1503060 – Pavement Clearance Table of Contents
| 1.1 |
| Concept of Operations |
| 2 |
| Management And Administration |
| 2.1 |
| Definitions and Acronyms |
| 2.2.1 |
| Certification, Training, and Licensing |
| 2.3.2 |
| Equipment Restrictions |
| 2.3.3 |
| Work Identification |
| 2.5 |
| References and Technical Documents |
1503060 - Pavement Clearance
| Spec Item |
| Title |
| Description |
| 1 |
| General Information |
| The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Pavement Clearance at Naval Base Point Loma, specifically the piers at the Deperming complex. |
| 1.1 |
| Concept of Operations |
| Pavement Clearance services are performed to maintain physical safety of personnel and minimize the health hazard. To that end the piers will be regularly hydro-washed with pressurized sea water. |
1503060 - Pavement Clearance
| Spec Item |
| Title |
| Description |
| 2 |
| Management And Administration |
| 2.1 |
| Definitions and Acronyms |
| Definitions and Acronyms are listed in J-0200000-01. |
| 2.2 |
| Personnel |
| The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required to efficiently provide pavement clearance services. |
| 2.2.1 |
| Certification, Training, and Licensing |
| Contractor must be fully licensed for the work to be performed. All personnel shall be trained per OEM guidance in the use of all power washing equipment to be used onsite. |
| 2.3.1 |
| Safety |
| Contract personnel shall wear all personal protective equipment (PPE) required by the EM 385 and OSHA when operating power washing equipment. |
| 2.3.2 |
| Equipment Restrictions |
| Power washing equipment must be able to utilize seawater for washing. Equipment must be either; light enough to pose not hazard to finger piers or have hoses of sufficient length to reach the full length of finger piers. Equipment may utilize on pier power or have generator capacity. |
| 2.3.3 |
| Work Identification |
| The Contractor shall identify and recommend IDIQ work as appropriate to the KO. |
| 2.3.4 |
| Environmental Restriction |
| The Contractor shall utilize saltwater whenever possible to perform work. Should the seawater pumps on the piers both be down the Contractor may request Government permission to use portable water for a limited time. |
Under no circumstances will the use of heated water be permitted or any kind of sand, grit, or shot blasting.
| 2. 4 |
| Communication |
| The Contractor shall coordinate all access to performance areas including the piers and any location ordered with appropriate Government authority. The Contractor shall provide monthly schedules of work to be performed. See Section F. |
| 2.5 |
| References and Technical Documents |
| References and Technical Documents are listed in J-0200000-03. |
1503060 - Pavement Clearance
| Spec Item |
| Title |
| Performance Objective |
| Related Information |
| Performance Standard |
| 3 |
| FFP Work |
| Contractor shall provide pavement clearance to achieve a cleared appearance and safe use of paved surfaces. |
Pier site maps are included in J-1503060-01.
The FFP services within this specification will be pier cleaning..
Paved surfaces are clear, safe, and passable.
| 3.1 |
| Pier Clearing |
| The Contractor shall sweep and power wash piers to ensure they are clear of all debris. |
| Contractor shall provide sweeping and power-washing (hydro-cleaning) to remove all debris organic and artificial, maintain the safety of the pier, improve sanitation, and reduce maintenance costs by keeping piers clean of corrosive substances. |
To meet environmental requirements the Contractor shall pick up large loose debris prior to washing.
All methods employed, especially calibration of the psi, to clean the piers shall take care to minimize all potential damage, corrosion, and erosion of the pier surfaces.
The Contractor shall develop and submit a schedule for pavement sweeping service. The contractor shall also provide a quarterly log and discharge records. See Section F.
Informational Note:
Historically piers have required service 2-3 times per week to maintain operational safety.
Surfaces are swept and power-washed per the schedule and safe for personnel.
1503060 - Street Sweeping and Snow Removal
| Spec Item |
| Title |
| Performance Objective |
| Related Information |
| Performance Standard |
| 4 |
| IDIQ Work |
| IDIQ work may be ordered utilizing DoD EMALL or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause. The order will specify the exact locations and types of work to be accomplished. The number of Contractor working days will be specified in each ELIN. |
| Refer to IDIQ ELINs for task listings, descriptions, and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance standards for IDIQ work will be the same as those in Spec Item 3 where applicable. |