Exhibit J JOC IDIQ SAMPLE SUBMITTAL REGISTER.docx
DOCX document 15 KB Posted
- Attached to
- Travis Air Force Base, Ca 8(a) Set-Aside Under NAICS 238990 Specialty Trade Job Order Contract
- Solicitation number
- N62473-20-R-0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit G Revised RFI Form.docx | DOCX document | |
| EXH M SPECIALTY JOC NAICS 238990 PTO 0001.xlsx | XLSX spreadsheet | |
| Exhibit A - Offeror Team Composition and Management.docx | DOCX document | |
| Exhibit X Post-Award-Limitations-on-Subcontracting-Report.docx | DOCX document | |
| Exhibit H GENERIC UFGS Guides for projects.docx | DOCX document | |
| N62473-20-R-0010 RFP.pdf | ||
| Exhibit E Financial Questionnaire.docx | DOCX document | |
| SOLANO COUNTY WD 122719.pdf | ||
| Exhibit F Surety Form.docx | DOCX document | |
| Exhibit C - PPQ.docx | DOCX document | |
| Exhibit B - Experience - Offeror.docx | DOCX document | |
| Exhibit D Safety Data 123019.docx | DOCX document | |
| EXHIBIT K COEFFICIENT WORKSHEET with profit language 072418.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAMPLE SUBMITTAL REGISTER
| SUBMITTAL/BENCHMARK |
| DURATION |
| BENCHMARK |
| REQUIRED |
| STATUS |
| 1 |
| Quality Control Plan |
| Prior to |
| Start of Construction |
| 2 |
| Material Safety Data Sheets |
| Prior to |
| Start of Construction |
| 3 |
| Planning/Construction Schedule |
| Within 15 days |
| After Award |
| 4 |
| Waste Management Plan |
| Prior to |
| Start of Construction |
| 5 |
| Safety and Health Plan or Accident Prevention Plan |
| Prior to |
| Start of Construction |
| 6 |
| Utility Outage Plan |
| Prior to |
| Start of Construction |
| 7 |
| Schedule of Prices |
| Within 21 days |
| After Award |
| 8 |
| Operation and Maintenance Information |
| Prior to |
| Final Payment |
| 9 |
| Licenses and Permits |
| Prior to |
| Start of Construction |
| 10 |
| Badge Requests, DBIDS requests |
| Prior to |
| Any work on Government Property |
| 11 |
| Statement of Acknowledgement SF 1413 |
| Prior to |
| Any work on Government Property |
| 12 |
| Demolition and Work Plan |
| Prior to |
| Start of Construction |
| 13 |
| Design Development Docs (HVAC preliminary drawings of equipment and air distribution layout, structural cals and drawings, preliminary electrical single line drawings) |
| Prior to |
| Start of Construction |
| 14 |
| Final Design Docs (HVAC shop drawings of equipment and air distribution layout, structural shop drawings, electrical single line shop drawings) |
| Prior to |
| Start of Construction |
| 15 |
| Submittal Register |
| Prior to |
| Start of Construction |
| 16 |
| Performance/Payment Bonds |
| Within 15 days |
| After Award |
| 17 |
| Environmental Protection Plan |
| Prior to |
| Start of Construction |
| 18 |
| Certificates of Insurance |
| Prior to |
| Start of Construction |
| 19 |
| Door Details / Drawings |
| Prior to |
| Start of Construction |
| 20 |
| Manufacturer Material Cut Sheets and Specifications |
| Prior to |
| Start of Construction |
| 21 |
| eOMSI |
| Prior to |
| BOD |
| 22 |
| Operating and Maintenance Support Hazard Analysis |
| Prior to |
| Start of Construction |
File details come from the government source that posted it. Updated .