| File | Type | Posted |
|---|---|---|
| Exhibit G Revised RFI Form.docx | DOCX document | |
| Exhibit A - Offeror Team Composition and Management.docx | DOCX document | |
| Exhibit X Post-Award-Limitations-on-Subcontracting-Report.docx | DOCX document | |
| Exhibit H GENERIC UFGS Guides for projects.docx | DOCX document | |
| N62473-20-R-0010 RFP.pdf | ||
| Exhibit E Financial Questionnaire.docx | DOCX document | |
| SOLANO COUNTY WD 122719.pdf | ||
| Exhibit F Surety Form.docx | DOCX document | |
| Exhibit C - PPQ.docx | DOCX document | |
| Exhibit B - Experience - Offeror.docx | DOCX document | |
| Exhibit D Safety Data 123019.docx | DOCX document | |
| Exhibit J JOC IDIQ SAMPLE SUBMITTAL REGISTER.docx | DOCX document | |
| EXHIBIT K COEFFICIENT WORKSHEET with profit language 072418.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PRE-PRICED ITEM DESCRIPTION | MEANS ITEM # | QTY # | QTY UNIT | NATIONAL AVERAGE MATERIAL (MATL) UNIT COST | MATL TOTAL COST | NATIONAL AVERAGE LABOR UNIT COST | LABOR TOTAL COST | NATIONAL AVERAGE EQUIPMENT (EQUIP) UNIT COST | EQUIP TOTAL COST | OTHER COST | OTHER TOTAL COST |
| Pre-Cleaning HEPA vacuum and wet wipe | 02 82 13.42 0100 | 1000 | sf | $ 0.01 | $ 10.00 | $ 0.31 | $ 310.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Separation barrier (approx 8' x 30') | 02 82 13 42.0300 | 240 | sf | $ 3.08 | $ 739.20 | $ 2.13 | $ 511.20 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Personnel decontamination chamber | 02 82 13 42.0400 | 9 | sf | $ 3.55 | $ 31.95 | $ 3.04 | $ 27.36 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Set up negative air machine | 02 82 13 42.0900 | 1 | ea | $ - 0 | $ - 0 | $ 109.00 | $ 109.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Set up and remove portable shower unit | 02 82 13 42.0950 | 1 | ea | $ - 0 | $ - 0 | $ 235.00 | $ 235.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Remove VAT and mastic from floor by hand | 02 82 13 43.5000 | 1000 | sf | $ 0.07 | $ 70.00 | $ 1.57 | $ 1,570.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Industrial hygienist | 02 82 13 45.0120 | 1 | day | $ - 0 | $ - 0 | $ 385.00 | $ 385.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Asbestos sampling | 02 82 13 45.0200 | 4 | ea | $ 15.90 | $ 63.60 | $ 58.50 | $ 234.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Remove decontamination facility | 02 82 13 46.4000 | 1 | ea | $ 15.15 | $ 15.15 | $ 176.00 | $ 176.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Collect and bag bulk material | 02 82 13 47.0100 | 2 | ea | $ 0.77 | $ 1.54 | $ 9.40 | $ 18.80 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Double bag and decontaminate | 02 82 13 47.1000 | 2 | ea | $ 0.77 | $ 1.54 | $ 3.91 | $ 7.82 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Containerize bagged material in drums | 02 82 13 47.2000 | 2 | ea | $ 18.90 | $ 37.80 | $ 4.70 | $ 9.40 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Remove Cove Base | 09 05 05.20 0850 | 160 | lf | $ - 0 | $ - 0 | $ 0.34 | $ 54.40 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Remove VCT | 09 05 05.20 0900 | 1000 | sf | $ - 0 | $ - 0 | $ 0.67 | $ 670.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Install Cove Base | 09 65 13.13 0700 | 160 | lf | $ 1.17 | $ 187.20 | $ 1.26 | $ 201.60 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Install VCT | 09 65 19.19 7150 | 1000 | sf | $ 3.51 | $ 3,510.00 | $ 0.79 | $ 790.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTALS | $ 4,667.98 | $ 5,309.58 | $ - 0 | $ - 0 |
| NON PRE-PRICED ITEM DESCRIPTION | QTY # | QTY UNIT | MATERIAL (MATL) UNIT COST | MATL TOTAL COST | LABOR UNIT COST | LABOR TOTAL COST | EQUIPMENT (EQUIP) UNIT COST | EQUIP TOTAL COST | OTHER COST | OTHER TOTAL COST | |
| Air Pollution Control District (APCD) notification fee 501 SF to 2,000 SF | 1 | ea | $ 250.00 | $ 250.00 | |||||||
| PREPRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER) | $ 9,977.56 | ||||||||||
| CITY COST INDEX _114.4____ (_SACRAMENTO, CA__WEIGHTED AVERAGE)_ | $ 1,436.77 | ||||||||||
| SUBTOTAL (PREPRICED LINE TOTALS + CCI) | $ 11,414.33 | ||||||||||
| APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT __7.75%______ | $ 361.77 | THE PROVIDED UNIT PRICING IS BASED ON R. S. MEANS 2020 BASE DATA. | |||||||||
| SUBTOTAL (PREPRICED LINE ITEMS + CCI + SALES TAX) | $ 11,776.10 | DO NOT CHANGE THE UNIT PRICING OR SALES TAX PROVIDED. | |||||||||
| PRE-PRICED COEFFICIENT _______ (FROM EXHIBIT K WORKSHEET) | ENTER YOUR EXHIBIT K COEFFICIENTS, COMPLETE THE CALCULATIONS IN ROWS 22 TO 31, AND RETURN. | ||||||||||
| TOTAL (PRE-PRICED LINE ITEMS + CCI + SALES TAX, LINE 27) + PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 27 X LINE 28) |
| NON PRE-PRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER) | $ 250.00 |
| APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT _7.75%_________ | $ - 0 |
| SUBTOTAL | $ 250.00 |
| NON PRE-PRICED COEFFICIENT _________ (FROM EXHIBIT K WORKSHEET) | |
| SUBTOTAL | |
| TOTAL (NON PRE-PRICED LINE ITEMS + SALES TAX, LINE 33) + NON PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 33 X LINE 34) |
| TOTAL TASK ORDER PRICE (LINE 29 + LINE 36) |