AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 3

AMENDMENT NO. 0005 06/08/20 1644214

ROICC81

OFFICER IN CHARGE OF CONSTRUCTION FLORENCE

NAVAL FACILITIES ENGINEERING COMMAND ATLANTIC

1121 HAMMOND ROAD

CAMP LEJEUNE, NC 28547-2521

See Item 6

✘ N6247020R6006

05/08/20

N6247020R6006 Bulkhead and Shoreline Repairs, Marine Corps Air Station Cherry Point, NC

The date and the hour for the receipt of proposals remains 18 June 2020 no later than 2:00 pm

(EDT).

See continuation page(s).

Bulkhead and Shoreline Repairs Solicitation N6247020R6006 Marine Corps Air Station Cherry Point, North Carolina Amendment 0005

Block 14. DESCRIPTION OF AMENDMENT (cont.)

A. The following provides the Government’s responses to preaward inquiries:

REFERENCE

Page Section Para.

QUESTION GOVERNMENT RESPONSE

FOR THE OFFICER CLUB

WORK, PLAN SHEET S001-O,

NOTE 3 UNDER CONCRETE

STATES CONCRETE SHALL BE

BATCHED ONSITE. PLEASE

CONFIRM IF CONCRETE WILL

BE ALLOWED TO BE

CONVENTIONALLY TRUCKED

TO THIS PARTICULAR AREA.

Concrete may be batched conventionally.

BT-11 BUILDING 9014 IS SET

TO BE DEMOLISHED BY

ANOTHER CONTRACT AT A

LATER DATE, AS DESCRIBED

IN THE PLANS AND

SPECIFICATION (01 14 00). A

SECTION OF BULKHEAD CAN

NOT BE BUILT UNTIL THAT

DEMOLITION OCCURS, PER

THE PLANS. AT THIS TIME, IS

THERE A SCHEDULED DATE

OF DEMOLITION OF BUILDING

9014? THAT WOULD AFFECT

THE MOBILIZATION AND

PRICING TO BT11 TO BEGIN

THIS PROJECT.

No; we do not have a schedule for demolition of B9014 at this time.

A RAMP IS LOCATED ON BT11

THAT WILL NEED TO BE

SEVERED TO INSTALL THE

SHEET PILING AND

CONCRETE CAP. SHEET S701-

B, PIC C4 SHOWS THIS RAMP.

MULITPLE UTILTIES WOULD

NEED TO BE SHUT DOWN ON

THIS RAMP. WOULD IT BE

NECESSARY TO FIGURE ON

TEMPORARY UTILITY RE-

ROUTING, OR COULD THOSE

UTILITIES BE TEMPORARILY

SHUT DOWN, FOR 2 MONTHS?

The photo you're referring to is a timber pier. Any of these utilities that are not already abandoned may be shut down for 2 months.

CAN WE ASSUME THAT OUR

CREW COULD USE THE

RESTROOMS AT BT11, OR

SHOULD WE PLAN ON

Provide portable toilet.

Bulkhead and Shoreline Repairs Solicitation N6247020R6006 Marine Corps Air Station Cherry Point, North Carolina Amendment 0005

MAINTAINING PORTABLE

FACILITIES?

WE WILL NEED CLEAN

WATER FOR A CONCRETE

BATCH PLANT AT BT11. CAN

WE USE BT11 WATER

SOURCES FOR THIS PROCESS?

Yes, BT-11 water sources can be used.

MULTIPLE AREAS CALL FOR

MARINE MAMMAL

OBSERVERS. CAN THE

MARINE MAMMAL OBSERVER

BE A CREW LEADER OR JOB

FOREMAN?

Yes, the Marine Mammal Observer can be a crew leader or job foreman.

SPECIFICATION 31 23 00 CALLS

FOR A RIP RAP WITH 30 MAX,

18 AVG, AND 9 MIN SIZE. OUR

LOCAL QUARRIES SUPPLY A

CLASS II RIP RAP WITH 23

MAX, 14 AVE, AND 9 MIN SIZE.

WILL THAT SIZE BE

SUFFICIENT, OR SHOULD

QUARRIES CREATE A SPECIAL

BLEND?

Provide per specification.

S001- O S001-B

General Notes

Concrete Notes #3

Pertaining to Project No. 1 and Project No. 4, please confirm that concrete is required to be batched onsite at the Bulkhead Repair locations.

Concrete may be batched conventionally for all sites except at BT-11.

B. All other contract terms and conditions remain unchanged.

Amnd 0005 20R6006 FINAL
Pg2 Amnd 0005 20R6006