N62470-17-R-4010_Amendment_0002.pdf
PDF 161 KB Posted
- Attached to
- N62470-17-R-4010 Professional Services to support NAVFAC Public Works Business Line in NAVFAC AOR
- Solicitation number
- N6247017R4010
About this file
N62470-17-R-4010_Amendment_0002.pdf
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N62470-17-R-4010: Professional Services to Support NAVFAC Public Works Business Line in the NAVFAC AOR w ith a Concentration of Work w ithin the Continental United States, the Caribbean, Europe, Africa, and Southw est Asia.
This amendment is issued to provide various revisions, provided responses to pre-aw ard inquiries, and extend the proposal due date. (SEE
CONTINUATION PAGE)
CS: Sue McKenzie, susan.mckenzie@navy.mil, 757-322-4844
1. CONTRACT ID CODE PAGE OF PAGES
J 1 21
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Feb-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247017R4010
X 9B. DATED (SEE ITEM 11)
25-Jan-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Feb-2018
CODE
COMMANDER NAVFAC ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247017R4010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is to disseminate the below information.
1) Section A, Extend the proposal due date from 28 February 2018 to 01 March 2018.
2) Section C, Item 1.3 title was revised. Revisions are documented in red font.
3) Section J, Amendment 0002 Pre-award inquiries responses are provided.
4) Section L, Item L.6, (b) Non-Price Factors (Volume II), Tab C, Factor 4 Small Business Utilization solicitation submittal requirements are revised. Revisions are documented in red font.
This is the final amendment for solicitation N62470-17-R-4010. Please note that no additional pre-award inquiries will be accepted.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 28-Feb-2018 02:00 PM to 01-Mar-2018 02:00 PM.
The following have been modified:
SECTION A
NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC), ATLANTIC
6506 HAMPTON BLVD
NORFOLK, VIRGINIA 23508-1278
SOLICITATION: N62470-17-R-4010 PROFESSIONAL SERVICES TO SUPPORT NAVFAC PUBLIC
WORKS BUSINESS LINE, INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ)
NOTICE: PROPOSALS ARE DUE BY 2:00 P.M. (NORFOLK, VA LOCAL TIME) ON 01 March 2018
Proposal is to be submitted to office listed below:
Naval Facilities Engineering Command (NAVFAC), Atlantic Attn: Susan McKenzie and Erin Quimby, Code ACQ22 6506 Hampton Blvd, Mail Room Norfolk, Virginia 23508-1278
A.1 Contract Title Professional Services to support NAVFAC Public Works Business Line in NAVFAC AOR with a concentration of work within the continental United States, the Caribbean, Europe, Africa and Southwest Asia.
A.2 Type of Contract
Single award Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) contract.
A.3 COMPETITION REQUIREMENTS/SET-ASIDE
This procurement is unrestricted.
A.4 NAICS CODE
The NAICS code assigned to this procurement is 541330, Engineering Services, having a small business size standard of $15 Million. Refer to Section K, Representations, Certifications and Other Statements of Offerors.
A.5 REQUEST FOR PROPOSAL (RFP) FILES
It is the sole responsibility of the Offeror to obtain the RFP files, along with any amendments, from either Navy Electronic Commerce Online (NECO) website (www.neco.gov) or Federal Business Opportunities (www.fbo.gov.)
Unprotected editable electronic file copies of the RFP documents, including Word, Excel, and/or Adobe files will not be provided. Please plan accordingly.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
DESCRIPTIONS AND SPECIFICATION
SECTION C:
1 Introduction This effort is to provide professional services related to supporting Naval Facilities Engineering Command’s (NAVFAC) Public Works Business Line. Work will be predominantly performed within NAVFAC’s Atlantic Area of Responsibility (AOR) with a concentration of work within the Continental United States, the Caribbean, Europe, Africa, and Southwest Asia. Task orders may also be issued from time to time in support of NAVFAC Pacific to include Hawaii, Guam, and the Far East. The primary tasks anticipated under this contract include support of Public Works Business Line products and services supporting Naval Facilities (buildings, structures, utilities, energy support, & water efficiency) belonging to the U.S. Government on naval installations.
1.1 Mission
NAVFAC is an integral element of the shore infrastructure for the Navy and Marine Corps worldwide. NAVFAC plans, builds and maintains sustainable facilities, expertly delivers utilities and services, and strengthens the linkage between the Shore Enterprise and the Fleet.
1.2 Background
NAVFAC Public Works is responsible for the operations and maintenance of naval infrastructure worldwide. Naval infrastructure includes buildings, structures such as bridges, piers, runways, and roads, and utilities systems. A need has been identified to utilize professional services to support routine operations, inventory and logistics management, to assist in updating current asset records, and to improve processes and efficiencies within the Public Works Business Line.
1.3 Scope / Statement of Work
Services provided shall support the Navy’s Public Works Business Line for work predominantly within the Naval Facilities Engineering Command's (NAVFAC) Atlantic Area of Responsibility (AOR) with a concentration of work within the Continental United States, the Caribbean, Europe, Africa, and Southwest Asia. Task orders may also be issued from time to time in support of NAVFAC Pacific to include Hawaii, Guam, and the Far East. The primary tasks anticipated under this contract include support of Public Works Business Line products and services supporting Naval Facilities (i.e. buildings, structures, utilities, energy support, & water efficiency). The intent of this contract is to utilize professional services to support routine operations, inventory and logistics management, to assist in updating current asset records, and to improve processes and efficiencies within the Public Works Business
Line. The scope of operations, inventory & logistics management includes, but is not limited to: providing reports and studies, specification development, manuals and other written documentation, conducting field surveys, inspections, testing, commissioning/re-commissioning, inventory assessments, system analyses, productivity analyses, business case analyses, supply chain management support (including logistics analyses), developing initiatives, developing and/or performing process improvements, preparing training manuals and delivering training, researching and recommending tools and processes to increase efficiencies, cost control studies and management of Public Works assets.
The majority of the Navy’s facilities are located on federal installations (some of which are historical) and include office and operational buildings, science and/or research laboratories, waterfront and aviation assets, training areas, medical facilities, etc. along with both aboveground and underground utilities and other support infrastructure. The specific types of services to be provided include, but are not limited to:
a. Performance of studies, surveys, and assessments including, but not limited to: Mission Dependency Index (MDI) surveys; Technical studies; including, but not limited to, roof surveys, energy assessments, audits and surveys, ICS Inventories, and Pavement Condition Inspections; Energy & Water Efficiency Conservation assessments; Facility Condition assessments and inspections; Condition-Based Maintenance Management support (such as development of standard processes and support for computer-based maintenance management systems); Facilities Management Support; Reliability Centered Maintenance Support; Product Line Staffing studies; and Supply Chain Management studies and recommendations.
b. Conducting Extensive Research of Regulations, Policies and Analyses of Data to Prepare: Business Case Analyses, Training Programs, Process Improvements, Preventive Maintenance Programs, Initiatives (including development/update of Standard Operating Procedures (SOPs)/Business Management System (BMS) Processes, Material Supply Initiatives, Database Management Services (e.g. Maximo and iNFADS) and Safety/SAFE processes and documentation), Computer-based Maintenance Management Systems (utilizing Builder/Railer/Paver/Roofer), and Project Development for CAT III/IV work.
c. Surveys, Assessments, Evaluations, and Analyses for Indoor Air Quality and Hazardous Material such as Asbestos, Mold and Lead-based Paint.
d. Technical Writing/Scope Development and Estimation to include assistance in the development of Performance Work Statements and Cost Estimating for CAT III/IV Projects. Support development of cost estimating training and tools.
e. Recommissioning or Retro-commissioning of facilities including review and analyses to determine required facility modifications, the development of Measurement & Verification (M&V) Plans, and commissioning services or oversight.
f. Inventory control and management such as Linear Segmentation (LS) services, baseline creation, updating and validating assets, and Geographic Information System (GIS) support.
g. Support for Electronic Operations and Maintenance Support Information (eOMSI) submittals and implementation.
2 General Requirements This section describes the general requirements for this effort, and the following sub-sections provide further detail for consideration.
2.1 Non-Personal Services
The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.
2.2 Business Relations
The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.
2.3 Contract Management and Administration
The following subsections specify requirements for contract management, and personnel administration.
2.3.1 Contract Management
The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The contractor must maintain continuity between the support operations at all locations and the contractor's corporate offices.
2.3.2 Contract Administration
The contractor shall establish processes and assign appropriate resources to effectively administer the requirement.
The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and contractor personnel assigned to support task orders. The contractor shall assign work effort and maintain proper and accurate time keeping records of personnel assigned to work individual task orders.
2.3.3 Certificate of Insurance
Within 15 calendar days after award, the Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified in accordance with the FAR Clause 52.228, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.
2.4 Subcontract Management
The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after written approval of the Procuring Contracting Officer (PCO) or Contracting Officer’s Representative (COR).
2.5 Specific Personnel Requirements
The contractor shall furnish sufficient technical, supervisory, and administrative personnel at all times to ensure timely execution of the work for each project (task order). The Program Manager shall be responsible for maintaining a fully-staffed and equipped workforce and for providing coordination between the contract personnel, the Contracting Officer (KO), and the Contracting Officer’s Representative (COR). All work shall be accomplished according to schedule for each task order. It shall be the Project Manager's responsibility to ensure adequate internal controls and review procedures which shall eliminate conflicts, errors, and omissions, as well as ensuring the technical accuracy and timeliness of all work required under each task order.
Agencies, institutions, corporations, associations, or individuals will be considered qualified when they meet the criteria given below. If, during the performance of this contract, the contractor must utilize personnel other than those identified in the technical proposal, such substitution shall not be made without written approval of the KO.
For all positions for which qualifications are outlined below, the KO shall have the right to request documentation sufficient to verify compliance with the qualification requirements at any time during the course of the contract.
1. Program Manager – This position shall be held by a principal officer or senior manager of the contractor with authority to represent the interest of the contractor in all matters relating to the contract or to specific task orders.
The program manager shall be responsible for liaison between contract personnel and the contracting officer or COR, and for maintaining a fully-staffed and equipped work force. The program manager shall have a minimum of a Bachelor’s degree and shall have at least 10 years of full-time professional experience in management, public works related services/support, or a closely related field, and shall have a minimum of 3 years of experience as a project principal or project director. The program manager must be able to demonstrate his success with meeting government timelines managing contracts of similar size, scope and complexity. The program manager must be committed to devoting sufficient time to this contract and associated task orders.
2. Project Manager - This position shall be held by staff with a minimum of a Bachelor’s degree and shall have at least 10 years of full-time professional experience with at least 2 years of experience in a project manager capacity.
Project managers coordinate the efforts of the other personnel (including sub-contractors) to ensure timeliness, quality deliverables, adherence to project scope, etc. Additionally, project managers will be the main points of contact for all required results and/or progress on projects. Project managers must possess professional experience and rapport with colleagues that will enable them to assemble a credible team of experts to ensure data are collected, analyzed, processed and distributed. The prime contractor will ensure a primary project manager is assigned to the contract with responsibility for overseeing and managing all tasks on a task order.
3. Subject Matter Expert – This position shall be held by a subject matter expert with a minimum of a Bachelor’s degree, a professional license or certification, and at least 15 years of unique specialized expertise or advisory level experience in executive/policy analysis and decision making in the specialized field of the work to be performed as identified in individual task orders.
4. Senior Technical Specialist – This position shall be held by a senior professional expert with a Bachelor’s degree and at least 10 years of experience in this field including, but not limited to, leading the performance of studies, surveys and assessments (such as calculation of condition indices (CI) and facility condition indices (FCI), requirements generation utilizing builder methodology, water and energy efficiency conservation, CBMM, RCM, and Supply Chain Management). This labor category also includes individuals with experience conducting extensive research of regulations, policies, and analysis of data to prepare business case analyses, process improvements, SOPs and staffing studies; technical writing and Project Development Scopes for Cat III/IV work;
recommissioning or retro-commissioning of facilities.
5. Technical Specialist - This position shall be held by a professional with a minimum of a Bachelor’s degree and at least 5 years of experience in this field including, but not limited to, leading the performance of studies, surveys and assessments (such as calculation of condition indices (CI) and facility condition indices (FCI), requirements generation utilizing builder methodology, water and energy efficiency conservation, CBMM, RCM, and Supply Chain Management). This labor category also includes individuals with experience conducting extensive research of regulations, policies, and analysis of data to prepare business case analyses, process improvements, SOPs and staffing studies; technical writing and Project Development Scopes for Cat III/IV work; recommissioning or retro-commissioning of facilities. The technical specialist works under the supervision of a senior technical specialist.
6. Senior Inspector - This position shall be held by a subject matter expert with a Bachelor’s degree and at least 10 years of experience in this field or a subject matter expert with at least 20 years of experience in this field including, but not limited to, performing condition assessments utilizing direct condition ratings to calculate condition indices for incorporation into Builder, performing pavement inspections utilizing Paver, and performing roof inspections and surveys. This labor category also includes inspection services or surveys for hazardous materials or air quality related items such as asbestos, lead based paint, and mold.
7. Inspector - This position shall be held by a professional with a Bachelor’s degree and at least 5 years of experience in this field or a professional with at least 10 years of experience in this field including, but not limited to, performing condition assessments utilizing direct condition ratings to calculate condition indices for incorporation into Builder, performing pavement inspections utilizing Paver, and performing roof inspections and surveys. This labor category also includes inspection services or surveys for hazardous materials or air quality related items such as asbestos, lead based paint, and mold. The inspector works under the supervision of a senior inspector.
8. Senior GIS Specialist - This position requires someone with a Bachelor’s degree and at least 10 years of computer mapping experience with ESRI compatible products. The specialist shall have an in-depth knowledge of the principles of cartography and must be able to collect and interpret mapping data from a variety of sources including field survey data and aerial photography. Knowledge of relational database management systems (RDMSs) and structural query languages (SQL) such as Oracle is required.
9. GIS Specialist – This position requires someone with a Bachelor’s degree and at least 5 years of computer mapping experience with ESRI compatible products. The specialist shall have an in-depth knowledge of the principles of cartography and must be able to collect and interpret mapping data from a variety of sources including field survey data and aerial photography. The GIS specialist works under the supervision of a senior GIS specialist.
10. Senior Trainer/Materials Developer - This position requires someone with a Bachelor’s degree and at least 10 years of experience developing both classroom and online training programs, materials, manuals and other related visual aids. This labor category also includes training presenters experienced in providing both classroom and live online training presentations.
11. Trainer/Materials Developer - This position requires someone with a minimum of an Associate’s degree and at least 5 of experience developing both classroom and online training programs, materials, manuals and other related visual aids. This labor category also includes training presenters experienced in providing both classroom and live online training presentations. The trainer/materials developer works under the supervision of a senior trainer/materials developer.
12. Senior Cost Estimator - This position shall be held by a subject matter expert with a Bachelor’s degree and at least 10 years of experience cost modeling.
13. Cost Estimator - This position shall be held by a professional with a minimum of an Associate’s degree and at least 5 years of experience in cost modeling. This position works under the supervision of a senior cost estimator.
14. Senior QA Specialist - This position shall be held by a subject matter expert with a Bachelor’s degree and at least 10 years of experience in providing quality control and assurance for projects and associated deliverables.
15. QA Specialist - This position shall be held by a professional with a Bachelor’s degree and at least 5 years of experience in providing quality control and assurance for projects and associated deliverables. This position works under the supervision of a senior QA specialist.
2.6 Location and Hours of Work
Accomplishment of the results contained in this Performance Work Statement (PWS) may require work at various Government facilities world-wide. Normal Government workdays are Monday through Friday except U.S Federal Holidays. Work may include evening and weekend work to accommodate installation schedules or other special requirements.
2.7 Travel
Performance under this contract may require travel by contractor personnel. The Government will negotiate a firm, fixed price with the Contractor on each individual task order for all allowable, allocable, and reasonable travel costs incurred by the contractor in performance of the task order in accordance with FAR Subpart 31.2 and the rules and definitions set forth for relocation, temporary duty and local travel in the Joint Travel Regulations (JTR), but not to exceed the amounts authorized in the JTR. If travel is required, the contractor is responsible for making all needed arrangements for personnel.
3. Special Requirements This section describes the special requirements for this effort, and the following sub-sections provide further detail for consideration.
3.1 Security and Safety
This section describes the security and safety for this effort, and the following sub-sections provide further detail for consideration.
3.1.1 Safety
Contractor Compliance: The contractor and its subcontractors shall comply with Public Law 91-596 (Occupational Safety and Health Act (OSHA)) and the Environmental, Safety, and Occupational Health (ESOH) (DODD 4715.1E) and pertinent sections of the U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual EM 385-1-1. These requirements shall be incorporated into the contractor’s safety and health program. The Department of Defense (DoD) participates in the OSHA Voluntary Protection Program (VPP). Contractor personnel performing services on a DoD installation shall participate in the local VPP activities where applicable. Information on VPP is available at https://www.osha.gov/dcsp/vpp/index.html. The Contractor shall develop and implement an overarching Accident Prevention Plan (APP). The APP shall follow the format and include all elements addressed in Appendix A of EM 385-1-1. The Contractor shall submit an APP for acceptance per Section F. The Contractor shall not commence work until the APP has been accepted and no activity shall be started on site until the applicable Activity Hazard Analyses (AHAs) (if applicable and on a per task order basis) have been accepted. Once accepted, the APP and attachments will be enforced as part of the contract.
Mishap Notification and Investigation: The contractor and its subcontractors (if applicable) shall promptly notify and provide an investigation report following USACE EM 385-1-1 criteria to record pertinent facts regarding mishaps involving contractor employees, government property damage or injury to Government personnel that occur on Navy property which is associated with contract execution and to cooperate in any resulting DoD safety investigation. The contractor shall notify (via telephone) the appropriate contracting officer, the contracting officer’s representative (COR), and/or other applicable members within four (4) hours of all mishaps or incidents. The Government person notified by the contractor will in-turn notify the Safety office. Contractor notifications made after duty hours shall be reported to the appropriate installation Command Post. If requested by the appropriate contracting officer, the contracting officer’s representative, and/or the appropriate program manager, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records until released by the investigating safety office. If the Government also investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the Government personnel until the investigation is completed.
3.2 Government Furnished Materials
None.
3.3 Quality
This section describes the Quality Control components for this effort and the following sub-sections provide further details for consideration.
3.3.1 Quality Control
The Contractor shall develop a Task/Delivery Order quality control plan (QCP) and maintain an effective quality control program to ensure services are performed in accordance with the IDIQ contract and this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractors QCP is the means by which he assures himself that his work complies with the requirement of the contract.
The finalized QCP will be accepted by the Government at the time of the award of the Task/Delivery Order. The Contracting Officer may notify the Contractor of required modifications to the plan during the period of performance. The Contractor then shall coordinate suggested modifications and obtain acceptance of the plan by the Contracting Officer. Any modifications to the program during the period of performance shall be provided to the Contracting Officer for review no later than 10 working days prior to effective date of the change. The QCP shall be subject to the Government’s review and approval. The Government may find the QCP "unacceptable" whenever the
Contractor’s procedures do not accomplish quality control objective(s). The Contractor shall revise the QCP within 10 working days from receipt of notice that QCP is found "unacceptable."
3.3.2 Quality Assurance Surveillance Plan (QASP)
The Government shall monitor the Contractor’s performance on individual task orders under this IDIQ in accordance with the Government’s QASP.
4. Deliverables The contractor shall provide deliverables as described in each individual task order. Deliverables shall be specified by the government. Format and delivery schedule for deliverables shall be specified in the individual task orders.
Refer to Section F for a list of deliverables.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
AMENDMENT 0002- PRE-AWARD INQ.
REFERENCE QUESTION GOVERNMENT RESPONSE
Page Section Para.
5 C 1.3 Facilities Condition Assessments are an important part of the scope and will require the successful firm to inspect and audit condition where the maintenance activities are provided by a BOS contractor. The scope also includes services such as specification development, policy/process support, and initiatives support/development that likely will relate to overarching BOS/FSC contract strategies and/or performance work statements. Can Navy O&M/BOS/FSC contractors who provide day to day Public Works services be selected for this contract? If so, how can they avoid a potential conflict of interest?
Navy O&M/BOS/FSC contractors, who provide day to day Public Works services may be selected for this contract, provided they are fully qualified to perform the scope of services outlined in the solicitation.
If after award of the contract the contractor believes that work issued to them presents an OCI, the Contractor shall follow procedures outlined in the FAR and NFAS clause 5252.209-9300.
77 Tab C 4.a.2 If we are using experience of a team member, please confirm that they are to complete Attachment 4.A
Attachment 4.A is required for any Corporate Experience project performed by the offeror whether as a prime contractor or subcontractor.
If the project was performed by a planned subcontractor, Attachment 4.A is not required. (See revised language in Factor 4, paragraph (a)(1).
C 1.3 What are the specific types of projects that will be awarded from this contract?
Refer to Section C, Item 1.3 Scope.
12 E 3 We've noted a specific reference to the "Statement of Work" throughout the RFP. Will a "Statement of Work" be provided to the offerors?
Refer to revised Section C, Item 1.3.
70-
L 2 What is the evaluation weighting of Factor 5?
Refer to Section M, M.2 Evaluation Factors, (b)(5) Factor 5, Past Performance basis of evaluation.
C 2.5 Are resumes required for this submittal? If so, in what Section should they appear?
Resumes were not requested in the solicitation submittal requirements.
2 A Intro Based on the clarifications of these questions we are requesting a one week extension to March 7, 2018.
Refer to amendment 0002.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
SECTION L
L.1 SUBMITTING YOUR PROPOSAL
Proposals must be submitted via express mail carriers or hand –carried the following address:
Naval Facilities Engineering Command, Atlantic Attn: Susan McKenzie and Erin Quimby Code ACQ22
Bldg A - Mail Room 6506 Hampton Blvd Norfolk, Virginia 23508-1278
The signature of the Offeror provided in Box 17 of the SF33 agrees, if this offer is accepted within 180 calendar days from the date of receipt of offers specified as the due date in Box 9 of the SF33 or any extended due date, to furnish any or all items upon which the prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
Annotate solicitation number N62470-17-R-4010 on the bottom of the envelope or box. Proposals must be received and date stamped at the stated address above no later than the date and time identified in block 9 on the SF33.
Hand-carried Proposal Security Information:
All visitors to NAVFAC Atlantic who do not have a CAC badge must have a background check run by the Naval Station Pass & ID office (Security Department at Commander, Naval Region Mid-Atlantic) and be issued a temporary DBIDS (Defense Biometric Identification System) visitor pass.
Visitors who do not have a CAC badge must complete the attached Visitor Access Pass Request form (Excel spreadsheet) (Attachment L.1). Visitors must complete and provide the attached form to the security department NO LESS THAN 5 BUSINESS DAYS prior to either: 1) the proposal due date or; 2) the date on which the firm plans to hand-deliver their proposal, to allow ample time to process and complete the background check. Visitors must complete and forward the form directly to the following personnel in the security department via email:
1. Iris Gholston, 757-322-8116, iris.gholston@navy.mil
2. Robert Hernandez, 757-322-8044, robert.hernandez3@navy.mil
3. Steven K. Anderson, 757-322-8115, steven.k.anderson@navy.mil
Please email a copy of the completed Visitor Access Pass Request form (Attachment L.1) spreadsheet to the Contract Specialist, Susan McKenzie at email to susan.mckenzie@navy.mil.
Express mail carriers Security Information:
Commercial couriers such as FEDEX, DHL or UPS follow the same visitor procedures listed above and they are required to have a background check if they do not have a CAC badge. Commercial couriers must also have their vehicle inspected prior to accessing the LRA.
Firms should check with their intended courier to ensure they have the proper identification credentials to access the LRA.
DBIDS passes must be picked up by the approved visitor from the Naval Station Pass and ID Office located at the following address prior to visiting NAVFAC Atlantic on LRA:
Address: Naval Station Pass and ID Office 9040 Hampton Blvd Building #CD9 Norfolk, VA 23505 Telephone Number: 757-322-2975 Hours of Operation: 0700 -1530 on Monday through Friday
All potential offerors must adhere to this notice in order to avoid delay in submitting your proposal. The level of security at Lafayette River Annex may change at any time. As the level of security heightens, the amount of time required to gain access to the Lafayette River Annex also increases.
L.2 PRE-AWARD INQUIRIES/REQUEST FOR PROPOSALS (RFP) INFORMATION/
CLARIFICATIONS/QUESTIONS
Contractors are required to review the entire solicitation package before submitting questions. Submit all questions via one document using Attachment L.2, Pre-award Inquiry Form, by E-mail to susan.mckenzie@navy.mil and erin.quimby@navy.mil no later than fifteen (15) days prior to the RFP due date. This is the most efficient way to ensure all questions are addressed in a timely manner.
L.3 REQUEST FOR PROPOSAL (RFP) FILES
Solicitations are posted to the Navy Electronic Commerce Online (NECO) website. By necessity, these files are protected to prevent unauthorized editing. The Contract Specialist will post the RFP files to a single website:
www.neco.navy.mil.
It is the sole responsibility of the Offeror to obtain the RFP files, along with any amendments, from the NECO website.
L.4 GENERAL PROPOSAL REQUIREMENTS
a. General Information: The price proposal and non-price proposals shall be submitted in separate three-ring binders and tabbed appropriately. Binders must be marked as “Volume 1: Price Proposal” and “Volume 2: Non-price Proposal”. Should there be a discrepancy between paper and electronic information, the paper copies shall govern.
b. Elaborate brochures or other presentations beyond that sufficient to present a complete and effective proposal are not desired. Elaborate artwork and expensive visual or other presentation aids are not necessary. Organization, clarity, accuracy of information, relevance, and completeness are of prime importance.
c. The signature of the Offeror provided in Box 17 of the SF33 agrees, if this offer is accepted within 180 calendar days from the date of receipt of offers specified as the due date in Box 9 of the SF33 or any extended due date, to furnish any or all items upon which the prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
L.5 EVALUATION FACTORS
1. The solicitation requires the evaluation of price and the following non-price factors:
Factor 1– Corporate Experience Factor 2 – Technical Approach/Management Approach Factor 3 – Safety Factor 4– Small Business Utilization
Factor 5 – Past Performance
The distinction between experience and past performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. The relative order of importance of the non-price evaluation factors is the technical factors, 1, 2, and 4 are the most important and of equal importance to each other, respectively, and factor 3 is of lesser importance. All technical factors combined (Factors 1 through 4), are equal in importance to the past performance evaluation/performance confidence assessment Factor 5. When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are approximately equal to price.
The importance of price will increase if the Offeror’s non-price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
L.6 PRICE AND NON-PRICE PROPOSAL SUBMITTAL REQUIREMENTS
(a) Price (Volume 1):
Solicitation Submittal Requirements: Submit one (1) “Original” and two (2) copies of the price proposal in three-ring binders clearly marked as the Price Proposal. In addition to providing hard copies of the price proposal offerors shall provide two (2) electronic copies of the price proposal on a non-rewritable CD. Offerors are advised that, in the event of a discrepancy between pricing information contained on the CD and the hard copy proposal, the original hard copy will govern. There is no page limit for Volume I. Each copy of the price proposal shall include a separate tab for each item specified below:
Tab A. Identify the Company profile to include, the Offeror’s name, address, names of two (2) points of contact (including title, phone number and email address), the DUNS number and CAGE code;
Tab B. Completed and signed Standard Form 33 (SF-33)
Tab C. Acknowledgement of all solicitation amendment(s) (SF-30’s) related to this RFP.
Tab D. CONTRACTOR PROPOSAL CERTIFICATION:
____________________________________________ (Name of Offeror) warrants that its proposal _____________________________ (of date or other identifier) incorporated herein by reference, including, but not limited to, proposed approaches, staffing, methodology, or work plans, will meet the performance objectives set forth in this contract during the execution thereof. The contractor is not excused from meeting such performance objectives in the event such proposal proves inadequate as conceived or executed to meet such performance objectives. The contractor understands that it bears all of the cost and performance risk associated with adopting acceptable additional (and/or alternative) means or methods of meeting the performance objectives.
Tab E. Representations and Certifications (ref: https://www.sam.gov).
Tab F. Any offeror proposing as a partnership, joint venture, other teaming arrangement, or resource of a parent company/subsidiary/affiliate shall submit the following information:
i. Provide a listing of the team members’ corporate name (no abbreviations), address, point of contact, phone number, DUNS Number, and CAGE Code.
ii. Submit signed letters of commitment from the team members. The commitment letter shall clearly identify the expected relationship, role and responsibility of the team member.
iii. If proposing as a Joint Venture, submit a signed copy of the Joint Venture Agreement.
When proposing as a joint venture, all members of the joint venture shall sign the SF33 unless a written agreement by the joint venture is furnished with the proposal designating that one firm with the authority to bind the other member(s) of the joint venture. In addition, a signed copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirement may eliminate the proposal from further consideration. If the joint venture is subject to the SBA Mentor-Protégé Program, a copy of the SBA approval of the joint venture arrangement shall be included.
Tab G. Completed Attachment B- Schedule of Services, for the base and all option years in U.S.
Dollars.;
Note: Firm fixed-price task orders will be negotiated for the services required under this contract using the fully burdened labor rates and percent mark-ups for travel and other direct costs proposed under Attachment B- Schedule of Services, for the base year and each option year (if exercised).
However, the quantities listed in Attachment B- Schedule of Services are estimates only for proposal purposes and will not be ordered with the award or incorporated into the basic Contract. Actual quantities ordered over the duration of the contract are expected to vary and are not limited to those listed in Attachment B and shall not exceed $45,000,000 for the base and all option years, Attachment B- Schedule of Services shall be completed as follows (items a-e):
a. Offerors shall enter unit prices, percent mark-ups, extended prices and total amounts as indicated on Attachment B- Schedule of Services, for the base period and all option years. All labor rates and extended prices shall be rounded to two (02) decimal places and the rounded prices will be used for evaluation purposes.
b. In the event there is a difference between a labor rate and the extended total amount (i.e. Hourly labor rate x estimated hours = extended total) the labor rate will be held to be the intended offer and the extended price and total price will be recomputed accordingly. If the offeror provides a total amount for a labor category(s) listed in Attachment B- Schedule of Services, but fails to enter the unit price, the extended price divided by the estimated labor hours will be held to the intended unit price or labor rate.
c. Proposed burdened labor rates shall reflect composite fully burdened hourly labor rates for prime/Joint Venture contractor, as applicable, performing work under the contract. Burdened hourly labor rates shall include the following costs: direct labor, fringe benefits, overhead, phone service (cellular and landline), all computer charges for computer workstations and laptops including standard software packages, general and administrative costs, and profit. Additionally, administrative costs for contract management, invoicing and other task order administrative tasks will not be separately negotiated, and shall be incorporated in the indirect costs included in the fully burdened hourly labor rates. Additional burdened labor classifications for the prime/JV will not be added to the contract or negotiated under individual task orders.
d. Applicable travel costs will be negotiated under individual task orders. Travel, subsistence and per diem costs negotiated under task orders shall be in compliance with current Joint Travel Regulation rates. The estimated travel costs listed in Schedule B are for proposed costs to be directly incurred by the prime/JV under task orders issued under the contract. The prime/JV travel costs will be multiplied by the percentage shown on the schedule for direct costs and profit applied to travel. The multiplier percentage proposed shall include all handling fees, indirect costs, i.e., overhead and general and administrative costs, and profit applicable to travel. No additional indirect costs or profit will be applied to the prime contractor’s travel except as included in the multiplier percentage listed in the Attachment B- Schedule of Services.
e. Supplies/equipment/other direct costs will be negotiated under individual task orders. The estimated supplies/equipment/other direct costs listed in Attachment B- Schedule of Services are for proposed costs to be directly incurred by the prime/JV under task orders issued under the contract. These costs include, but are not limited, to equipment, supplies, material, reproduction, and shipping. The prime/JV “other direct costs” will be multiplied by the percentage shown on the schedule for indirect costs and profit applied to “other direct costs.” The multiplier percentage proposed shall include all handling fees, indirect costs, i.e., overhead and general and administrative costs, and profit applicable to “other direct costs.” No additional indirect costs or profit will be applied to the prime contractor’s “other direct costs’ except as included in the multiplier percentage listed in the schedule.
f. Subcontractor costs will be negotiated under individual task orders. The estimated subcontractor costs listed in Schedule B.1 are for proposed costs to be directly incurred by the prime/JV under task orders issued under the contract. The prime/joint venture subcontractor costs will be multiplied by the percentage shown on the schedule for indirect costs and profit applied to subcontractor costs. The multiplier percentage includes all handling fees, indirect costs, i.e., overhead and general and administrative costs, and profit applicable to subcontractor costs. No additional indirect costs or profit will be applied to the prime contractor’s subcontractor costs, except as included in the multiplier percentage listed in the schedule.
Tab H. Submit the below items (a through c) with your price proposal in a SEALED envelope.
Although this information is required to be submitted with your firm’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award. In order to be eligible for award, your firm must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards.
a. Provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or at least by an authorized officer of the organization.
Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements submit the latest three complete fiscal year financial statements for each Joint Venture company and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.
b. One (1) signed Bank Reference demonstrating adequate financial resources. If your firm has a line of credit, provide information on how many figures can your firm borrow against the line of credit (i.e.
“medium 6 figures”,-exact line of credit is not required).
c. Three (3) signed credit references. Credit references must verify that your firm pays its creditors timely and in accordance with the terms negotiated with the creditor.
d. The Government may request additional information if needed to determine responsibility.
Tab I. Compensation Plan for Professional Employees. Provide a total compensation plan in accordance with FAR 52.222-46, Evaluation of Compensation for Professional Employees (FEB 1993), setting forth salaries and fringe benefits proposed for the professional employees who will work under the contract.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.