N6247018R4008_Amendment_0002.pdf

PDF 168 KB Posted

Attached to
MILCON Project P-1804 Construction of Hydrant System Piping Loop at NAS Sigonella in Sicily, Italy
Solicitation number
N6247018R4008
Issued by

About this file

N6247018R4008_Amendment_0002.pdf

View the file

Other files

File Type Posted
14058480_CS_06.pdf PDF
18R4008_Amend_01.pdf PDF
18R4008_P1804_SF1442.pdf PDF
Att_(B)_PPQ.docx DOCX document
Att_(C)_SECNAV_Form_5512.pdf PDF
Att_(A)_Construction_Data_Sheet.docx DOCX document
N6247018R4008_P1804_Pre_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0002 is issued for the follow ing:

1. To answ er PPIs 14 – 38

2. Provide Revised Specs Section 33 08 53

3. Provide Revised Specs Section 00 01 15

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Nov-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247018R4008

X 9B. DATED (SEE ITEM 11)

02-Oct-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Nov-2018

CODE

COMMANDER NAVFAC ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247018R4008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

Amendment 0002 is issued for the following:

1. To answer PPIs 14 – 38

2. Provide Revised Specs Section 33 08 53

3. Provide Revised Specs Section 00 01 15

1. Pre-proposal inquiries and responses:

Question 14: Paragraph 33 08 53 requires the contractor to provide filter elements for the existing filter separators.

In order to properly price this, we would need to know the model numbers of the existing vessels

Answer 14: Please see Item 2 below

Question 15: Paragraph 33 08 53 requires the contractor to provide temporary cone type strainers in the suction side of the fueling pumps. Since these pumps are existing, can you provide the size of the pump suctions?

Answer 15: Please see Item 2 below

Question 16: Please note we cannot retrieve the "ATEX" classification of the seven runway pits. This classification is needed to choose the electrical equipment and the internal and the adjacent PIT equipment (pressure gauge, cables, etc). Not knowing exactly this information could mislead the work price assessment.

Answer 16: All mechanical equipment located in the pits should be ATEX listed for use in Zone 1 locations. There is no electrical equipment in the pits.

Question 17: Please note that we have observed a discrepancy between "P&I page M-002" and the piping sketches at pages M-404 and M-402.

In the P&I the Pig Launching is a four-valve double-sphere, however in the sketches there are onlu two valves in line and reduced "Tee".

The four-valve solution appears to be technically correct however, considering the high cost impact, we would like to request confirmation of the correct configuration, as well as the diameter to be chosen (150 mm as the "Tee" or 200mm)?

Answer 17: See Item 3 below

Question 18: Considering that the project is to be entirely carried out in Italy, we request that offers are accepted in EURO currency and that, consequently, payments during the contract duration are made in EURO. This is to avoid the currency exchange risk throughtout the contract execution, and especially to avoid over- or underpricing by offerors.

Answer 18: No changes to the currency will be made.

Question 19: Please consider the possibility to increase the maximum number of pages of the Safety Narrative from 1 single-sided page to 1 double-sided page, this to allow offerors the possibility to better enter into the details of their Safety Management Systems.

Answer 19: Change Factor 1 Safety Paragrah (i) to; "The Safety narrative shall be limited to one (1) double sided or two (2) single sided, 8 1/2 x 11 page size.

Question 20: Certificate of Classification. Additional Work Categories. Among the required categories we read that the sub-category OG 3 is required.

At page 2 of Amendment 0001 the Category OG 3 (Roads, motorways, bridges, railways, underground railways) has been replaced by Category 0S 3 (Plumbing, kitchen and laundry). Please confirm this SOA requirement

Answer 20: OS 3 should read OG 3. The following is corrected to reflect SOCIETÀ ORGANISMI DI ATTESTAZIONE (SOA) CERTIFICATION is as follows: OG-6, class IV bis

OS-1, class III OG-3, class III OS-26, class III OG-12, class III OS-23, class III

Question 21: In the Instruction to Offerors we read: "In the case of a JV prime offeror, at least one member of the JV must have the required SOA Certifications. The JV member who has the SOA Certification must perform the majority of the work pertinent to the certification. In the case of a JV certification submitted by a subcontractor will not be accepted. " Is the last sentence referred to the prevailing category of works only or to the sub-categories as well? We are qualified in the prevailing work category OG-6 and we plan to enter into a Joint Venture agreement with another company. Can we still qualify subcontractors for some of the sub-categories? (i.e. OG 12, OS 1)

Answer 21: The statement is referring to the Prevailing Category of Works. "Companies that are QUALIFIED in the Prevailing Work Category and pertinent Classification, but NOT QUALIFIED also in the Additional Work Categories and pertinent Classification, can still bid against the subject solicitation, by forming a Joint-Venture or subcontracting for the execution of the work pertaining to the categories (or alternatives) for which they are not qualified."

Question 22: FACTOR 2 Construction experience. If the Offeror is a Joint Venture, may the JV utilize experience of a Subcontractor to demonstrate construction experience under this evaluation Factor?

Answer 22: Yes, the solicitation states "The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offeror must provide a letter of commitment from the subcontractor and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract."

Question 23: Is part of the scope of work to create a SCADA system from scratch or to replace an existing one? In the second option, is it possible to have information about the engineering software and the existing SCADA project?

Answer 23: It is the intention of this project to provide a new SCADA (Control) System using a mixture of new and existing field devices connected to a new Pump Control Panel (PCP). All software and programming is new for this project

Question 24: The ASTM A358 and ASME 36.10 norms that regulate construction standards of STAINLESS STEEL PIPING do not correspond to the measures mentioned in chart A of the give specifications. The measures mentioned in the chart appear to be a conversion in millimeters of american standards. The result is that the mentioned products are not available on the market according to ASTM norm. As an example: the 200 mm pipe is mentioned in chart A with a diameter of 203 mm and 6.2 mm thickness whereas the ASTM standard for this 8" pipe Sch. 20 is with 6.35 mm thickness.

We therefore request to which prescriptions offerors must abide by, either ASTM standard (and therefore disregard the chart A data) or the data mentioned in chart A that do not correspond to ASTM standards. This second solution would require additional work on the thickness of the metal sheets and a subsequent certification according to the norms, and please note that this solution would be extremely disadvantageous in terms of purchasing process and work schedule in general.

Answer 24: The pipe should be constructed in accordance with the ASTM and ASME standards provided in the specifications.

Question 25: According to the technical specs the PVC pipes are classified according to the pressure and resistance according to AWWA C900. Nonetheless the spec 2.2.2 Plastic Piping at item 2.2.2.1 PVC piping modifies the AWWA compliance and prescribes to abide by UNI EN ISO 1452-3. First, please confirm you intend to use PVC pipes. As far as we know, the standard for this type of pipes in Sigonella base is HDPE. Second, given the discrepancy between the norm and the specs, please confirm which one prevails?

Answer 25: The pipe should be PVC conforming to UNI EN ISO 1452-3 as specified.

Question 26: SOW SAYS: For purposes of this evaluation, a relevant project is further defined as construction of a new Aviation Aircraft Pressurized Hydrant Direct Fueling System with a construction cost no less than $3,000,000.

QUESTION: Some Construction Experience will be submitted in euro. Please clarify which exchange rate has to be applied to the Contractor Past Experience value.

Answer 26: Change FACTOR 2

FROM: "For purposes of this evaluation, a relevant project is further defined as construction of a new Aviation Aircraft Pressurized Hydrant Direct Fueling System with a construction cost no less than $3,000,000."

TO: "For purposes of this evaluation, a relevant project is further defined as construction of a new Aviation Aircraft Pressurized Hydrant Direct Fueling System with a construction cost no less than 2,500,000 US Dollars or 2,000,000 Euro."

Question 27: SOW CALLS FOR: First additional Work Category OG-3 (Percentage of Work 18%) The related classifications (sub-categories) and percentages for this work category: Classification OS-26 (Percentage of Work 9.5%). With reference to O26 subcategory, please clarify if, at the BID phase, it is possible to just submit a Subcontract Statement, as per italian regulation or USG wants us to indicate the Company Name and the Letter of Committment.

Answer 27: A subcontract statement as per Italian Regulation will be acceptable as a letter of commitment for subcategory O26.

Question 28: IN REGARDS TO SOA OS-26, CLASS III, PLEASE CONFIRM IF SUCH SUB-CATEGORY

WORK CAN BE PERFORMED UNDER A SUBCONTRACTING AGREEMENT, AND IF SO,

SUBCONTRACTING AGREEMENT (TEAMING AGREEMENT). IF SO, MUST THE OFFEROR SUBMIT A

SIGNED COPY OF THE AGREEEMENT CONTAINING ROLES AND RESPONSIBILITIES WITH THE

SUBMISSION OF THE PROPOSAL PACKAGE?

Answer 28: Yes, the solicitation states "The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offeror must provide a letter of commitment from the subcontractor and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract." A subcontract statement as per Italian Regulation will be acceptable as a letter of commitment for subcategory O26.

Question 29: IN REGARDS TO THE "ASSOCIAZIONE TEMPORANEA DI IMPRESE" (ATI), WILL THE US

GOVERNMENT ACCEPT UNDER THIS PROCUREMENT A FINAL & SIGNED DRAFT VERSION

(PRIVATE AGREEMENT BETWEEN PARTIES) OF THE "ATI" CONTAINING THE COMPOSITION

PROCUREMENT A FINAL & SIGNED DRAFT VERSION (PRIVATE AGREEMENT BETWEEN PARTIES)

OF THE "ATI" INCLUDING ALL INFORMATION AS PROVIDED IN PARAGRAPH 1, PAGE 11/44 OF THIS RFP, WITH THE INTENT TO ESTABLISH AND PROVIDE AN OFFICIAL NOTARIZED VERSION OF THE

"ATI" UPON NOTICE OF CONTRACT AWARD? MOREOVER, CAN THE "ATI" BE PROVIDED IN THE

ITALIAN LANGUAGE?

Answer 29: Yes, the government will accept A FINAL & SIGNED DRAFT VERSION (PRIVATE AGREEMENT

BETWEEN PARTIES) OF THE "ATI" CONTAINING THE COMPOSITION PROCUREMENT A FINAL &

SIGNED DRAFT VERSION (PRIVATE AGREEMENT BETWEEN PARTIES) OF THE "ATI" INCLUDING

ALL INFORMATION AS PROVIDED IN PARAGRAPH 1, PAGE 11/44 OF THIS RFP, WITH THE INTENT TO ESTABLISH AND PROVIDE AN OFFICIAL NOTARIZED VERSION OF THE "ATI" UPON NOTICE OF CONTRACT AWARD. Please provide an English translation of the agreement.

Question 30: SOW SAYS: For purposes of this evaluation, a relevant project is further defined as construction of a new Aviation Aircraft Pressurized Hydrant Direct Fueling System with a construction cost no less than $3,000,000.

QUESTION: Some Construction Experience will be submitted in euro. Please clarify which exchange rate has to be applied to the Contractor Past Experience value.

Answer 30: See Answer 26 above

Question 31: SOW CALLS FOR: First additional Work Category OG-3 (Percentage of Work 18%) The related classifications (sub-categories) and percentages for this work category: Classification OS-26 (Percentage of Work 9.5%). With reference to O26 subcategory, please clarify if, at the BID phase, it is possible to just submit a Subcontract Statement, as per italian regulation or USG wants us to indicate the Company Name and the Letter of Committment.

Answer 31: A subcontract statement as per Italian Regulation will be acceptable as a letter of commitment for subcategory O26.

Question 32: SOW SAYS: Submit a minimum of two (2) up to a maximum of five (5) construction projects ...... For purposes of this evaluation, a relevant project is further defined as construction of a new Aviation Aircraft Pressurized Hydrant Direct Fueling System with a construction cost no less than $3,000,000. QUESTION: Our Company has 3 Construction Experences, performed within 10 years, in compliance with the SOW. Please confirm if the following 3 Construction Experiences could satisfy the minimum Construction Experience value requirements, for partecipating in the bid competition:

1) €5.000.000,00; 2) €2.500.000,00; 3) €2.700.000,00

Answer 32: See Answer 26 above

Question 33: IN REGARDS TO "A RELEVANT PROJECT MUST HAVE A CONSTRUCTION COST NO LESS THAN $3,000,000", PLEASE ADVISE IF THE FOLLOWING PROJECTS CAN BE RATED ACCEPTABLE:

PROJECT #1 - YEAR COMPLETED: 2016; LOCATION: OMAN; AMOUNT EURO: 5,600,000 (USD:

6,720,000); PROJECT #2 - YEAR COMPLETED: 2012; LOCATION: GROTTAGLIE (IT); AMOUNT EURO:

2,411,000 (USD: 2,880,0000); PROJECT #3 - YEAR COMPLETED: 2009; LOCATION: TRAPANI (IT);

AMOUNT EURO: 1,720,000 (USD: 2,040,0000);

Answer 33: See Answer 26 above

Question 34: Certificate of Classification. Additional Work Categories. OG 3 is required.

Page 2 of Amendment 0001 Category OG 3 (Roads, motorways, bridges, railways, underground railways) has been replaced by Category 0S 3 (Plumbing, kitchen and laundry).

Was it an error or did the SOA Category and Classification change?

Answer 34: OS 3 should read OG 3. The following is corrected to reflect SOCIETÀ ORGANISMI DI ATTESTAZIONE (SOA) CERTIFICATION is as follows: OG-6, class IV bis OS-1, class III OG-3, class III OS-26, class III OG-12, class III OS-23, class III

Question 35: In the referred section, instruction to offerors it is indicated: "In the case of a JV prime offeror, at least one member of the JV must have the required SOA Certifications. The JV member who has the SOA Certification must perform the majority of the work pertinent to the certification. In the case of a JV certification submitted by a subcontractor will not be accepted. " In reference to the underlined sentence does it refer to the prevailing category ( in this case OG 6) or to the sub-categories? We plan to enter in a Joint Venture agreement with another company.

Can we still qualify subcontractors for some of the sub-categories? (i.e. OG 12, OS 1)

Answer 35: The statement is referring to the Prevailing Category of Works. "Companies that are QUALIFIED in the Prevailing Work Category and pertinent Classification, but NOT QUALIFIED also in the Additional Work Categories and pertinent Classification, can still bid against the subject solicitation, by forming a Joint-Venture or subcontracting for the execution of the work pertaining to the categories (or alternatives) for which they are not qualified."

Question 36: FACTOR 2 Construction experience. If the Offeror is a Joint Venture, may the JV utilize experience of a Subcontractor to demonstrate construction experience under this evaluation Factor?

Answer 36: Yes, the solicitation states "The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offeror must provide a letter of commitment from the subcontractor and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract."

Question 37: CLIN 0002 : the Unit appears to be "Cubic Centimeter" however the clin description is "Unit Price per cubic meter for removal, stockpiling, testing and off station disposal of contaminated soil."

Please confirm which unit shall be used ?

Answer 37: CLIN 0002 Unit price shall be in Cubic Meters

Question 38: Please confirm if surety bonds are an acceptable form of performance guarantee and if so, what is the required amount of the bonds?

Reference:

PERFORMANCE GUARANTEE

Submittal Time: The offeror whose offer is accepted shall, within ten (10) days after award, furnish either (1) a Performance Guarantee and a notarized Performance Guarantee Letter conforming to the requirements below, or (2) Performance and Payment bonds conforming to the requirements below. If the offeror fails to provide either (1) a Performance Guarantee and a notarized Performance Guarantee Letter or (2) Performance and Payment Bonds within ten (10) days, the contract may be terminated for default. In such event, the offeror shall be liable for any cost of procuring the work which exceeds the amount of its offer and the bid guarantee shall be available toward offsetting such difference.

Answer 38: Please see Pages 18 and 19 of the solicitation. These pages detail the requirements for the Performance Guarantee/Bond for this procurement. In accordance with the solicitation, the offeror whose offer is accepted shall submit "either (1) a Performance Guarantee and a notarized Performance Guarantee Letter conforming to the requirements below, or (2) Performance and Payment bonds conforming to the requirements below."

Under "Form of Performance Guarantee Letter," the solicitation states that the "Performance Guarantee shall be an amount equal to ten percent (10%) of the amount of the contract."

2. Revise Specifications as follows, SECTION 33 08 53 AVIATION FUEL DISTRIBUTION SYSTEM START-UP

2.2.1.G

After the first sentence, insert the following sentence:

“The existing filter-separators are manufactured by Facet Italiana, model number HCS-C-643-236.”

3.1.2 Strainers

In the first sentence, insert the following words after the words “suction line”:

(150 mm, field verify)

3. Revise Specifications as follows, SECTION 00 01 15 LIST OF DRAWINGS

The following drawing is revised as of 13 November, 2018:

NAVFAC DWG NO. Title 14058480 System Flow Schematic, Revised 13 November 2018

The revised Drawing accompanies this Amendment.

(End of Summary of Changes)