N6247314R0003_-_Exhibit_D_-_LEED_checklist.xls
XLS spreadsheet 135 KB Posted
- Solicitation number
- N6247314R0003
About this file
Exhibit D - LEED Checklist
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Exhibit D - LEED Checklist | |||||||
| LEED 2009 for Core and Shell Development | |||||||
| New HVAC System - Reserve Training Center | |||||||
| Naval Air Station, Fresno, CA | |||||||
| Yes | ? | No | |||||
| 12 | Sustainable Sites | Possible Points | 28 | Method of Achieving | |||
| Y | Prereq 1 | Construction Activity Pollution Prevention | |||||
| 1 | Credit 1 | Site Selection | 1 | ||||
| Credit 2 | Development Density and Community Connectivity | 5 | |||||
| Credit 3 | Brownfield Redevelopment | 1 | |||||
| 3 | Credit 4.1 | Alternative Transportation - Public Transportation Access | 6 | ||||
| 2 | Credit 4.2 | Alternative Transportation - Bicycle Storage and Changing Rooms | 2 | ||||
| 1 | Credit 4.3 | Alternative Transportation - Low-Emitting and Fuel Efficient Vehicles | 3 | ||||
| 2 | Credit 4.4 | Alternative Transportation - Parking Capacity | 2 | ||||
| 1 | Credit 5.1 | Site Development - Protect or Restore Habitat | 1 | ||||
| 1 | Credit 5.2 | Site Development - Maximize Open Space | 1 | ||||
| Credit 6.1 | Stormwater Design - Quantity Control | 1 | |||||
| Credit 6.2 | Stormwater Design - Quality Control | 1 | |||||
| Credit 7.1 | Heat Island Effect - Non-Roof | 1 | |||||
| 1 | Credit 7.2 | Heat Island Effect - Roof | 1 | ||||
| Credit 8 | Light Pollution Reduction | 1 | |||||
| Credit 9 | Tenant Design and Construction Guidelines | 1 | |||||
| Yes | ? | No | |||||
| 2 | Water Efficiency | Possible Points | 10 | Method of Achieving | |||
| Y | Prereq 1 | Water Use Reduction - 20% Reduction | |||||
| 2 | Credit 1 | Water Efficient Landscaping | 2 to 4 | ||||
| Credit 2 | Innovative Wastewater Technologies | 2 | |||||
| Credit 3 | Water Use Reduction | 2 to 4 | |||||
| Yes | ? | No | |||||
| Energy & Atmosphere | Possible Points | 37 | Method of Achieving | ||||
| Y | Prereq 1 | Fundamental Commissioning of Building Energy Systems | |||||
| Y | Prereq 1 | Minimum Energy Performance | |||||
| Y | Prereq 1 | Fundamental Refrigerant Management | |||||
| Credit 1 | Optimize Energy Performance | 3 to 21 | |||||
| Credit 2 | On-Site Renewable Energy | 4 | |||||
| Credit 3 | Enhanced Commissioning | 2 | |||||
| Credit 4 | Enhanced Refrigerant Management | 2 | |||||
| Credit 5.1 | Measurement & Verification - Base Building | 3 | |||||
| Credit 5.2 | Measurement & Verification - Tenant Submetering | 3 | |||||
| Credit 6 | Green Power | 2 | |||||
| Yes | ? | No | |||||
| 5 | Materials & Resources | Possible Points | 13 | Method of Achieving | |||
| Y | Prereq 1 | Storage and Collection of Recyclables | |||||
| Credit 1 | Building Reuse - Maintain Existing Walls, Floors and Roof | 1 to 5 | |||||
| 2 | Credit 2 | Construction Waste Management | 1 to 2 | ||||
| Credit 3 | Materials Reuse | 1 | |||||
| 1 | Credit 4 | Recycled Content | 1 to 2 | ||||
| 1 | Credit 5 | Regional Materials | 1 to 2 | ||||
| 1 | Credit 6 | Certified Wood | 1 | ||||
| Yes | ? | No | |||||
| 2 | Indoor Environmental Quality | Possible Points | 12 | Method of Achieving | |||
| Y | Prereq 1 | Minimum Indoor Air Quality Performance | |||||
| Y | Prereq 1 | Environmental Tobacco Smoke (ETS) Control | |||||
| Credit 1 | Outdoor Air Delivery Monitoring | 1 | |||||
| Credit 2 | Increased Ventilation | 1 | |||||
| Credit 3 | Construction IAQ Management Plan - During Construction | 1 | |||||
| Credit 4.1 | Low-Emitting Materials - Adhesives and Sealants | 1 | |||||
| Credit 4.2 | Low-Emitting Materials - Paints and Coatings | 1 | |||||
| 1 | Credit 4.3 | Low-Emitting Materials - Flooring Systems | 1 | ||||
| 1 | Credit 4.4 | Low-Emitting Materials - Composite Wood and Agrifiber Products | 1 | ||||
| Credit 5 | Indoor Chemical and Pollutant Source Control | 1 | |||||
| Credit 6 | Controllability of Systems - Thermal Comfort | 1 | |||||
| Credit 7 | Thermal Comfort - Design | 1 | |||||
| Credit 8.1 | Daylight and Views - Daylight | 1 | |||||
| Credit 8.2 | Daylight and Views - Views | 1 | |||||
| Yes | ? | No | |||||
| Innovation & Design Process | Possible Points | 6 | Method of Achieving | ||||
| Credit 1.1 | Innovation in Design: Specific Title | 1 | |||||
| Credit 1.2 | Innovation in Design: Specific Title | 1 | |||||
| Credit 1.3 | Innovation in Design: Specific Title | 1 | |||||
| Credit 1.4 | Innovation in Design: Specific Title | 1 | |||||
| Credit 1.5 | Innovation in Design: Specific Title | 1 | |||||
| Credit 2 | LEED® Accredited Professional | 1 | |||||
| Yes | ? | No | |||||
| Regional Priority Credits | Possible Points | 4 | Method of Achieving | ||||
| Credit 1.1 | Regional Priority: Specific Credit | 1 | |||||
| Credit 1.2 | Regional Priority: Specific Credit | 1 | |||||
| Credit 1.3 | Regional Priority: Specific Credit | 1 | |||||
| Credit 1.4 | Regional Priority: Specific Credit | 1 | |||||
| 21 | Total | Possible Points | 110 | ||||
| Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110 points |
&CPage &P of &N
File details come from the government source that posted it. Updated .