J-B-01_ELIN_Schedule.xlsx

XLSX spreadsheet 57 KB Posted

Attached to
IDIQ FOR ROOFING WORK UNDER NAICS 238160, NAVAL BASE VENTURA COUNTY, VENTURA, CA.
Solicitation number
N6247318R2278
Issued by

About this file

This document outlines an indefinite delivery indefinite quantity (IDIQ) contract opportunity for roofing work at various government facilities within Naval Base Ventura County in Ventura, California. The contract term is for a base period of two years, with one two-year option period and a final one-year option period for a maximum term of five years. The estimated maximum value is $30 million. The work includes design-bid-build and minimal design task orders for alterations, repairs, and construction of roofing systems. The North American Industry Classification System code is 238160. The solicitation is open only to HUBZone small businesses and will be posted on September 19, 2018 to the Navy Electronic Commerce Online website. Evaluation factors are ability to manage projects, experience, past performance, safety, and price based on an exhibit line item schedule. The task order range is $2,000 to $750,000 and award will be made to one responsible offeror in best value source selection.

View the file

Other files

File Type Posted
Exhibit_I_Monterey_County_WD_091318.pdf PDF
COMBINED_IDIQ_RFP_EXHIBITS.pdf PDF
N62473-18-R-2278.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Offerer Name: Total Cost

(IDIQ)

BASE PERIOD (2-YEARS)
Indefinite Delivery Indefinite Quantity (IDIQ)
1ST OPTION (2-YEARS)
Indefinite Delivery Indefinite Quantity (IDIQ)
2ND OPTION (ONE YEAR)
Indefinite Delivery Indefinite Quantity (IDIQ)

Total Indefinite Delivery Indefinite Quantity Cost

Base Period

BASE PERFORMANCE PERIOD (YEARS ONE AND TWO) FOR ROOF REPAIR/WATERPROOFING (Offeror Guidance Notes Are located At The End Of The Final Page Of The Base Period)
ITEMDESCRIPTION: Unit Pricing Shall Include All Labor, Materials, Tools, Transportation, Equipment, Management, Supervision, Incidental Engineering, Overhead and Profit.QUANTITYUNITUNIT PRICEEXTENDED PRICE
ROOFING SHINGLES
A00130-YEAR PREMIUM LAMINATED MULTI-LAYERED SHINGLES. Provide new Mineral Granule-Surface Asphalt Shingle roof system complete and ready for use over existing substrate, which includes all new metal flashing, roof jacks, eave flashing, wall flashing, step flashing, gravel stops, rake flashing, roof diverters, vent jacks, base sheets or felts, attic vents or anything that penetrates the roofing system that is considered standard for residential or commercial application. Motor operated vent systems are not considered standard. Class A Fire Rating to include a minimum 30-Year Manufacturer Warranty.300SQ
SHINGLE DEMOLITION
A002COMPOSITION SHINGLE TYPE ROOF SYSTEM DEMOLITION: Remove and dispose of existing shingle system. Includes up-to 3-layers or roof systems thick which include the possible combined systems such as a shingle over a rolled roofing membrane.300SQ
BUILT-UP ROOF SYSTEMS, ROOF DRAINS, DRAIN PIPE, AND WALKWAYS
A003(APP) MODIFIED BITUMEN ROOF SYSTEM 4-PLY: Provide new Atactic Poly-Propylene (APP) Modified Bitumen Sheet Roof system complete and ready for use over existing substrate, which includes all new metal flashing, roof jacks, eave flashing, wall flashing, gravel stops, rake flashing, roof diverters, vent jacks, attic vents, and anything that penetrates the roofing system. Note: Wall Copings and Treated Wood Nailers are found in the Miscellaneous Roof Metal Fabrications and Carpentry ELINs, not included as part of this line item. Motor operated vent systems are not considered standard. Class A Fire Rating to include a minimum 20-Year Manufacturer Warranty.400SQ
A004ROOF DRAINS: Remove existing roof drain. Provide a new 10-inch roof drain. Intended for use as a repair item in conjunction with re-roofing.20EA
A005ROOF DRAIN PIPE: Remove existing and dispose. Provide a new PVC Schedule-40 drain pipe, larger than 2-inch up-to 6-inch in diameter. Includes all fastening devices, hangers, couplings, and elbows necessary for complete ready to use installation.200LF
A006ROOF WALK MATES: Provide mineral surface or granular surface treads to access mechanical equipment. (2 FT by 3 FT in size)100EA
BUILT-UP ROOF SYSTEMS DEMOLITION AND DECK PREPARATION
A007DEMO - Remove and dispose of existing Built-up Roofing System. Includes all built-up systems to an application level of 4-ply.400SQ
A008REMOVAL/SPUDDING AND BROOMING: Spud and or rake loosely embedded gravel/ballast, remove and dispose of gravel and debris from roof in preparation for an overlayment.400SQ
METAL WALL AND ROOF SYSTEMS
A009ARCHITECTURAL STANDING SEAM METAL ROOF SYSTEM: Provide a Architectural Standing Seam Metal Roof System. To include new roof panels at a minimum thickness of 24-gage galvanized steel with manufacturer's standard paint coatings, related roof flashings, copings, closures, fillers, metal expansion joints, ridge covers, roof panel mounting clips, gable and eave trim, gutters and downspouts, waterproof membranes or base felts, and other accessory items. Provide a minimum 20-Year Manufacturer's Watertight and Finish Warranty.100,000SF
A010HIGH PROFILE METAL OVER METAL ROOF SYSTEM WITHOUT THERMAL SPACER BLOCK: Provide a retro-fit roof system, which includes all new roof panels at a minimum thickness of 22-gage galvanized steel with manufacturer's standard paint coatings, fasteners, fiberglass insulation, panel clips, roof system clips, copings, and other related accessory items. Intended for use over existing roof systems with minimal to no demolition of existing roof. Provide a minimum 20-Year Manufacturer's Watertight and Finish Warranty.30,000SF
A011HIGH PROFILE METAL OVER METAL ROOF SYSTEM WITH THERMAL SPACER BLOCK: Provide a retro-fit roof system, which includes all new roof panels at a minimum thickness of 24-gage galvanized steel with manufacturer's standard paint coatings, fasteners, rigid insulation filling void between new and existing roof systems, panel clips, roof system clips, copings, and other related accessory items. Intended for use over existing roof systems with minimal to no demolition of existing roof. Provide a minimum 20-Year Manufacturer's Watertight and Finish Warranty.50,000SF
A012STRUCTURAL METAL WALL AND ROOF SYSTEM: Provide a structural Metal Roof System, which includes all new roof panels at a minimum thickness of 22-gage galvanized steel with manufacturer's standard paint coatings, related roof flashings, copings, closures, fillers, metal expansion joints, ridge covers, roof panel mounting clips, gable and eave trim, gutters and downspouts, waterproof membranes or base felts, and other accessory items. Note: Depending on the span of existing purlin the thickness of the roofing panel may require a thicker gauged product. Increase in cost for such a condition shall be negotiated using the material Line Item located within the section entitled Remedial Repair. Provide a minimum 20-Year Manufacturer's Watertight and Finish Warranty.100,000SF
A013MISCELLANEOUS SHEET METAL WORK ASSOCIATED WITH METAL ROOFS: Provide sheet metal fabrication and installation associated with metal roof system retrofitting for existing roofs. Fabrications for such items as flashing for curbs/stands and other penetrations of sorts requiring same type of metal and color to tie together newly installed metal roofs with old existing conditions for a complete blend between the old and the new.20,000SF
METAL WALL AND ROOF SYSTEM DEMOLITION
A014REMOVAL - Any metal roof or siding system applied to a beam or purlin type roof structure without a plywood or steel sheathed substrate, such as but not limited to PEB's.300,000SF
A015REMOVAL - Any metal roof system applied to a plywood or steel sheathed substrate.100,000SF
FIBERGLASS REINFORCE PLASTIC (FRP) ROOF & WALL SYSTEMS
A016Fiberglass reinforced plastic panel, Shall offer Mfg. full line of either corrugated or ribbed style panels with standard Mfg. color chart of either pigmented or clear color selections, siding and roof panels, textured, a minimum of 16 ounce per SF. Fasteners with grommets shall be stainless steel. All work shall meet existing UFC/UFGS/ASTM minimum standards for FRP roofing systems and available components such as but not limited to ASTME72, ASTME84, ASTMD696, ASTMD2583 and ASTMD1494. All standard commercial manufacturer warranties will be applicable to these FRP systems including, but not limited to, the minimum 20-year, no dollar limit warranty specified in the UFGS.150,000SF
FLUID APPLIED ELASTOMERIC COATING SYSTEMS
A017FLUID APPLIED ELASTOMERIC COATING: Provide Elastomeric Coating For Metal Roof Systems. Minimum DFT 40-mils.20,000SF
A018MINOR METAL REPAIRS: Minor repair of deteriorated area of metal roof, up to 1 SF of area.100EA
A019MAJOR METAL ROOF REPAIR: Repair metal roof with sheet metal patch, up to 4 SF of area.1000SF
SINGLE PLY MEMBRANES (PVC and KEE) ROOFING
A020SINGLE PLY 80-MIL PVC ROOFING SYSTEM: Provide a new membrane roof system. Installation shall comply with the Manufacturer's written and detailed instructions. A complete system shall include all flashings, edge metals, and boots for such things as mechanical support legs, conduits, and piping's. All work shall meet existing UFC/UFGS/ASTM minimum standards for single-ply 80-mil PVC roofing systems. All standard commercial manufacturer warranties will be applicable to these roofing systems including, but not limited to, the minimum 30-year, no dollar limit warranty specified in the UFGS. Provide a minimum 30-Year NDL Manufacturer's Warranty. Note: For other than just the membrane to complete the roof system make selections for the most appropriate line items located in the gypsum board and or rigid insulation line items.2,000SQ
A021SINGLE PLY 80-MIL PVC ROOFING SYSTEM (Intended use is as an overlay of existing BUR or thermo plastic single ply membrane system): Provide a new membrane roof system. Installation shall comply with the Manufacturer's written and detailed instructions. A complete system shall include all flashings, edge metals, and boots for such things as mechanical support legs, conduits, and piping's. All work shall meet existing UFC/UFGS/ASTM minimum standards for single-ply 80-mil PVC roofing systems. All standard commercial manufacturer warranties will be applicable to these roofing systems including, but not limited to, the minimum 20-year, no dollar limit warranty specified in the UFGS. Provide a minimum 20-Year NDL Manufacturer's Warranty. Note: For other than just the membrane to complete the roof system make selections for the most appropriate line items located in the gypsum board and or rigid insulation line items.1,000SQ
A022WALKING MATE FOR A 80-MIL SINGLE PLY PVC ROOFING SYSTEM: Provide walking mate. Standard thickness as recommended by the Manufacturer, 2-foot by 3-foot square mates. Note: Walk mates are recommended for inclusion with the project whenever there is roof mounted equipment or products of various sorts requiring at least annual maintenance present.500EA
A023SINGLE PLY KEE ROOFING SYSTEM: Provide a new minimum 60-mil membrane roof system. Installation shall comply with the Manufacturer's written and detailed instructions. A complete system shall include all flashings, edge metals, and boots for such things as mechanical support legs, conduits, and piping's. Membrane shall meet or exceed all requirements of ASTM D6754 “Standard Specification for KEE Sheet Roofing” or all requirements of ASTM D4434 “Standard Specification for Poly (Vinyl Chloride) Sheet Roofing” while containing KEE HP or a minimum of 33% KEE (Elvaloy level of quality or better). Provide a minimum 30-Year NDL Manufacturer's Warranty for whole roof tear-off and replacement. Note: To include installation of gypsum board and or insulation select from the appropriate gyp board and insulation line items.3,000SQ
A024SINGLE PLY KEE ROOFING SYSTEM (Intended use is as an overlay of existing BUR or thermoplastic single ply membrane system): Provide a new minimum 60-mil membrane roof system. Installation shall comply with the Manufacturer's written and detailed instructions. A complete system shall include all flashings, edge metals, and boots for such things as mechanical support legs, conduits, and piping's. Membrane shall meet or exceed all requirements of ASTM D6754 “Standard Specification for KEE Sheet Roofing” or all requirements of ASTM D4434 “Standard Specification for Poly (Vinyl Chloride) Sheet Roofing” while containing KEE HP or a minimum of 33% KEE (Elvaloy level of quality or better). To include installation of gypsum board select from the appropriate gyp board line items. Provide a minimum 20-Year NDL Manufacturer's Warranty. Note: To include installation of gypsum board and or insulation select from the appropriate gyp board and insulation line items.1,000SQ
A025WALKING MATE FOR SINGLE PLY KEE ROOFING SYSTEM: Provide walking mate. Standard thickness as recommended by the Manufacturer, 2-foot by 3-foot square mates. Note: Walk mates are recommended for inclusion with the project whenever there is roof mounted equipment or products of various sorts requiring at least annual maintenance present.500EA
A026FULLY ADHERED SURCHARGE (Single Ply Systems): Intended for use when fully adhered roof systems are ordered to cover additional cost for such as Manufacturer adhesives.1,000SF
SINGLE PLY SYSTEMS DEMOLITION
A027SINGLE PLY DEMO: Single ply systems fully adhered and/or mechanically fastened to substrates, remove and dispose.1000SF
ROOFING GYPSUM BOARD PRODUCTS
A028GYPSUM BOARD: Provide when ordered siliconized gypsum board with glass-mat facers, 1/4-inch thick. Mechanically fastened over existing built-up roof systems.4,000SQ
A029GYPSUM BOARD: Provide when ordered siliconized gypsum board with glass-mat facers, 1/2-inch thick. Mechanically fastened over existing built-up roof systems.4,000SQ
INSULATION - Initial Layer Of Insulation Shall Be Mechanically Fastened While Additional Layers Shall be Moped in Place. Should More Than One Layer Of The Indicated ELIN Thickness Be Desired The Appropriate Additional Quantity Will Be Indicated And The Delivery Order Statement Of Work Stating The Overall Desired Insulation Thickness. For Tapered Systems, Use Remedial Repair Materials (As Necessary) For Any Additional Material Cost Incurred.
A030RIGID ISOCYANURATE FOAM INSULATION: Provide in insulation with black mat facers, board thickness a minimum of 1 inch. Mechanically fastened. This particular product line is intended primarily for use with single ply membrane roofing system installations. But this line can be replaced with other insulations located in the insulation section based on the need determined by the single ply membrane Manufacturers specifications and is considered common in use with thermoplastic single ply roof systems.6000SQ
A031STEEL DECK SUBSTRATES: Provide Perlite/Fiberboard/Fiberglass/Foam/Polystyrene/Polyisocyanurate one-inch thick fully adhered and or mechanically fastened in place to substrate as per Manufacturer's recommendations regarding the specific use with the specified roofing system and conditions.50,000SF
A032WOOD SUBSTRATES: Provide Perlite/Fiberboard/Fiberglass/Foam/Polystyrene/Polyisocyanurate one-inch thick fully adhered and or mechanically fastened in place to substrate as per Manufacturer's recommendations regarding the specific use with the specified roofing system and conditions.40,000SF
A033CONCRETE SUBSTRATES: Provide Perlite/Fiberboard/Fiberglass/Foam/Polystyrene/Polyisocyanurate one-inch thick fully adhered and or mechanically fastened in place to substrate as per Manufacturer's recommendations regarding the specific use with the specified roofing system and conditions.10,000SF
A034TAPPERED INSULATION: Provide varying sized insulation for use in built-up type roofing systems. Product lines may vary due to the independent need of a particular project.20,000SF
INSULATION DEMOLITION
A035REMOVAL: Remove and dispose of all types of roof insulation from 1-inch to 6-inch thick fully adhered or mechanically fastened to base/substrate.60,000SF
CARPENTRY - Framing Lumber Shall Be No less Than No.2 In Grade, And Fascia Board No.1 Or Better In Grade. Replacement Of Rafters, Trim Materials, Purlins, Joist, Beams, And Other Structural Members Shall Be Obtained By Means Of The Section Entitled Remedial Repair.
A036FASCIA BOARD REPLACEMENT: Remove existing, provide new 2-inch by 8-inch fascia board. Douglas Fir, No.1 or better, fascia board.1,000BF
A037FASCIA BOARD REPLACEMENT: Remove existing, provide new 2-inch by 10-inch fascia board. Douglas Fir, No.1 or better, fascia board.1,000BF
A038FASCIA BOARD REPLACEMENT: Remove existing, provide new 2-inch by 12-inch fascia board. Douglas Fir, No.1 or better, fascia board.1,000BF
A039LUMBER MATERIALS: Provide 2" x 4" S4S Douglas Fir no less than Strc 2 in grade.1,000BF
A040LUMBER MATERIALS: Provide 2" x 6" S4S Douglas Fir no less than Strc 2 in grade.1,000BF
A041LUMBER MATERIALS: Provide 2" x 8" S4S Douglas Fir no less than Strc 2 in grade1,000BF
A042LUMBER MATERIALS: Provide 2" x 10" S4S Douglas Fir no less than Strc 2 in grade.1,000BF
A043TREATED WOOD MATERIALS: Provide 2" x 4" treated Douglas Fir.1,000BF
A044TREATED WOOD MATERIALS: Provide 2" x 6" treated Douglas Fir.1,000BF
A045TREATED WOOD MATERIALS: Provide 2" x 8" treated Douglas Fir.1,000BF
A046TREATED WOOD MATERIALS: Provide 2" x 10" treated Douglas Fir.1,000BF
A047MISCELLANEOUS SMALL STOCK REPLACEMENT MATERIALS: Remove and dispose of existing deteriorated wood roof nailers, edge strips, and cants. Provide new wood roof nailers, edge strips, and cants.1,000LF
A048PLYWOOD: Remove and dispose of existing deteriorated 1/2-inch thick Plywood Roof Sheathing. Provide new 1/2-inch thick exterior grade Plywood Roof Sheathing.1,000SF
A049PLYWOOD: Remove and dispose of existing deteriorated 5/8-inch thick Plywood Roof Sheathing. Provide new 5/8-inch thick exterior grade Plywood Roof Sheathing.1,000SF
MISCELLANEOUS ROOF MATERIALS, FLASHINGS, AND SHEET METAL WORK FABRICATIONS - Intended For Use Where Wholesale Roof Replacement Is Not Required, Only Specific Repairs. All Exposed Metal Work, Other Than Stainless Steel And Copper, Shall Have A Factory Or Shop Paint Finish Of One-Coat Primer And Two Coats Exterior Enamel at Minimum. All Coping Shall Be Fabricated As A Snap-On In Type. Note: Replacement Of Small Quantity Miscellaneous Metal Fabrications Such Certain Types Of Roof Jacks, Ventilators (Gravity/Stationary Or Turbine/Wind Driven), And Flashings Of All Sorts Not Mentioned By Line Item Should Be Obtained By Means Of The Section Entitled Remedial Repair.
A050GRAVEL STOP: Remove and dispose of existing gravel stops. Provide new factory finished galvanized metal gravel stops.200LF
A051STAINLESS STEEL GRAVEL STOP: Remove and dispose of existing gravel stops. Provide new gravel stops, Stainless Steel.200LF
A052EAVE FLASHING: Remove and dispose of existing eave flashing. Provide new factory finished galvanized metal eave flashing.200LF
A053STAINLESS STEEL EAVE FLASHING: Remove and dispose of existing eave flashing. Provide new eave flashing.200LF
A054RAKE FLASHING: Remove and dispose of existing rake flashing. Provide new factory finished galvanized metal rake flashing.200LF
A055STAINLESS STEEL RAKE FLASHING: Remove and dispose of existing rake flashing. Provide new rake flashing.200LF
A056WALL FLASHING: Remove and dispose of existing wall flashing. Provide new factory finished galvanized wall flashing.200LF
A057STAINLESS STEEL WALL FLASHING: Remove and dispose of existing wall flashing. Provide new wall flashing.200LF
A058COPING: Provide new Steel Roof Edge Metal Coping, 5" to 8" in width. Includes all mechanical clips and fastening devices. Fastening from the top side or surface of coping is not acceptable. Finish shall be factory baked on enamel at minimum.800LF
A059COPING: Provide new Steel Roof Edge Metal Coping, 8" to 10" in width. Includes all mechanical clips and fastening devices. Fastening from the top side or surface of coping is not acceptable. Finish shall be factory baked on enamel at minimum.800LF
A060STAINLESS STEEL COPING: Provide new Steel Roof Edge Metal Coping, 3" to 5" in width. Includes all mechanical clips and fastening devices. Fastening from the top side or surface of coping is not acceptable.800LF
A061STAINLESS STEEL COPING: Provide new Steel Roof Edge Metal Coping, 5" to 10" in width. Includes all mechanical clips and fastening devices. Fastening from the top side or surface of coping is not acceptable.800LF
A062STATIONARY VENTILATOR / GRAVITY SYPHON EXHAUSTER: Provide a new attic exhauster as either a removal of existing with the replacement of or a cut-in as new attic exhauster. Furnish and install new attic exhauster unit. Sizing includes 8-inch to 12-inch neck diameters.50EA
A063STATIONARY VENTILATOR / GRAVITY SYPHON EXHAUSTER: Provide a new attic exhauster as either a removal of existing with the replacement of or a cut-in as new attic exhauster. Sizing includes larger than 12-inch up-to 16-inch neck diameter.50EA
A064STATIONARY VENTILATOR / GRAVITY SYPHON EXHAUSTER: Provide a new attic exhauster as either a removal of existing with the replacement of or a cut-in as new attic exhauster. Sizing includes larger than 16-inch up-to 20-inch neck diameter.50EA
A065TURBIN VENTILATOR / ROTARY WIND DRIVEN EXHAUSTER: Provide a new attic exhauster as either a removal of existing with the replacement of or a cut-in as new attic exhauster. Sizing includes 8-inch to 12-inch neck diameters.50EA
A066TURBINE VENTILATOR / ROTARY WIND DRIVEN EXHAUSTER: Provide a new attic exhauster as either a removal of existing with the replacement of or a cut-in as new attic exhauster. Sizing includes larger than 12-inch up-to 16-inch neck diameter.50EA
A067TURBINE VENTILATOR / ROTARY WIND DRIVEN EXHAUSTER: Provide a new attic exhauster as either a removal of existing with the replacement of or a cut-in as new attic exhauster. Sizing includes larger than 16-inch up-to 20-inch neck diameter.50EA
A068STEEL GUTTER AND DOWNSPOUT: Remove and dispose of existing roof gutter system. Provide new commercial grade steel roof gutter, box 5" fabrication. Factory baked on enamel finish at minimum .2,000LF
A069STAINLESS STEEL GUTTER AND DOWNSPOUT: Remove and dispose of existing roof gutter system. Provide new commercial grade 5" box roof gutter and downspout system.1,000LF
A070SEAMLESS GUTTER AND DOWNSPOUT: Remove and dispose of existing roof gutter. Provide new rolled formed factory finished roof gutter and downspout system.1,000LF
A071PLASTIC GUTTER AND DOWNSPOUT: Remove and dispose of existing roof gutter system. Provide new plastic roof gutter and downspout system, commercial grade in size.600LF
ROOF ACCESSORIES - Repair And Replacement Of Roof Access Hatches Will Be Ordered By Means Of Remedial Repair Line Items. Cutting-In Of New Skylights Where None Previously Existed May Be Accomplished By Ordering A Combination Of Skylight, Carpentry, And Roofing Line Items
A072CURB MOUNTED PLASTIC DOME TYPE SKYLIGHT: Remove and dispose of existing skylight. Provide a new skylight. Curb repair or replacement may be ordered by means of carpentry and roofing line items. This line item does not include curb repair or replacement. Plastic dome shall be either clear or white opaque in color, task order statement of work will indicate desired color selection and inside dimensions of skylight.3,000SF
A073SELF-FLASHING PLASTIC DOME TYPE SKYLIGHT: Remove and dispose of existing skylight. Provide a new skylight. Includes repair of roof. Plastic dome shall be either clear or white opaque in color, task order statement of work will indicate desired color selection and inside dimensions of skylight.1,500SF
A073.1POLYCARBONATE SKYLIGHTS: Remove and dispose of existing skylight. Provide a new skylight. Includes repair of roof. Plastic dome shall be either clear or white opaque in color, task order statement of work will indicate desired color selection and inside dimensions of skylight. UFC 04-010-01, DoD Minimum Anti-Terrorism Standards for Buildings, Section B-3.1.6 requires minimum 1/4" (6mm)
1,500SF
A074CORRUGATED FIBERGLASS ROOF PANELS: Remove and dispose of existing panels. Provide new minimum 12-ounce per SF panels including wafer board. Color selection will be indicated on the task order statement of work. Actual intended use is with ordered structural metal ribbed roof or siding panels.2,000SF
MISCELLANEOUS FIELD PAINTING
A075WOOD PRODUCTS - RAW WOOD: Prep and paint exterior wood trim, fascia's, rakes, soffits, eaves, and or any exposed wood product ordered for preservation by use of paint products. Raw newly installed material shall receive a primer coat and two finish coats of exterior enamel. Surface shall be cleaned prior to any application of paint. NOTE: Should Line Item be included as part of a roof replacement fascia board shall be painted prior to the installation of roof edge or eave metal flashings.3,000SF
A076WOOD PRODUCTS - PREVIOUSLY PAINT WOOD: Prep and paint exterior wood trim, fascia's, rakes, soffits, eaves, and or any exposed wood product ordered for preservation by use of paint products. Previously painted material shall receive one primer coat and one exterior enamel coat. Surface shall be cleaned prior to any application of paint. NOTE: Should ELIN be included as part of a roof replacement fascia board shall be painted prior to the installation of roof edge or eave metal flashings.3,000SF
A077METAL PRODUCTS - RAW OR GALVANIZED METALS: Prep and paint exposed metal flashings or metal products. Newly installed material shall receive a primer coat and two finish coats of exterior enamel. Surface shall be cleaned prior to any application of paint with a wash-down of trisodium-phosphate and rinse.3,000SF
A078METAL PRODUCTS - PREVIOUSLY PAINTED METALS: Prep and paint exposed metal flashings or metal products. Includes a primer coat and one finish coat of exterior enamel. Surface shall be cleaned prior to any application of paint.3,000SF
A079MASONRY - RAW EXPOSED SURFACES: Prep and paint exposed concrete, stucco, or CMU constructed surfaces as they may associate with the individual Task Order. Raw to mean surfaces not previously coated or painted. Application shall include a primer coat and two finish coats of an environmentally approved product manufactured specifically for such use. Surface shall be cleaned prior to any application of paint with a wash-down of trisodium-phosphate and rinse.3,000SF
A080MASONRY - PREVIOUSLY PAINTED SURFACES: Prep and paint exposed concrete, stucco, or CMU constructed surfaces as they may associate with the individual Task Order. Application shall include a primer coat and two finish coats of an environmentally approved product manufactured specifically for such use. Surface shall be cleaned prior to any application of paint with a wash-down of trisodium-phosphate and rinse.3,000SF
A081HIGH WORK SURCHARGE PAINTING - Increased cost to unit for work performed 12-Ft or more above ground level or other horizontal supportive surfaces requiring scaffolding or equipment such as a man lift to meet safety requirements. Does not apply to roof top applications where personnel/craftsman has a supportive surface and does not requiring tethering. This Line Item is intended for labor only. Any additional equipment, i.e. scaffolding or man lift, shall be negotiated by means of the equipment remedial repair section.5,000SF
FALL PROTECTION ANCHOR DEVICES - This section is intended to furnish existing roof systems with permanently placed fall protection devices where none presently exist. Installation of each device shall be determined by conditions to support individual needs regarding various types of roof and substrates as well as proximity of roof mounted equipment. Consideration for basic roof maintenance is of ample importance. Exact location of each device/devices or system shall be determined jointly by the Contractor and a Government Facility Representative (PM, CM, or ET) in compliance with OHSA and EM 385-1-1 whichever is the most appropriate for the condition under consideration.
A082GUARD RAIL: Provide roof mounted Guard Rail, meet or exceed salient features of such product lines as the Garlock System.1,000LF
A083ACCESS LADDER: Provide a new replacement roof access ladder with cage, hinged door and hasp for locking, exterior mounted in type, spring hinged gate with extending handrails at the top of the ladder. Price includes a factory painted finish and demo of existing.1,000LF
A084LADDER CABLE SYSTEM: Provide the approved ladder climbing cable safety assist system. Standard minimum order is 30-LF. Only required for ladder extending over 20-FT in height. Meet or exceed salient features of such product lines as the Vi-Go by Miller500LF
A085CABLE SYSTEM SLEEVE: Provide the Automatic Pass Through Cable Sleeve for the approved ladder cable system.20EA
A086SKYLIGHT CAGE: Provide Metal Cage Cover for skylight fall protection.3,000SF
A087HARNESS RING: Provide Harness Ring Fall Protection Device (wood substrate application).500EA
A088HARNESS RING: Provide Harness Ring Fall Protection Device (steel substrate application).500EA
A089HARNESS RING: Provide Harness Ring Fall Protection Device (concrete substrate application).70EA
A090ROOF HATCH: Provide Roof Hatch Guard Rail w/Gate (Non-Roof Penetrating in type).40EA
A091ROOF HATCH: Provide Roof Hatch Guard Rail w/Gate (permanently attached to the hatch structure in type).40EA
MINOR ROOF REPAIRS AND INSPECTION REPORTS
A092REPAIR AND REPORTS: When ordered for a specific site or building the Contractor shall perform minor repairs to the roof and drainage systems. Repairs shall include such things as but not limited to the corrections of obvious deficiencies in the manner of abrasions to the membranes, openings such as fish mouths, obscured mechanical flashings, loose copings, and faults in the drainage system be it scuppers or gutter. To ensure inspection to find and repair roofing problem issues removal of debris and clearing of drainage systems is required. A follow-up roof inspection report shall be submitted in reference to repairs performed, existing condition of the roof which also shall include a single line sketch of roof, roof dimensions, type of roof and a coring defining roof elements and thickness. In addition an ELIN line item breakdown denoting any additional costs such as a condition for possible replacement or more expensive repair costs other than replacement for Government review.40,000SF
A093ABATEMENT FOR LEAD PAINT AND ASBESTOS CONTAMINATED MATERIALS: General intent is for use in performing roof repair task orders that has a Government furnished third party survey indicating the presence of contaminated materials such as lead paint or asbestos in some manner. Not intended to be as a base wide abatement contract but functions only within the realm of roof and roofing element repair and those ELINs associated with or in the scope of this contract. Like in the remedial repair sections there are many variables for line items that establishing ELINs could make for a high quantity of line items so reserved lines (place holders) shall be used to establish need and cost. Insert requirement description and appropriate unit in the unit column (i.e. EA, LF, SF, etc..). Additional Line items may be inserted for need of more requirements specific abatement line items by use of adding the ELIN number followed with the appropriate alphabet distinction (i.e. A094.a, A094.b, etc.). (sample: A094.a Description; Abate and dispose of, Quantity XXX, Unit SF, Unit Cost $XXX)
A093.aRESERVED
A093.bRESERVED
A093.cRESERVED
A093.dRESERVED
A093.eRESERVED
A093.fRESERVED
A093.gRESERVED
A093.hRESERVED
A093.iRESERVED
A093.jRESERVED
SUB-TOTAL OF CRAFT HOURS ELIN A093:
REMEDIAL REPAIRS - Use of Remedial Repair Line Items is intended for use on a case by case basis as a means to pay for work and materials not defined by another Line Item but associated with a need in the process of roofing repair or replacement. NOTE: THIS IS CONSIDERED NON-PRE-PRICED WORK AS DEFINED IN SECTION B OF THE CONTRACT.
Note 1: When Craft Hours are needed to support work being ordered to perform on Other Than Standard Hours/OT the ELIN shall be calculated to represent time and one half or 150%.
A094ADDITIONAL LABOR CRAFT HOURS: Will be negotiated at task order level, based on DOL Wage Determination in affect.
A094.aRESERVEDCH
A094.bRESERVEDCH
A094.cRESERVEDCH
A094.dRESERVEDCH
A094.eRESERVEDCH
SUB-TOTAL OF CRAFT HOURS ELIN A094:
A095REMEDIAL REPAIR - MATERIALS: Furnish new materials associated with tasking for craft hours and products not called out or determined within any particular Line Item. Insert Product Description and appropriate unit in the unit column (i.e. EA, LF, SF, etc...)
A095.aRESERVED
A095.bRESERVED
A095.cRESERVED
A095.dRESERVED
A095.eRESERVED
SUB-TOTAL OF CRAFT HOURS ELIN A095:
A096REMEDIAL REPAIR - EQUIPMENT: Furnish equipment associated with tasking for craft hours or extraordinary conditions. Insert in the unit column Day, Week, or Month as it is associated with rental unit pricing.
A096.aRESERVED
A096.bRESERVED
A096.cRESERVED
SUB-TOTAL OF CRAFT HOURS ELIN A096:
INSTALLATION CERTIFICATIONS
A097MANUFACTURER INSTALLATION CERTIFICATION: When ordered a certification from the roofing material Manufacturer shall be furnished in conjunction with the Contractor warrantee submittal per project. The certification shall be of a industry standard in type and indicate the particular Manufacturer used for the roof system installed by letter head and statement at minimum "certifies the installation is in compliance and meets all installation details and specifications of that Manufacturer for the roofing system installed." Included will be the date of certification, customer, specific to which site and structure number. Certifications will be required for complete roof installations or replacement systems when ordered by use of this line item and the individual project.30EA
FACILITY ROOF WARRANTEE NOTIFICATION PLAQUES / CARDS
A098For each roof, furnish a typewritten card, laminated in plastic and framed for interior display, or a photoengraved 0.032 inch thick aluminum card for exterior display. Card shall be 8-1/2 by 11-inches minimum and shall contain the information listed on Form 1 located at end of this section. Location of the card mounting shall be deferred to the individual facility manager but in general cards should be mounted along other normal facility information directives such as building map or emergency oriented information. It is the Contractors responsibility to furnish and install plaques or cards.30EA
SPECIAL CONSIDERATIONS - Other Than Standard Hour/OT is not allowed and will not be paid with Island or FHL Task Orders. Only Standard Hourly rates will be allowed.
A099OTHER THAN STANDARD HOURS: In General a coefficient/surcharge to be added to unit cost for work performed during other than the standard working hours. Materials and equipment are not included for they can be established by use of ELINs located within the Craft Hour, Material, and Equipment remedial repair sections. Based on the total of the Extend Price Column of Craft Hours a standard company ratio or percentage may be applied to cover costs for O&P and required field supervision and oversite. Also in general regularly ordered Task Orders are not performed on other than standard hours but on an emergency basis where costs exceed the Government Purchase Card (GPC) limitations.PCT
A100WORK PERFORMED AT SAN NICOLAS AND SANTA CRUZ ISLAND: Coefficient/surcharge to be added to unit cost for work performed on the island shall be based on the total of ELINs A001 through A096's sub-total line multiplied by a proposed rate as a percentage. Other than standard hour rates will not be paid for island work.PCT
A101WORK PERFORMED AT FORT HUNTER LIGGETT: Coefficient/surcharge to be added to unit cost for work performed on the base at Hunter Liggett shall be based on the total of ELINs A001 through A096's sub-total line multiplied by a proposed rate as a percentage. Other than standard hour rates will not be paid for this work location.PCT
A102PERFORMANCE AND PAYMENT BOND: The Government shall order Payment Bonds in conjunction with individual task orders valued between $30,000.00 and $150,000.00. The Government shall order both Performance and Payment Bonds in conjunction with individual task orders exceeding $150,000.00.
PCT
GRAND TOTAL:
ABBREVIATIONS USED IN SCHEDULE:
ELIN = EXHIBIT LINE ITEM
BF = BOARD FOOT
EA = EACH
LF = LINEAR FOOT
SF = SQUARE FOOT
SQ = ROOFING SQUARE (100-SQUARE FOOT)
CH = CRAFT HOUR
NTE = NOT TO EXCEED
DAY = DAY
WK = WEEK
MO = MONTH
FT = FOOT
OT = OVERTIME

CONTRACTOR PROPOSAL BID GUIDANCE:

Option Period 1

OPTION PERIOD ONE (YEARS 3 AND 4) ROOF REPAIR/WATERPROOFING ELIN SCHEDULE (Offeror Guidance Notes Are located At The End Of The Final Page Of The Base Period)
ITEMDESCRIPTION: Unit Pricing Shall Include All Labor, Materials, Tools, Transportation, Equipment, Management, Supervision, Incidental Engineering, Overhead and Profit.QUANTITYUNITUNIT PRICEEXTENDED PRICE
ROOFING SHINGLES
B00130-YEAR PREMIUM LAMINATED MULTI-LAYERED SHINGLES. Provide new Mineral Granule-Surface Asphalt Shingle roof system complete and ready for use over existing substrate, which includes all new metal flashing, roof jacks, eave flashing, wall flashing, step flashing, gravel stops, rake flashing, roof diverters, vent jacks, base sheets or felts, attic vents or anything that penetrates the roofing system that is considered standard for residential or commercial application. Motor operated vent systems are not considered standard. Class A Fire Rating to include a minimum 30-Year Manufacturer Warranty.300SQ
SHINGLE DEMOLITION
B002COMPOSITION SHINGLE TYPE ROOF SYSTEM DEMOLITION: Remove and dispose of existing shingle system. Includes up-to 3-layers or roof systems thick which include the possible combined systems such as a shingle over a rolled roofing membrane.300SQ
BUILT-UP ROOF SYSTEMS, ROOF DRAINS, DRAIN PIPE, AND WALKWAYS
B003(APP) MODIFIED BITUMEN ROOF SYSTEM 4-PLY: Provide new Atactic Poly-Propylene (APP) Modified Bitumen Sheet Roof system complete and ready for use over existing substrate, which includes all new metal flashing, roof jacks, eave flashing, wall flashing, gravel stops, rake flashing, roof diverters, vent jacks, attic vents, and anything that penetrates the roofing system. Note: Wall Copings and Treated Wood Nailers are found in the Miscellaneous Roof Metal Fabrications and Carpentry ELINs, not included as part of this line item. Motor operated vent systems are not considered standard. Class A Fire Rating to include a minimum 20-Year Manufacturer Warranty.400SQ
B004ROOF DRAINS: Remove existing roof drain. Provide a new 10-inch roof drain. Intended for use as a repair item in conjunction with re-roofing.20EA
B005ROOF DRAIN PIPE: Remove existing and dispose. Provide a new PVC Schedule-40 drain pipe, larger than 2-inch up-to 6-inch in diameter. Includes all fastening devices, hangers, couplings, and elbows necessary for complete ready to use installation.200LF
B006ROOF WALK MATES: Provide mineral surface or granular surface treads to access mechanical equipment. (2 FT by 3 FT in size)100EA
BUILT-UP ROOF SYSTEMS DEMOLITION AND DECK PREPARATION
B007DEMO - Remove and dispose of existing Built-up Roofing System. Includes all built-up systems to an application level of 4-ply.400SQ
B008REMOVAL/SPUDDING AND BROOMING: Spud and or rake loosely embedded gravel/ballast, remove and dispose of gravel and debris from roof in preparation for an overlayment.400SQ
METAL WALL AND ROOF SYSTEMS
B009ARCHITECTURAL STANDING SEAM METAL ROOF SYSTEM: Provide a Architectural Standing Seam Metal Roof System. To include new roof panels at a minimum thickness of 24-gage galvanized steel with manufacturer's standard paint coatings, related roof flashings, copings, closures, fillers, metal expansion joints, ridge covers, roof panel mounting clips, gable and eave trim, gutters and downspouts, waterproof membranes or base felts, and other accessory items. Provide a minimum 20-Year Manufacturer's Watertight and Finish Warranty.100,000SF
B010HIGH PROFILE METAL OVER METAL ROOF SYSTEM WITHOUT THERMAL SPACER BLOCK: Provide a retro-fit roof system, which includes all new roof panels at a minimum thickness of 22-gage galvanized steel with manufacturer's standard paint coatings, fasteners, fiberglass insulation, panel clips, roof system clips, copings, and other related accessory items. Intended for use over existing roof systems with minimal to no demolition of existing roof. Provide a minimum 20-Year Manufacturer's Watertight and Finish Warranty.30,000SF
B011HIGH PROFILE METAL OVER METAL ROOF SYSTEM WITH THERMAL SPACER BLOCK: Provide a retro-fit roof system, which includes all new roof panels at a minimum thickness of 24-gage galvanized steel with manufacturer's standard paint coatings, fasteners, rigid insulation filling void between new and existing roof systems, panel clips, roof system clips, copings, and other related accessory items. Intended for use over existing roof systems with minimal to no demolition of existing roof. Provide a minimum 20-Year Manufacturer's Watertight and Finish Warranty.50,000SF
B012STRUCTURAL METAL WALL AND ROOF SYSTEM: Provide a structural Metal Roof System, which includes all new roof panels at a minimum thickness of 22-gage galvanized steel with manufacturer's standard paint coatings, related roof flashings, copings, closures, fillers, metal expansion joints, ridge covers, roof panel mounting clips, gable and eave trim, gutters and downspouts, waterproof membranes or base felts, and other accessory items. Note: Depending on the span of existing purlin the thickness of the roofing panel may require a thicker gauged product. Increase in cost for such a condition shall be negotiated using the material Line Item located within the section entitled Remedial Repair. Provide a minimum 20-Year Manufacturer's Watertight and Finish Warranty.100,000SF
B013MISCELLANEOUS SHEET METAL WORK ASSOCIATED WITH METAL ROOFS: Provide sheet metal fabrication and installation associated with metal roof system retrofitting for existing roofs. Fabrications for such items as flashing for curbs/stands and other penetrations of sorts requiring same type of metal and color to tie together newly installed metal roofs with old existing conditions for a complete blend between the old and the new.20,000SF
METAL WALL AND ROOF SYSTEM DEMOLITION
B014REMOVAL - Any metal roof or siding system applied to a beam or purlin type roof structure without a plywood or steel sheathed substrate, such as but not limited to PEB's.300,000SF
B015REMOVAL - Any metal roof system applied to a plywood or steel sheathed substrate.100,000SF
FIBERGLASS REINFORCE PLASTIC (FRP) ROOF & WALL SYSTEMS
B016Fiberglass reinforced plastic panel, Shall offer Mfg. full line of either corrugated or ribbed style panels with standard Mfg. color chart of either pigmented or clear color selections, siding and roof panels, textured, a minimum of 16 ounce per SF. Fasteners with grommets shall be stainless steel. All work shall meet existing UFC/UFGS/ASTM minimum standards for FRP roofing systems and available components such as but not limited to ASTME72, ASTME84, ASTMD696, ASTMD2583 and ASTMD1494. All standard commercial manufacturer warranties will be applicable to these FRP systems including, but not limited to, the minimum 20-year, no dollar limit warranty specified in the UFGS.150,000SF
FLUID APPLIED ELASTOMERIC COATING SYSTEMS
B017FLUID APPLIED ELASTOMERIC COATING: Provide Elastomeric Coating For Metal Roof Systems. Minimum DFT 40-mils.20,000SF
B018MINOR METAL REPAIRS: Minor repair of deteriorated area of metal roof, up to 1 SF of area.100EA
B019MAJOR METAL ROOF REPAIR: Repair metal roof with sheet metal patch, up to 4 SF of area.1000SF
SINGLE PLY MEMBRANES (PVC and KEE) ROOFING
B020SINGLE PLY 80-MIL PVC ROOFING SYSTEM: Provide a new membrane roof system. Installation shall comply with the Manufacturer's written and detailed instructions. A complete system shall include all flashings, edge metals, and boots for such things as mechanical support legs, conduits, and piping's. All work shall meet existing UFC/UFGS/ASTM minimum standards for single-ply 80-mil PVC roofing systems. All standard commercial manufacturer warranties will be applicable to these roofing systems including, but not limited to, the minimum 30-year, no dollar limit warranty specified in the UFGS. Provide a minimum 30-Year NDL Manufacturer's Warranty. Note: For other than just the membrane to complete the roof system make selections for the most appropriate line items located in the gypsum board and or rigid insulation line items.2,000SQ
B021SINGLE PLY 80-MIL PVC ROOFING SYSTEM (Intended use is as an overlay of existing BUR or thermo plastic single ply membrane system): Provide a new membrane roof system. Installation shall comply with the Manufacturer's written and detailed instructions. A complete system shall include all flashings, edge metals, and boots for such things as mechanical support legs, conduits, and piping's. All work shall meet existing UFC/UFGS/ASTM minimum standards for single-ply 80-mil PVC roofing systems. All standard commercial manufacturer warranties will be applicable to these roofing systems including, but not limited to, the minimum 20-year, no dollar limit warranty specified in the UFGS. Provide a minimum 20-Year NDL Manufacturer's Warranty. Note: For other than just the membrane to complete the roof system make selections for the most appropriate line items located in the gypsum board and or rigid insulation line items.1,000SQ
B022WALKING MATE FOR A 80-MIL SINGLE PLY PVC ROOFING SYSTEM: Provide walking mate. Standard thickness as recommended by the Manufacturer, 2-foot by 3-foot square mates. Note: Walk mates are recommended for inclusion with the project whenever there is roof mounted equipment or products of various sorts requiring at least annual maintenance present.500EA
B023SINGLE PLY KEE ROOFING SYSTEM: Provide a new minimum 60-mil membrane roof system. Installation shall comply with the Manufacturer's written and detailed instructions. A complete system shall include all flashings, edge metals, and boots for such things as mechanical support legs, conduits, and piping's. Membrane shall meet or exceed all requirements of ASTM D6754 “Standard Specification for KEE Sheet Roofing” or all requirements of ASTM D4434 “Standard Specification for Poly (Vinyl Chloride) Sheet Roofing” while containing KEE HP or a minimum of 33% KEE (Elvaloy level of quality or better). Provide a minimum 30-Year NDL Manufacturer's Warranty for whole roof tear-off and replacement. Note: To include installation of gypsum board and or insulation select from the appropriate gyp board and insulation line items.3,000SQ
B024SINGLE PLY KEE ROOFING SYSTEM (Intended use is as an overlay of existing BUR or thermoplastic single ply membrane system): Provide a new minimum 60-mil membrane roof system. Installation shall comply with the Manufacturer's written and detailed instructions. A complete system shall include all flashings, edge metals, and boots for such things as mechanical support legs, conduits, and piping's. Membrane shall meet or exceed all requirements of ASTM D6754 “Standard Specification for KEE Sheet Roofing” or all requirements of ASTM D4434 “Standard Specification for Poly (Vinyl Chloride) Sheet Roofing” while containing KEE HP or a minimum of 33% KEE (Elvaloy level of quality or better). To include installation of gypsum board select from the appropriate gyp board line items. Provide a minimum 20-Year NDL Manufacturer's Warranty. Note: To include installation of gypsum board and or insulation select from the appropriate gyp board and insulation line items.1,000SQ
B025WALKING MATE FOR SINGLE PLY KEE ROOFING SYSTEM: Provide walking mate. Standard thickness as recommended by the Manufacturer, 2-foot by 3-foot square mates. Note: Walk mates are recommended for inclusion with the project whenever there is roof mounted equipment or products of various sorts requiring at least annual maintenance present.500EA
B026FULLY ADHERED SURCHARGE (Single Ply Systems): Intended for use when fully adhered roof systems are ordered to cover additional cost for such as Manufacturer adhesives.1,000SF
SINGLE PLY SYSTEMS DEMOLITION
B027SINGLE PLY DEMO: Single ply systems fully adhered and/or mechanically fastened to substrates, remove and dispose.1000SF
ROOFING GYPSUM BOARD PRODUCTS
B028GYPSUM BOARD: Provide when ordered siliconized gypsum board with glass-mat facers, 1/4-inch thick. Mechanically fastened over existing built-up roof systems.4,000SQ
B029GYPSUM BOARD: Provide when ordered siliconized gypsum board with glass-mat facers, 1/2-inch thick. Mechanically fastened over existing built-up roof systems.4,000SQ
INSULATION - Initial Layer Of Insulation Shall Be Mechanically Fastened While Additional Layers Shall be Moped in Place. Should More Than One Layer Of The Indicated ELIN Thickness Be Desired The Appropriate Additional Quantity Will Be Indicated And The Delivery Order Statement Of Work Stating The Overall Desired Insulation Thickness. For Tapered Systems, Use Remedial Repair Materials (As Necessary) For Any Additional Material Cost Incurred.
B030RIGID ISOCYANURATE FOAM INSULATION: Provide in insulation with black mat facers, board thickness a minimum of 1 inch. Mechanically fastened. This particular product line is intended primarily for use with single ply membrane roofing system installations. But this line can be replaced with other insulations located in the insulation section based on the need determined by the single ply membrane Manufacturers specifications and is considered common in use with thermoplastic single ply roof systems.6000SQ
B031STEEL DECK SUBSTRATES: Provide Perlite/Fiberboard/Fiberglass/Foam/Polystyrene/Polyisocyanurate one-inch thick fully adhered and or mechanically fastened in place to substrate as per Manufacturer's recommendations regarding the specific use with the specified roofing system and conditions.50,000SF

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .