This document contains an amendment to a solicitation for an environmental remedial action contract as well as the related federal contract opportunity details. The amendment extends the closing date of the solicitation to June 24, 2019 at 1:45 PM Eastern Time, and requires all inquiries to be received by June 10, 2019. The opportunity is a 100% small business set-aside for an Indefinite Delivery/Indefinite Quantity contract with a maximum value of $95 million over one base year and four option years. The Naval Facilities Engineering Command Atlantic seeks to award a Cost Plus Award Fee contract to provide environmental remediation services at sites contaminated with hazardous substances in locations including the eastern U.S., Africa, Europe, and Southwest Asia. Potential tasks include remedial actions, removal actions, expedited response, studies, operations and maintenance, installing support facilities, developing work plans, and technical support.

N6247019R4003_0002.pdf

View the file

Other files

File Type Posted
N6247019R4003_0005.pdf PDF
N6247019R4003_0004.pdf PDF
N6247019R4003_0003.pdf PDF
N6247019R4003_0001.pdf PDF
N6247019R4003.pdf PDF
Attachment_JL1_List_of_Directives.doc DOC document
Attachment_JL2A_Direct_Labor_Rate_Escalation_Submission.xls XLS spreadsheet
Attachment_JL2_Direct_Labor_Bid_and_Billing_Rate_Submission.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

ENVIRONMENTAL REMEDIAL ACTION CONTRACT

This amendment is being issued to address questions received in response to the solicitation and to extend the closing date of the solicitation. It is the Offerors responsibility to read the entire solicitation including all amendments.

The closing date of the solicitation has been extended to 24 June 2019 at 01:45 PM Eastern Time. All inquiries concerning the RFP must be received electronically by 10 June 2019 in order to permit adequate time to reply to the inquiry.

1. CONTRACT ID CODE PAGE OF PAGES

R 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-May-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247019R4003

X 9B. DATED (SEE ITEM 11)

15-May-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-May-2019

CODE

COMMANDER NAVFAC ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247019R4003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

Questions and Answers:

1. Question: RFP Reference (page 133 of 149): “If a standalone contract is submitted as an example project, the standalone contract must have been completed or substantially completed since May 2016. Substantially completed means that the majority of the essential work has been completed.” Please confirm that NAVFAC defines “substantially completed” as at least 50% of work finished.

Response: As stated in the solicitation, substantially completed means that the majority of the essential work has been completed.

2. Question: Section L, Factor 1, Corporate Experience—Our firm has multiple active, 10-year IDIQ remedial action contracts with significant work performed since May 2016 that have received extensions, but were awarded prior to 2009. Would NAVFAC please consider removing the base year award restriction, and allow IDIQ example projects that were awarded prior to 2009, as long as the project example includes work performed since May 2016.

Response: No, the solicitation remains unchanged.

(End of Summary of Changes)