N62473-13-R-2011 _Amendment_01.pdf
PDF 475 KB Posted
- Solicitation number
- N62473-13-R-2011
About this file
AMENDMENT 01 - PDF DOCUMENT
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section_B_-_Pricing_-_Amend_01.xls | XLS spreadsheet | |
| J-04_-_Post-Award_Limitations_on_Subcontracting_Report.doc | DOC document | |
| JL-06_-_Pre-Award_Contractor_Self-Performance_Certification.doc | DOC document | |
| J-08_-_Burdened_Rate_Breakout_-_Amend_01.xls | XLS spreadsheet | |
| J-07_-_IDIQ_ELINS_-_Amend_01.xls | XLS spreadsheet | |
| N62473-13-R-2011.pdf | ||
| Section_J_-_pdf.pdf | ||
| J-04_-_DHS _Form_I-9.pdf | ||
| J-08_-_Burdened_Rate_Breakout.xls | XLS spreadsheet | |
| J-07_-_IDIQ_ELINS.xls | XLS spreadsheet | |
| Section_B_-_Pricing.xls | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR3235442
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N62473-13-R-2011, FY14 CONTRACT LABOR SUPPORT SERVICES FOR NAVFAC SOUTHWEST AOR
* * * SEE ATTACHED * * *
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Aug-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N62473-13-R-2011
X 9B. DATED (SEE ITEM 11)
02-Aug-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Aug-2013
CODE
NAVFAC SOUTHWEST
SPECIALTY CONTRACTS CORE
CODE RAQ30
1220 PACIFIC HWY, BLDG 127
SAN DIEGO CA 92132-5190
N62473 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N62473-13-R-2011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND 01
1. The purpose of Amendment 01 is to add the following positions to Section C, Scope of Work:
Para 2.15 - Hazardous Waste Program Manager Contractor Support (HWCS), Level II Para 2.16 - Engineering Technician Contractor Support (ETEMCS) Para 2.17 - Automotive Mechanics Contractor Support (AMMCS) Para 2.18 - Boiler Plan Operator Contractor Support (BPOCS) Para 2.19 - Carpenter Contractor Support (CARPCS) Para 2.20 - Crane Operator Contractor Support (CROCS) Para 2.21 - Electromotive Equipment Mechanic Contractor Support (EEMCS) Para 2.22 - Electrician Contractor Support (ELECCS) Para 2.23 - Electrical Power Comptroller Contractor Support (EPCCS) Para 2.24 - Electronic Security Systems Mechanic Contractor Support (ESSMCS) Para 2.25 - Heavy Mobile Equipment Mechanics (Crane) Contractor Support (HMECCS) Para 2.26 – Heavy Mobile Equipment Mechanic Contractor Support (HMEMCS) Para 2.27 – HVAC Contractor Support (HVACCS) Para 2.28 – High Voltage Electrician Contractor Support (HVECS) Para 2.29 – Industrial Equipment Mechanic Contractor Support (INEMCS) Para 2.30 – Insulator Contractor Support (INSRCS) Para 2.31 – Locksmith Contractor Support (LOCKCS) Para 2.32 – Machinist Contractor Support (MACHCS) Para 2.33 – Maintenance Mechanics Contractor Support (MTMCCS) Para 2.34 – Motor Vehicle Operator Contractor Support (MVOCS) Para 2.35 – Pest Controller Contractor Support (PESTCS) Para 2.36 – Plumber Contractor Support (PLMBCS) Para 2.37 – Rigger Contractor Support (RIGCS) Para 2.38 – Utilities System Operator Contractor Support (USOCS) Para 2.39 – Scheduling Consulting Services (SCS) , Level II
2. This amendment also answers Contractor questions (see attached).
3. The following sections/pages of the RFP have been updated and are made a part of this Amendment:
Section A, paragraph A.3 – updated to correct size standard and paragraphs A.12 thru A.15 added. Replace page 2 with attached new page 2. Replace Page 5 of 133 with attached new page 5 and page 5A.
Section B, Schedule of Supplies for Services Pricing/Costs (for base and all option periods) – updated to include additional personnel requirements and ODC limit. Replace all pages of Section B, Schedule of Supplies for Services Pricing/Costs pages with new attached Section B, Schedule of Supplies for Services Pricing/Costs pages.
Section C, Scope of Work – updated to include additional personnel requirements.
Replace entire Section C of “N62473-13-R-2011.pdf” (pages 10 through 56 of 133) with attached revised Section C, Amendment 01.
Section E, Inspection and Acceptance - Paragraphs E.1 thru E.7 omitted from original pdf document.
Section F, Deliveries or Performance – Paragraph F.10, Approval to Subcontract has been updated. Replace page 63 with attached new page 63.
Section I, FAR Clause 222.42, Statement of Equivalent Rates for Federal Hires (May 1989) – updated to include additional personnel requirements.
Section J, Attachment J-06, Historical Data – updated to include additional historical data. Replace Attachment J-06 will attached revised Attachment J-06.
Section J, Attachment J-07, IDIQ ELINs (for base and all option periods) – updated to include additional personnel requirements. Replace entire Attachment J-07 with attached revised Attachment J-07.
Section J, Attachment J-08, Breakout of Burdened Labor Costs Rates (for base and all option periods) – updated to include additional personnel requirements. Replace entire Attachment J-08 with attached revised Attachment J-08.
Section L, Instructions, Conditions and Notices to Bidders – updated to clarify Factor 3, Safety, DART/EMR requirements and paragraph L.5, Submission Requirements. Replace pages 116, 117, 119, and 121 with attached revised pages 116, 117, 119, and 121.
Section M, Evaluations Factors for Award – paragraphs M.4 updated to correct CFR reference, and paragraph M.5 updated to clarify past performance and recent relevant experience of JVs. Replace pages 128, 129, and 130 with attached revised pages 128, 129, and 130.
4. The deadline for submission of Requests for Information (RFI’s) or Contractor questions has expired.
5. The proposal due date has been extended until September 6, 2013 at 12:00 noon (PT). All other clauses and previsions remain unchanged.
6. A red font has been used to reflect the changes made to the solicitation. Deleted items are annotated with a “strike thru.”
7. Contractor must state their acknowledgement of this Amendment when submitting your proposal.
SECTION I - CONTRACT CLAUSES
The following have been modified:
52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 1989)
In compliance with the Service Contract Act of 1965, as amended, and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
THIS STATEMENT IS FOR INFORMATION ONLY: IT IS NOT A WAGE DETERMINATION
Professional Employee Class Monetary Wage‐Fringe Benefits
GS‐09 $24.73 ‐ $32.15
GS‐11 $29.92 ‐ $38.90
GS‐12 $35.87 ‐ $46.63
GS‐13 $42.65 ‐ $55.45
Source: http://www.opm.gov/policy‐data‐oversight/pay‐leave/salaries‐ wages/2012/general‐schedule/san‐diego‐carlsbad‐san‐marcos‐ca‐ hourlyovertime‐rates‐by‐grade‐and‐step/
Blue Collar Employee Class
Monetary Wage‐Fringe Benefits
WG‐08 $20.79 ‐ $24.25
WG‐09 $22.06 ‐ $25.70
WG‐10 $23.30 ‐ $27.18
Source: http://www.cpms.osd.mil/Content/AF%20Schedules/survey‐ sch/017/017R‐10Apr2013.html
(End of clause)
(End of Summary of Changes)
CONTRACTOR QUESTIONS AND ANSWERS
QUESTION 1: Is this a new or follow on requirement? If it is a follow on, please let us know the current contract number and contract value?
Section Of RFP - - Section J, Documents, Exhibits and Other Attachments Paragraph - - Attachment J-06, Historical Data
Page Number - - Page 23 of 60 of “Section J.pdf” Response - - This is a follow-on contract which will replace three expired/expiring contracts for similar services awarded from 2009 through 2013. Attachment J-06, Historical Data, has been updated with additional historical information.
QUESTION 2: Who is the incumbent? Is it still eligible to bid as a prime for this contract?
Section Of RFP - - Section J, Documents, Exhibits and Other Attachments
Paragraph - - Attachment J-06 Historical Data Page Number - - Page 23 of 60 of “Section J.pdf”
Response - - This is a follow-on contract which will replace three expired/expiring contracts for similar services awarded from 2009 through 2013. Information about the current contracts and the incumbent contractors can be found in Attachment J-06, Historical Data. The incumbent(s) can only bid on this re-procurement if they are a certified 8(a) company.
QUESTION 3: How many total FTE's (Key Personnel) are required under this requirement?
Section Of RFP - - Section B, Supplies or Services and Prices
Paragraph - - Schedule of Supplies for Services Pricing/Costs (for base and all option periods) Page Number - - Pages 7 thru 9 of 136 of “N62473-13-R-2011.pdf”
Response - - The initial RFP included approximately 91 employees per year (total of “Quantity” column). This amendment adds 108 more positions, for a total of approximately 202 employees per year.
QUESTION 4: Do we need to submit resumes with the response?
Section Of RFP - - Section L, Instructions, Conditions and Notices to Bidders
Paragraph - - Paragraph L.6, Proposal Format/Submission Requirements Page Number - - Pages 119 thru 121 of 136 of “N62473-13-R-2011.pdf”
Response - - No resumes are required with your initial proposal. Resumes will be required to be submitted at the Task Order level.
QUESTION 5:
The solicitation Section A.3, Set-Aside Determination references NAICS code 561320, Temporary Help Services. When looking this up the size standard is listed as $13.5M however the listing on Fed Biz Ops states “The North American Industry Classification System (NAICS) Code is 561320, Temporary Help Services with a SBA Small Business size standard of $25.5 million. Please clarify if the size standard is $13.5 or $25.5 million.
Section Of RFP - - Section A, Solicitation/Contract Form Paragraph - - A.3, Set-Aside Determination
Page Number - - Page 2 of 136 of “N62473-13-R-2011.pdf” Response - - The correct SBA size standard is $25.5 million. Section A.3, Set Aside
Determination has been updated to reflect the correct size standard.
QUESTION 6: Do we have to assign labor category on SCA wages?
Section Of RFP - - Section C, Scope of Work
Paragraph - - Paragraph 2 Page Number - - Pages 14 thru 36 of 136 of “N62473-13-R-2011.pdf”
Response - - The original RFP included all “professional” categories of employees, so SCA only applies in regards to your overhead costs for clerical support, office staff, etc.
However, this amendment adds "blue collar" positions so SCA applies to the blue collar positions (identified in revised Section C, Scope of Work, paragraphs 2.16 thru 2.38).
QUESTION 7: For Recent Relevant Experience, will you consider Marine Corps Installations?
Section Of RFP - - Section L, Instructions, Conditions and Notices to Bidders
Paragraph - - L.6, Factor 1 Page Number - - Page 121 of 136 of “N62473-13-R-2011.pdf”
Response - - Yes, as long as the experience is similar in size, scope, and complexity to that described in the PWS of the solicitation.
QUESTION 8: For Recent Relevant Experience, will you consider any other Federal Agency Installations and/or Facilities?
Section Of RFP - - Section L, Instructions, Conditions and Notices to Bidders Paragraph - - L.6, Factor 1, Recent Relevant Experience
Page Number - - Page 121 of 136 of “N62473-13-R-2011.pdf” Response - - Yes, as long as the experience is similar in size, scope, and complexity to that described in the PWS of the solicitation.
QUESTION 9: Does NAVFAC have a certain contractor that it prefers to give the contract to?
Section Of RFP - - Section A, Solicitation/Contract Form
Paragraph - - A.3, Set-Aside Determination Page Number - - Page 2 of 136 of “N62473-13-R-2011.pdf”
Response - - No. This procurement is open to all 8(a) Business Development Program participants with the assigned NAICS code of 561320, Temporary Help Services.
QUESTION 10: Is the current contract held by 8(a) SDB?
Section Of RFP - - Section J, Documents, Exhibits and Other Attachments
Paragraph - - Attachment J-06, Historical Data Page Number - - Page 23 of 60 of “Section J.pdf”
Response - - Two contractors were SBA Certified 8(a) businesses. One contractor was a large business. Attachment J-06, Historical Data has been updated to include the business size of each of the previous contractors.
QUESTION 11: How did NAVFAC rate the current contract holder, if there was a rating or evaluation?
Section Of RFP - - Section J, Documents, Exhibits and Other Attachments Paragraph - - Attachment J-06, Historical Data
Page Number - - Page 23 of 60 of “Section J.pdf” Response - - The two NAVFAC contracts were negotiated, sole-source procurements. It is unknown what acquisition strategy, rating, or evaluation criteria were used for the SeaportE contract. Attachment J-06, Historical Data has been updated to include this information.
QUESTION 12: Is this solicitation restricted to 8(a) for NAVFAC to meet its 8(a) participation requirement?
Section Of RFP - - Section A, Solicitation/Contract Form
Paragraph - - A.3, Set-Aside Determination Page Number - - Page 2 of 136 of “N62473-13-R-2011.pdf”
Response - - NAVFAC consistently meets their small business statutory goals established under the Small Business Act. NAVFAC’s procurement strategies are based on extensive market research which indicated that sufficient competition exists within the 8(a) community for this procurement.
QUESTION 13: Why is there a doubt about funding for this task?
Section Of RFP - - Section A, Solicitation/Contract Form
Paragraph - - A.11, Continuing Resolution Page Number - - Page 5 of 136 of “N62473-13-R-2011.pdf”
Response - - The United States is currently under a Continuing Resolution, enacted under H.R.
933, the Full-Year Continuing Appropriations Act of 2013 in March. The bill provides funding until the end of the 2013 fiscal year (September 30, 2013). No information has been released on passage of the FY14 budget. If funds are not made available, no award will be made.
QUESTION 14: As there is a federal mandate that SB contractors be rotated, does NAVFAC intend to give preference to other 8(a) SDBs over the current contractor even if the contractor, as an 8(a), is eligible to bid on this contract?
Section Of RFP - - Section M, Evaluations Factors for Award Paragraph - - M.1, Evaluation Protocol
Page Number - - Page 129 of 136 of “N62473-13-R-2011.pdf” Response - - The contract will be awarded based on best value to the Government using the Low
Price, Technically Acceptable (LPTA) Source Selection process (see FAR 15.101-2).
No preferential treatment will be given to any proposal or proposer.
QUESTION 15: Per SOW Page 48, Section 17.2 " The Contractor shall submit an Organizational Chart showing lines of authority of the key personnel and on-site supervisor(s) with the offer for this contract." Would Navy provide an onsite office for on-site supervisor(s) assuming that the on-site supervisor(s) has/have to be there at all work hours?
Section Of RFP - - Section C, Scope of Work Paragraph - - Paragraph 17.2, Organizational Chart
Page Number - - Pages 14 thru 36 of 136 of “N62473-13-R-2011.pdf” Response - - An on-site supervisor is not required for this contract, however, a supervisor shall be available to be on-site within one hour of government's request, during normal working hours. Paragraph 17.2 has been updated to clarify one-site supervisor requirements (See Section C, Revised Scope of Work attached).
QUESTION 16: Is it acceptable for a 8(a) business to partner with a non-8(a) business to meet the recent experience and past performance requirements?
Section Of RFP - - Section M, Evaluation Factors for Award Paragraph - - Paragraph M.5 Relative Importance Of The Evaluation Factors
Page Number - - Page 131 of 136 of “N62473-13-R-2011.pdf” Response - - If proposing as a MP or JV, Past Performance and experience may be submitted for either party of the team, as long as it is recent and relevant, and contract was performed as a prime.
QUESTION 17: Would a JV between an 8(a) firm and a SDVOSB firm qualify for this solicitation?
Section Of RFP - - Section M, Evaluation Factors for Award
Paragraph - - Paragraph M.5 Relative Importance Of The Evaluation Factors Page Number - - Page 131 of 136 of “N62473-13-R-2011.pdf”
Response - - You may propose as a MP or JV, as long as your teaming/partnering agreements comply with the Small Business Administration requirements set forth in 13 CFR 124, 8(A) Business Development/Small Disadvantaged Business Status Determinations, paragraph 124.513.
QUESTION 18: Would past performance of a teaming partner or major subcontractor be considered relevant?
Section Of RFP - - Section M, Evaluation Factors for Award Paragraph - - Paragraph M.5 Relative Importance Of The Evaluation Factors
Page Number - - Page 131 of 136 of “N62473-13-R-2011.pdf” Response - - Past performance will only be considered If proposing as a MP or JV. Past
Performance and experience may be submitted for either party of the MP or JV, as long as it is recent and relevant and contract was performed as a prime.
QUESTION 19:
Page 121 of the RFP asks for the EMR for previous calendar years 2008-2010, and the DART rate for previous calendar years 2010-2012. Is this correct, or do you want rates for previous calendar years 2010-2012 for both EMR and DART rates?
Section Of RFP - - Section L, Instructions, Conditions and Notices to Bidders Paragraph - - L.6, Factor 3, Safety
Page Number - - Page 124 of 136 of “N62473-13-R-2011.pdf” Response - - The correct calendar years for EMR and DART requirements are 2010 – 2012.
Section L.6 has been updated to include correct requirements.
QUESTION 20:
On page 116 of the instructions to bidders, the top of the page instructs bidders to submit proposals via electronic mail. In L.6.c, it states electronic mail will not be acceptable. What are the correct requirements for the proposal submittal?
Section Of RFP - - Section L, Instructions, Conditions and Notices to Bidders Paragraph - - Paragraph L.5, Submission of Proposal
Page Number - - Page 119 of 136 of “N62473-13-R-2011.pdf” Response - - The Navy wants the proposals mailed or hand-delivered (U.S. Postal Service, FedEx, UPS, etc). Please allow time for delivery. Proposals must be received by 12:00 (Noon PST) on the proposal due date. Paragraph L.5 has been updated to clarify submission requirements.
QUESTION 21: Is Solicitation Number: N62473-13-R-2011 set aside for 8(a) competitive bid?
Section Of RFP - - Section A, Solicitation/Contract Form
Paragraph - - A.3, Set-Aside Determination Page Number - - Page 2 of 136 of “N62473-13-R-2011.pdf”
Response - - Yes, this is a competed solicitation.
QUESTION 22:
Will past performance and experience be considered for the “Offeror” if the Offeror is utilizing a “Teaming Agreement” for support to execute the Program?
Section Of RFP - - Section M, Evaluation Factors for Award Paragraph - - Paragraph M.5 Relative Importance Of The Evaluation Factors
Page Number - - Page 129 of 136 of “N62473-13-R-2011.pdf” Response - - If proposing as a JV, Past Performance and experience may be submitted for either party of the JV, as long as it is recent and relevant. Paragraph M.5 has been updated to clarify submission requirements.
QUESTION 23:
Can PPQ information for Factor 1 be submitted from our subcontractor when they were performing as a subcontractor and the experience is relevant?
Section Of RFP - - Section L.6, Proposal Format/Submission Requirements Paragraph - - Factor 1 – Recent Relevant Experience
Page Number - - Page 122 of 136 of “N62473-13-R-2011.pdf” Response - - No. Past Performance may only be submitted for work performed as a prime.
QUESTION 24:
Can the government provide clarification as to who can submit PPQs – does all PPQs have to come from the Prime Contractor relevant experience.
Section Of RFP - - Section L.6, Proposal Format/Submission Requirements –and- Section M.5. Relative Importance Of The Evaluation Factors
Paragraph - - Factor 1 – Recent Relevant Experience Page Number - - Page 122 of 136 of “N62473-13-R-2011.pdf”
Response - - If proposing as a JV, Past Performance and experience may be submitted for either party of the JV, as long as it is recent and relevant. Paragraph M.5 has been updated
QUESTION 25:
Can the government define key personnel. Section H.8, Key Personnel does not clearly define. Or can the table requirement be removed.
Section Of RFP - - Section H, Special Contract Requirements –and- Section L, Instructions, Conditions and Notices to Bidders
Paragraph - - Paragraph H.8, Key Personnel –and- Paragraph L.6(g), Proposal Format/Submission Requirements
Page Number - - Page 86 and 120 of 136 of “N62473-13-R-2011.pdf” Response - - The key personnel are those personnel considered to be critical to the successful performance of this contract. Key personnel will be identified at the Task Order Level. Paragraph L.6(g) has been updated to remove “tables allowed for the list of key personnel.”
QUESTION 26:
Would the Government consider adding relevant experience that is equilivant to a Bachelor’s Degree?
Section Of RFP - - Section C, Descriptions and Specifications Paragraph - - Paragraph C.2, Contractor Support Position Descriptions
Page Number - - Pages 14 thru 26 of 136 of “N62473-13-R-2011.pdf” Response - - No. Employee must meet education requirements for each position, as identified in the SOW.
QUESTION 27:
Under additional information, it states that the Navy has provided a number designation before each Labor Category to show the equilivant to federal employees.
Where can this number be found?
Section Of RFP - - Section C, Descriptions and Specifications Paragraph - - Paragraph C.2, Contractor Support Position Descriptions
Page Number - - Pages 14 thru 26 of 136 of “N62473-13-R-2011.pdf” Response - - Information inadvertently left off RFP. Section C has been updated to show equilivant federal rating.
QUESTION 28: What hours are we to use for the base year, option year one and option year two?
Section Of RFP - - Section J, Documents, Exhibits and Other Attachments
Paragraph - - Attachment J-07, IDIQ ELINs Page Number - - Page 24 thru 26 of 60 of “Section J.pdf”
Response - - The hours identified for each contract period are the actual work days in each month.
i.e., October 2013 has 22 work days in the month (1-4, 7-11, 15-18, 21-25 and 28- 31).
QUESTION 29: Does this document need to be signed by the Contracting Officer and the SBA?
Section Of RFP - - Section J, Document, Exhibits and Other Attachments
Paragraph - - Attachment JL-06, Pre-Award Contractor’s Self-Performance Certification and Notification of Subcontracting
Page Number - - Page 59 of 60 of “Section J.pdf” Response - - You should submit the document with the SBA’s signature. The Contracting Officer will sign upon contract award.
QUESTION 30: Can the Government provide this document as a fillable document.
Section Of RFP - - Section J, Document, Exhibits and Other Attachments
Paragraph - - Attachment JL-06, Pre-Award Contractor’s Self-Performance Certification and Notification of Subcontracting
Page Number - - Page 59 of 60 of “Section J.pdf” Response - - Document is attached as a word document to this Amendment.
QUESTION 31:
Since the Government is not allowing Contractors to ride in Government vehicles, can local mileage be changed to be reimbursed as most positions require local travel.
Section Of RFP - - Section C, Descriptions and Specifications Paragraph - - Paragraph 10.2, Travel
Page Number - - Pages 48 of 136 of “N62473-13-R-2011.pdf” Response - - No.
QUESTION 32: What is the direct, productive labor hours per FTE?
Section Of RFP - - Section J, Document, Exhibits and Other Attachments
Paragraph - - Attachment J-07, IDIQ ELINs Page Number - - Page 24 thru 26 of 60 of “Section J.pdf”
Response - - The hours identified for each contract period are the actual work days i.e., direct productive labor hours) in each month. i.e., October 2013 has 22 work days in the month (1-4, 7-11, 15-18, 21-25 and 28-31).
QUESTION 33:
What are the page limits for Volume # 1 –Technical Proposal, and each of the sub areas Tabs A through D.
Section Of RFP - - Section L, Instructions, Conditions and Notices to Bidders Paragraph - - Paragraph L.6(g), Proposal Format/Submission Requirements
Page Number - - Page 120 of 136 of “N62473-13-R-2011.pdf” Response - - Section L has been updated to include page limits for Volume #1, Technical
Proposal.
QUESTION 34:
If a contractor proposes a subcontractor at the contract level, does a resultant award infer said subcontractor use was approved, or does the narrative outlined in Section F.10 need to be included with the contractor proposal, or does it need to be submitted for each task order proposal regardless of if the sub was included with the contract proposal.
Section Of RFP - - Section F, Deliveries or Performance –and- Section J, Section J, Documents, Exhibits and Other Attachments
Paragraph - - Paragraph F.10, Approval to Subcontract –and- Attachment JL-06, Pre-Award Contractor’s Self-Performance Certification and
Notification of Subcontracting Page Number - - Page 65 of 136 of “N62473-13-R-2011.pdf” –and-
Page 59 of 60 of “Section J.pdf” Response - - Subcontractors may be substituted at any time during the performance of the contract with written approval from the SBA and the Contracting Officer. Paragraph F.10 has been updated to include this information.
QUESTION 35:
Regarding employee retention, can you please provide the accrued vacation time, anniversary hire date, and/or years of service for each employee currently providing services under the contract?
Section Of RFP - - -N/A- Paragraph - - -N/A-
Page Number - - -N/A- Response - - This information is not available.
QUESTION 36:
It appears this contract falls within the regulations of the Service Contract Act (SCA), therefore, are we required to have a Retirement/Benefit Plan or are we responsible for adhering to the Health & Welfare (H&W) mandate under the SCA?
Section Of RFP - - Section B, Supplies or Services and Prices Paragraph - - Paragraph B.2, Labor Standards
Page Number - - Page 10 of 136 of “N62473-13-R-2011.pdf” Response - - In accordance with FAR Clause 52.222-41, Service Contract Act of 1965 (as amended, (41 U.S.C. 351, et seq.), paragraph 3(d) states “Obligation to Furnish Fringe Benefits - The Contractor or subcontractor may discharge the obligation to furnish fringe benefits specified in the attachment or determined under subparagraph (c)(2) of this clause by furnishing equivalent combinations of bona fide fringe benefits, or by making equivalent or differential cash payments, only in accordance with Subpart D of 29 CFR Part 4, Section 4.170.” You are not required to have your own company Retirement/Benefit Plan. However, if your company has an established Plan, you may use your Plan, as long as you provide benefits equivalent to those established by the DOL Wage Decision.
QUESTION 37: Do the employees fall under a Collective Bargaining Agreement (CBA)?
Section Of RFP - - -N/A-
Paragraph - - -N/A- Page Number - - -N/A-
Response - - No. None of the original contractors identified in Attachment J-06, Historical Data had collective bargaining agreements.
QUESTION 38:
Does the Government intend that only 8(a) firms with the primary NAICS of 561320 as assigned by SBA as part of the 8(a) certification process to propose? Or, is it sufficient that a firm has the assigned NAICS 561320 in SAM.
Section Of RFP - - Section A, Solicitation/Contract Form Paragraph - - A.3, Set-Aside Determination
Page Number - - Page 2 of 136 of “N62473-13-R-2011.pdf” Response - - Although the Government would prefer your primary NAICS be 561320, as long as it is listed in your SAM record and you meet the size requirements, 561320 does not need to be your primary NAICS.
QUESTION 39: What experience aspects is the Government referring to as “both” for the
“ACCEPTABLE” rating in paragraph a)?
Section Of RFP - - Section M, Evaluations Factors for Award
Paragraph - - Factor 1, Recent Relevant Experience Page Number - - Page 133 of 136 of “N62473-13-R-2011.pdf”
Response - - The paragraph has been revised to identify where “both” fits into the sentence.
QUESTION 40:
If the 8(a) prime cannot meet the Factor 1, Recent Relevant Experience minimum requirements (p. 119) on its own, and the 8(a) has entered into a properly executed Teaming Agreement will the Government accept the Teaming Partners experience if it meets the threshold as defined?
Section Of RFP - - Section L.6, Proposal Format/Submission Requirements –and- Section M.5. Relative Importance Of The Evaluation Factors
Paragraph - - Factor 1 – Recent Relevant Experience Page Number - - Page 122 of 136 of “N62473-13-R-2011.pdf”
Response - - If proposing as a JV, Past Performance and experience may be submitted for either party of the JV, as long as it is recent and relevant. Paragraph M.5 has been updated
QUESTION 41:
To meet the Recent Relevant Experience requirements does the past performance have to have been procured under the temporary labor support services NAICS code?
Section Of RFP - - Section M, Evaluations Factors for Award Paragraph - - Factor 1, Recent Relevant Experience
Page Number - - Page 133 of 136 of “N62473-13-R-2011.pdf” Response - - No. But the Offeror must explain why they feel the experience is recent and relevant.
QUESTION 42:
Page 118 of the solicitation requests a minimum of two projects, but on page 130 it seems one project submission is acceptable. Does the government require one or two relevant projects to be acceptable?
Section Of RFP - - Section M, Evaluations Factors for Award Paragraph - - Factor 1, Recent Relevant Experience
Page Number - - Page 121-122 of 136 of “N62473-13-R-2011.pdf” Response - - The Government requires a minimum of two recent, relevant projects. Factor 1 has been revised with correct information.
QUESTION 43: Can you remove paragraph M.1(j)?
Section Of RFP - - Section M, Evaluation Factors for Award
Paragraph - - M.1, Evaluation Protocol Page Number - - Page 130 of 136 of “N62473-13-R-2011.pdf”
Response - - No. This is a standard Factor for NAVFAC Source Selection procedures.
QUESTION 44: Can you remove paragraph M.5(c)?
Section Of RFP - - Section M, Evaluation Factors for Award
Paragraph - - M.5(c), Relevant Importance of Evaluation Factors Page Number - - Page 132 of 136 of “N62473-13-R-2011.pdf”
Response - - No. This is a standard Factor for NAVFAC Source Selection procedures.
QUESTION 45: Can you remove paragraph M.5, Factor 1(a)?
Section Of RFP - - Section M, Evaluation Factors for Award
Paragraph - - M.5, Factor 1(a) Page Number - - Page 132 of 136 of “N62473-13-R-2011.pdf”
Response - - No. This is a standard Factor for NAVFAC Source Selection procedures.
QUESTION 46: Is the $1,000,000.00 cap for ODCs for contract duration correct?
Section Of RFP - - Section C, Descriptions and Specifications
Paragraph - - Paragraph C.10, Reimbursable Other Direct Costs (ODCs) Page Number - - Pages 47 of 136 of “N62473-13-R-2011.pdf”
Response - - Yes. ODC limit is $1,000,000.00 per life of the contract (base and all option periods). Sections B, Schedule of Supplies for Services Pricing/Costs (for base and all option periods) and Section J, Attachment J-07, IDIQ ELINs (for base and all option periods) have been updated with correct information.
Page 2of 133
Amendment 01 Section A - Solicitation/Contract Form
SECTION A
Section A - Solicitation/Contract Form
ADDITIONAL INSTRUCTIONS
A.1 CONTRACT TITLE
Naval Facilities Engineering Command, Southwest (NAVFAC SW) has the responsibility to obtain temporary professional and “blue collar“ labor support services as described in this Scope of Work (SOW). The requirement is to provide Planner Consulting Services (PCS), Design Manager Consulting Services (DMCS), Technical Consulting Services (TCS), Project Manager Consulting Services (PMCS), Construction Manager Consulting Services (CMCS), Engineering Technician Consulting Services (ETCS), and Field Support Consulting Services (FSCS). The professional and “blue collar“ services must be provided on site at the required duty station including at NAVFAC SW and at Installations within NAVFAC SW area of responsibility. Travel will be required.
A.2 TYPE OF CONTRACT
This is a Indefinite Delivery/Indefinite Quantity (IDIQ) contract. Refer to FAR Clause 52.216-1, Type of Contract (Apr 1984) in Section L. The performance period will be for base year and two, 12 month option periods. It is anticipated that one contract will be awarded. The anticipated base performance period will be from October 1, 2013 thru September 30, 2014. Anticipated option periods will be:
October 1, 2014 -thru- September 30, 2015 October 1, 2015 -thru- September 30, 2016
A.3 SET-ASIDE DETERMINATION
In accordance with FAR, Subpart 19.8, Contracting with the Small Business Administration, DFARS, Subpart 219.8, Contracting with the Small Business Administration, and under the guidelines of the Partnership Agreement (PA) between the Small Business Administration and the Department of Defense as signed on October 23, 2012. it has been determined that competition for this procurement will be limited to 8(a) Business Development Program participants, with the assigned NAICS code of 561320, Temporary Help Services, with a size standard of $25.5 million.
A.4 STANDARD EXECUTION PROCEDURES
The NAVFAC SW Specialty Contracts Core (Code RAQ4) Team is the procuring and administering office and is responsible for all contractual matters related to the basic contract, task orders, and invoices.
A.5 SUMMARY OF SOURCE SELECTION PROCESS
Amendment 01 Code RAQ4 Phone: 619-532-1219 1220 Pacific Highway Fax: 619-532-1155 San Diego, CA 92132-5190 Email: richard.lovering@navy.mil
Capital Improvement Core Jennifer Llamas, BLTL Code CI, Bldg 110 Phone: 619-532-1641 1220 Pacific Highway Fax: 619-532-1155 San Diego, CA 92132-5190 Email: jennifer.llamas@navy.mil
A.11 CONTINUING RESOLUTION
Offerors are advised that funding may not become available. If funds are not available, no award will be made as a result of this solicitation. Offerors will not be reimbursed for any effort or proposal costs resulting from this solicitation.
A.12. NON-PERSONAL SERVICES STATEMENT
This contract is a “non-personal services contract” as defined in FAR 37.101. It does not create employment rights with the U.S. Government whether actual, inherent, or implied. By agreeing to perform the services described in these specifications, the Contractor acknowledges that he/she is not, and shall not become, an employee of the U.S. Government. The Contractor further agrees that he/she shall not bring any cause of action in any forum claiming that he/she has become an employee of the U.S. Government.
A.13. GOVERNMENT-CONTRACTOR RELATIONSHIPS
Contractor employees performing services under this order will be controlled, directed, and supervised at all times by management personnel of the contractor. Contractor management will ensure that employees properly comply with the performance work standards outlined in the statement of work. Contractor employees will perform their duties independent of, and without the supervision of, any Government official or other Defense Contractor.
The tasks, duties, and responsibilities set forth in the task order may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation
(FAR).
a. The Government will control access to the facility and will perform the inspection and acceptance of the completed work.
b. The Government and the Contractor understand and agree that the services to be delivered under this contract by the Contractor to the Government are non-personal services and the parties recognize and agree that no employer-employee or master-servant relationships exist or will exist under the contract between the Government and the contractor and/or between the Government and the contractor’s employees.
Page 5A of 133 Amendment 01
A.14. CONTRACTOR OBLIGATIONS UNDER THIS CONTRACT
It is in the best interest of the Government to afford the parties a full and complete understanding of their respective obligations.
It is understood and agreed that the Contractor and/or the Contractor’s employees or subcontractor shall:
(1) Shall perform the services specified herein as independent Contractors, not as employees of the government.
(2) Shall manage and administer the work required and bear sole responsibility for complying with any and all technical, schedule, or financial requirements or constraints attendant to the performance of this contract.
(3) Shall be free from supervision or control by any government employee with respect to the manner or method of performance of the services specified; but
(4) Shall pursuant to the government’s right and obligation to inspect, accept, or reject the work, comply with such general direction of the Contracting Officer, or the duly authorized representative of the Contracting Officer as is necessary to ensure accomplishment of the contract objectives.
It is understood and agreed that the Contractor and/or the Contractor’s employees or subcontractor shall not:
(1) Shall not be placed in a position where they are appointed or employed by a Federal Officer, or are under the supervision, direction, or evaluation of a Federal Officer, Military or Civilian.
(2) Shall not be placed in a staff or policy making position.
(3) Shall not be placed in a position of command, supervision, administration, or control over Military or Civilian personnel, or personnel of other contractors, or become a part of the Government organization.
(4) Shall not be used for the purpose of avoiding manpower ceilings or other personnel rules and regulations of DA or the Civil Service Commission.
(5) Shall not be used in administration or supervision of military procurement activities.
A.15. EMPLOYEE RELATIONSHIPS
The services to be performed under this contract do not require the contractor or its employees to exercise personal judgment and discretion on behalf of the Government, but rather the contractor’s employees will act and exercise personal judgment and discretion on behalf of the contractor.
Rules, regulations, directions, and requirements which are issued by command authorities under their responsibility for good order, administration, and security are applicable to all personnel who enter the installation, or who travel on Government transportation.
This is not to be construed or interpreted to establish any degree of Government control which is inconsistent with a non-personal services contract.
Amendment 01
QUANTITY HOURLY TOTAL HRS TOTAL
(# of Employees) RATE (Based on 8hr day) PRICE
Electromotive Equipment Mechanic Contractor Support (EEMCS)
A001-20 Crane Operator Contractor Support (CROCS) Position Location:
Period of Performance:
5 2,016 $0.00
A001-19 Carpenter Contractor Support (CARPCS) Position Location:
Period of Performance:
1 2,016 $0.00
A001-18 Boiler Plan Operator Contractor Support (BPOCS) Position Location:
Period of Performance:
6 2,016 $0.00
A001-17 Automotive Mechanics Contractor Support (AMMCS) Position Location:
Period of Performance:
3 2,016 $0.00
A001-16 Engineering Technician Contractor Support (ETEMCS) Position Location:
Period of Performance:
2 2,016 $0.00
A001-15 Hazardous Waste Program Manager Contractor Support (HWCS) , Level II Position Location:
Period of Performance:
5 2,016 $0.00
ELIN DESCRIPTION
2,016 Project Manager Contractor Support (PMCS), Level III Position Location:
Period of Performance:
A001-10
A001-05
A001-06
Planner Contractor Support (PCS) , Level II Position Location:
Period of Performance:
A001-04
SECTION B - SCHEDULE OF SUPPLIES OR SERVICES PRICING/COSTS
A001-02 $0.00
BASE PERIOD - OCTOBER 1, 2013 - SEPTEMBER 30, 2014
A001-01 Design Manager Contractor Support (DMCS), Level II Position Location:
Period of Performance:
7 2,016
$0.00A001-03 Planning and Engineering Contractor Support (PECS) , Level II Position Location:
Period of Performance:
2 2,016
$0.00
Planning and Engineering Technican Contractor Support (PETCS) , Level
II
Position Location:
Period of Performance:
3 2,016 $0.00
5 2,016 $0.00
2,016 $0.00
Construction Manager Contractor Support (CMCS), Level II Position Location:
Period of Performance:
11 2,016 $0.00
$0.00
A001-08 Field Support Contractor Support (FSCS), Level III Position Location:
Period of Performance:
1 2,016
A001-07 Engineering Technican Contractor Support (ETCS), Level I Position Location:
Period of Performance:
A001-09 NEPA Specialist Contractor Support (NSCS) , Level II Position Location:
Period of Performance:
11 2,016 $0.00
Evironmental Compliance Specialist Contractor Support (ECCS) , Level I Position Location:
Period of Performance:
5 2,016 $0.00
A001-11 Natural Resource Specialist Contractor Support (NRCS) , Level I Position Location:
Period of Performance:
11 2,016 $0.00
A001-12
Hazardous Waste Program Manager Contractor Support (HWCS) , Level
III
Position Location:
Period of Performance:
5 2,016 $0.00
A001-13 Environmental Protection Specialist Contractor Support (EPCS) , Level I Position Location:
Period of Performance:
11 2,016 $0.00
A001-14 EV Technical Specification Writer Contractor Support (SWCS) , Level I Position Location:
Period of Performance:
5 2,016 $0.00
NOTE: HOURLY RATES ARE FULLY BURDENED
TOTAL FOR CONTRACT - - - - - - . $333,333.33
A001-40 $333,333.33
A001-39 Scheduling Consulting Services (CSC), Level II Position Location:
Period of Performance:
3 2,016 $0.00
Estimated Travel, Supplies, Equipment, and Specialized Training Costs NTE total of $1,000,000.00 for total contract term.
Approximately $333,333.33 per year
NTE $1,000,000.00
A001-21 Position Location:
Period of Performance:
3 2,016 $0.00
Electrician Contractor Support (ELECCS) Position Location:
Period of Performance:
A001-22
A001-23 Electrical Power Comptroller Contractor Support (EPCCS) Position Location:
Period of Performance:
Electronic Security Systems Mechanic Contractor Support (ESSMCS) Position Location:
Period of Performance:
Heavy Mobile Equipment Mechanics (Crane) Contractor Support
(HMECCS)
Position Location:
Period of Performance:
Heavy Mobile Equipment Mechanic Contractor Support (HMEMCS) Position Location:
Period of Performance:
HVAC Contractor Support (HVACCS) Position Location:
Period of Performance:
High Voltage Electrician Contractor Support (HVECS) Position Location:
Period of Performance:
Industrial Equipment Mechanic Contractor Support (INEMCS) Position Location:
Period of Performance:
A001-24
A001-25
A001-26
A001-27
A001-28
A001-29
A001-30 Insulator Contractor Support (INSRCS) Position Location:
Period of Performance:
Locksmith Contractor Support (LOCKCS) Position Location:
Period of Performance:
Machinist Contractor Support (MACHCS) Position Location:
Period of Performance:
Maintenance Mechanics Contractor Support (MTMCCS) Position Location:
Period of Performance:
Motor Vehicle Operator Contractor Support (MVOCS) Position Location:
Period of Performance:
Pest Controller Contractor Support (PESTCS) Position Location:
Period of Performance:
Plumber Contractor Support (PLMBCS) Position Location:
Period of Performance:
Rigger Contractor Support (RIGCS) Position Location:
Period of Performance:
Utilities System Operator Contractor Support (USOCS) Position Location:
Period of Performance:
A001-31
A001-32
A001-33
A001-34
A001-35
A001-36
A001-37
A001-38
6 2,016 $0.00
8 2,016 $0.00
2 2,016 $0.00
3 2,016 $0.00
4 2,016 $0.00
11 2,016 $0.00
8 2,016 $0.00
3 2,016 $0.00
3 2,016 $0.00
3 2,016 $0.00
1 2,016 $0.00
4 2,016 $0.00
2,016 $0.00
5 2,016 $0.00
1 2,016 $0.00
10 2,016 $0.00
3 2,016 $0.00
QUANTITY HOURLY TOTAL HRS TOTAL
(# of Employees) RATE (Based on 8hr day) PRICE
B001-21 Electromotive Equipment Mechanic Contractor Support (EEMCS) Position Location:
Period of Performance:
3 2,016 $0.00
B001-20 Crane Operator Contractor Support (CROCS) Position Location:
Period of Performance:
5 2,016 $0.00
B001-19 Carpenter Contractor Support (CARPCS) Position Location:
Period of Performance:
1 2,016 $0.00
B001-18 Boiler Plan Operator Contractor Support (BPOCS) Position Location:
Period of Performance:
6 2,016 $0.00
B001-17 Automotive Mechanics Contractor Support (AMMCS) Position Location:
Period of Performance:
3 2,016 $0.00
B001-16 Engineering Technician Contractor Support (ETEMCS) Position Location:
Period of Performance:
2 2,016 $0.00
B001-15 Hazardous Waste Program Manager Contractor Support (HWCS) , Level II Position Location:
Period of Performance:
5 2,016 $0.00
SECTION B - SCHEDULE OF SUPPLIES OR SERVICES PRICING/COSTS
OPTION PERIOD ONE - OCTOBER 1, 2014 - SEPTEMBER 30, 2015
ELIN DESCRIPTION
B001-01 Design Manager Contractor Support (DMCS), Level II Position Location:
Period of Performance:
7 6,264 $0.00
B001-02 Project Manager Contractor Support (PMCS), Level III Position Location:
Period of Performance:
1 6,264 $0.00
B001-03 Planning and Engineering Contractor Support (PECS) , Level II Position Location:
Period of Performance:
2 6,264 $0.00
B001-04
Planning and Engineering Technican Contractor Support (PETCS) , Level
II
Position Location:
Period of Performance:
3 6,264 $0.00
B001-05 Planner Contractor Support (PCS) , Level II Position Location:
Period of Performance:
5 6,264 $0.00
B001-06 Construction Manager Contractor Support (CMCS), Level II Position Location:
Period of Performance:
11 6,264 $0.00
B001-07 Engineering Technican Contractor Support (ETCS), Level I Position Location:
Period of Performance:
13 6,264 $0.00
B001-08 Field Support Contractor Support (FSCS), Level III Position Location:
Period of Performance:
1 6,264 $0.00
B001-09 NEPA Specialist Contractor Support (NSCS) , Level II Position Location:
Period of Performance:
11 6,264 $0.00
B001-10 Evironmental Compliance Specialist Contractor Support (ECCS) , Level I Position Location:
Period of Performance:
5 6,264 $0.00
B001-11 Natural Resource Specialist Contractor Support (NRCS) , Level I Position Location:
Period of Performance:
11 6,264 $0.00
B001-12
Hazardous Waste Program Manager Contractor Support (HWCS) , Level
III
Position Location:
Period of Performance:
5 6,264 $0.00
B001-13 Environmental Protection Specialist Contractor Support (EPCS) , Level I Position Location:
Period of Performance:
11 6,264 $0.00
B001-14 EV Technical Specification Writer Contractor Support (SWCS) , Level I Position Location:
5 6,264 $0.00
(# of Employees) RATE (Based on 8hr day) PRICE
ELIN DESCRIPTION
NOTE: HOURLY RATES ARE FULLY BURDENED
TOTAL FOR CONTRACT - - - - - - . $333,333.33
B001-40 $333,333.33
B001-39 Scheduling Consulting Services (CSC), Level II Position Location:
Period of Performance:
3 2,016 $0.00
Estimated Travel, Supplies, Equipment, and Specialized Training Costs NTE total of $1,000,000.00 for total contract term.
Approximately $333,333.33 per year
NTE $1,000,000.00
B001-38 Utilities System Operator Contractor Support (USOCS) Position Location:
Period of Performance:
10 2,016 $0.00
B001-37 Rigger Contractor Support (RIGCS) Position Location:
Period of Performance:
8 2,016 $0.00
B001-36 Plumber Contractor Support (PLMBCS) Position Location:
Period of Performance:
3 2,016 $0.00
B001-35 Pest Controller Contractor Support (PESTCS) Position Location:
Period of Performance:
1 2,016 $0.00
B001-34 Motor Vehicle Operator Contractor Support (MVOCS) Position Location:
Period of Performance:
5 2,016 $0.00
B001-33 Maintenance Mechanics Contractor Support (MTMCCS) Position Location:
Period of Performance:
4 2,016 $0.00
B001-32 Machinist Contractor Support (MACHCS) Position Location:
Period of Performance:
1 2,016 $0.00
B001-31 Locksmith Contractor Support (LOCKCS) Position Location:
Period of Performance:
3 2,016 $0.00
B001-30 Insulator Contractor Support (INSRCS) Position Location:
Period of Performance:
3 2,016 $0.00
B001-29 Industrial Equipment Mechanic Contractor Support (INEMCS) Position Location:
Period of Performance:
3 2,016 $0.00
B001-28 High Voltage Electrician Contractor Support (HVECS) Position Location:
Period of Performance:
8 2,016 $0.00
B001-27 HVAC Contractor Support (HVACCS) Position Location:
Period of Performance:
11 2,016 $0.00
B001-26 Heavy Mobile Equipment Mechanic Contractor Support (HMEMCS) Position Location:
Period of Performance:
4 2,016 $0.00
$0.00
B001-25
Heavy Mobile Equipment Mechanics (Crane) Contractor Support
(HMECCS)
Position Location:
Period…