Responses to Questions August 30, 2017 15:14
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Responses_to_Questions_9012017_730.pdf | ||
| Responses_to_Questions_8282017_1636.pdf | ||
| Responses_to_Questions_8242017_1325.pdf | ||
| Responses_to_Questions_8242017_820.pdf | ||
| Responses_to_Questions_8232017_735.pdf | ||
| Responses_to_Questions_8222017_710.pdf | ||
| Responses_to_Questions_8212017_740.pdf | ||
| Attachment_A_RFP_Multibeam_Data_Collection_N6230617R0008_818.pdf | ||
| Attachment_C_Questions_Request_Form.docx | DOCX document | |
| Attachment_1_SCA_15-5613_Rev6_2017_08_03.pdf | ||
| Attachment_B_Price_Schedule.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Responses to Questions August 30, 2017
# SOW/PWS
Reference
Question Answer
1. PWS
2.Scope
What are the required detailed specifications for survey and processing to develop technical procedures? This is needed to create commercial proposal correctly ‐‐‐‐ Example‐1 will 10% overlap between lines is sufficient – although if there are large variations in bottom reflectivity is expected, or reflectivity is unknown, it may be necessary to increase the overlap – also the overlap must also be increased if the vessel’s roll is excessive. EXAMPLE‐2 It appears there may be steep slopes on the seafloor – Contractor assumes lines will be run along slopes – not up or down slope – keeping coverage constant along survey lines. Would contractor assumptions be correct. Note: If circumstances require that surveys lines are run up & down slope, reduction of vessel speed may be required to allow the MBES to track the seafloor continuously – therefore reduction in speed would directly affect “Fixed Firm” pricing model. If this occurs when vessel enters area of operations‐ how will this be handled commercially”?
Minimum overlap of 10% is acceptable.
Survey lines can be run along slope.
Speed used to determine best collection.
Must have 100% post processed coverage. Speed and direction of survey lines should be designed that the best data are collected at the locations.
Overlap is not specified
2. PWS
2.Scope
What is the required linear km(s) that will be required to be performed?
Areas are approximately 100nm2 in size.
3. PWS
2.Scope
What is the required maximum and minimum swath width?
No required min. and max. swath width. Swath width to be determined by depth. Must have 100% post processed coverage
4. PWS
2.Scope
What are the locations of CLIN 1 & 2 to determine mobilization & demobilization cost of vessel?
Locations will be provided upon award of contract.
Attachment D provides estimate port of embarkation and travel distance.