About this file

RFP - Basic Contract

View the file

Other files

File Type Posted
HVAC_III_MACC_-_Q_ _A_-_10_March_2014.pdf PDF
N6247314R0003_-_Amendment_0003.pdf PDF
N6247314R0003_-_Exhibit_D_-_LEED_checklist_-_Revised_5MAR2014.xls XLS spreadsheet
N6247314R0003_-_PTO_0001_RFP_-_Drawing_A101.pdf PDF
HVAC_III_MACC_-_Q_ _A_-_5_March_2014.pdf PDF
N6247314R0003_-_PTO_0001_RFP_-_Drawing_A505.pdf PDF
HVAC_III_MACC_-_Q_ _A_-_4_March_2014.pdf PDF
HVAC_III_MACC_-_Q_ _A_-_26_February_2014.pdf PDF
HVAC_III_MACC_-_Q_ _A_-_21_February_2014.pdf PDF
N6247314R0003_-_Amendment_0002.pdf PDF
HVAC_III_MACC_-_Q_ _A_-_19_February_2014.pdf PDF
HVAC_III_MACC_-_Q_ _A_-_11_February_2014.pdf PDF
HVAC_III_MACC_-_Q_ _A_-_7_February_2014.pdf PDF
N6247314R0003_-_PTO_0001_RFP_-_SECTION_07_54_00.pdf PDF
N6247314R0003_-_PTO_0001_RFP_-_Updated_Wage_Decision_CA140029_-_2014_Jan_31.pdf PDF
N6247314R0003_-_Exhibit_D_-_LEED_checklist.xls XLS spreadsheet
N6247314R0003_-_Amendment_0001.pdf PDF
N6247314R0003_-_FAR_Clause_52.209-7_ _DFARS_Clause_252.209-7999.docx DOCX document
N6247314R0003_-_Exhibit_C_-_Safety_Data_ _Narrative.docx DOCX document
N6247314R0003_-_Financial_Questionnaire.doc DOC document
N6247314R0003_-_Surety_Form.doc DOC document
N6247314R0003_-_RFI_Form.doc DOC document
N6247314R0003_-_MACC_Frequently_Asked_Questions.pdf PDF
N6247314R0003_-_RFP_-_PTO_0001.pdf PDF
N6247314R0003_-_Exhibit_A_-_Experience_-_Offeror.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP N62473‐14‐R‐0003

Appropriation:

TBD per Task Order

BASIC CONTRACT

INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD

CONSTRUCTION CONTRACT (MACC) SMALL BUSINESS SET‐ASIDE FOR

NEW CONSTRUCTION, REPAIR, AND RENOVATION OF HEATING,

VENTILATION, AND AIR CONDITIONING (HVAC) SYSTEMS AND

ASSOCIATED WORK AT VARIOUS LOCATIONS WITHIN THE NAVAL

FACILITIES ENGINEERING COMMAND SOUTHWEST AREA OF

RESPONSIBILITY INCLUDING BUT NOT LIMITED TO CALIFORNIA,

ARIZONA, NEVADA, COLORADO, UTAH, AND NEW MEXICO

January 2014

TABLE OF CONTENTS

(RFP PARTS 1 – 6)

PART 1 – CONTRACT REQUIREMENTS

STANDARD FORM 1442 – SOLICITATION, OFFER, AND AWARD

SECTION 00100 – INSTRUCTION TO OFFERORS

SECTION 00210 – BASIS OF AWARD AND EVALUATION FACTORS

SECTION 00600 – REPRESENTATIONS AND CERTIFICATIONS

SECTION 00700 – CONTRACT CLAUSES

SECTION 00801 – CONTRACT TYPE/PERFORMANCE/SPECIAL CONTRACT REQUIREMENTS

SECTION 00802 – CONTRACT ADMINISTRATION DATA

SECTION 00803 – TASK ORDER ISSUANCE PROCEDURES

PART 2 – GENERAL REQUIREMENTS DESIGN-BUILD

Part 2 sections are included in each Task Order

PART 3 – PROJECT PROGRAM

Part 3 sections are included in each Task Order

PART 4 – PERFORMANCE TECHNICAL SPECIFICATIONS

B20 EXTERIOR ENCLOSURE

B30 ROOFING

C10 INTERIOR CONSTRUCTION

C30 INTERIOR FINISHES

D10 CONVEYING

D20 PLUMBING

D30 HVAC

D40 FIRE PROTECTION

D50 ELECTRICAL

E10 EQUIPMENT

F10 SPECIAL CONSTRUCTION

F20 SELECT BUILDING DEMOLITION

G30 SITE CIVIL/MECHANICAL UTILITIES

G40 SITE ELECTRICAL UTILITIES

Z10 GENERAL PERFORMANCE TECHNICAL SPECIFICATION

PART 5 – PRESCRIPTIVE TECHNICAL SPECIFICATIONS

Part 5 sections are included in each Task Order

PART 6 – ATTACHMENTS

Performance Assessment Plan - MONTHLY EVALUATION Permit Record of Decision (PROD) Mechanical Systems CQM Assurance Plan

Additional Part 6 sections are included in each Task Order

RFP N62473‐14‐R‐0003

Small Business Set‐Aside HVAC MACC

PART 1

Contract Requirements

Proposal Forms and Documents

January 2014

ACQR3200874PR

INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) SMALL BUSINESS SET-ASIDE FOR NEW CONSTRUCTION, REPAIR, AND RENOVATION OF HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) SYSTEMS AND ASSOCIATED WORK AT VARIOUS LOCATIONS WITHIN THE NAVFAC SOUTHWEST AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED

TO CALIFORNIA, ARIZONA, NEVADA, COLORADO, UTAH, AND NEW MEXICO

This procurement is 100% set-aside for Small Business concerns.

NAICS: 238220 Size Standard: $14 Million Maximum dollar amount for all contracts combined is $99,000,000 Task Order range is $50,000 to $5,000,000 Minimum Guarantee is $5,000 Offerors must demonstrate a minimum aggregate bonding capacity of $5 million to allow for the management of multiple, concurrent projects at the higher dollar magnitude w ithin the task order price range.

Construction Contract – Net 14 days for payment (FAR 52.232-27)

MICHELLE E. SANDERS 619-532-3834

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

27-Jan-2014

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______1 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Each TaskOrder

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________13 Mar 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFAC SOUTHWEST

CAPITAL IMPROVEMENTS CONTRACTS CORE

CODE RAQ20

1220 PACIFIC HWY

SAN DIEGO CA 92132-5190

N62473

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

619-532-4789FAX:TEL: TEL: FAX:

N62473-14-R-0003 131

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 99,000,000 Each HVAC SB Set-Aside MACC

FFP

This is an indefinite delivery indefinite quantity (IDIQ) contract with no pre-established fixed contract prices. The actual amount of work to be performed and the time of such performance will be determined by the Contracting Officer or his/her properly authorized representative, who will issue written task orders to the Contractor. Award of the task order will be on a firm-fixed price basis.

Maximum of $99,000,000 is for all contracts combined and will serve as the maximum/NTE amount of the entire contract period. The Government has the option to extend the term of the contract for a term of one (1) to forty-eight (48) months by written notice to the Contractor within the performance period specified in the Schedule.

PURCHASE REQUEST NUMBER: ACQR3200874PR

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0002 1 Each Proposed Task Order (PTO) 0001

FFP

FOB: Destination

PURCHASE REQUEST NUMBER: ACQR3200874PR

MAX

NET AMT

Section 00100 - Bidding Schedule/Instructions to Bidders

SECTION 00100

INSTRUCTION TO OFFERORS

1. Inquiries

Inquiries regarding the Request for Proposal (RFP) shall be submitted electronically using the Request for Information (RFI) form provided as an attachment. The Point of Contact (POC) for inquiries is Michelle Sanders at 619-532-3834 or e-mail at michelle.sanders@navy.mil. The Government does not intend to respond to inquiries submitted less than 10 days before the proposal receipt date.

2. Proposal Submittal Requirements

Proposals submitted in response to this solicitation shall be formatted as follows and furnished in the number of copies stated herein. A cover letter shall accompany the proposal.

The cover letter shall include—

(a) The solicitation number;

(b) The name, address, telephone and facsimile numbers, and email address of the Offeror;

(c) The DUNS Number, CAGE Code, and Tax Identification Number (TIN) of the Offeror;

(d) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(e) Names, titles, phone and facsimile numbers, and email addresses of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation and;

(f) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

Proposals shall be submitted in three ring binders or bound, with tabs or separators. Page limits, if stipulated, must be adhered to. Proposals shall be submitted on 8.5” X 11” paper, utilizing both sides of the paper.

The format for the proposal is as follows:

Cover Letter First two pages of SF1442 - with blocks 14 through 20c completed Financial Questionnaire (Original in sealed envelope from financial institution in original proposal folder only) Surety Form FAR Clause 52.209-7 - with (b) completed & DFARS Clause 252.209-7999 - with (b) completed VETS-100 and/or VETS-100A Report Submission Confirmation (or Statement of Non-applicability) Tab “Price”:

- Price (In sealed envelope in original proposal folder only) – The envelope shall contain the following original documents: SF1442 (Solicitation, Offer, and Award) with blocks 14 through 20c completed; Bid Bond (in the amount of 20% for PTO #0001)

Tab “Exhibits A & B”:

- Factor 1, Experience (Exhibits “A”)

- Factor 2, Past Performance (Exhibits “B” or CCASS Evaluations)

(Evaluations should immediately follow the project shown on Exhibit “A” to which they pertain) Tab “Exhibit C”:

- Factor 3, Safety (Exhibit “C”)

Representations and Certifications, Financial Questionnaires, and Surety Forms will not be rated. However, they will be considered in assessing the Offeror’s responsibility.

Offerors are asked to submit only the information/exhibits required. Do not submit any additional information such as brochures, CDs, or other pre-printed materials.

A total of one (1) original and three (3) hard copies of the complete proposal in response to this RFP must be received by this office no later than the date and time stated in Block 13 of the SF1442. Offerors should address all evaluation factors and shall submit the proposal to the following address:

Naval Facilities Engineering Command Southwest Capital Improvements Contracts Core /RAQ20.MS Attention: Michelle Sanders 1220 Pacific Highway, Building 127 San Diego, CA 92132-5190

Proposal must be clearly marked on the outside of the package with the solicitation number.

LATE SUBMITTALS WILL NOT BE CONSIDERED.

It is an Offeror's responsibility to deliver its proposal to the proper place at the proper time, which includes allowing a reasonable amount of time for the delivery of the proposal. (See FAR 15.208(a)). Proposals that are received after the stated date and time in Block 13 of the SF1442 will not be considered.

Offerors shall ensure that proposals are mailed or sent by courier in a timely manner to be delivered to the NAVFAC Southwest facility no later than the date and time stated in Block 13 of the SF1442.

Offerors intending to deliver the proposals in person to the facility at the address above are cautioned that this NAVFAC Southwest facility is located in downtown San Diego. An Offeror risks the late receipt and rejection of a proposal where it delays delivering its proposal until the last few minutes before the time set for receipt of proposals. It is recommended that the Offeror allows for delays in driving through downtown San Diego caused by traffic (both freeway and downtown), construction projects, train/trolley crossing, parking at the pay lots/meters near the facility, and gaining access to a secure Government facility. No parking or offloading of proposals is available at the Government facility. Proposals are to be delivered to personnel in the mailroom in Building 128, and reasonable time shall be allowed for the person in the mailroom to receive and time stamp the proposal. The stamp time is determined from the NAVFAC Southwest facility mailroom time stamp and not any other time keeping equipment that the Offeror may own.

Immediately upon proposal delivery, the Offeror shall leave the Government facility. An Offeror that does not leave the premises may be requested to leave or escorted by security personnel.

3. Pre-Proposal Conference

(a) A pre-proposal conference and site visit will not be conducted at this time.

(b) A list of Frequently-Asked-Questions (FAQ) with appropriate responses is provided as an attachment to the

RFP. All firms are encouraged to review the FAQ. The FAQ should be viewed prior to submitting any questions regarding the RFP.

(c) Failure of a prospective Offeror to submit any questions will be construed to mean that the Offeror fully understands all requirements of the solicitation.

(d) All prospective Offerors are advised that this solicitation will remain unchanged unless it is amended in writing. Amendments will be posted on the website at http://www.fbo.gov. However, if an amendment is issued, normal procedures relating to the acknowledgment and receipt of any such amendment as described in Contract Clause “Amendment to Solicitations” of this section shall be applicable.

4. Financial Questionnaire

Offerors shall submit the Financial Questionnaire to their financial institution and request the financial institution complete the questionnaire with regard to the Offeror’s firm. Upon completion of the questionnaire, the financial institution should place the completed questionnaire in a sealed envelope showing the return address of the financial institution and forward it to the Offeror so that the Offeror can include the questionnaire (in the sealed envelope) with the Offeror’s proposal.

If the Offeror is a joint venture, information should be submitted for the joint venture. If there is no information for the joint venture, information should be submitted for each joint venture partner.

5. Surety Form

Offerors shall submit the Surety Form to report their surety bonding information, verifying aggregate bonding capacity, current available bonding, as well as single project limit. Ensure the name of the Offeror’s surety, including the name and phone number of the Offeror’s agent within the surety, is shown on the form.

If the Offeror is a joint venture, one Surety Form shall be submitted for the joint venture, not the individual partners.

6. System for Award Management

The System for Award Management (SAM) is combining federal procurement systems and the Catalog of Federal Domestic Assistance into one new system. This consolidation includes the functionality from the following systems:

* Central Contractor Registry (CCR)

* Federal Agency Registration (Fedreg)

* Online Representations and Certifications Application (ORCA)

* Excluded Parties List System (EPLS)

Contractors must be registered in the System for Award Management (SAM) prior to award of a DoD contract. In order to participate on this solicitation, contractors must also complete electronic representations and certifications.

For more information and to complete the electronic Reps & Certs, see the SAM website at http://www.sam.gov. A contract cannot be awarded to a contractor not registered in SAM. Remember to review the NAICS codes listed in your SAM record and make sure that you have listed the NAICS code for this procurement.

Note: FAR Clause 52.209-7 and DFARS Clause 252.209-7999 are not found in the electronic Reps & Certs in SAM; therefore, Offerors shall submit FAR Clause 52.209-7 with paragraph (b) completed to report whether or not they have current active Federal contracts and grants with a total value greater than $10,000,000 and Offerors shall submit DFARS Clause 252.209-7999 with paragraph (b) completed to report whether or not they have any unpaid Federal tax liability or were convicted of a felony criminal violation under a Federal law within the preceding 24 months.

7. Federal Contractor Program

In accordance with Federal Acquisition Regulation (FAR) 22.1303, any contractor or subcontractor with a contract of $100,000 or more with the Federal Government must take affirmative action to hire and promote qualified targeted veterans which includes, special disabled veterans, veterans of the Vietnam-era, recently separated veterans, and any other veterans who served on active duty during a war or in a campaign or expedition for which a campaign badge has been authorized.

If subject to the reporting requirements, companies must file an annual VETS-100 and/or VETS-100A Report, which shows the number of targeted veterans in their work force by job category, hiring location, and number of new hires, including targeted veterans hired during the reporting period and the maximum number and minimum number of employees of such contractor during the period covered by the report. Instructions, information, and follow-up assistance is provided at VETS-100 Internet site at http://www.dol.gov/vets/vets-100.html or employers may contact the VETS-100 customer support at (866) 237-0275 or e-mail at VETS100-customersupport@dol.gov.

Upon the successful submission of a VETS-100 and/or VETS-100A report(s), federal contractors will receive an email confirmation of receipt notification for their records. Offerors shall include a copy of their confirmation notification email in their proposal as verification of submission for the current reporting period. DO NOT SUBMIT A COPY OF THE REPORT ITSELF. If this requirement is not applicable to your firm, provide a statement that your firm does not have any contracts subject to this requirement.

A contract cannot be awarded to a contractor that has not submitted a required annual form VETS-100, Federal Contractor Veterans’ Employment Report (VETS-100 and/or VETS-100A Report) if subject to the reporting requirements of 38 U.S.C. 4212(d) for that fiscal year.

8. Incurred Expenses

The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.

9. No Alternate or Multiple Proposals

Neither multiple proposals, nor proposal variations or options, nor alternate or alternative proposals will be considered in the evaluation.

SECTION 00210

BASIS OF AWARD AND EVALUATION FACTORS

1. BASIS OF AWARD

Selection of contractor(s) will be accomplished using Source Selection Procedures on the basis of Best Value to the Government, considering price and non-price factors. Interested firms are expected to review the RFP and participate in a pre-proposal conference and site visit (if conducted), provide proposed prices for the initial project, and provide proposal information requested to evaluate their technical and past performance factors.

The best value continuum source selection process to be used for this acquisition is the lowest price technically acceptable (LPTA) process as described in FAR 15.101-2.

The LPTA process is selected as appropriate for this acquisition because the best value is expected to result from selection of the technically acceptable proposals with the lowest evaluated prices. No more than five (5) awards will be made. In order to permit efficient competition, the following methodology will be utilized. Proposals will be initially screened for price and placed in order of price (lowest price to highest price). The Government will then evaluate the non-price factors of the ten (10) lowest priced proposals in accordance with the criteria of acceptability set forth in the solicitation. However, the Government, at its sole discretion, reserves the right to increase the number of proposals it will review under this methodology. If at least five (5) of those proposals are technically acceptable, and if the prices are determined to be reasonable in the price evaluation, the Government will make an award to those five (5) Offerors with the lowest price. If there are fewer than five (5) technically acceptable proposals, groups of five (5) proposals will continue to be evaluated in the order of lowest price to highest price until up to five (5) offers have been determined to be technically acceptable. Accordingly, under this methodology, the non-price factors of some proposals may not be evaluated by the Government. If discussions are deemed necessary by the Contracting Officer, all proposals will be evaluated (both non-price and price) for the purpose of establishing a competitive range. Proposals shall be provided to the evaluators without any identification of prices or any rank order of prices.

The Government intends to evaluate proposals and award contracts without discussions with Offerors (except clarifications as described in FAR 15.306(a)). Offerors should not assume that they would be contacted or afforded the opportunity to qualify, discuss, or revise their proposal. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for the non-price factors. Each non-price factor will be rated as either Acceptable or Unacceptable. An “UNACCEPTABLE” rating in any factor results in the overall non-price proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall non-price rating of “UNACCEPTABLE” makes a proposal ineligible for award.

The Government intends to award between three and five multiple award construction contracts resulting from this solicitation. Award of the basic multiple award construction contracts will be made to those responsible Offerors with the lowest price technically acceptable proposals based on the evaluation factors in this solicitation. The Government reserves the right to award up to five contracts under this solicitation or to award only the initial project (Proposed Task Order 0001) identified in the RFP as a single-action contract. The Government reserves the right not to award the Proposed Task Order 0001. The Government reserves the right to substitute or add other projects that meet the scope of the MACC.

The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contracts; to negotiate with Offerors in the competitive range; and to award up to five (5) contracts to the Offerors submitting the lowest price technically acceptable offers.

Successful Offerors will receive the following contract awards:

The lowest price technically acceptable Offeror receives award with a minimum guarantee and the initial project, if the Government chooses to award it. Second, third, and any additional selected contractor will each receive award with a minimum guarantee, and selection will be based on the same criteria as the first selection.

2. DEFINITIONS

DEFICIENCY: A material failure of a proposal to meet a solicitation requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

WEAKNESS: A flaw in the proposal that increases the risk of unsuccessful contract performance.

SIGNIFICANT WEAKNESS: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.

ACCEPTABLE FEATURES: A proposed method or technique in the proposal that addresses solicitation requirements such that no further explanation or documentation is necessary.

PAST PERFORMANCE: Relates to how well an Offeror has performed; e.g., the quality of work accomplished, schedule compliance, customer satisfaction.

EXPERIENCE: Pertains to work performed by an Offeror, within the prescribed timeframe, which is the same or similar to the work that may be ordered under this contract in terms of size, scope, and complexity. Experience is distinct from past performance (how well an Offeror has performed).

PROJECT: A design-build or design-bid-build construction activity or task, with a single starting point and a single ending point.

COMBINED PROJECT(S): Projects with multiple starting and ending points, performed under separate task orders, delivery orders, or multiple contracts combined in a single description. No credit will be given for work performed under MACC/IDIQ contracts in the aggregate or for multiple projects completed under more than one task/delivery order.

RENOVATION/REPAIR PROJECT TYPES: Refers to projects where the work replaces part of, or an entire, existing HVAC system, or adds to/expands an existing HVAC system.

NEW CONSTRUCTION: Refers to installing a brand new HVAC system where none exists; this includes when the brand new system ties-in to an existing central plant system.

100% COMPLETE: The facility/work is completely constructed and ready for the intended use.

OFFEROR: Refers to the Contractor submitting the proposal as Offeror, including joint ventures, whose name appears in Block 14 of Standard Form (SF) 1442 (Solicitation, Offer and Award). In the event of a conflict or inconsistency between the Offeror’s name cited on the SF 1442 and any other part of the proposal, the SF 1442 is the conclusive document in determining the Offeror who is submitting the proposal.

LEAD DESIGN FIRM: Applies to the Offeror’s primary design consultant firm(s) and any in-house lead designer(s).

JOINT VENTURE (JV): A legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together.

FIVE-YEAR PERIOD: The prescribed timeframe for this solicitation that refers to the period of time for which projects may be submitted for experience or past performance. The five-year period is calculated by counting back five years from the initial RFP issuance date.

DESIGN-BUILD: Refers to combining design and construction in a single contract with one contractor. Design-build projects require design of the project by a licensed professional (i.e. engineer, architect). Projects that only require shop drawing level effort are not design-build projects.

DESIGN-BID-BUILD: Refers to the traditional delivery method where design and construction are sequential and contracted for separately with two contracts and two contractors.

SELF-PERFORM: Refers to performing relevant major trade work in-house without subcontractors. This does not include administrative or management functions. Relevant major trade work is that which is the same or similar to the work that may be ordered under this contract.

PAGE: Refers to one printed side of a piece of paper. (For example, 5 pieces of paper printed on both sides would result in 10 pages of narrative.)

3. EVALUATION FACTORS

The solicitation requires the evaluation of price and the following non-price factors:

Factor 1 – Experience Factor 2 – Past Performance Factor 3 – Safety

According to FAR 15.304, the evaluation factors that apply to this acquisition are a part of this RFP and are evaluated individually. The applicable evaluation factors and submission requirements that establish the requirements of acceptability are identified below.

a. Price Factor

PRICE – Based on Proposed Task Order 0001

a. Proposal Submission Requirements:

The Offeror (see definition) shall complete and submit (in a sealed envelope) the following in the order shown below under Tab “Price” of the original proposal only.

- Standard Form (SF) 1442 (Solicitation, Offer and Award)

- Bid Bond

With regard to price as shown on the SF 1442, the only Contract Line Item that Offerors are to complete is Line Item 0002 of Section 00010 Solicitation for Proposed Task Order 0001.

Failure to submit a Bid Bond conforming to the requirements of the solicitation may result in an Offeror's proposal being rejected as unacceptable.

b. Basis of Evaluation:

The price proposal for Proposed Task Order 0001 will be evaluated to determine the reasonableness and completeness of the Offeror’s proposal. The following techniques will be used to ensure a fair and reasonable price:

- Comparison of proposed prices received in response to the solicitation.

- Comparison of proposed prices with the independent Government estimate.

In addition, one or more of the following techniques may also be utilized:

- Comparison of proposed prices with available historical information.

- Comparison of proposed prices with resources proposed.

- Obtain information/reports from Defense Contract Audit Agency (DCAA) or other outside agencies as required.

b. Non-price Factors

FACTOR 1: EXPERIENCE (See definition)

a. Proposal Submission Requirements:

Submit Exhibit “A” (Construction Experience Project Data Sheet) under Tab “Exhibits A & B.”

Submit five (5) 100% complete construction projects for the Offeror that best demonstrate your experience on relevant projects that are similar in size, scope, and complexity to projects that may be ordered under this contract.

For purposes of this evaluation, relevant projects are further defined as new construction, repair, and/or renovation of heating, ventilation, and air conditioning (HVAC) systems and associated work, by design-build or design-bid-build, within the construction cost range of $50,000 to $5,000,000.

Projects may include, but are not limited to: Boiler/Chiller plants; Digital Direct Controls or Energy Management Control System; HVAC equipment energy optimization; commissioning and retro-commissioning; distribution systems including supply and return air systems, ventilation and exhaust systems, steam, glycol, medical gas, refrigerant, heating hot water and chilled water distribution, associated terminal devices, heat recovery equipment, heat exchangers, sound attenuation, insulation, and associated appurtenances; energy supply including oil, gas, steam, heating hot and chilled water distribution systems;

other Heating, Ventilation, and Air-Conditioning (HVAC) systems and equipment including special cooling and humidity control, dust and fume collectors, air purifiers, paint booth ventilation systems; and system testing and balancing.

Additional submission requirements:

- Submit at least two (2) projects with a construction cost of $1,500,000 or above.

- Submit at least one (1) project demonstrating self-performed construction experience with boiler/chiller plants replacement and modernization.

- Submit at least one (1) project demonstrating construction experience with installation of Digital Direct

Controls or Energy Management Control Systems.

- At least one (1) of the self-performed projects shall demonstrate experience with design-build.

Projects submitted for the Offeror shall be 100% complete (see definition) within the past five (5) years of the date of issuance of this RFP.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction Experience Project Data Sheet (Exhibit “A”) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods).

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, at least one relevant project shall be submitted for each Joint Venture partner. If no shared project experience is demonstrated, proposals that fail to submit at least one relevant project for each partner in the Joint Venture will be rated Unacceptable. Offerors are still limited to a total of five (5) projects combined.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent/LLC/LTD firm will have meaningful involvement in the performance of the contract. Regarding any such submitted project, if the Offeror fails to demonstrate the affiliate/subsidiary/parent firm’s meaningful involvement in the performance of this contract, the project will not be considered relevant and will not be evaluated. Offerors are still limited to a total of five (5) projects combined.

The Offeror may utilize experience of a subcontractor to demonstrate experience with the installation of Digital Direct Controls or Energy Management Control Systems. The Offeror shall provide an explanation of the meaningful involvement that the subcontractor will have in performance of this contract. Regarding any such submitted project, if the Offeror fails to demonstrate the subcontractor’s meaningful involvement in the performance of this contract, the project will not be considered relevant and will not be evaluated.

Offerors are still limited to a total of five (5) projects combined.

Experience of a subcontractor submitted to demonstrate construction experience other than the installation of Digital Direct Controls or Energy Management Control Systems will not be considered.

b. Basis of Evaluation:

The basis of evaluation will be the Offeror’s demonstrated experience in performing five (5) relevant construction projects as defined in the proposal submission requirements above. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP.

Proposals which submit fewer than five (5) relevant construction projects or fail to demonstrate experience as required above will be rated Unacceptable.

Any project submitted which is (1) in excess of the five (5) required projects, (2) combined projects (see definition), (3) not 100% complete within the five-year period specified (see definition), (4) outside the scope of work of this solicitation, or (5) outside the construction cost range of $50,000 to $5,000,000, will not be evaluated.

FACTOR 2: PAST PERFORMANCE

Past performance information is one indicator of an Offeror’s ability to perform the contract successfully.

The currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered.

The Offeror may be given an opportunity to clarify certain aspects of its proposal, (e.g., the relevance of the Offeror’s past performance information and adverse past performance information to which the Offeror has not previously had an opportunity to respond) or to resolve minor or clerical errors.

a. Proposal Submission Requirements:

Submit evaluations under Tab “Exhibits A & B” immediately following each of the projects shown on Exhibit “A” to which they pertain. For each project submitted in Factor 1, use one of the following formats to demonstrate past performance:

- For commercial projects, submit a past performance questionnaire (PPQ) (Exhibit “B”). Ensure correct/current phone numbers and email addresses are provided for the client point of contact. Offerors are required to provide PPQs with their proposal.

- For Government projects, submit a copy of a U.S. Army Corps of Engineers Construction Contractor

Appraisal Support System (CCASS) performance evaluation, for construction. If no CCASS evaluation exists, the Offeror may submit a PPQ; however, the government will not consider any PPQ submitted for a project if an official CCASS evaluation exists in the government database.

If you are submitting a project your firm performed as a subcontractor, include the name and POC for the prime contractor.

If the rating received was less than Satisfactory, provide a brief description of the problem(s) resulting in this evaluation and what corrective action, if any, was taken. Offerors may also address any adverse past performance issues. Explanations for all projects combined shall not exceed one (1) double-sided page (or two (2) single-sided pages) in total.

Past performance information submitted for projects other than those listed in Factor 1 will not be considered.

Proposals that fail to provide required and complete information and an accessible point of contact (POC) with a correct phone number may be rated as Unacceptable.

The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.

Performance award or additional information submitted will not be considered.

b. Basis of Evaluation:

This evaluation focuses on how well the Offeror performed on the relevant projects submitted under Factor 1

– Experience and past performance on other projects currently documented in known sources. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), and any other known sources not provided by the Offeror.

Offerors will be rated as acceptable when PPQs/CCASS evaluations and information obtained from any other sources reflect, at a minimum, a satisfactory level of performance considering the following: the contractor’s history of reasonable and cooperative behavior; commitment to customer satisfaction; record of conforming to specifications and applicable law (i.e., Davis Bacon Wage Determinations/Safety Standards, etc.); quality of workmanship; record of recommending and/or implementing innovative approaches and/or technologies;

record of controlling costs; safety performance record; and adherence to schedules.

In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)

(2) (iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability “unknown” shall be considered “acceptable.”

FACTOR 3: SAFETY

a. Proposal Submission Requirements:

The Offeror shall use Exhibit “C” (Safety Data & Narrative) to submit (under Tab “Exhibit C”) the following information: (For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. EMR and DART rates shall not be submitted for subcontractors.)

1) Experience Modification Rate (EMR):

For the three (3) previous complete calendar years [2010, 2011, and 2012], submit your EMR (which compares your company’s annual losses in insurance claims against its policy premiums over a three (3) year period). If you have no EMR, affirmatively state so and explain why. Any extenuating circumstances that adversely affected the EMR should be addressed as part of this element.

2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:

For the three (3) previous complete calendar years [2010, 2011, and 2012], submit your OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate, as defined by the U. S.

Department of Labor, Occupational Safety and Health Administration (OSHA). If you cannot submit an OSHA DART rate, affirmatively state so, and explain why. Any extenuating circumstances that adversely affected the OSHA DART rate data should be addressed as part of this element.

3) Technical Approach for Safety:

Describe the plan that the Offeror will implement to evaluate the safety performance of potential subcontractors, as part of the selection process for all levels of subcontractors. Also, describe how the Offeror will ensure and monitor safe work practices at all subcontractor levels. The safety narrative shall be limited to two (2) pages.

b. Basis of Evaluation:

The Government will evaluate the Offeror’s overall safety record and the Offeror’s plan to select and monitor subcontractors to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The Government’s sources of information for evaluating safety may include, but are not limited to, OSHA, NAVFAC’s Enterprise Safety Applications Management System (ESAMS), and other related databases.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The evaluation will collectively consider the following:

- Experience Modification Rate (EMR)

- OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate

- Offeror’s Technical Approach for Safety

- Other sources of information available to the Government

1) Experience Modification Rate (EMR):

The Government will evaluate the EMR to determine if the Offeror has demonstrated a history of safe work practices. An EMR greater than 1.0 is considered high risk and may be considered Unacceptable; however, the Government may take into account any upward or downward trends and extenuating circumstances that impact the rates.

2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:

The Government will evaluate the OSHA DART Rate to determine if the Offeror has demonstrated a history of safe work practices. A DART Rate of 3.00 or higher is considered high risk and may be considered Unacceptable; however, the Government may take into account any upward or downward trends and extenuating circumstances that impact the rates.

3) Technical Approach for Safety:

The Government will evaluate the narrative to determine that the safety performance of potential subcontractors will be considered in the selection of all levels of subcontractors and that the Offeror’s plan will monitor and ensure safe work practices at all subcontractor levels. Offerors who fail to address either of these items will be rated Unacceptable.

EXHIBITS FOR SUBMISSION REQUIREMENTS ARE PROVIDED AS SEPARATE ATTACHMENTS

ON THE FEDERAL BUSINESS OPPORTUNITIES WEBSITE AT http://www.fbo.gov.

CLAUSES INCORPORATED BY FULL TEXT

52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)

(a) Definitions. As used in this provision--

“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.

“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.

Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show--

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, or revision, of proposals.

(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of…

This is the start of the file's text. The full file is on GovTribe.