This solicitation is for the procurement of a 15-ton electro-hydraulic, pedestal-mounted crane to be installed on a research barge for the Naval Surface Warfare Center, Carderock Division, Acoustic Research Detachment in Bayview, Idaho. The new crane must be capable of lifting specified minimum loads at given radii, including 30,000 pounds at 10 feet radius and 65 feet above the deck. The crane must also withstand defined ancillary loads applied to points on the crane. The contractor will be responsible for removal of the existing crane and installation, testing, and commissioning of the new crane in accordance with the specification. The crane must bear an API 2C Monogram and be designed, fabricated, assembled, shop tested, delivered, installed and field tested by a licensed Professional Engineer.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
J 1 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable)
0003 20 October 2021
6. ISSUED BY Code N62470 7. ADMINISTERED BY (If other than item 6.) Code
COMNAVFACSYSCOM Atlantic Navy Crane Center
Norfolk Naval Shipyard Building 491 Portsmouth, Virginia 23709-5000
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N62470-21-R-9014
9B. DATED (SEE ITEM 11) 14-Aug- 2019
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended . Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NAVFAC ATLANTIC COMBINED SYNOPSIS/SOLICITATION N62470-21-R-9014 –NSWCCD BAYVIEW 15T HYDRAULIC
BOOM PEDESTAL CRANE BAYVIEW, IDAHO
Amendment 0003 is issued for the following reasons:
1. To respond to pre-proposal inquiries 8-18
2. To revise Section H (Attachment (i))
SEE CONTINUATION PAGE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (49 CFR) 53.243
20 October 2021 Amendment 0003
SF30 CONTINUATION PAGE
Summary of Changes:
1. PRE-PROPOSAL INQUIRIES & RESPONSES:
RFP
Document Impact Question Response
Section Subsection Page #
8 Specification 1.3.1 Third paragraph 7 Substantive
This section also states "Crane operations will be conducted in sea state of 5 or less"
Please clarify what this means and exactly how and at what level sea state conditions are to be applied to any required load capacities?
The telescoping crane shall have full rated capacity at all operating radii during Sea State 3 conditions (Amendment 0001 corrected this requirements). The crane shall withstand Sea State 5 while stowed (no operations).
9 Specification 1.3.1 Fourth paragraph 8 General
This section states that "The crane shall be designed using the vessel specific method and for construction duty as defined in API Specifications 2C". The vessel specific method usually refers to the method of load chart calculation. At the proposal submission stage we are not likely to have all the required information and parameters available specific to the existing vessel and how it would be operated after the crane replacement, so calculation of the load charts using this vessel specific method would probably not be the best option.
We could calculate the load charts using the vessel specific method based on the information available, or we could calculate the load charts using the Legacy Dynamic Method as per API-2C. The charts from the two methods are likely to be similar - would the Legacy Dynamic Method be acceptable for load chart
API 2C 5.4.4. States "Legacy Dynamic Method is only allowed for bottom supported structures (where the barge/platform is on a fixed strucure). This is not the case, thus Legacy Dynamic Method is not acceptable.
Anticipate using the load charts using the vessel specific method.
calculations?
10 Specification 1.5.1 18 General
This section states "Crane design shall be accomplished by, or directly supervised by, a licensed PE. PE licensing shall be by a board or agency authorized to license and register PEs in the U.S. or Canada. The PE may be the Contractor's regular employee or a consultant.
The PE's review and attestation of specification compliance and professional responsibility shall be signified by his or her PE original seal and dated signature on the final drawing and design calculations."
Could these PE requirements please be clarified and how they would be applied to an API-2C certified manufacturer?
The PE requirements in the specification (with regards to the calculations and drawings) would apply to components not part of the commercial telescopic crane design (i.e. the custom walkways, ladders, and ancillary padeyes to be used with the deck winch).
11 Specification 1.7.3 19 General
What general equipment, hoisting equipment and riggers, welding equipment and welders, utilities and general labor along with PPE/Safety equipment would be furnished at the site by the customer/client and what the customer/client work scope would be with reference to the removal of the existing crane?.
What would be considered as the work scope and responsibility with reference to the removal of the existing crane?
The customer (NSWCCD ARD) will NOT be providing any general equipment, hoisting equipment, riggers, welding equipment and welders, general labor, or PPE/Safety equipment for the removal of the existing crane.
Existing crane removal work scope is addressed in SD-
08.2 and Section 1.8 of the Crane Specification.
NSWCCD ARD can provide the original crane installation instructions for the existing crane which defines weights and assembly of components, etc. NSWCCD ARD will remove hydraulic fluids from the existing crane prior to the crane contractor's start of work. NSWCCD ARD will provide all electrical power required for the crane removal.
12 Specification 1.7.3 19 General
What general equipment, hoisting equipment and riggers, welding equipment and welders, utilities and general labor along with PPE/Safety equipment would be furnished at the site by the customer/client and what the customer/client work scope would be with reference to the installation, testing and commissioning of the replacement crane?
What would be considered as the work scope and responsibility with reference to the installation, testing and commissioning of the replacement crane?
The customer (NSWCCD ARD) will not provide any general equipment, hoisting equipment, riggers, welding equipment and welders, general labor, or PPE/Safety equipment for installation of the new crane. NSWCCD ARD will supply NAVFAC- P307 compliant test weights and rigging for post-installation field testing.
NSWCCD ARD will provide all electrical power required for the installation and testing.
Field testing is the responsibility of the crane contractor, see SD-09.4 Field Test Record of the Crane Specification. NSWCCD ARD will observe the field testing. Upon award, the government will provide the contractor an example field test for the crane contractor to use as a guide in development of the field test.
At a minimum, the field test will include testing all operational features of the crane, load testing, and condition inspections following field testing.
13 Specification 2.3.1.3 21 Critical
Please confirm that innovative rack and pinion based RaPiDS technology, which does not use hydraulic cylinders and utilizes externally mounted hydraulic gearboxes to undertake telescoping functions, would be acceptable under this procurement?
A hydraulic rack and pinion system for boom extension would be acceptable.
14 Specification 2.3.2.1 22 Substantive
Please confirm whether a pedestal mounted or rotating platform mounted electric-hydraulic power unit is required?
Either a HPU mounted internal to the pedestal or mounted on the rotate platform is acceptable. See Section 2.3.2.1 of the Crane Specification. The existing crane's HPU is mounted on the rotate platform and this is completely acceptable.
15 Specification 1.3 Fourth paragraph 7 Substantive
Within this section the specification states that "The crane shall be built to the design drawings of a licensed Professional Engineer (PE)". Please confirm that an API-2C certified crane manufacturer would be acceptable?
The PE requirements in the specification (with regards to the calculations and drawings) would apply to components not part of the commercial telescopic crane design (i.e. the custom walkways, ladders, and ancillary padeyes to be used with the deck winch).
16 Specification 1.3.1 First paragraph 7 Critical
This section states "Capacities are illustrated in Appendix A". On page Appendix A-4 item F) states "Significant wave height for operations = 3ft". Do we assume that all hoisting requirements listed in the specifications and under Appendix A are to be available under significant wave height of 3ft which corresponds to Sea State Condition 3?
Yes, all hoisting requirements are to be available during wave height of 3 ft.
17 Specification 1.3.1 First paragraph 7 General
This section states "At a minimum, the crane shall be capable of lifting 30,000 pounds at 10 feet radius and 65 feet above the deck;
10,000 pounds at 25’ radius;
4,300 pounds at 55 feet radius and 12 feet. The capacity of 4,300 pounds at 55 feet may be limited to stable platform operations (1 degree list/trim, and 2 foot waves), provided the crane has a 3,000 pound capacity at 55 feet and 12 feet above the deck at Sea State 3."
- Please clarify what significant wave height applies to the hoisting requirements 30,000lbs @ 10ft, 10,000lbs @ 25ft and 4,300lbs @ 55ft?
- Are these hoisting requirements based on a significant wave height of 3ft (Sea State Condition 3) as listed in Appendix A?
- If not, what significant
A 3 ft. significant wave height (Sea State 3) applies to the hoisting requirements of 30,000 lbs. @ 10 ft., 10,000 lbs. @ 25 ft., and 3,000 lbs.
@ 55 ft. The capacity of 4,300 lbs. @ 55 ft. can be limited to 2 ft. waves, 1 degree of barge list/trim, stable barge platform, Sea State 2. Lifting 3,000 lbs. @ 55 ft. in Sea State 3 is a requirement. Loading condition on the ancillary pad eyes (Section 1.3.5 of the Crane Specification) can also be limited to 2 ft. waves, 1 degree of barge list/trim, stable barge platform, Sea State 2.
wave height applies?
- Is the 3,000lbs at 55ft under Sea State 3 a confirmed hoisting requirement? As this is a severe lift, this lift would likely define the overall hoisting capacity of the crane.
18 Specification 1.3.1 First paragraph 7 Substantive
This section states that "The boom shall extend to a minimum of 55 feet with a maximum retracted length of 30 feet".
Is the maximum retracted boom length critical and a fixed requirement or would a 33 foot retracted boom length be acceptable?
A 33 ft. retracted boom length would be acceptable, provided it achieves all lifting radii and associated rated capacities of the specification. A 60 ft.
extended boom length that would meet the stated lifting requirements would be acceptable.
2. REVISE SECTION H
See Attachment (i)