AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 3
AMENDMENT NO. 0005 06/08/20 1644214
ROICC81
OFFICER IN CHARGE OF CONSTRUCTION FLORENCE
NAVAL FACILITIES ENGINEERING COMMAND ATLANTIC
1121 HAMMOND ROAD
CAMP LEJEUNE, NC 28547-2521
See Item 6
✘ N6247020R6006
05/08/20
N6247020R6006 Bulkhead and Shoreline Repairs, Marine Corps Air Station Cherry Point, NC
The date and the hour for the receipt of proposals remains 18 June 2020 no later than 2:00 pm
(EDT).
See continuation page(s).
Bulkhead and Shoreline Repairs Solicitation N6247020R6006 Marine Corps Air Station Cherry Point, North Carolina Amendment 0005
Block 14. DESCRIPTION OF AMENDMENT (cont.)
A. The following provides the Government’s responses to preaward inquiries:
REFERENCE
Page Section Para.
QUESTION GOVERNMENT RESPONSE
FOR THE OFFICER CLUB
WORK, PLAN SHEET S001-O,
NOTE 3 UNDER CONCRETE
STATES CONCRETE SHALL BE
BATCHED ONSITE. PLEASE
CONFIRM IF CONCRETE WILL
BE ALLOWED TO BE
CONVENTIONALLY TRUCKED
TO THIS PARTICULAR AREA.
Concrete may be batched conventionally.
BT-11 BUILDING 9014 IS SET
TO BE DEMOLISHED BY
ANOTHER CONTRACT AT A
LATER DATE, AS DESCRIBED
IN THE PLANS AND
SPECIFICATION (01 14 00). A
SECTION OF BULKHEAD CAN
NOT BE BUILT UNTIL THAT
DEMOLITION OCCURS, PER
THE PLANS. AT THIS TIME, IS
THERE A SCHEDULED DATE
OF DEMOLITION OF BUILDING
9014? THAT WOULD AFFECT
THE MOBILIZATION AND
PRICING TO BT11 TO BEGIN
THIS PROJECT.
No; we do not have a schedule for demolition of B9014 at this time.
A RAMP IS LOCATED ON BT11
THAT WILL NEED TO BE
SEVERED TO INSTALL THE
SHEET PILING AND
CONCRETE CAP. SHEET S701-
B, PIC C4 SHOWS THIS RAMP.
MULITPLE UTILTIES WOULD
NEED TO BE SHUT DOWN ON
THIS RAMP. WOULD IT BE
NECESSARY TO FIGURE ON
TEMPORARY UTILITY RE-
ROUTING, OR COULD THOSE
UTILITIES BE TEMPORARILY
SHUT DOWN, FOR 2 MONTHS?
The photo you're referring to is a timber pier. Any of these utilities that are not already abandoned may be shut down for 2 months.
CAN WE ASSUME THAT OUR
CREW COULD USE THE
RESTROOMS AT BT11, OR
SHOULD WE PLAN ON
Provide portable toilet.
Bulkhead and Shoreline Repairs Solicitation N6247020R6006 Marine Corps Air Station Cherry Point, North Carolina Amendment 0005
MAINTAINING PORTABLE
FACILITIES?
WE WILL NEED CLEAN
WATER FOR A CONCRETE
BATCH PLANT AT BT11. CAN
WE USE BT11 WATER
SOURCES FOR THIS PROCESS?
Yes, BT-11 water sources can be used.
MULTIPLE AREAS CALL FOR
MARINE MAMMAL
OBSERVERS. CAN THE
MARINE MAMMAL OBSERVER
BE A CREW LEADER OR JOB
FOREMAN?
Yes, the Marine Mammal Observer can be a crew leader or job foreman.
SPECIFICATION 31 23 00 CALLS
FOR A RIP RAP WITH 30 MAX,
18 AVG, AND 9 MIN SIZE. OUR
LOCAL QUARRIES SUPPLY A
CLASS II RIP RAP WITH 23
MAX, 14 AVE, AND 9 MIN SIZE.
WILL THAT SIZE BE
SUFFICIENT, OR SHOULD
QUARRIES CREATE A SPECIAL
BLEND?
Provide per specification.
S001- O S001-B
General Notes
Concrete Notes #3
Pertaining to Project No. 1 and Project No. 4, please confirm that concrete is required to be batched onsite at the Bulkhead Repair locations.
Concrete may be batched conventionally for all sites except at BT-11.
B. All other contract terms and conditions remain unchanged.