SubAnnex Spec Item 1503010/multiple, ‘Scheduled Services,’ several of the buildings listed in the descriptions for the ELIN/Sub-ELINs do not match the same customer as found in Attachment 4J.1503010-06 – MCAGCC Custodial Inventory and Frequency or they are missing. Some examples include :

1. In Attachement 4J, Building 1447S is shown as part of Customer G-7; it also shows Building 1447N as part of Customer MCCS. In the Attachment 2J ELINs workbook, ELIN/Sub-ELIN X002CP, it only shows Building 1447 as part of Customer G-7. There is no separation of 1447S and 1447N.

2. In Attachement 4J, Building 1525N is shown as part of Customer Housing; there is also Building 1525S as part of Customer HRO ; however in Attachment 2J workbook, ELIN/Sub-ELIN X002CPit shows correctly 1525N as part of Customer Housing but there is no ELIN/Sub-ELIN for Building 1525S.

3. In Attachement 4J, Building 1523N is shown as part of Customer G-7; there is also Building 1523S as part of Customer G-7 ; however in Attachment 2J workbook, ELIN/Sub-ELIN X002CQ shows as Building 1523 as part of Customer G-8.

4. In Attachment 2J workbook, the ELIN/Sub-ELIN A002CU it shows as Building 1551 as part of Customer HRO ; however, this Building is not in Attachement 4J.

5. In Attachment 2J workbook, ELIN/Sub-ELIN A002CV it shows as Building 1551 also as part of Customer MCCS ; however, this Building is not in Attachement 4J.

6. In Attachement 4J, Building 1982 is shown as part of Customer MCTOG; however in Attachment 2J workbook, ELIN/Sub-ELIN X002CX it shows as part of Customer MCLOG

7. In Attachement 4J, Building 1458N is shown as part of Customer Navy; there is also Building 1458S as part of Customer HQBN; however in Attachment 2J workbook, ELIN/Sub-ELIN X002CY it shows correctly 1458N as part of Customer Navy but there is no ELIN/Sub-ELIN for Building 1458S.

8. In Attachement 4J, Building 1031 is shown as part of Customer H; it also shows Building 1447N as part of Customer MCCS. In Attachment 2J workbook, ELIN/Sub-ELIN X002CP, it only shows Building 1447 as part of Customer G-7. There is no separation of 1447S and 1447N.

9. In Attachment 2J workbook, ELIN/Sub-ELIN A002DD shows as Building 1551 as part of Customer Religious Ministries; however, this Building is not in Attachement 4J.

10. In Attachement 4J, Building 1577 is shown as part of Customer PWD; however this building is not found in Attachment 2J workbook

11. In Attachement 4J, Building 1428N is shown as part of Customer Religious Ministries; however this building is not found in Attachment 2J workbook

12. In Attachement 4J, Building 1433N is shown as part of Customer HRO; however this building is not found in Attachment 2J workbook

QUESTION 18:

Will the Government please provide guidance as to how to complete 2J. J-0200000-11 Exhibit Line Numbers (ELINs) - NOT POPULATED (12JUL2021)?

RESPONSE: Pending.

RFI #77:

Backup to Question 19:

In Attachment J1502000, there are limited Service Call information provided for years 2015, 2016, 2017, 2018, and 2019. The workload data shows 75 Service Calls in 10 Attachments. Based upon the workload data shown, it appears there may be very few Service Orders at MCAGCC. With the size of the installation, we would expect to see more workload history.

QUESTION 19 :

Would the Government provide the last two years of Service Orders in an Microsoft Excel spreadsheet with detailed information so we can review the workload data and prepare a more accurate and detailed basis of estimate?

RESPONSE: Pending.

RFI #78: Section of the Request for Proposal: ___2J.J-0200000-11 Exhibit Line Numbers (ELIN) - NOT

POPULATED (2AUG2021):

On the Recurring Tabs_ how does the Government want the column “Wage Rate” populated?

We assume this should be a composite Wage Rate which would result from dividing the Direct Labor Cost by the Direct Labor Hours for each ELIN / Sub-ELIN, not that each Offeror should add rows under the ELIN / Sub-ELIN to include every labor category proposed and to show their specific “Wage Rate”. Please confirm.

RESPONSE: Pending.

RFI #79: Section of the Request for Proposal: _2J.J-0200000-11 Exhibit Line Numbers (ELIN) - NOT

POPULATED (2AUG2021):

Can you confirm that this should be a composite Wage Rate which would result from dividing the Direct Labor Cost by the Direct Labor Hours for each ELIN / Sub-ELIN to include any Vendor costs, not that each Offeror should add rows under the ELN / Sub-ELIN to include every labor category proposed and to show their specific “Wage Rate” which will be problematic when Vendors consider this information to be proprietary?

RESPONSE: Pending.

RFI #80: Section of the Request for Proposal: _2J.J-0200000-11 Exhibit Line Numbers (ELIN) - NOT

POPULATED (2AUG2021):

Reference A001AQ, Spec Item listed is 3.4.5, PWS has 3.4.4. Please correct this discrepancy.

RESPONSE: Pending.

RFI #81: Section of the Request for Proposal: 3.C. 1502000 C Facility Investment, Paragraph: 2.2.1, Page number: 5:

Do the existing contracts listed in SF N6247321R0011 29 BOSC Section B, paragraph B12 contain the certification, training and licensing requirements called out in PWS 2.2.1?

RESPONSE: Pending.

RFI #82: Section of the Request for Proposal: 3J. 1502000 J Facility Investment – 29 Palms BOS 18FEB2021 (1 of 2), Paragraph: Galley Exhaust hood, ducting, and fan cleaning shall include but not be limited to the following:

Page number: 136:

In part 3J. 1502000 says: shall be cleaned at the frequency as identified on the Exhibit Line Item Schedule (ELIN) of this contract for each individual galley exhaust hood system. There are no frequencies identified in 2J. J-02000-11 Exhibit Line Numbers ELINS), please address.

RESPONSE: Pending.

RFI #83: Section of the Request for Proposal: __Section C – 0200000 Management and Administration Paragraph: _2.2.1.1:

Observed Federal Holidays lists the heretofore standard 10 holidays. Will this section be amended to include Juneteenth as the 11th holiday? Is the offeror expected to include Juneteenth in its pricing calculations?

RESPONSE: Pending.

RFI #84: 2.4.4 Government Furnished Utilities:

Once connected at Contractor’s expense, will the cost of electricity and water be borne by the Government?

RESPONSE: Pending.

RFI #85: Section of the Request for Proposal: Section C – 0200000 Management and Administration Paragraph: 2.4.2 Government Furnished Facilities:

What is the approximate size of the lay down area to be provided by the Government?

RFI #86: Section of the Request for Proposal: Section C – 0200000 Management and Administration Paragraph: 2.6.8.5 Defense Medical Logistics Standard Support (DMLSS):

The section states in part « The Contractor shall obtain electrical system repair tickets from designated Government hospital employees. » Are electrical repairs the only type of work required to be managed in DMLSS?

RESPONSE: Pending.

RFI #87: Section of the Request for Proposal: Section C – 0200000 Management and Administration Paragraph: 2.7.1 Key Personnel_ and 2.7.1.2 Quality Manager:

The section 2.7.1 states in part « For the purposes of this contract, the responsibility of the QCM and SSHO may be the same person, but not same as the PM « However, section 2.7.1.2 states « The Quality Manager or designated alternate shall not be the same person as the SSHO. » Please clarify this discrepancy.

RESPONSE: Pending.

RFI #88: Section of the Request for Proposal: Section C – 0200000 Management and Administration Paragraph: 2.9.14 Excavations:

The section states in part « The Contractor shall provide a third party, independent, private utility locating company to positively identify underground utilities in the work area in addition to any station locating service and coordinated with the station utility department. » Question #1: Is there a preferred utility locating company in the area that the Government can recommend?

Question #2: Please provide historical or anticipated workload for 3rd party utility locating requirements.

RESPONSE: Pending.

RFI #89: Section of the Request for Proposal: Section C – 0200000 Management and Administration Paragraph: 2.10.2.1 Sampling, Testing and Laboratory Services:

The section states « The Contractor shall provide collection and analytical testing of samples in accordance with the latest version of the test methods set forth in 40 CFR 261, 40 CFR 262 or Test Methods for evaluating Solid Waste, Physical/Chemical Methods, EPA Publication SW0846 and State of Florida, Department of Environmental Protection Sampling SOPs. Laboratory shall be certified by the State of Florida Department of Health for the specific analytical procedure in accordance with all Federal and State regulations. Analytical reports shall be in the format described in the Florida Administrative Code (FAC) 62-160. »

Will this section be amended to replace State of Florida references with State of California references ?

RESPONSE: Pending.

RFI #90: Section of the Request for Proposal: Section C – 0200000 Management and Administration Paragraph: 2.10.2.2 ODS Requirements for Refrigerant Recycling:

Will the Government please provide historical workload data regarding the quantity / volume / number of shipments of excess Class I ODS that must be returned to DLA in Richmond, VA?

RESPONSE: Pending.

RFI #91: Section of the Request for Proposal: 1502000 – Facility Investment, Paragraph: 3.2.7.1 Fire Hydrant Pressure Testing:

Is fire hydrant flushing part of this requirement?

RFI #92: Section of the Request for Proposal: 1502000 – Facility Investment, Paragraph: 3.4.6 Cooling Towers:

The description states « The Contractor shall provide, where water is used as the chilled media, eddy current tests and water chemical treatment analysis to ensure optimum equipment operation and efficiency. » Is the eddy current testing referenced herein directed toward the chillers associated with the cooling water ?

RESPONSE: Pending.

RFI #93: Section of the Request for Proposal: 2C.02000 C Management and Administration, Paragraph: 2.7.1.2.1 Quality Control Personnel, Page number: 13 of 38:

Are Quality Control Personnel deemed to be « key » and required whether the workload supports the need or not?

RESPONSE: Pending.

RFI #94: Section of the Request for Proposal: 1502000 – Facility Investment, Paragraph: 3.4.9 Fuel Farm:

Section states in part « The Contractor shall inspect and test Fuel Farm systems in accordance with UFC 3-460-03.

The Contractor shall provide a qualified inspector for certification of Fuel Farm Equipment. » Is a qualified inspector one who is API 570 certified ? If not, is a qualified inspector one who is API 653 or STI SP001 certified ?

RESPONSE: Pending.

RFI #95: Section of the Request for Proposal: 1503010 – Custodial, Paragraph: 3.1.1.1 Emptying Waste Containers:

Section states in part « The Contractor shall replace trash receptacle liners twice Daily. » This frequency seems excessive. Please confirm that the requirement includes twice daily removal of trash and replacement of liners.

RESPONSE: Pending.

RFI #96: Section of the Request for Proposal: 1503020 - Pest Control, Paragraph: 2.3.1 Business Licensing:

The section states that the Contractor shall possess a business license issued by the state of California to provide pest control services. Does this requirement hold true if the contractor subcontracts the pest control function in its entirety to a CA licensed pest control company ?

RESPONSE: Pending.

RFI #97: Section of the Request for Proposal: 1503050 - Grounds Maintenance and Landscaping, Paragraph:

3.1.4 Plant & Plant Bed Maintenance, 3.1.5 Shrub & Hedge Maintenance:

Both sections state that the Contractor is responsible for plant, shrub, and hedge replacement up to $50 per plant not to exceed 30 plants annually. Is the $50 per plant limited to the cost of the replacement plant or does it cover the plant and the labor to replace it?

RESPONSE: Pending.

RFI #98: Question is regarding: 2J.J-0200000-11 Exhibit Line Numbers (ELIN) - NOT POPULATED

(2AUG2021):

ELIN/Sub Elin X002BL Vertical Transportation Equipment (VTE) – 5 year Performed in Option Year 3.

This states it should be priced in Opt 3. It is greyed out in Opt 2, 4-7 and extension but NOT for Base and Opt 1.

We assume that Offerors should NOT price this in Base and Opt 1 and should instead change the format to grey it out. Please confirm.

RESPONSE: Pending.

RFI #99: 2J.J-0200000-11 Exhibit Line Numbers (ELIN) - NOT POPULATED (2AUG2021):

ELIN/Sub Elin X002CC Grease Traps (2 Year Permit) – Performed in Option Year 1, 3, 5 &7. This states it should be priced in Options 1, 3, 5 & 7. It is greyed out in Opt 2, 4, 6 and extension but NOT for Base. We assume that Offerors should NOT price this in Base and should instead change the format to grey it out. Please confirm.

RFI #100: DBA WD CA20210026 07.29.21:

This WD has now been updated effective 08/06/21. We assume that there will be an amendment issued to supply the most current wage determination. Please confirm.

RESPONSE: Pending.

RFI #101: SCA WD 2015-5629 12.21.20:

This WD has now been updated effective 08/03/21. We assume that there will be an amendment issued to supply the most current wage determination. Please confirm.

RESPONSE: Pending.

RFI #102: Question is regarding: 4. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page. Section of the Request for Proposal: _(4) Factor 4, Safety:

The RFP on page 66 states that Technical Approach to Safety narrative is limited to 2 pages, but in the Exhibit E template it states total page limit shall not exceed 5 pages. Can the Government clarify which is correct?

RESPONSE: Pending.

RFI #103: Question is regarding: (b) Non-cost/price Factors: The Offeror shall complete and submit for evaluation Files 1 through 5 (Factors 1 through 5) in an electronic folder or zip file and title “Volume 2 – Technical Proposal”.

Section of the Request for Proposal: VOLUME 2 – TECHNICAL PROPOSAL, Page number: 61:

For each file, prior to the Exhibit template, can the Offeror add a Cover and Cover Letter with our standard company information?

RESPONSE: Pending.

RFI #104: Section of the Request for Proposal: SF133 Factor 1, Paragraph: (1) i (g) Paragraph # 3: Individual blocks on Exhibit B may be expanded; however, total page limit for each project data sheet shall not exceed three

(3) single-sided pages. Page number: 62 of 79:

This paragraph says 3 single-sided pages whereas every other reference to the Exhibit B says not to exceed 4 single-sided pages. Please confirm responders may expand Exhibit B up to 4 single-sided pages for each contract referenced.

RESPONSE: Pending.

RFI #105: Section of the Request for Proposal: SF133 Factor 5, Paragraph: (5) Factor 5, Past Performance on Recent, Relevant Projects: Page number: __ page 66-67 of 79:

There does not appear to be a specified page limit or form for Factor 5 other than PPQ (Exhibit F), (if needed) and a directive to submit no more than 2 pages explaining any performance problems on citations. Please confirm that Factor 5 is unlimited except for the explanation of problems encountered which is limited to a total of 2 pages for all citations in total.

(End of Summary of Changes)