Annex_1503060_Pavement_Clearance_W-O___2.19.13.doc

DOC document 63 KB Posted

Attached to
8(a) San Diego Metro MASC Federal contract opportunity
Solicitation number
N6247313R4011
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

Annex 1503060 Seed Project Detail

View the file

Other files for this federal contract opportunity

Other files attached to 8(a) San Diego Metro MASC, newest first.
File Type Posted
N6247313R4011_Amendment_0006.zip ZIP file
N6247313R4011_Amendment_0006.zip ZIP file
N62473-13-R-4011_Amendment_0005_Date_Extend.pdf PDF
N62473-13-R-4011_Amend_0004.pdf PDF
EXHIBIT_B_complete.docx DOCX document
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001_4011.pdf PDF
N62473-13-R-4011_RFP_Files.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1503060 – Pavement Clearance Table of Contents

Spec Item
Title
1
General Information
1.1
Concept of Operations
2
Management And Administration
2.1
Definitions and Acronyms
2.2
Personnel
2.2.1
Certification, Training, and Licensing
2.3
Special Requirements
2.3.1
Safety
2.3.2
Equipment Restrictions
2.3.3
Work Identification
2.4
Communication
2.5
References and Technical Documents
3
FFP Work
3.1
Pier Cleaning
4
IDIQ Work

1503060 - Pavement Clearance

Spec Item
Title
Description
1
General Information
The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Pavement Clearance at Naval Base Point Loma, specifically the piers at the Deperming complex.
1.1
Concept of Operations
Pavement Clearance services are performed to maintain physical safety of personnel and minimize the health hazard. To that end the piers will be regularly hydro-washed with pressurized sea water.

1503060 - Pavement Clearance

Spec Item
Title
Description
2
Management And Administration
2.1
Definitions and Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2
Personnel
The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required to efficiently provide pavement clearance services.
2.2.1
Certification, Training, and Licensing
Contractor must be fully licensed for the work to be performed. All personnel shall be trained per OEM guidance in the use of all power washing equipment to be used onsite.
2.3
Special Requirements
2.3.1
Safety
Contract personnel shall wear all personal protective equipment (PPE) required by the EM 385 and OSHA when operating power washing equipment.
2.3.2
Equipment Restrictions
Power washing equipment must be able to utilize seawater for washing. Equipment must be either; light enough to pose not hazard to finger piers or have hoses of sufficient length to reach the full length of finger piers. Equipment may utilize on pier power or have generator capacity.
2.3.3
Work Identification
The Contractor shall identify and recommend IDIQ work as appropriate to the KO.
2.3.4
Environmental Restriction
The Contractor shall utilize saltwater whenever possible to perform work. Should the seawater pumps on the piers both be down the Contractor may request Government permission to use portable water for a limited time.

Under no circumstances will the use of heated water be permitted or any kind of sand, grit, or shot blasting.

2. 4
Communication
The Contractor shall coordinate all access to performance areas including the piers and any location ordered with appropriate Government authority. The Contractor shall provide monthly schedules of work to be performed. See Section F.
2.5
References and Technical Documents
References and Technical Documents are listed in J-0200000-03.

1503060 - Pavement Clearance

Spec Item
Title
Performance Objective
Related Information
Performance Standard
3
FFP Work
Contractor shall provide pavement clearance to achieve a cleared appearance and safe use of paved surfaces.

Pier site maps are included in J-1503060-01.

The FFP services within this specification will be pier cleaning..

Paved surfaces are clear, safe, and passable.

3.1
Pier Clearing
The Contractor shall sweep and power wash piers to ensure they are clear of all debris.
Contractor shall provide sweeping and power-washing (hydro-cleaning) to remove all debris organic and artificial, maintain the safety of the pier, improve sanitation, and reduce maintenance costs by keeping piers clean of corrosive substances.

To meet environmental requirements the Contractor shall pick up large loose debris prior to washing.

All methods employed, especially calibration of the psi, to clean the piers shall take care to minimize all potential damage, corrosion, and erosion of the pier surfaces.

The Contractor shall develop and submit a schedule for pavement sweeping service. The contractor shall also provide a quarterly log and discharge records. See Section F.

Informational Note:

Historically piers have required service 2-3 times per week to maintain operational safety.

Surfaces are swept and power-washed per the schedule and safe for personnel.

1503060 - Street Sweeping and Snow Removal

Spec Item
Title
Performance Objective
Related Information
Performance Standard
4
IDIQ Work
IDIQ work may be ordered utilizing DoD EMALL or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause. The order will specify the exact locations and types of work to be accomplished. The number of Contractor working days will be specified in each ELIN.
Refer to IDIQ ELINs for task listings, descriptions, and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance standards for IDIQ work will be the same as those in Spec Item 3 where applicable.