J-0200000-13_ELIN_Schedule_-_PV_Maintenance.xls
XLS spreadsheet 783 KB Posted
- Attached to
- Photovoltaic Maintenance Federal contract opportunity
- Solicitation number
- N6247319Q5012
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| ATTACHMENT J-0200000-13 | ||||
| EXHIBIT LINE ITEM NUMBERS | ||||
| SOLICITATION/CONTRACT #N62473-19-Q-5012 | ||||
| EXHIBIT A - E - CLIN 0001-3002 | ||||
| Indefinite Delivery / Indefinite Quantity Price - Summary | ||||
| PROVIDE PRICES TO MAINTAIN AND SERVICE PHOTOVOLTAIC POWER GENERATION AND DISTRIBUTION SYSTEMSQUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||
| FIRM FIXED PRICING AND INDEFINITE DELIVERY / INDEFINITE | ||||
| Summary Sheet: Base plus Three Option Periods | ||||
| Description | FFP | IDIQ | Total | |
| 0001 | Base Period (REGION SW) | $0.00 | $0.00 | |
| Base Period (USMC WEST) | $0.00 | $0.00 | ||
| 0002 | Base Period (IDIQ)) | $1,268,540.00 | $1,268,540.00 | |
| TOTAL BASE PERIOD | $0.00 | $1,268,540.00 | $1,268,540.00 | |
| 1001 | Option Period One (REGION SW) | $0.00 | $0.00 | |
| Option Period One (USMC WEST) | $0.00 | $0.00 | ||
| 1002 | Option Period One (IDIQ) | $75,000.00 | $75,000.00 | |
| TOTAL OPTION PERIOD ONE | $0.00 | $75,000.00 | $75,000.00 | |
| 2001 | Option Period Two (REGION SW) | $0.00 | $0.00 | |
| Option Period Two (USMC WEST) | $0.00 | $0.00 | ||
| 2002 | Option Period Two (IDIQ) | $75,000.00 | $75,000.00 | |
| TOTAL OPTION PERIOD TWO | $0.00 | $75,000.00 | $75,000.00 | |
| 3001 | Option Period Three (REGION SW) | $0.00 | $0.00 | |
| Option Period Three (USMC WEST) | $0.00 | $0.00 | ||
| 3002 | Option Period Three (IDIQ) | $75,000.00 | $75,000.00 | |
| TOTAL OPTION PERIOD THREE | $0.00 | $75,000.00 | $75,000.00 | |
| TOTAL CONTRACT CAPACITY | $0.00 | $1,493,540.00 | $1,493,540.00 |
ELINs-Base Period (FFP)
| ATTACHMENT J-0200000-13 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT #N62473-19-Q-5012 | ||||||
| EXHIBIT A - CLIN 9000 | ||||||
| Line Item 0001 Recurring (Firm Fixed Price) Base Period | ||||||
| PROVIDE PRICES TO MAINTAIN AND SERVICE PHOTOVOLTAIC POWER GENERATION AND DISTRIBUTION SYSTEMS | ||||||
| RECURRING (FIRM FIXED PRICE) IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| REGION SOUTHWEST | ||||||
| A001 | El Centro Spec Item 3 | |||||
| A001AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| A001AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| A001AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| A003AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| A003AE | Startup Maintenance (One-Time) Provide a PV System Equipment Condition Report per Condition Assessments and Operational Testing, Spec Items 2.3.4, 3, 3.1, 3.2 and 3.4 | 0 | LS | $0.00 | $0.00 | 8310 |
| El Centro Subtotal | $0.00 | |||||
| A002 | NAS Lemoore Spec Item 3 | |||||
| A002AA | Urgent Service Orders, Spec item 3.1.2 | 2 | EA | $0.00 | $0.00 | 8310 |
| A002AB | Routine Service Orders, Spec Item 3.1.3 | 4 | EA | $0.00 | $0.00 | 8310 |
| A002AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| A002AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 17 | EA | $0.00 | $0.00 | 8310 |
| A002AE | Startup Maintenance (One-Time) Provide a PV System Equipment Condition Report per Condition Assessments and Operational Testing, Spec Items 2.3.4, 3, 3.1, 3.2 and 3.4 | 1 | LS | $0.00 | $0.00 | 8310 |
| NAS Lemoore Subtotal | $0.00 | |||||
| A003 | Naval Base Coronado Spec Item 3 | |||||
| A003AA | Urgent Service Orders, Spec item 3.1.2 | 4 | EA | $0.00 | $0.00 | 8310 |
| A003AB | Routine Service Orders, Spec Item 3.1.3 | 4 | EA | $0.00 | $0.00 | 8310 |
| A003AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| A003AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 20 | EA | $0.00 | $0.00 | 8310 |
| A003AE | Startup Maintenance (One-Time) Provide a PV System Equipment Condition Report per Condition Assessments and Operational Testing, Spec Items 2.3.4, 3, 3.1, 3.2 and 3.4 | 1 | LS | $0.00 | $0.00 | 8310 |
| Naval Base Coronado Subtotal | $0.00 | |||||
| A004 | Naval Base Point Loma Spec Item 3 | |||||
| A004AA | Urgent Service Orders, Spec item 3.1.2 | 3 | EA | $0.00 | $0.00 | 8310 |
| A004AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| A004AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| A004AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 13 | EA | $0.00 | $0.00 | 8310 |
| A004AE | Startup Maintenance (One-Time) Provide a PV System Equipment Condition Report per Condition Assessments and Operational Testing, Spec Items 2.3.4, 3, 3.1, 3.2 and 3.4 | 1 | LS | $0.00 | $0.00 | 8310 |
| Naval Base Point Loma Subtotal | $0.00 | |||||
| A005 | Naval Base San Diego Spec Item 3 | |||||
| A005AA | Urgent Service Orders, Spec item 3.1.2 | 4 | EA | $0.00 | $0.00 | 8310 |
| A005AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| A005AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| A005AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 11 | EA | $0.00 | $0.00 | 8310 |
| A005AE | Startup Maintenance (One-Time) Provide a PV System Equipment Condition Report per Condition Assessments and Operational Testing, Spec Items 2.3.4, 3, 3.1, 3.2 and 3.4 | 1 | LS | $0.00 | $0.00 | 8310 |
| Naval Base San Diego Subtotal | $0.00 | |||||
| A006 | Naval Base Ventura County Spec Item 3 | |||||
| A006AA | Urgent Service Orders, Spec item 3.1.2 | 2 | EA | $0.00 | $0.00 | 8310 |
| A006AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| A006AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| A006AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 8 | EA | $0.00 | $0.00 | 8310 |
| A006AE | Startup Maintenance (One-Time) Provide a PV System Equipment Condition Report per Condition Assessments and Operational Testing, Spec Items 2.3.4, 3, 3.1, 3.2 and 3.4 | 1 | LS | $0.00 | $0.00 | 8310 |
| Naval Base Ventura County Subtotal | $0.00 | |||||
| A007 | NAWS China Lake Spec Item 3 | |||||
| A007AA | Urgent Service Orders, Spec item 3.1.2 | 3 | EA | $0.00 | $0.00 | 8310 |
| A007AB | Routine Service Orders, Spec Item 3.1.3 | 3 | EA | $0.00 | $0.00 | 8310 |
| A007AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| A007AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| A007AE | Startup Maintenance (One-Time) Provide a PV System Equipment Condition Report per Condition Assessments and Operational Testing, Spec Items 2.3.4, 3, 3.1, 3.2 and 3.4 | 1 | LS | $0.00 | $0.00 | 8310 |
| NAWS China Lake Subtotal | $0.00 | |||||
| A008 | NSA Monterey Spec Item 3 | |||||
| A008AA | Urgent Service Orders, Spec item 3.1.2 | 1 | EA | $0.00 | $0.00 | 8310 |
| A008AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| A008AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| A008AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 7 | EA | $0.00 | $0.00 | 8310 |
| A008AE | Startup Maintenance (One-Time) Provide a PV System Equipment Condition Report per Condition Assessments and Operational Testing, Spec Items 2.3.4, 3, 3.1, 3.2 and 3.4 | 0 | LS | $0.00 | $0.00 | 8310 |
| NSA Monterey Subtotal | $0.00 | |||||
| A009 | NWS Seal Beach Spec Item 3 | |||||
| A009AA | Urgent Service Orders, Spec item 3.1.2 | 1 | EA | $0.00 | $0.00 | 8310 |
| A009AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| A009AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| A009AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 5 | EA | $0.00 | $0.00 | 8310 |
| A009AE | Startup Maintenance (One-Time) Provide a PV System Equipment Condition Report per Condition Assessments and Operational Testing, Spec Items 2.3.4, 3, 3.1, 3.2 and 3.4 | 1 | LS | $0.00 | $0.00 | 8310 |
| NWS Seal Beach Subtotal | $0.00 | |||||
| TOTAL FFP REGION SOUTHWEST (BASE PERIOD) | $0.00 | |||||
| USMC-WEST | ||||||
| A010 | MCAS Miramar Spec Item 3 | |||||
| A010AA | Urgent Service Orders, Spec item 3.1.2 | 2 | EA | $0.00 | $0.00 | 8310 |
| A010AB | Routine Service Orders, Spec Item 3.1.3 | 3 | EA | $0.00 | $0.00 | 8310 |
| A010AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| A010AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 10 | EA | $0.00 | $0.00 | 8310 |
| A010AE | Startup Maintenance (One-Time) Provide a PV System Equipment Condition Report per Condition Assessments and Operational Testing, Spec Items 2.3.4, 3, 3.1, 3.2 and 3.4 | 1 | LS | $0.00 | $0.00 | 8310 |
| TOTAL - MCAS Miramar | $0.00 | |||||
| A011 | MCAS Yuma Spec Item 3 | |||||
| A011AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| A011AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| A011AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| A011AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| A011AE | Startup Maintenance (One-Time) Provide a PV System Equipment Condition Report per Condition Assessments and Operational Testing, Spec Items 2.3.4, 3, 3.1, 3.2 and 3.4 | 0 | LS | $0.00 | $0.00 | 8310 |
| TOTAL - MCAS Yuma | $0.00 | |||||
| A012 | MCLB Barstow Spec Item 3 | |||||
| A012AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| A012AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| A012AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| A012AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| A012AE | Startup Maintenance (One-Time) Provide a PV System Equipment Condition Report per Condition Assessments and Operational Testing, Spec Items 2.3.4, 3, 3.1, 3.2 and 3.4 | 0 | LS | $0.00 | $0.00 | 8310 |
| TOTAL - MCLB Barstow | $0.00 | |||||
| A013 | MCRD San Diego Spec Item 3 | |||||
| A013AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| A013AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| A013AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| A013AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| A013AE | Startup Maintenance (One-Time) Provide a PV System Equipment Condition Report per Condition Assessments and Operational Testing, Spec Items 2.3.4, 3, 3.1, 3.2 and 3.4 | 0 | LS | $0.00 | $0.00 | 8310 |
| TOTAL - MCRD San Diego | $0.00 | |||||
| TOTAL USMC-WEST (BASE PERIOD) | $0.00 | |||||
| TOTAL FFP (BASE PERIOD) | $0.00 |
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-Base Period (IDIQ)
| ATTACHMENT J-0200000-13 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT #N62473-19-Q-5012 | |||||||
| EXHIBIT A - CLIN 9000 | |||||||
| Line Item 0002 Non-Recurring (Indefinite Delivery / Indefinite Quantity) Price - Base Period | |||||||
| PROVIDE PRICES TO MAINTAIN AND SERVICE PHOTOVOLTAIC POWER GENERATION AND DISTRIBUTION SYSTEMS | |||||||
| RECURRING (FIRM FIXED PRICE) IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Quantity (Maximum) | Unit of Issue | Unit Price | Extended Price (Maximum) | IMAP CAC(s) |
| A700 | Additional Labor Work | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 2500 | HR | $0.00 | $0.00 | |
| A701 | Additional Material Costs | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Final costs must be negotiated by KO in the order. | 1 | LS | $1,268,540.00 | $1,268,540.00 | |
| A702 | Emergency Service Order | Labor and Material for additional Emergency Service Orders, Spec Item 3.1.1 | 0 | EA | $0.00 | $0.00 | |
| A703 | Urgent Service Order | Labor and Material for additional Urgent Service Orders, Spec Item 3.1.2 | 27 | EA | $0.00 | $0.00 | |
| A704 | Routine Service Order | Labor and Material for additional Routine Service Orders, Spec Item 3.1.3 | 27 | EA | $0.00 | $0.00 | |
| TOTAL NON-RECURRING (IDIQ) BASE PERIOD | $1,268,540.00 |
ELINs-Opt Pd One (FFP)
| ATTACHMENT J-0200000-13 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT #N62473-19-Q-5012 | ||||||
| EXHIBIT B - CLIN 9001 | ||||||
| Line Item 1001 Recurring (Firm Fixed Price) Option Period One | ||||||
| PROVIDE PRICES TO MAINTAIN AND SERVICE PHOTOVOLTAIC POWER GENERATION AND DISTRIBUTION SYSTEMS | ||||||
| RECURRING (FIRM FIXED PRICE) IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| REGION SOUTHWEST | ||||||
| B001 | El Centro Spec Item 3 | |||||
| B001AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| B001AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| B001AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| B001AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| El Centro Subtotal | $0.00 | |||||
| B002 | NAS Lemoore Spec Item 3 | |||||
| B002AA | Urgent Service Orders, Spec item 3.1.2 | 2 | EA | $0.00 | $0.00 | 8310 |
| B002AB | Routine Service Orders, Spec Item 3.1.3 | 4 | EA | $0.00 | $0.00 | 8310 |
| B002AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| B002AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 17 | EA | $0.00 | $0.00 | 8310 |
| NAS Lemoore Subtotal | $0.00 | |||||
| B003 | Naval Base Coronado Spec Item 3 | |||||
| B003AA | Urgent Service Orders, Spec item 3.1.2 | 4 | EA | $0.00 | $0.00 | 8310 |
| B003AB | Routine Service Orders, Spec Item 3.1.3 | 4 | EA | $0.00 | $0.00 | 8310 |
| B003AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| B003AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 20 | EA | $0.00 | $0.00 | 8310 |
| Naval Base Coronado Subtotal | $0.00 | |||||
| B004 | Naval Base Point Loma Spec Item 3 | |||||
| B004AA | Urgent Service Orders, Spec item 3.1.2 | 3 | EA | $0.00 | $0.00 | 8310 |
| B004AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| B004AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| B004AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 13 | EA | $0.00 | $0.00 | 8310 |
| Naval Base Point Loma Subtotal | $0.00 | |||||
| B005 | Naval Base San Diego Spec Item 3 | |||||
| B005AA | Urgent Service Orders, Spec item 3.1.2 | 4 | EA | $0.00 | $0.00 | 8310 |
| B005AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| B005AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| B005AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 11 | EA | $0.00 | $0.00 | 8310 |
| Naval Base San Diego Subtotal | $0.00 | |||||
| B006 | Naval Base Ventura County Spec Item 3 | |||||
| B006AA | Urgent Service Orders, Spec item 3.1.2 | 2 | EA | $0.00 | $0.00 | 8310 |
| B006AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| B006AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| B006AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 8 | EA | $0.00 | $0.00 | 8310 |
| Naval Base Ventura County Subtotal | $0.00 | |||||
| B007 | NAWS China Lake Spec Item 3 | |||||
| B007AA | Urgent Service Orders, Spec item 3.1.2 | 3 | EA | $0.00 | $0.00 | 8310 |
| B007AB | Routine Service Orders, Spec Item 3.1.3 | 3 | EA | $0.00 | $0.00 | 8310 |
| B007AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| B007AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| NAWS China Lake Subtotal | $0.00 | |||||
| B008 | NSA Monterey Spec Item 3 | |||||
| B008AA | Urgent Service Orders, Spec item 3.1.2 | 1 | EA | $0.00 | $0.00 | 8310 |
| B008AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| B008AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| B008AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 7 | EA | $0.00 | $0.00 | 8310 |
| NSA Monterey Subtotal | $0.00 | |||||
| B009 | NWS Seal Beach Spec Item 3 | |||||
| B009AA | Urgent Service Orders, Spec item 3.1.2 | 1 | EA | $0.00 | $0.00 | 8310 |
| B009AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| B009AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| B009AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 5 | EA | $0.00 | $0.00 | 8310 |
| NWS Seal Beach Subtotal | $0.00 | |||||
| TOTAL FFP REGION SW (OPTION PERIOD ONE) | $0.00 | |||||
| USMC-WEST | ||||||
| B010 | MCAS Miramar Spec Item 3 | |||||
| B010AA | Urgent Service Orders, Spec item 3.1.2 | 2 | EA | $0.00 | $0.00 | 8310 |
| B010AB | Routine Service Orders, Spec Item 3.1.3 | 3 | EA | $0.00 | $0.00 | 8310 |
| B010AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| B010AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 10 | EA | $0.00 | $0.00 | 8310 |
| TOTAL - MCAS Miramar | $0.00 | |||||
| B011 | MCAS Yuma Spec Item 3 | |||||
| B011AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| B011AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| B011AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| B011AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| TOTAL - MCAS Yuma | $0.00 | |||||
| B012 | MCLB Barstow Spec Item 3 | |||||
| B012AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| B012AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| B012AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| B012AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| TOTAL - MCLB Barstow | $0.00 | |||||
| B013 | MCRD San Diego Spec Item 3 | |||||
| B013AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| B013AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| B013AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| B013AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| TOTAL - MCRD San Diego | $0.00 | |||||
| TOTAL USMC-WEST (OPTION PERIOD ONE) | $0.00 | |||||
| TOTAL FFP (OPTION PERIOD ONE) | $0.00 |
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-Opt Pd One (IDIQ)
| ATTACHMENT J-0200000-13 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT #N62473-19-Q-5012 | |||||||
| EXHIBIT B - CLIN 9001 | |||||||
| Line Item 1002 Non-Recurring (Indefinite Delivery / Indefinite Quantity) Price - Option Period One | |||||||
| PROVIDE PRICES TO MAINTAIN AND SERVICE PHOTOVOLTAIC POWER GENERATION AND DISTRIBUTION SYSTEMS | |||||||
| RECURRING (FIRM FIXED PRICE) IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Quantity (Maximum) | Unit of Issue | Unit Price | Extended Price (Maximum) | IMAP CAC(s) |
| B700 | Additional Labor Work | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 360 | HR | $ - 0 | $0.00 | |
| B701 | Additional Material Costs | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Final costs must be negotiated by KO in the order. | 1 | LS | $ 75,000.00 | $75,000.00 | |
| B702 | Emergency Service Order | Labor and Material for additional Emergency Service Orders, Spec Item 3.1.1 | 2 | EA | $ - 0 | $0.00 | |
| B703 | Urgent Service Order | Labor and Material for additional Urgent Service Orders, Spec Item 3.1.2 | 5 | EA | $ - 0 | $0.00 | |
| B704 | Routine Service Order | Labor and Material for additional Routine Service Orders, Spec Item 3.1.3 | 5 | EA | $ - 0 | $0.00 | |
| TOTAL NON-RECURRING (IDIQ) OPTION PERIOD ONE | $75,000.00 |
ELINs-Opt Pd Two (FFP)
| ATTACHMENT J-0200000-13 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT #N62473-19-Q-5012 | ||||||
| EXHIBIT C - CLIN 9002 | ||||||
| Line Item 2001 Recurring (Firm Fixed Price) Option Period Two | ||||||
| PROVIDE PRICES TO MAINTAIN AND SERVICE PHOTOVOLTAIC POWER GENERATION AND DISTRIBUTION SYSTEMS | ||||||
| RECURRING (FIRM FIXED PRICE) IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| REGION SOUTHWEST | ||||||
| C001 | El Centro Spec Item 3 | |||||
| C001AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| C001AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| C001AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| C001AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| El Centro Subtotal | $0.00 | |||||
| C002 | NAS Lemoore Spec Item 3 | |||||
| C002AA | Urgent Service Orders, Spec item 3.1.2 | 2 | EA | $0.00 | $0.00 | 8310 |
| C002AB | Routine Service Orders, Spec Item 3.1.3 | 4 | EA | $0.00 | $0.00 | 8310 |
| C002AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| C002AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 17 | EA | $0.00 | $0.00 | 8310 |
| NAS Lemoore Subtotal | $0.00 | |||||
| C003 | Naval Base Coronado Spec Item 3 | |||||
| C003AA | Urgent Service Orders, Spec item 3.1.2 | 4 | EA | $0.00 | $0.00 | 8310 |
| C003AB | Routine Service Orders, Spec Item 3.1.3 | 4 | EA | $0.00 | $0.00 | 8310 |
| C003AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| C003AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 20 | EA | $0.00 | $0.00 | 8310 |
| Naval Base Coronado Subtotal | $0.00 | |||||
| C004 | Naval Base Point Loma Spec Item 3 | |||||
| C004AA | Urgent Service Orders, Spec item 3.1.2 | 3 | EA | $0.00 | $0.00 | 8310 |
| C004AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| C004AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| C004AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 13 | EA | $0.00 | $0.00 | 8310 |
| Naval Base Point Loma Subtotal | $0.00 | |||||
| C005 | Naval Base San Diego Spec Item 3 | |||||
| C005AA | Urgent Service Orders, Spec item 3.1.2 | 4 | EA | $0.00 | $0.00 | 8310 |
| C005AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| C005AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| C005AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 11 | EA | $0.00 | $0.00 | 8310 |
| Naval Base San Diego Subtotal | $0.00 | |||||
| C006 | Naval Base Ventura County Spec Item 3 | |||||
| C006AA | Urgent Service Orders, Spec item 3.1.2 | 2 | EA | $0.00 | $0.00 | 8310 |
| C006AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| C006AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| C006AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 8 | EA | $0.00 | $0.00 | 8310 |
| Naval Base Ventura County Subtotal | $0.00 | |||||
| C007 | NAWS China Lake Spec Item 3 | |||||
| C007AA | Urgent Service Orders, Spec item 3.1.2 | 3 | EA | $0.00 | $0.00 | 8310 |
| C007AB | Routine Service Orders, Spec Item 3.1.3 | 3 | EA | $0.00 | $0.00 | 8310 |
| C007AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| C007AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| NAWS China Lake Subtotal | $0.00 | |||||
| C008 | NSA Monterey Spec Item 3 | |||||
| C008AA | Urgent Service Orders, Spec item 3.1.2 | 1 | EA | $0.00 | $0.00 | 8310 |
| C008AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| C008AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| C008AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 7 | EA | $0.00 | $0.00 | 8310 |
| NSA Monterey Subtotal | $0.00 | |||||
| C009 | NWS Seal Beach Spec Item 3 | |||||
| C009AA | Urgent Service Orders, Spec item 3.1.2 | 1 | EA | $0.00 | $0.00 | 8310 |
| C009AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| C009AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| C009AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 5 | EA | $0.00 | $0.00 | 8310 |
| NWS Seal Beach Subtotal | $0.00 | |||||
| TOTAL FFP REGION SW (OPTION PERIOD TWO) | $0.00 | |||||
| USMC-WEST | ||||||
| C010 | MCAS Miramar Spec Item 3 | |||||
| C010AA | Urgent Service Orders, Spec item 3.1.2 | 2 | EA | $0.00 | $0.00 | 8310 |
| C010AB | Routine Service Orders, Spec Item 3.1.3 | 3 | EA | $0.00 | $0.00 | 8310 |
| C010AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| C010AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 10 | EA | $0.00 | $0.00 | 8310 |
| TOTAL - MCAS Miramar | $0.00 | |||||
| C011 | MCAS Yuma Spec Item 3 | |||||
| C011AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| C011AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| C011AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| C011AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| TOTAL - MCAS Yuma | $0.00 | |||||
| C012 | MCLB Barstow Spec Item 3 | |||||
| C012AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| C012AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| C012AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| C012AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| TOTAL - MCLB Barstow | $0.00 | |||||
| C013 | MCRD San Diego Spec Item 3 | |||||
| C013AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| C013AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| C013AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| C013AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| TOTAL - MCRD San Diego | $0.00 | |||||
| TOTAL USMC-WEST (OPTION PERIOD TWO) | $0.00 | |||||
| TOTAL FFP (OPTION PERIOD TWO) | $0.00 |
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-Opt Pd Two (IDIQ)
| ATTACHMENT J-0200000-13 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT #N62473-19-Q-5012 | |||||||
| EXHIBIT C - CLIN 9002 | |||||||
| Line Item 2002 Non-Recurring (Indefinite Delivery / Indefinite Quantity) Price - Option Period Two | |||||||
| PROVIDE PRICES TO MAINTAIN AND SERVICE PHOTOVOLTAIC POWER GENERATION AND DISTRIBUTION SYSTEMS | |||||||
| RECURRING (FIRM FIXED PRICE) IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Quantity (Maximum) | Unit of Issue | Unit Price | Extended Price (Maximum) | IMAP CAC(s) |
| C700 | Additional Labor Work | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 360 | HR | $ - 0 | $0.00 | |
| C701 | Additional Material Costs | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Final costs must be negotiated by KO in the order. | 1 | LS | $ 75,000.00 | $75,000.00 | |
| C702 | Emergency Service Order | Labor and Material for additional Emergency Service Orders, Spec Item 3.1.1 | 2 | EA | $ - 0 | $0.00 | |
| C703 | Urgent Service Order | Labor and Material for additional Urgent Service Orders, Spec Item 3.1.2 | 5 | EA | $ - 0 | $0.00 | |
| C704 | Routine Service Order | Labor and Material for additional Routine Service Orders, Spec Item 3.1.3 | 5 | EA | $ - 0 | $0.00 | |
| TOTAL NON-RECURRING (IDIQ) OPTION PERIOD TWO | $75,000.00 |
ELINs-Opt Pd Three (FFP)
| ATTACHMENT J-0200000-13 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT #N62473-19-Q-5012 | ||||||
| EXHIBIT D - CLIN 9004 | ||||||
| Line Item 3001 Recurring (Firm Fixed Price) Option Period Three | ||||||
| PROVIDE PRICES TO MAINTAIN AND SERVICE PHOTOVOLTAIC POWER GENERATION AND DISTRIBUTION SYSTEMS | ||||||
| RECURRING (FIRM FIXED PRICE) IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| REGION SOUTHWEST | ||||||
| D001 | El Centro Spec Item 3 | |||||
| D001AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| D001AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| D001AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| D001AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| El Centro Subtotal | $0.00 | |||||
| D002 | NAS Lemoore Spec Item 3 | |||||
| D002AA | Urgent Service Orders, Spec item 3.1.2 | 2 | EA | $0.00 | $0.00 | 8310 |
| D002AB | Routine Service Orders, Spec Item 3.1.3 | 4 | EA | $0.00 | $0.00 | 8310 |
| D002AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| D002AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 17 | EA | $0.00 | $0.00 | 8310 |
| NAS Lemoore Subtotal | $0.00 | |||||
| D003 | Naval Base Coronado Spec Item 3 | |||||
| D003AA | Urgent Service Orders, Spec item 3.1.2 | 4 | EA | $0.00 | $0.00 | 8310 |
| D003AB | Routine Service Orders, Spec Item 3.1.3 | 4 | EA | $0.00 | $0.00 | 8310 |
| D003AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| D003AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 20 | EA | $0.00 | $0.00 | 8310 |
| Naval Base Coronado Subtotal | $0.00 | |||||
| D004 | Naval Base Point Loma Spec Item 3 | |||||
| D004AA | Urgent Service Orders, Spec item 3.1.2 | 3 | EA | $0.00 | $0.00 | 8310 |
| D004AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| D004AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| D004AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 13 | EA | $0.00 | $0.00 | 8310 |
| Naval Base Point Loma Subtotal | $0.00 | |||||
| D005 | Naval Base San Diego Spec Item 3 | |||||
| D005AA | Urgent Service Orders, Spec item 3.1.2 | 4 | EA | $0.00 | $0.00 | 8310 |
| D005AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| D005AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| D005AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 11 | EA | $0.00 | $0.00 | 8310 |
| Naval Base San Diego Subtotal | $0.00 | |||||
| D006 | Naval Base Ventura County Spec Item 3 | |||||
| D006AA | Urgent Service Orders, Spec item 3.1.2 | 2 | EA | $0.00 | $0.00 | 8310 |
| D006AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| D006AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| D006AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 8 | EA | $0.00 | $0.00 | 8310 |
| Naval Base Ventura County Subtotal | $0.00 | |||||
| D007 | NAWS China Lake Spec Item 3 | |||||
| D007AA | Urgent Service Orders, Spec item 3.1.2 | 3 | EA | $0.00 | $0.00 | 8310 |
| D007AB | Routine Service Orders, Spec Item 3.1.3 | 3 | EA | $0.00 | $0.00 | 8310 |
| D007AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| D007AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| NAWS China Lake Subtotal | $0.00 | |||||
| D008 | NSA Monterey Spec Item 3 | |||||
| D008AA | Urgent Service Orders, Spec item 3.1.2 | 1 | EA | $0.00 | $0.00 | 8310 |
| D008AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| D008AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| D008AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 7 | EA | $0.00 | $0.00 | 8310 |
| NSA Monterey Subtotal | $0.00 | |||||
| D009 | NWS Seal Beach Spec Item 3 | |||||
| D009AA | Urgent Service Orders, Spec item 3.1.2 | 1 | EA | $0.00 | $0.00 | 8310 |
| D009AB | Routine Service Orders, Spec Item 3.1.3 | 2 | EA | $0.00 | $0.00 | 8310 |
| D009AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| D009AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 5 | EA | $0.00 | $0.00 | 8310 |
| NWS Seal Beach Subtotal | $0.00 | |||||
| TOTAL FFP REGION SW (OPTION PERIOD THREE) | $0.00 | |||||
| USMC-WEST | ||||||
| D010 | MCAS Miramar Spec Item 3 | |||||
| D010AA | Urgent Service Orders, Spec item 3.1.2 | 2 | EA | $0.00 | $0.00 | 8310 |
| D010AB | Routine Service Orders, Spec Item 3.1.3 | 3 | EA | $0.00 | $0.00 | 8310 |
| D010AC | PM Program, Spec Item 3.2 | 12 | MO | $0.00 | $0.00 | 8310 |
| D010AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 10 | EA | $0.00 | $0.00 | 8310 |
| TOTAL - MCAS Miramar | $0.00 | |||||
| D011 | MCAS Yuma Spec Item 3 | |||||
| D011AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| D011AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| D011AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| D011AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| TOTAL - MCAS Yuma | $0.00 | |||||
| D012 | MCLB Barstow Spec Item 3 | |||||
| D012AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| D012AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| D012AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| D012AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| TOTAL - MCLB Barstow | $0.00 | |||||
| D013 | MCRD San Diego Spec Item 3 | |||||
| D013AA | Urgent Service Orders, Spec item 3.1.2 | 0 | EA | $0.00 | $0.00 | 8310 |
| D013AB | Routine Service Orders, Spec Item 3.1.3 | 0 | EA | $0.00 | $0.00 | 8310 |
| D013AC | PM Program, Spec Item 3.2 | 0 | MO | $0.00 | $0.00 | 8310 |
| D013AD | Inspection, Testing, and Certification Program, Spec Item 3.4 | 0 | EA | $0.00 | $0.00 | 8310 |
| TOTAL - MCRD San Diego | $0.00 | |||||
| TOTAL USMC-WEST (OPTION PERIOD THREE) | $0.00 | |||||
| TOTAL FFP (OPTION PERIOD THREE) | $0.00 |
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.